life-cycle assessment made easy - world's fastest building ... · integration - bim, excel,...

18
LIFE-CYCLE ASSESSMENT MADE EASY Confidential © Bionova Ltd. All rights reserved

Upload: others

Post on 23-Jul-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LIFE-CYCLE ASSESSMENT MADE EASY - World's fastest Building ... · Integration - BIM, Excel, etc. BIM, Excel, etc. Users Up to three Any (internal) Any (also external) Training Shared

LIFE-CYCLE ASSESSMENT MADE EASY

Confidential © Bionova Ltd. All rights reserved

Page 2: LIFE-CYCLE ASSESSMENT MADE EASY - World's fastest Building ... · Integration - BIM, Excel, etc. BIM, Excel, etc. Users Up to three Any (internal) Any (also external) Training Shared

Confidential 2009Your partner for sustainable performance 2

Sustainable performance for everyone

SALES IN APPLICATIONS

30+COUNTRIES

80+TOOLS AVAILABLE

FOUNDED IN

2001IN FINLAND

WE MAKE EASY TO USE, AUTOMATED LIFE-CYCLE METRICS SOFTWARE

FOR CONSTRUCTION INDUSTRY WITH LOCAL DATA & CERTIFICATIONS

Page 3: LIFE-CYCLE ASSESSMENT MADE EASY - World's fastest Building ... · Integration - BIM, Excel, etc. BIM, Excel, etc. Users Up to three Any (internal) Any (also external) Training Shared

Confidential 2009Your partner for sustainable performance 3

Life-cycle assessment used to be hard

City of Tampere decided to award land

tenders based on embodied carbon.

1st time firms couldn’t do LCAs at all.

2nd time results weren’t comparable.

With One Click LCA they reach their goal.

JOIN LCA MADE EASY.

Page 4: LIFE-CYCLE ASSESSMENT MADE EASY - World's fastest Building ... · Integration - BIM, Excel, etc. BIM, Excel, etc. Users Up to three Any (internal) Any (also external) Training Shared

Confidential 2009Your partner for sustainable performance 4

Unique performance & capabilities

EXTREMELY FAST VERY EASY TO USE LCC, MATERIALS, MORE

GREAT SUPPORT LOCAL DATA & APPROVALS USE BIM, EXCEL + MORE

Page 5: LIFE-CYCLE ASSESSMENT MADE EASY - World's fastest Building ... · Integration - BIM, Excel, etc. BIM, Excel, etc. Users Up to three Any (internal) Any (also external) Training Shared

Confidential 2009Your partner for sustainable performance 5

Contributes to certification credits

LCA 3+1+1 points

Other tools 5 pts

www.lcaforleed.com

LCA 6+1 credits

Other tools 12 credits

www.lcaforbreeam.com

LCA 151 points

Other tools 98 points

Read more

* credits may vary by version, region and project type

LCA AND OTHER SUPPORTED CREDITS

ALSO

FOR

Page 6: LIFE-CYCLE ASSESSMENT MADE EASY - World's fastest Building ... · Integration - BIM, Excel, etc. BIM, Excel, etc. Users Up to three Any (internal) Any (also external) Training Shared

Confidential 2009Your partner for sustainable performance 6

Identify low-carbon choices easily

Your design data Instant LCA results

Page 7: LIFE-CYCLE ASSESSMENT MADE EASY - World's fastest Building ... · Integration - BIM, Excel, etc. BIM, Excel, etc. Users Up to three Any (internal) Any (also external) Training Shared

Confidential 2009Your partner for sustainable performance 7

“I love this approach to make

LCA as easy as possible.”

Petr Lhoták, Senior Green

Business Specialist

Easy-to-use tool, PhD not required

Page 8: LIFE-CYCLE ASSESSMENT MADE EASY - World's fastest Building ... · Integration - BIM, Excel, etc. BIM, Excel, etc. Users Up to three Any (internal) Any (also external) Training Shared

Confidential 2009Your partner for sustainable performance 8

Use in the life and times of a project

Concept Design Sourcing Construction Operation

High level LCC

High level LCA

Climate risks

Component LCC

Detailed LCA As built LCA

When you have data, including BIMWhen you actually

can change things

Utilities tracking

FM tools in use

Environmental

Carbon trackingSpecification

Financial

Other tools

Site impacts User satisfaction

Page 9: LIFE-CYCLE ASSESSMENT MADE EASY - World's fastest Building ... · Integration - BIM, Excel, etc. BIM, Excel, etc. Users Up to three Any (internal) Any (also external) Training Shared

Confidential 2009Your partner for sustainable performance 9

Nearly 90 % would use LCA with BIM

86,5 %

say yes

WOULD YOU DO LCA IF INTEGRATED WITH BIM?

Results from a survey to green building professionals in spring 2016

Page 10: LIFE-CYCLE ASSESSMENT MADE EASY - World's fastest Building ... · Integration - BIM, Excel, etc. BIM, Excel, etc. Users Up to three Any (internal) Any (also external) Training Shared

Confidential 2009Your partner for sustainable performance 10

LCA easily, with or without BIM

Cloud Excel Energy models BIM Revit plugin

IFC

SIMPLE TO USE WITHOUT BIM, AND WITH BIM IT'S FULLY AUTOMATED

Page 11: LIFE-CYCLE ASSESSMENT MADE EASY - World's fastest Building ... · Integration - BIM, Excel, etc. BIM, Excel, etc. Users Up to three Any (internal) Any (also external) Training Shared

Confidential 2009Your partner for sustainable performance 11

0

10

20

30

40

50

60

70

80

90

0

20

40

60

80

100

120

Classic LCA Simplified LCA One Click LCA -web

One Click LCA -BIM

Less work. More profit.

Hours spent on LCA Profit margin

Get your required LCA 100 x faster

100

50

10

1

Classical Simplified One Click - web One Click - BIM

THE TIME YOU SAVE IS PROFITS YOU KEEP

Page 12: LIFE-CYCLE ASSESSMENT MADE EASY - World's fastest Building ... · Integration - BIM, Excel, etc. BIM, Excel, etc. Users Up to three Any (internal) Any (also external) Training Shared

Confidential 2009Your partner for sustainable performance 12

“We delivered in a schedule

we could otherwise hardly

have met.”

Andreas Asker

Sustainability Consultant

Save time and improve margins

Page 13: LIFE-CYCLE ASSESSMENT MADE EASY - World's fastest Building ... · Integration - BIM, Excel, etc. BIM, Excel, etc. Users Up to three Any (internal) Any (also external) Training Shared

Confidential 2009Your partner for sustainable performance 13

Portfolio of tools in addition to LCA

Europe Credits LCA Materials LCC Tracking More

LEED v4 8-11 x x x x

BREEAM 10-19 x x x x x

HQE 4-6 x x x x

DGNB ~23 % x X x

CEEQUAL 151 p. x x x

North America Credits LCA Materials More

LEED v4 8-11 x x x

Green Globes 33 p. x

Living Building Challenge - x

Envision (infrastructure) 43 p. x

Page 14: LIFE-CYCLE ASSESSMENT MADE EASY - World's fastest Building ... · Integration - BIM, Excel, etc. BIM, Excel, etc. Users Up to three Any (internal) Any (also external) Training Shared

Confidential 2009Your partner for sustainable performance 14

IBU

Global & local databases integrated

Verified

Updated

Enhanced

ALL DATA IS

QA process approved by BRE

Page 15: LIFE-CYCLE ASSESSMENT MADE EASY - World's fastest Building ... · Integration - BIM, Excel, etc. BIM, Excel, etc. Users Up to three Any (internal) Any (also external) Training Shared

Confidential 2009Your partner for sustainable performance 15

Used by leaders in 30+ countries

Page 16: LIFE-CYCLE ASSESSMENT MADE EASY - World's fastest Building ... · Integration - BIM, Excel, etc. BIM, Excel, etc. Users Up to three Any (internal) Any (also external) Training Shared

Confidential 2009Your partner for sustainable performance 16

Product packaging and pricing

EASY TO START MOST EFFICIENT MOST VERSATILE

Tools LCA only LCA + LCC All available

Integration - BIM, Excel, etc. BIM, Excel, etc.

Users Up to three Any (internal) Any (also external)

Training Shared 1,5 h Shared 1,5 h Private 3 h

Support Named user Named user Any user

BIM + WEB FULL TOOLKITWEB ONLY

ANNUAL SUBSCRIPTION BASED ON NR OF PROJECTS, FROM 1 PROJECT

CHOOSE:

* EDUCATIONAL INSTITUTES: IF YOU ARE LOOKING FOR A CLASSROOM SOLUTION, PLEASE ENQUIRE

Page 17: LIFE-CYCLE ASSESSMENT MADE EASY - World's fastest Building ... · Integration - BIM, Excel, etc. BIM, Excel, etc. Users Up to three Any (internal) Any (also external) Training Shared

Confidential 2009Your partner for sustainable performance 17

Great support and training offered

Training & webinars

► Free demo webinars

Sign up here

► Kick off trainings

► Webinar trainings

► On-site trainings

Customer support

► For customers only

[email protected]

► Staffed by LCA engineers

► Additional services

► Third party verification

A TEAM OF PROFESSIONALS IS ALWAYS THERE FOR YOU

Page 18: LIFE-CYCLE ASSESSMENT MADE EASY - World's fastest Building ... · Integration - BIM, Excel, etc. BIM, Excel, etc. Users Up to three Any (internal) Any (also external) Training Shared

Confidential 2009Your partner for sustainable performance 18

The future is here today. Join it now.

Your contacts

► Panu Pasanen

[email protected]

+358 44 2871 722

► Technical: [email protected]

► Commercial: [email protected]

Further resources

► Book your LCA training

► Create free user account

► Join our LinkedIn group