library infrastructure – a new paradigm. building program: library lobby lobby information...

16
LIBRARY INFRASTRUCTURE – A NEW PARADIGM

Upload: terrence-burr

Post on 15-Jan-2016

224 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: LIBRARY INFRASTRUCTURE – A NEW PARADIGM. BUILDING PROGRAM: LIBRARY LOBBY LOBBY INFORMATION INFORMATION ISSUE AND RETURN ISSUE AND RETURN PROPERTY COUNTER

LIBRARY INFRASTRUCTURE –

A NEW PARADIGM

Page 2: LIBRARY INFRASTRUCTURE – A NEW PARADIGM. BUILDING PROGRAM: LIBRARY LOBBY LOBBY INFORMATION INFORMATION ISSUE AND RETURN ISSUE AND RETURN PROPERTY COUNTER

BUILDING PROGRAM:LIBRARY• LOBBY • INFORMATION• ISSUE AND RETURN• PROPERTY COUNTER• JOURNAL SECTION• LENDING BOOKS AREA• REFERENCE SECTION• BOOK BANK• READING ROOM• OFFICES SPACES FOR• LIBRARIAN, DEPUTY LIBRARIAN• ACQUISITION AND TECHNICAL SECTION• DOCUMENTATION CENTER• COMPUTER CENTER• PARKING FOR 50 CARS AND 50 TWO WHEELERS

PROJECT: LIBRARY AND COMPUTER CENTRE LOCATION: Deen bandhu Chottu Ram University of

Science and Technology , Murthal, SonepatPLOT AREA: 17026 SQ.MT. Total Built up Area : 12,177 SQ.MT. PROJECT COST : Rs. 24.00 Crore

Page 3: LIBRARY INFRASTRUCTURE – A NEW PARADIGM. BUILDING PROGRAM: LIBRARY LOBBY LOBBY INFORMATION INFORMATION ISSUE AND RETURN ISSUE AND RETURN PROPERTY COUNTER

SITE PLAN

GRASS PAVERS TO REDUCE

HEAT ISLAND EFFECT

GRASS PAVERS TO REDUCE

HEAT ISLAND EFFECT

GRASS PAVERS TO REDUCE

HEAT ISLAND EFFECT

TREES TO CREATE

BUFFER FROM WEST SUN

TREES TO CREATE

BUFFER FROM WEST SUN

TREES TO PROVIDE SHADE AND REDUCE HEAT ISLAND EFFECT

EXISTING TREESCONSERVED

EXISTING TREESCONSERVED

EXISTING TREESCONSERVED

CONVENTION CENTER

LIBRARY / COMPUTER

CENTER

Page 4: LIBRARY INFRASTRUCTURE – A NEW PARADIGM. BUILDING PROGRAM: LIBRARY LOBBY LOBBY INFORMATION INFORMATION ISSUE AND RETURN ISSUE AND RETURN PROPERTY COUNTER
Page 5: LIBRARY INFRASTRUCTURE – A NEW PARADIGM. BUILDING PROGRAM: LIBRARY LOBBY LOBBY INFORMATION INFORMATION ISSUE AND RETURN ISSUE AND RETURN PROPERTY COUNTER
Page 6: LIBRARY INFRASTRUCTURE – A NEW PARADIGM. BUILDING PROGRAM: LIBRARY LOBBY LOBBY INFORMATION INFORMATION ISSUE AND RETURN ISSUE AND RETURN PROPERTY COUNTER

EFFECTIVE DEPTH OF BUILDING FLOORS FOR OPTIMUM DAY LIGHT AND VIEWS

N

NATURALLY LIT FLOOR

AREA : 80%

EFFECTIVE DEPTH OF

OPTIMUM DAY LIGHT

AND VIEWS

EFFECTIVE DEPTH OF

OPTIMUM DAY LIGHT

AND VIEWS

GROUND FLOOR PLAN FIRST FLOOR PLAN

THIRD FLOOR PLANSECOND FLOOR PLAN

NN

N

NATURALLY LIT FLOOR

AREA : 85%

NATURALLY LIT FLOOR

AREA : 80%

NATURALLY LIT FLOOR

AREA : 85%

Page 7: LIBRARY INFRASTRUCTURE – A NEW PARADIGM. BUILDING PROGRAM: LIBRARY LOBBY LOBBY INFORMATION INFORMATION ISSUE AND RETURN ISSUE AND RETURN PROPERTY COUNTER

High Efficiency Pumps

High EfficiencyAHUs, FCUs

Heat ExchangerHigh Efficiency

Chillers

Reduced HVAC

requirements

Water Recycling & Conservation

Reduced Lighting requirements

Building Envelope

design

Sensors, Controls

Daylighting

High Performance Glazing

Insulation

Passive Systems

High Efficiency Lamps, Ballasts,

Luminaires

Earth Air TunnelOccupancy Load,

Equipment Schedule

Whole building energy optimization

Reduced Energy

requirements

Page 8: LIBRARY INFRASTRUCTURE – A NEW PARADIGM. BUILDING PROGRAM: LIBRARY LOBBY LOBBY INFORMATION INFORMATION ISSUE AND RETURN ISSUE AND RETURN PROPERTY COUNTER

EARTH AIR TUNNEL

Earth air tunnel is a tunnel for the passage of calculated amount of air for the purpose of heating, ventilation and air conditioning of a space using natural heat of the earth four meter below earth surface.

WHAT IS EARTH AIR TUNNEL :

Page 9: LIBRARY INFRASTRUCTURE – A NEW PARADIGM. BUILDING PROGRAM: LIBRARY LOBBY LOBBY INFORMATION INFORMATION ISSUE AND RETURN ISSUE AND RETURN PROPERTY COUNTER
Page 10: LIBRARY INFRASTRUCTURE – A NEW PARADIGM. BUILDING PROGRAM: LIBRARY LOBBY LOBBY INFORMATION INFORMATION ISSUE AND RETURN ISSUE AND RETURN PROPERTY COUNTER
Page 11: LIBRARY INFRASTRUCTURE – A NEW PARADIGM. BUILDING PROGRAM: LIBRARY LOBBY LOBBY INFORMATION INFORMATION ISSUE AND RETURN ISSUE AND RETURN PROPERTY COUNTER
Page 12: LIBRARY INFRASTRUCTURE – A NEW PARADIGM. BUILDING PROGRAM: LIBRARY LOBBY LOBBY INFORMATION INFORMATION ISSUE AND RETURN ISSUE AND RETURN PROPERTY COUNTER
Page 13: LIBRARY INFRASTRUCTURE – A NEW PARADIGM. BUILDING PROGRAM: LIBRARY LOBBY LOBBY INFORMATION INFORMATION ISSUE AND RETURN ISSUE AND RETURN PROPERTY COUNTER

FRONT VIEW

Page 14: LIBRARY INFRASTRUCTURE – A NEW PARADIGM. BUILDING PROGRAM: LIBRARY LOBBY LOBBY INFORMATION INFORMATION ISSUE AND RETURN ISSUE AND RETURN PROPERTY COUNTER

ATRIUM

Page 15: LIBRARY INFRASTRUCTURE – A NEW PARADIGM. BUILDING PROGRAM: LIBRARY LOBBY LOBBY INFORMATION INFORMATION ISSUE AND RETURN ISSUE AND RETURN PROPERTY COUNTER
Page 16: LIBRARY INFRASTRUCTURE – A NEW PARADIGM. BUILDING PROGRAM: LIBRARY LOBBY LOBBY INFORMATION INFORMATION ISSUE AND RETURN ISSUE AND RETURN PROPERTY COUNTER