City of Richmond
To: Planning Committee
From: Wayne Craig Director, Development
Report to Committee
Date: September 4, 2019
File: RZ 17-794300
Re: Application by Konic Development Ltd. for Rezoning at 10231, 10251, 10351, 10371, 10391, 10395 and 10397 No.2 Road from Single Detached (RS1/E) to Low Density Townhouses (RTL4)
Staff Recommendation
That Richmond Zoning Bylaw 8500, Amendment Bylaw 10088, for the rezoning of 10231, 10251, 10351, 10371, 10391, 10395 and 10397 No.2 Road from "Single Detached (RSl/E)" to "Low Density Townhouses (RTL4)", be introduced and given first reading.
J L"~i ,/ /~~'( / •/ ... t " /)
Wayne raig / Director, Dev~lopm t
I WC:el Att. 6
ROUTED To:
Affordable Housing
6245!87
REPORT CONCURRENCE
CONCURRENCE CONCURRENCE OF GENERAL MANAGER
~
CNCL - 187
September 4, 2019 - 2 - RZ 17-794300
Staff Report
Origin
Konic Development Ltd. has applied to the City of Richmond for permission to rezone 1 0231, 10251, 10351, 10371, 10391, 10395 and 10397 No.2 Road (Attachment 1) from "Single Detached (RS1/E)" zone to "Low Density Townhouses (RTL4)" zone in order to permit the development of22 townhouse units and four secondary suites with right-in/right-out vehicle access from No.2 Road.
Project Description
The seven properties under this application have a total combined frontage of approximately 11 0 m, and are required to be consolidated into one development parcel prior to final adoption of the rezoning bylaw. The proposed density is 0.60 floor area ratio (FAR). The site layout includes 10 two-storey units and 12 three-storey units in eight townhouse clusters. Four secondary suites and two convertible units are included in this proposal. Vehicle access is provided by a single right-in/right-out driveway access to No. 2 Road. A preliminary site plan, building elevations, and landscape plan are contained in Attachment 2.
Findings of Fact
A Development Application Data Sheet providing details about the development proposal is attached (Attachment 3).
Subject Site Existing Housing Profile
There are seven houses on the development site. The applicant has advised that there is one secondary suite in one of the houses. All seven houses and the secondary suite are currently tenanted.
Surrounding Development
To the North: Existing single family dwellings on lots zoned "Single Detached (RS 1/E)" fronting No.2 Road, which are all identified for townhouse development under the Arterial Road Land Use Policy ..
To the South: Three existing single family dwellings on lots zoned "Single Detached (RS 1/E)" fronting Wallace Road, which are all identified for townhouse development under the Arterial Road Land Use Policy.
To the East: Across No. 2 Road, existing single family dwellings on lots zoned "Single Detached (RS 1/B)" fronting Goldsmith Drive, a childcare centre on a lot zoned "School & Institutional Use (SI)" and a 133-unit townhouse complex zoned "Town Housing (ZT72)- London I Steveston (No.2 Road)".
To the West: Existing single family dwellings on lots zoned "Single Detached (RS 1/B)" fronting Sandiford Drive.
6245187
CNCL - 188
September 4, 2019 - 3 - RZ 17-794300
Related Policies & Studies
Official Community Plan/Steveston Area Plan
The 2041 Official Community Plan (OCP) Land Use Map designation for the subject site is "Neighbourhood Residential". The Steveston Area Land Use Map designation for the subject site is "Multiple-Family". This redevelopment proposal for 22 townhouses is consistent with these designations.
Arterial Road Policy
The subject site is identified for "Arterial Road Townhouse" on the Arterial Road Housing Development Map and the proposal is largely in compliance with the Townhouse Development Requirements under the Arterial Road Policy.
Properties to the South
The proposed site assembly will leave a residual development site to the south that will not meet the minimum 50 m site frontage requirement. The residual development site to the south at 5931, 5951 and 5971 Wallace Road, located between the subject site and Wallace Road, has a frontage of approximately 30m along No.2 Road.
The applicant advised staff in writing that they have made attempts to acquire adjacent properties, but cannot reach an agreement with the owners. The applicant has requested that this application proceed without the acquisition of the adjacent properties to the south.
While the proposed development would create an orphan site situation on the south side of the subject site, staff support the proposed development based on:
• the adjacent property owners are not interested in redeveloping their properties at this time;
• the proposed development will not restrict redevelopment ofthe adjacent site at 5931, 5951 and 5971 Wallace Road as the orphan site is located at the corner ofNo. 2 Road and Wallace Road, with a lot width of30 m, a lot depth of 43.58m, and an overall site area of 1,310 m2
; and
• a Public Rights-of-Passage (PROP) Statutory Right-of-Way (SRW) over the entire internal drive aisle on the subject site will be registered on Title ofthe subject site as a condition of rezoning to provide vehicle access to future townhouse development on the adjacent site to the south.
Properties to the North
A city owned site is located at 10191 No.2 Road and this site is not envisioned to be redeveloped in the near future. The developer has explored the opportunity to include the property located between the subject site and the city owned site (i.e. 10211 No.2 Road) into the proposed townhouse development; however, the acquisition attempt was not successful. To proceed with the subject development proposal, the developer has agreed to provide:
6245187
CNCL - 189
September 4, 2019 - 4 - RZ 17-794300
• vehicle access to future townhouse development on the adjacent site to the north; a Public Rights-of-Passage (PROP) Statutory Right-of-Way (SRW) over the entire internal drive aisle on the subject site will be registered on Title of the subject site as a condition of rezoning to secure this arrangement;
• a development concept plan for the adjacent site to the north (on file); and
• shared use of outdoor amenity space and garbage/recycling collection facilities on-site with future townhouse development on the adjacent site to the north. A cross-access easement/agreement will be registered on Title of the subject site as a condition of rezoning to secure this arrangement.
Floodplain Management Implementation Strategy
The proposed redevelopment must meet the requirements of the Richmond Flood Plain Designation and Protection Bylaw 8204. Registration of a flood indemnity covenant on Title is required prior to final adoption of the rezoning bylaw.
Public Consultation
A rezoning sign has been installed on the subject property. Staff have not received any comments from the public about the rezoning application in response to the placement of the rezoning sign on the property.
The developers have also consulted with the owners/residents of the neighbouring properties on the proposed development; no concern was raised. A consultation summary package prepared by the developers and a map of the consultation area can be found in Attachment 4.
Should the Planning Committee endorse this application and Council grant 1st reading to the rezoning bylaw, the bylaw will be forwarded to a Public Hearing, where any area resident or interested party will have an opportunity to comment.
Public notification for the Public Hearing will be provided as per the Local Government Act.
Analysis
Built Form and Architectural Character
The applicant proposes to consolidate the seven properties into one development parcel, with a total net site area of approximately 4,857.6 m2
• The proposal consists of22 townhouses, in a mix of two-storey and three-storey townhouse units in eight clusters. The layout ofthe townhouse units is oriented around a single driveway providing access to the site from No. 2 Road and a north-south internal manoeuvring aisle providing access to the unit garages. The outdoor amenity area will be situated at the northwest corner of the site.
All three-storey units are proposed along No.2 Road; a minimum 7.5 m side yard setback is provided to the third floor of these buildings to minimize potential privacy concerns. Two-storey duplexes are proposed along the rear (west) lot line to serve as a transition to the single family homes to the west. The proposed building forms, heights and setbacks are in compliance with the design guidelines for arterial road townhouse developments.
6245187
CNCL - 190
September 4, 2019 - 5 - RZ 17-794300
Four ground level secondary suites are proposed to be included in the development. These suites will be contained in four of the three-storey units (unit types "C 1" & "C2") proposed on site (see Attachment 2). The size of each secondary suite is approximately 26 m2 (279 ft2
) and the total net floor area of each of these "C 1" and "C2" units is approximately 141 m2 (1 ,520 ft\ Each secondary suite contains a bedroom, a kitchen and a bathroom. No additional residential parking spaces will be assigned to the secondary suites since a side-by-side double car garage is proposed to be included in each of the townhouse units containing a secondary suite.
To ensure that these secondary suites will not be stratified or otherwise held under separate title, registration of a legal agreement on Title is required prior to final adoption of the rezoning bylaw.
To ensure that the secondary suites are built, registration of a legal agreement on Title, stating that no final Building Permit inspection will be granted until the secondary suites are constructed to the satisfaction ofthe City in accordance with the BC Building Code and the City's Zoning Bylaw, is required prior to final adoption of the rezoning bylaw.
Amenity Space
The applicant is proposing a cash contribution in-lieu of providing the required indoor amenity space on site, as per the OCP. As the rezoning application was submitted prior to the Amenity Contribution rates were updated, this townhouse development application will have to comply with the previous Council's Policy 5041 (Cash in Lieu oflndoor Amenity Space). The Policy requires that a cash contribution of $1,000 per unit up to 19 units, plus $2,000 per unit over 19 units, be provided in lieu of indoor amenity space. The total cash contribution required for this 22-unit townhouse development is $25,000.00.
Outdoor amenity spaces will be provided on-site. Based on the preliminary design, the total area of the proposed outdoor amenity spaces complies with the Official Community Plan (OCP) requirements (i.e., 6m2 of outdoor space per unit). Staff will work with the applicant at the Development Permit stage to ensure the configurations and designs of the outdoor amenity spaces meet the Development Permit Guidelines in the OCP, including provision of children's play equipment.
Existing Legal Encumbrances
There are existing utility Right-of-Ways (ROWs) along the west property line and south property lines of the site for existing sanitary sewer lines and connections. The developer is aware that no construction is permitted in these areas.
In addition, there is an existing utility Right-of-Ways along the north property line of 10351 No. 2 Road for an existing perimeter drain. The applicant is required to remove the existing perimeter drain along the common property line of 10251 and 10351 No.2 Road and apply to the City to discharge the portion of Right-of-Way Plan 58634 that contained the removed drain prior to Building Permit issuance. The developer will be responsible to coordinate with BC Hydro, Telus, Shaw, Fortis BC, and other private utility companies to confirm that there are no existing private utilities within the right of way prior to the right of way discharge.
6245187
CNCL - 191
September 4, 2019 - 6 - RZ 17-794300
Transportation and Site Access
One vehicular access from No. 2 Road is proposed, this access will be restricted to right-in/rightout traffic movements. The proposed vehicle access is envisioned to be utilized by adjacent properties to the north and south if they apply to redevelop. A Public Right-of-Passage (PROP) Statutory Right-of-Way (SRW) over the entire area ofthe proposed entry driveway from No.2 Road and the internal north-south manoeuvring aisle will be secured as a condition of rezoning.
Prior to final adoption of the rezoning bylaw, the developer is required to dedicate an approximately 0.09 m wide road across the entire No.2 Road frontage to accommodate the required frontage improvements including a new sidewalk and grass and treed boulevard. The developer is also required to contribute $50,000 towards a future upgrade of the special crosswalk at the intersection of No.2 Road and Goldsmith Drive. Pre-ducting for future works will be also required as part ofthe Servicing Agreement.
Tree Retention and Replacement
The applicant has submitted a Certified Arborist's Report; which identifies on-site and off-site tree species, assesses tree structure and condition, and provides recommendations on tree retention and removal relative to the proposed development. The Report assesses 28 bylaw-sized trees and one hedgerow on the subject property, six trees and three hedgerows on neighbouring properties, and one hedgerow that may be a shared property between 10397 No. 2 Road and 5971 Wallace Road.
The City's Tree Preservation Coordinator has reviewed the Arborist's Report and supports the Arborist's findings, with the following comments:
• 26 trees (tag# 1-6, 11, 13-15, 18, 20-23,27,44, 51-59) located on the development site either dead, dying (sparse canopy foliage), have been previously topped or exhibit structural defects such as cavities at the main branch union and co-dominant stems with inclusions. As a result, these trees are not good candidates for retention and should be replaced.
• One (1) hedgerow comprised of six (6) trees (tag# 45-50) located on the development site is in poor condition with little landscape value, and should be removed.
• One (1) hedgerow comprised of 16 trees (tag# 28-43) located on the development site is in poor condition with little landscape value. This hedgerow may be removed; consent letter from the neighbouring property owner to the south is on file as this hedgerow may be a shared property between 10397 No.2 Road and 5971 Wallace Road.
• One (1) tree (tag# 26) located onsite is proposed to be retained, this tree is to be protected as per City of Richmond Tree Protection Information Bulletin Tree-03.
• Seven (7) trees (tag# 7, 8, 10, 12, 16, 17 and 25) located on neighbouring properties to the west are to be protected as per City of Richmond Tree Protection Information Bulletin Tree-03.
• One (1) hedgerow (tag# 9) located on neighbouring property to the west is to be protected as per City of Richmond Tree Protection Information Bulletin Tree-03.
6245187
CNCL - 192
September 4, 2019 - 7 - RZ 17-794300
• Two (2) hedgerows (tag# 19 and 24) located on neighbouring properties to the west are in poor condition with little landscape value. These hedgerows may be removed but the developer is proposing to retain and protect them as per City of Richmond Tree Protection Information Bulletin Tree-03.
Tree Replacement
The applicant wishes to remove 26 on-site trees (Tree tag# 1-6, 11, 13-15, 18, 20-23,27,44, 51-59). The 2:1 replacement ratio would require a total of 52 replacement trees. According to the Preliminary Landscape Plan provided by the applicant (Attachment 2), the developer is proposing to plant 3 7 new trees on-site. The size and species of replacement trees will be reviewed in detail through Development Permit and overall landscape design. The applicant has agreed to provide a voluntary contribution of $7,500 to the City's Tree Compensation Fund in lieu of planting the remaining 15 replacement trees should they not be accommodated on the site.
Tree Protection
One tree onsite (tag #26), seven trees (tag# 7, 8, 10, 12, 16, 17 and 25) and three hedgerows (tag# 9, 19 and 24) on neighbouring properties are to be retained and protected. The applicant has submitted a tree protection plan showing the trees to be retained and the measures taken to protect them during development stage (Attachment 5). To ensure that the trees identified for retention are protected at development stage, the applicant is required to complete the following items:
• Prior to final adoption of the rezoning bylaw, submission to the City of a contract with a Certified Arborist for the supervision of all works conducted within or in close proximity to tree protection zones. The contract must include the scope of work required, the number of proposed monitoring inspections at specified stages of construction, any special measures required to ensure tree protection, and a provision for the arborist to submit a postconstruction impact assessment to the City for review.
• Prior to final adoption of the rezoning bylaw, submission to the City of a Tree Survival Security in the amount of $1,000 to ensure that the Mountain Ash tree (specifically tag# 26) located at the southwest corner of the site will be protected. No Tree Survival Security will be returned until the post-construction assessment report, confirming the protected trees survived the construction, prepared by the Arborist, is reviewed by staff.
• Prior to demolition of the existing dwelling on the subject site, installation of tree protection fencing around all trees to be retained. Tree protection fencing must be installed to City standards in accordance with the City's Tree Protection Information Bulletin Tree-03 prior to any works being conducted on-site, and remain in place until construction and landscaping on-site is completed.
6245187
CNCL - 193
September 4, 2019 - 8 - RZ 17-794300
Variance Requested
The proposed development is generally in compliance with the "Low Density Townhouses (RTL4)" zone; with one proposed variance to reduce the front yard setback from 6.0 m to 4.5 m. The resulting distance from the back of curb to the building face would be approximately 7.5 m. Staff support the requested variance recognizing that a minor road dedication (0.09 m) is required and that the Arterial Road Guidelines for Townhouses in the OCP support reduced front yard setback where a 6.0 rear yard setback is provided, on condition that there is an appropriate interface with neighbouring properties. The applicant is proposing a reduced front yard setback in order to provide a larger rear yard setback to facilitate a greater separation between the proposed townhouse development and the adjacent single family homes. The increased rear yard setback would also provide a larger protection buffer to the existing trees and hedges along the west property line that are to be retained as part of the development. This variance will be reviewed in the context of the overall detailed design of the project; including architectural form, site design and landscaping at the Development Permit stage.
Affordable Housing Strategy
In addition to the provision of four secondary suites on site, the applicant proposes to make a cash contribution to the Affordable Housing Reserve Fund in accordance to the City's Affordable Housing Strategy. As the proposal is for townhouses, the applicant will make a cash contribution of $8.50 per buildable square foot as per the Strategy; for a contribution of $266,662.53.
Public Art
In response to the City's Public Art Program (Policy 8703), the applicant will provide a voluntary contribution at a rate of $0.85 per buildable square foot (2017's rate) to the City's Public Art Reserve fund; for a total contribution in the amount of $26,666.25.
Energy Efficiency & Renewable Energy
The subject rezoning application and the associated Development Permit application were received prior to the introduction of the BC Energy Step Code (approved by Council on July 16, 20 18). The subject development will have until December 31, 2019 to submit an acceptable Building Permit application in order to build under previous energy efficiency requirements. Should the deadline pass the proposed development would then be subject to the Energy Step Code.
The applicants have committed to achieving an EnerGuide Rating System (ERS) score of 82 and all units will be pre-ducted for solar hot water for the proposed development. Registration of a legal agreement on Title to ensure that all units are built and maintained to this commitment is required prior to rezoning bylaw adoption. As part of the Development Permit Application review process, the developers will be required to retain a certified energy advisor (CEA) to complete an Evaluation Report to confirm details of construction requirements needed to achieve the rating.
6245187
CNCL - 194
September 4, 2019 - 9 - RZ 17-794300
Site Servicing and Frontage Improvements
Prior to final adoption of the rezoning bylaw, the applicant is required to enter into the City's standard Servicing Agreement to design and construct frontage beautification works and service connections (see Attachment 6 for details). All works are at the client's sole cost (i.e., no credits apply). The developer is also required to pay Development Cost Charges (DCC's) (City & GVS & DD), School Site Acquisition Charge and Address Assignment Fee.
Development Permit
A Development Permit processed to a satisfactory level is a requirement of zoning approval. Through the Development Permit, the following issues are to be further examined:
• Compliance with Development Permit Guidelines for multiple-family projects in the 2041 Official Community Plan (OCP).
• Refinement of the proposed building form to achieve sufficient variety in design to create a desirable and interesting streetscape along No.2 Road and along the internal drive aisles, to reduce visual massing of the three-storey units along No. 2 Road, and to address potential adjacency issues.
• Refinement of the proposed site grading to ensure survival of all proposed protected trees and appropriate transition between the proposed development to the public sidewalk on No. 2 Road, and to the adjacent existing developments.
• Refinement of the outdoor amenity area design, including the choice of play equipment, to create a safe and vibrant environment for children's play and social interaction.
• Review of size and species of on-site replacement trees to ensure bylaw compliance and to achieve an acceptable mix of conifer and deciduous trees on-site.
• Refinement of site layout and landscape design to maximize planting areas along internal drive aisles, to maximize permeable surface areas, and to better articulate hard surface treatments on site.
• Review of aging-in-place features in all units and the provision of convertible units.
• Review of the sustainability strategy for the development proposal, including measures to achieve an EnerGuide Rating System (ERS) score of 82 or Energy Step Code.
Additional issues may be identified as part of the Development Permit application review process.
Financial Impact or Economic Impact
The rezoning application results in an insignificant Operational Budget Impact (OBI) for off-site City infrastructure (such as roadworks, waterworks, storm sewers, sanitary sewers, street lights, street trees and traffic signals).
6245187
CNCL - 195
September 4, 2019 - 10- RZ 17-794300
Conclusion
The proposed 22-unit townhouse development is generally consistent with the Official Community Plan (OCP) and the Arterial Road Policy in the OCP. Further review of the project design is required to ensure a high quality project and design consistency with the existing neighbourhood context, and this will be completed as part of the Development Permit application review process. The list of rezoning considerations is included as Attachment 6; which has been agreed to by the applicants (signed concurrence on file). On this basis, staff recommend support of the application.
It is recommended that Richmond Zoning Bylaw 8500, Amendment Bylaw 10088 be introduced and given first reading.
Edwin Lee Planner 1
EL:rg
Attachment 1: Location Map Attachment 2: Conceptual Development Plans Attachment 3: Development Application Data Sheet Attachment 4: Consultation Summary Attachment 5: Tree Management Plan Attachment 6: Rezoning Considerations
6245187
CNCL - 196
City of Richmond
ATTACHMENT 1
·E~RS,I/C J IRDI ~I -. I tSIIE, I I I
HTLI I I RSI(E R~tc -fs'~f ~~~:tiC~ RTLI 11--Rsv:d [ RTMl
5651 21\.77 44.16
FLOYD AVE .00 14.45 13.50
60 5680 5686 ,._
~ ~ 27.65 0 "':g ~
27.65
14 47 9.40 20.57
27.65
27.65
WII.!I.!IAMS·RD
~o wN
'g ~ 28,09
oOO
"'"' ¥ .. ;;:;
26.02
\ 0 26.71
"' N Ol
0
~
0 o<o
~~
25.00
..... ._ 25.00
<o o<o
~~ a ceo 0"' "'O
~ ~
<o
25.00
0 IJ.oO ll.UU lO.UU
0
'!2 0 0 g
0
0
"' "'
c 0::: N . 0 z
21.63
6020
?1.0R
RZ 17-794300
Sf
Sf
11250 l '"' 15.24 ~
GOLDSMITH DR
12.19 12.19 12.19 12.19 12.19 12.19 12 19 1 6040 6060 6080 6100 6120 6140 6160
2.19 12 9 12.19 12.19 11219 1219 12 1Q 1 51.20 (0
,;: 104.09
12.02
""
l p C---=:1 lL:=J ~ Original Date: 01/08/18
Revision Date:
Note: Dimensions are in METRES
CNCL - 197
City of Richmond
RZ 17-794300 Original Date: 01/08/18
Revision Date: 09/03/19
Note: Dimensions are in METRES
CNCL - 198
if=
IL
TOW
NH
OU
SE
DE
VE
LOP
ME
NT
AT
1023
1,10
251,
1035
1,10
371,
1039
1,10
395,
1039
7 N
0.2
RO
AD
, R
ICH
MO
ND
, BC
(R
Z -1
7-79
4300
)
ISS
UE
D F
OR
RE
ZON
ING
RE
SU
BM
ISS
ION
20
19-0
7-26
CO
NTA
CT
LIS
T
CLI
EN
T KO
NIC
DEVE
LOPM
ENT
LTD.
11
3>13
7DO
MA
YFI
B.D
PLA
CE
, RI
CHM
OND
BC,
V6V
2E4
CO
NTAC
T: K
IETH
LEU
NG, C
EO
PHO
NE
504-
285-
3700
, FAX
6()4
..285
-370
2 EM
Ail:
INFO
@KO
NIC.
CA
ELE
CTR
ICA
L U
EW E
NGIN
EERI
NG L
TD,
ElEC
TRIC
AL. C
ON
SUlT
ING
EN
GIN
EER
S 10
3-11
121
HO
RSE
SHO
E W
AY. R
ICHM
OND
, BC
V7A
SG
7 CO
NTAC
T: R
ICHA
RD V
. UEW
, P. E
NG.
TEU
FAX
:6!)4
..2n.
J157
EM
Ail.;
RU
EWEN
Gllt>
@Ta
US.
NET
AR
CH
ITEC
T IM
PERI
AL A
RO-Ir
rECT
URE
no
s FRE
NCH
STRE
ET,
VAN
CO
UVE
R. B
C, V
6P 4
V5
CONT
ACT:
JW
IG Z
HU. A
RCH
ITEC
T AJ
BC
m:n
a.9Ja
-ass
z EM
AJL.:
IMPE
RIA
LARC
HIT
ECT\
JRE@
GMAI
LCOM
CIV
IL
CORE
CO
NC
EPT
CO
NSU
LTIN
G L
TD.
CIV
IL
t M
EO
WIIC
AL
+ S
UR
VEY
220.
2639
VIK
ING
WAY
, RIC
HMO
ND V
6V 3
87
CONT
ACT:
BRU
CE D
UFFY
, DIR
ECTO
R TB
..:60
4-24
9-50
40,F
AX
:604
-249
-504
1 EM
AIL:
BCO
UFF
Y@C
OR
ECO
NC
EFTC
ON
SUl T
ING
.CO
M
LAN
DSC
APE
AR
CH
ITE
CT
M2
LAN
DS
CA
PE
AR
CH
ITE
CTU
RE
AN
D
AR
BO
RIC
ULT
UR
E LT
D.
lol2
20 •
26
LOR
NE
ME
WS
, N
EW W
ESTM
INST
ER. B
.C.,
V3M
3l7
C
ON
TAC
T: M
ER
ED
ITH
MIT
CH
ELL
. PR
INC
IPA
L TE
L: 6
04-5
5>00
44, M
OBI
LE: (
604)
789
-901
2 E
MA
il.: M
ER
ED
ITH
.MIT
CH
ELL
@M
2lA
CO
M
AR
BO
RIS
T M
OUI
'ITAI
N M
APLE
GAR
DEN
& TR
EE S
ERVI
CE LT
D.
lt200
. S2t
la S
WEN
SON
WAY
D
ELTA
BCV4
G1J
6 CO
NTAC
T: lA
URA
LEIG
H TE
L:60
4..49
9.65
58
MO
UN
TAIN
.MAP
LE@
HO
TMAI
LCO
M
SU
RV
EY
OR
J.C
. TA
M&
AS
SO
CIA
TES
PR
OFE
SSIO
NAL
LAN
D SU
RVEY
ORS
~~
15·
883
3 O
DU
H C
RES
CEN
T,
RIC
HM
ON
D. B
C V
6X 3
Z7
CO
NTA
CT:
JO
HN
SON
TAM
, B.C
.LS
. lE
L:5(
14.2
14.a
~B
E-M
AIL:
OFF
ICE@
JCTA
M.C
OM
DR
AW
ING
LIS
T
AR
CH
ITE
CT
UR
AL
:
AO.O
CO
VER
SH
EET
A0.1
CO
LOR
REND
ERIN
GS
A02
CO
LOR
REN
DER
ING
S A0
.3
PRO
JEC
T DA
TA &
STA
TIST
ICS
A0.
4 SI
TE C
ON
TEXT
AER
IAL
IMAG
E &
CO
NTEX
T PL
AN
A0.5
SI
TE C
ON
TEXT
PLA
N &
STR
EET
ELEV
ATIO
NS
A0.6
SU
RVEY
PLA
N
A1.0
SI
TE I
ROO
F PL
AN
A1.
1 SI
TE I
LEVE
L 1
PLAN
A1
.1A
1021
1 N
O.2
RO
AD D
EVEL
OPM
ENT
POTE
NTI
AL P
LAN
A12
SI
TE P
LAN
A1.3
PA
RKIN
G P
LAN
A1.4
FI
RE F
IGHT
ING
PLA
N A1
.5
OVT
DO
OR
AR
EA O
VERL
AY &
CAL
CULA
TIO
NS
A1.6
SI
TE C
OVE
RAG
E (B
UIL
DIN
G) O
VER
LAY
& C
ALCU
LATI
ONS
A2.1
BL
DG A
& D
FLO
OR
PLAN
S A2
2 BL
DG
8 &
E F
LOO
R P
LAN
S A2
.3
BLDG
C &
F FL
OO
R PL
ANS
A2.4
BL
DG
G, H
& J
FLO
OR
PLAN
S
A3.0
C
ON
TEXT
ELE
VATI
ON
S A3
.1
BUIL
DING
A E
LEVA
TIO
NS
A32
BUIL
DING
B E
LEVA
TIO
NS
A3.3
BU
ILDI
NG C
& J
ELE
VATI
ONS
A3
.4
BUIL
DIN
G D
ELE
VATI
ON
S A3
.5
BUIL
DING
E E
LEvA
TIO
NS
A3.6
BU
ILDI
NG F
ELE
VATI
ONS
A
3.7
BUIL
DIN
G G
ELEV
ATIO
NS
A3.8
BU
ILDI
NG H
ELE
VATI
ON
S
A4.1
BU
ILDI
NG S
ECTI
ONS
A5.1
U
NIT
TYPE
A1 P
LANS
A5
.1A
UN
ITTY
PEA1
AR
EA C
ALC
ULA
TIO
N D
IAG
RAM
AS
.Z
UN
IT lY
PE
A2
PLAN
S AS
.ZA
UN
IT T
YPE
A2 A
REA
CAL
CULA
TIO
N DI
AGRA
M
A5.3
U
NIT
TYP
E A4
PLA
NS
A5.3
A UN
IT T
YPE
A4 A
REA
CAL
CU
LATI
ON D
IAG
RAM
A5
.4
UNIT
TYP
E C
1 PL
ANS
(LO
CK-O
FF U
NIT
I A
5.4A
UN
IT T
YPE
C1
AREA
CAL
CULA
TIO
N DI
AGRA
M
AS.S
U
NIT
TYP
E 01
PLA
NS
A5.
5A
UNIT
TYP
E 01
AR
EA C
ALCU
LATI
ON
DIAG
RAM
A5
.6
UN
IT T
YPE
02 P
LANS
A5
.6A
UNIT
TYP
E 02
AR
EA C
ALCU
LATI
ON
DIAG
RAM
A5
.7
UN
IT T
YPE
03 P
LANS
A5
.7A
UN
IT T
YPE
03 A
REA
CAL
CU
LATI
ON D
IAG
RAM
A5
.8
UNIT
TYP
E G1
PLA
NS
AS.B
A U
NIT
TYP
E G1
AR
EA C
ALC
ULA
TIO
N DI
AGRA
M
A5.9
UN
IT T
YPE
G2 P
LANS
AS
.9A
UN
IT T
YPE
G2 A
REA
CAL
CULA
TIO
N DI
AGRA
M
A5.1
0 U
NIT
TYP
E H1
PLA
NS (C
ONV
ERTI
BLE
) A5
.10A
UN
IT T
YPE
H1 A
REA
CAL
CULA
TIO
N DI
AGRA
M
A5.
11
UN
IT T
YPE
H2 P
LANS
(CO
NVER
TIBL
E)
A5.1
1A
UNIT
TYP
E H
2 AR
EA C
ALCU
LATI
ON
DIAG
RAM
A
5.12
U
NIT
TYP
E C2
PLA
NS (L
OC
K-O
FF U
NIT
) A5
.12A
UN
IT T
YPE
C2
AREA
CAL
CULA
TION
DIA
GRA
M
A6.0
EL
EVAT
OR
SPE
CIF
ICAT
ION
FRO
M M
ANUF
ACTU
RER
~
~i.':..~~;;-~=~~-
Oim
tmim
s
~-:-..;::.::.::_-:;;-;-.;" .. ~-~-
......
~ B
L~ I~ ~B
L~J ~
~G:
~~~~~B~
N0
.2 R
OA
D
~)
""'U
"'"i
i:""
-
~]£.
.!!:
2;!!
. ..
..!!
:...
...!
:!:.
...~
*~::.::~
--~-
i 2
019
-07
-26
1 I IS
SU
ED
FO
R R
EZ
ON
ING
I
I R
E-S
UB
MIS
SIO
N
~ ~ n ::c:
~
....,
N
CNCL - 199
lr
~
AJ:
C'H
IIlO
\IIt
t
·~
~
"""""'
C~
'ric
hoR.
...,
..•d
_,.. ..........
....... -
·""·'
"'"
---=-~
,..,e.,
.,.,.. ..
-.!. ..
....
....
....
... ._~
_.... ..
....
_~
.a-~ ..
tool
.ol•
•1"'
1''"
'o4 ..
....
....
....
....
....
....
....
....
. --... ..
..
..-.
..-•
• .,..--.-..-of~cororo<~-
.
Dil
ml'l
<W
.... .
._ .... ~
.. _
... _, _
_,_
.....
__ ..
,..... _
_ ,,..,
..r ..... ,
""" ..
,. ....
~ B
LDG
I~
SlO
G
rsLDG~
I
.0 E
1.
F
_ G
J _
H
_
·~~~~etft>J
N0
.2 R
OA
D
~)
-.:L~
ti&i>
~:EJ!§:
-%-~
~'-:
+~~=
2019
-07-
26
1 IS
SU
ED
FO
R R
EZ
ON
ING
R
E-S
UB
MIS
SIO
N
Cltrl~_..:
,..0.
1 R
OA
O T
OW
!'HO
USE
DE
VE
LO
PMfl\
T
CRZ-
17-79~;.
oQJ
.a'l~l.
'.'il.')'~~
ILC3
L.l!OI.IO~~I.IU371.lli3YI.I03~.lOJY7
!'0..2
ROAD.RJOL~IO!
'LI.
B
C
CO
LOR
RE
ND
ER
ING
S
-* #8
19
3
N.T
.S.
-* L=
A
0.1
· :_
j
CNCL - 200
!.=
IL
~
~;.;.."'i~~~~=
·~~-
Oiro
lrn> .
.....
~-:-..
;:.;:.:.::._~'"!.~~":
": ....
.......
~ B
L~G
I~ -B
~GJ ~B~
G:
·~~~
·~e~
J
N0.
2 R
OA
D
~)
~~=
-.:L""'ii:"""~
-;:L
-.:;
:-"'
iUJ.
ii"
+~::;:;:
,------
1 IIS
SUE~~~:~~~ONING
I R
E-S
UB
MIS
SIO
N
I =-_j
CNCL - 201
lr=
A S
TATU
ARY
RIG
HT-
OF-
WAY
OVE
R T
HE
ENTI
RE
VEH
ICLE
DR
IVE
AISL
E IS
TO
BE
REG
ISTE
RED
FO
R PU
BLIC
RIG
HT-
OF-
PASS
AGE
INTE
RN
AL D
RIV
E AI
SLE
TO B
E EN
GIN
EER
ED T
O S
UPP
OR
T FI
RE
TRU
CK@
80,
000
LBS
Z. U
NIT
2152
2(T
YP
EH
HH
2)M
E"T
HE
CO
NV
ERTI
BlE
UNIT
S.
3,
THEP
RO
lEC
T\I'l
l.l.P
RO
VID
!:HEA
T PU
MPN
CU
NIT
IYIT
HH
RVM
ECH
ANIC
AJ..
VENTlt.Anm<~SYSTEMTOACHIEVEENERGUIDE
ll2ST
MD
AA
D.F
OlL
D\V
ING
SUST
AIN
AB
I.E
FEA
l\IR
ES'I'/
IlLA
lSO
BEP
RO
YID
EDIN
"!l-l
E Pf
\OJE
CT6
EYO
OD
EI\E
RG
UJD
E!l2
RE
OUII'
lE!.I
O;t'fT
S:
(A~SOLARHOTWATERREADY
REOU
JREM
ENT
(B~ENERGYSTARAPPU!IliCESANO
UG
HTB
UlB
S (C~lOWEDOliBLEGLI\ZlNG'I'/!NVCl\'1'5
\O~pQYIEfiOUTlETINPRIVATE
GA
AA
GEF
ORC
HA
AG
ING
ELEC
TRlC
CARS
4.TH
EMEO
WIIC
AI..H
EATI
NG
ANO
CO
OLI
NG
SYSTEM~RSOURCEHEAT?UMPSYS'TEM)TO
COM
I'I.Y
WIT
HRE
t.AnV
EREC
UIR
EMEN
TSIN
B
CB
C-Z
t118
AN
DA
SHR
AE5
5REG
I\fW
ING
lliE
STAN
DAA
OSO
I'"lH
ER!o
,W.C
OO
FOR
T.
S.A
NA
VTO
MA
TED
IRRI
GA
TIO
NSY
STEM
FOR
RJTU
REO
N-G
OIN
GIIW
NTE
NA
J'lCE
WIL
lBE
L...: I
NST
AllE
O.S
EELA
ND
SCA
PE
L:
EXIS
TIN
G FIR
E~
HYDR
ANT
(1
\ S
ITE
I LE
VE
L 1
PLA
N
~SCALE
1/16
"=1'
-0"
~
EXIS
TIN
G S
.R.W
TO
BE
DIS
CH
ARG
ED A
ND R
EMO
VED
I I- ~
(f)w
g;
:::
00
:::
C9
0 r;
)
~
~9-07-zs
1 II
SS
UE
DF
OR
RE
ZO
NIN
G i
i R
E-S
UB
MIS
SIO
N
I :J
CNCL - 202
lr= ~ A
STA
TUAR
Y R
IGH
T-O
F-W
AY O
VER
THE
ENTI
RE
VEHI
CLE
DRIV
E AI
SLE
IS T
O B
E RE
GIS
TERE
D FO
R PU
BLIC
RIG
HT-
OF-
PASS
AGE
INTE
RN
AL D
RIV
E AI
SLE
TO B
E EN
GIN
EERE
D TO
SU
PPO
RT
FIRE
TR
UC
K@ 8
0,00
0 LB
S
Ave
rag
e G
rad
ing
cal
cula
tio
n
'"'~'·
··· ~
VAR
IAN
CE
REQ
UIRE
D: 4
.5M
FRO
NT Y
ARD
SETB
ACK
AS P
ER A
RTE
RIA
L RO
AD T
OW
NHO
USE
DESI
GN
GU
IDEL
INE
IN O
FFIC
IAL
CO
MM
UN
ITY
PLAN
(OCP
) G
rou
nd
Flo
or
Inte
rio
r E
lelv
atio
n C
alcu
lati
on
3.
TH
EPR
OJE
ctl'l
n.lP
RO
VIO
EH
EA
T
PIJM
F'NC
UNIT
WlTH
HRVI
~ECH>I.NICAL
VEN
nlA
TlO
NSY
STtM
TOA
CH
IEV
EEN
ERG
UID
E BZ
STAN
DAR
D ..
FOLL
OW
ING
SUST
AIN
ASLE
FE
ATU
RES
\'IIll
AlS
OB
EPR
OV
IOEO
!NTK
E PR
OJE
CTB
EYO
ND
ENER
GU
IOEB
2 R
EQU
IREM
ENTS
: (A~SOlARHOTI"/AlffiREADY
REQU
IREM
ENT
(i!~ENERGYSTARAPPUANCESAND
LIG
KTB
UU
!S
(C~LO\'IEOOU!li.EGI.AZINGWINOOI'IS
10~
POW
ER O
IJTL
£T IN
PR
NAT
E GAAAGEFORC~GINGB.ECTR!CCARS
4.TH
EMEC
HANI
OO
HEAT
ING
ANDC
OO
UNG
SY
STEM
(AIR
SO
URCE
HEA
TPIJ
M? SYST:!~)TO
COM
PI.Y
WJT
fiREL
ATh'E
REOU
IREM
ENTS
IN
BI:B
C-Z
il1eA
ND
ASH
AA
E5SR
EGA
RD
ING
W.E
S'
7AN
PAR
DSO
FTH
ERU
ALC
OU
FOR
f.
~AUTOMAlEOIRRIGATlONSYSTEMFOR
FliT
IJR
EON
-GO
ING
!M!N
TBW
!CEY
Vll.l.
BE
II IN
STA
J.LEO
.SEE
I .. MO
SCA
PE
EXIS
TIN
G FIR
E~
HYDR
ANT
SIT
E P
LAN
A
1.2
S
CA
LE
1
/16
"=1
'-0
"
EXIS
TING
S.R
.W T
O
BE D
ISCH
ARGE
D AN
D RE
MO
VED
PLAN
#1
:r:
t::
2 (/)w
g2
: O
cr::
<
.90
r;
) ~
EXIS
TIN
G S
.R.W
TO
BE
DIS
CH
ARG
ED A
ND R
EMO
VED
~
-Bill
Gl
BLD
G
IBU
5Gj
BLD
G fB
LOG~
I
_D
E
i F
~
G J
.
H
•
~~~~~atfGJ
N0
.2 R
OA
D
~)
:E:K~
iit :
~~ +-;-~=
--------~~~----
1 20
19-0
7-26
i
i ISS
UE
D F
OR
RE
ZO
NIN
G i
I R
E-S
UB
MIS
SIO
N
I
CNCL - 203
!-:=
IL
r-··--
------
------
------
------
------
-_!~?P
ERTYLI
NE ~--
------
---~.:
-~r:.L
~--i
--·-
-·-·
·-··
--·-
··-·
·-··
----
-·-·
·-··
_j
o-p=p=
p=p~,-
,-,-p-
A :01
I i i
~ ... ~
~crr
;;:.
/'f'
~~
'"lt
"lt
-~
-c,
IV
TRUC
K TU
RNIN
G D
IAG
RAM
; SU
.9 T
RUCK
TUR
NING
DIA
GRA
M S
IMU
lATI
ON
GEN
ERAT
ED B
Y AU
TOTU
RN S
OFT
WAR
E
Par
kin
g C
alcu
lati
on
~C<!dcntmiPar'<ongRcqu~t~d
Smalltar~tallsallowed(7.S.B'
1\~sld
en!l~l P~rklosProvlded
lndudln~tSmoiiU>rStaii>Pmvided
ll!U
nlt
S0
$1
•
0.2l5t~!ls/Unlt
-""",;
::_do
r ·a..
. .,..
-~
-~
..:-.
,, ·o,
·o
.;.'"::
::,r .
.,_,
NO
. 2
RO
AD
~
A ST
AT1J
AAY
RIGH
T-OF
-WAY
OVE
R Tl
iE E
NTIR
E VE
HICL
E DR
IVE
AISL
E IS
TO
BE R
EGIS
TERE
D F
OR
PUBL
IC R
IGH
T..O
F.PA
SSA
GE
INTE
RN
ALO
RIV
EA
!SlE
TOB
EE
NG
INE
ER
EO
TOS
\JP
PO
RTF
IRE
TR
UC
K@B!
l,OO
OLB
S
Vi>ilo<P~rkl~!!R~ouu~d
iVomorP~rkonRI'rovld~d
lncl
udln
nlH
/CS
tall
)
Wo:
k·of
fUni
lhrk
in
lie
uir
ed•
l:>
o:k·
ofiU
nltP
>rk
onP
rovl
ded"
"l
:>o
:k-o
ffU
nlt
Par
kln
fleu
hen
VanA
<c.>
»ibi
~H/C
Vblt
orP~
rkln
RReg
ulre
d VanAa:c.olbleH/CVhltorP3r1<ln~Provlded
Classlllik~Slcrag~ ll~
ouio
~d
CI3
»1D
okeS
tcr:
>R
ePrc
vode
d 1.
2Sis
r.a<
es/U
mt
Cla
n2
Bik
ehrk
ln&
lleq
ulr
ed
Class28ik~ P~rkingPoovlded
Par
king
Cal
cula
tion
By
Un
it
Con
.ert
lble
Unl
t
~
Re<l
den!
l~l
Parl
dnr,(
S!i!
ndar
d Re
<lde
~ti3
1Par
1<in
&!Sm
•IIC
;orl
Res
lden
tia1P
ar1<
1nr,P
rovl
ded
C!a
sslB
il<e{
Hof
l:ont
al)
'aa-
.tB
il<
e{V
erti
<::
.lf
Tot
llld
assl
Blk
ePrn
vide
d
Un
lll
-;;:-
1B
uUdl
norA
1 ,, ! ,, r T2 r:: ,,
u~s I u
:6 I u
:7 I u
~~a I u~
g~ u~1
0
1116
"=1'
-0"
ffi
PA
RK
ING
PLA
N
~::;t;ALto
SU
ild
in£
U
nlt
ll
Un
ltU
U
nlt
14
U
nlt
lS
Unit~
Un
lt1
7
CZ
01
O
Z D
l G
Z G
l
Bul
ldln
gG
U'!!
!_l!
l
"
Toto
! I
Un
llll
22
" u
Uni
ts
4 U
nit•
29
Stal
ls
lS
Stal
l<
2 44
S
tall
s
' I ~
1:·~·
33
Sp
oces
RIG
HT .
OU
T VE
HIC
LE
EN
TRY
(SE
EC
IVIL
)
~-~~q_,
I !::
:2:
(f) ow
...
J>
o-
GiS
~ ...
-?~ ~ VA
N A
CC
ES
SIB
LE H
IC S
TALL
(4.9
M X
5.5
M)
(~'
STA
ND
AR
D S
TALL
(2.
5M X
5.5
M)
ru''Af
Mi
____ ]
SM
ALL
STA
LL (
2.3M
X4.
fiM)
HO
RiZ
ON
TAL
BIC
YC
LE S
PA
CE
{G
AR
AG
E)
(1.B
MX
O.ll
M)
le:s
:;~
VE
RT
ICA
llliC
'!'C
LE
SPA
CE
(GA
RA
GE)
(0
.9M
X0
.6M
)
r;
PLAN
#2
~BLDG
i .0
E
BLD
G [B
LDG~
_
G J
_ H
-
~
~~~~~stEG
N0
.2 R
OA
D
@
,...
----
.;;;
:---
----
--1
I
2019
-07-
26
I I IS
SU
ED
FO
R R
EZO
NIN
G i
I R
E-S
UB
MIS
SIO
N
I =-_j
CNCL - 204
lr=
IL
lw .§
·~ I~ I[ i i
BU
ILD
ING
A
EA
ST
ELE
VA
TIO
N
BU
ILD
ING
B
EA
ST
ELE
VA
TIO
N
BU
ILD
ING
C
EA
ST
ELE
VA
TIO
N
BU
ILD
ING
D
EA
ST
ELE
VA
TIO
N
BU
ILD
ING
C
WE
ST
ELE
VA
TIO
N
BU
ILD
ING
E
EA
ST
ELE
VA
TIO
N
BU
ILD
ING
H
WE
ST
ELE
VA
TIO
N
BU
ILD
ING
G
WE
ST
ELE
VA
TIO
N
BU
ILD
ING
D
SO
UT
H E
LEV
AT
ION
B
UIL
DIN
G A
S
OU
TH
ELE
VA
TIO
N
!§ !I iii' i
BU
ILD
ING
B
WE
ST
ELE
VA
TIO
N
BU
ILD
ING
F
EA
ST
ELE
VA
TIO
N
BU
ILD
ING
G
EA
ST
ELE
VA
TIO
N
BU
ILD
ING
A
WE
ST
ELE
VA
TIO
N
BU
ILD
ING
H
EA
ST
ELE
VA
TIO
N
BU
ILD
ING
F
WE
ST
ELE
VA
TIO
N
BU
ILD
ING
E
WE
ST
ELE
VA
TIO
N
BU
ILD
ING
D
WE
ST
ELE
VA
TIO
N
BU
ILD
ING
B
NO
RT
H E
LEV
AT
ION
B
UIL
DIN
GG
N
OR
TH
ELE
VA
TIO
N
!§ i§ .& ill' i
lw .§ i~ -~
i~ i i I
~
~~~~stfGJ
N0
.2 R
OA
D
~)
..--
1
2019
-07-
26
1
ISS
UE
D F
OR
RE
ZO
NIN
G i
I R
E-S
UB
MIS
SIO
N
I ~
CNCL - 205
!--:= ~
I* :~ I~
,~
~
·-·-·-----·---,-,~
·-·-·-·-·-·--·-·-·-r----=---~-~~--
II 11
"91 ~ ~
1~1 11--+--------------t-t-~
2 S
CA
LE
118"
=1'-0
"
I~
~,.,..-------
---·
-·-·
---
~~ .& i~
-~·++-·-·-----------·---~
i
~~fl·r-·-----·-·-·-·-----·2
~~I
~ ~
~++--·-·---·-·-·-·-·--~
~+.L_·..
:
~ rl
~~!,
';;D
ING
A ~,;
?.~;
:H E
LEV
AT
ION
d--------·-·l!l·~
¥ ~
~ ~':
~-------·-·-++~
I~ ~~ .&
-------------------·---r-.-~
i~ i ~----------------·-·-++~
~===
=:::
;:;:
::;n
,,=;
;='l
i~·-
·-·-
·-·-
·-·-
·-·-
·---
t~~
~~~
~ ~~
I I
'"""
'~
II
« --·---·-·-------~~-~
-~
4 '\
BU
,I,';;D
ING
A ~2-
~.::
H E
LEV
AT
ION
sc
. __
118"
"'1'-l
l"
1 201
9-o:r::
zs-----
. 1 I IS
SU
ED
FO
R R
EZ
ON
ING
I
I R
E.S
UB
MIS
SIO
N
i =-_j
CNCL - 206
~
IL
~ ... ,-
----
----
----
----
---
.~l+
----
----
----
----
---1
1,
b
~-H--------------
I< I~~~
~
r;n~
~!..'!J1l---
~,-----
-----------
~~++---------------------~
BU
ILD
ING
B S
OU
TH
ELE
VA
TIO
N
SC
ALE
1/
6"=1
'-0"
lw 11 I[ i i
!~ ii jl£ I
---------,-,~
~---------------------f-1-~
,---------------------f;:f-~
~I~
1--------------------f+~
~;')~~,~.~DING B
~::
~:H
ELE
VA
TIO
N
-~
~:lil?
~
c--2
o-,S
-:07-
26 -
-----1
I ISS
UE
D F
OR
RE
ZO
NIN
G I
I R
E-S
UB
MIS
SIO
N
I
N0.
2 R
OA
D T
OW
!\HO
US
E D
EV
ELO
PM
EN
T \R
Z-1
7-i9
4300
l
~
CNCL - 207
~
IL ~,,---
----
----
----
----
-
-~-!-+----------------------
~-1 I
---
------
------
----1
< ~
'i2
I!
II
l I
~-t-L--
---
I 'W
I IW
I IW
I IW
I I
~,,---------------
----
---
-~++---------------~
~++---------------~
5' f
lw ~~ ~~
~-r_L_===-~~~~====l==k========m:dk======~----~--
3"\
BU
ILD
ING
C SO~_!H E
LEV
AT
ION
~3/
----
118"
•
lw 11 I~ i i
·=·t' -
·W_
-----
2 -·
" <
;.;
a ' ~
~~ __
_ :_ ___
_
WE
ST
ELE
VA
TIO
N
NO
RT
H E
LEV
AT
ION
:~;')~~!.:DING J
v;;,:;.~
& N
OR
TH
ELE
VA
TIO
NS
-=t;! :
~l§t--
=rr
J d
ml
d ::;
: ~--
~-
c;'R
;J~:
,___
r---
----
~----
EA
ST
ELE
VA
TIO
N
SO
UT
H E
LEV
AT
ION
-~;')~~-~.~DIN
G J ~.:,:.&SOUTH E
LEV
AT
ION
S
--------------------,-,~
~----------------++~
l 17{¥:v-------------+,t~
II
I I
I .J§
I
~---------------+-+~
I w
__
___ :
_:_:
_:_:
_:_:
_:=:
:='~
~
-4 "
) B
UIL
DIN
G C
NO
R:r
H E
LEV
AT
ION
A
S.3
/ ;;
>C
J\U
: 118"=•-<~
~
~)
:E:K~
*~~~
::£:::
E:W
if.ii"
+
-;-~
=
[-----
------
------
------
, i ISS
UE;~
~~~~
ONIN
G I
I R
E-S
UB
MIS
SIO
N
I ~
CNCL - 208
I:=
IL
!~ i~ :1>
I~
::Jl
----
----
----
j---
----
---=
~---
----
----
--.:
----
--~ '
~lt '
~
1
----___
__ L __ -
-i ~~~~
i --
----
----
--!
--
--
~--------------!---------
i (1
\ B
UIL
DIN
G D
EA
ST
ELE
VA
TIO
N
I ~
SC
ALE
~tt-------------------"11#F======~~~===~
§
~~----------
-----~
!~ i~ .~ jif i
~.,_
_t::
::::
::::
:::_
:_:_
:_:_
:___
__
I .....
..
-3\
BU
ILD
ING
D N
OR
TH
ELE
VA
TIO
N
!~ !I I~ i i
J ~~ ~:
~I
____
____
i___
____
____
__
I o-
'11&1
'.:!/ o
~I
I --
' ~
~--
---~---
~I II
'---J
_ ---
---~
--------
-tt~
K'~,
,~,
'~'"
n=9F
"'11i
I
_::::::
:::_:J:
_:_:_:
_:_:_:
::x:=
2 B
UIL
DIN
G D
WE
ST
ELE
VA
TIO
N
1/B
"ot1
'..0"
----------------------~'ll-"">
~==="'iF=======r========='~-------------------tt~
{ lu-i
~l lu
-i!l
lr
r=i'<
"'9i
I 4
----
----
----
-+it
-~
; __
::::::
::-:=
=t_
:::;
-4\
BU
ILD
ING
D S
OU
TH
ELE
VA
TIO
N
~
~o-1-8-or-zs
---1
I ISS
UE
D F
OR
RE
ZO
NIN
G I
I R
E-8
UB
MIS
SIO
N
I
RO
AlJ
TOW
NH
OU
SE D
EVEL
OPM
EI'T
fR
Z-1
7-79
4300
!
CNCL - 209
lr=
IL
~t-t-----------------
-.r;
:0.
......-0
I ''
~!!11!11!11~
['
~H----
------
------
---~
____,_ ~
BU
ILD
ING
H E
AS
T E
LEV
AT
ION
"'
-'
1/8"
=1'-0
"
~++----------------------"rffi===============~~i'rl
~~--
----
----
----
----
~
!~ !i i~ ! i i
:;;:;:1
:'=:=:
_:_:_:
_:_:_:
_:_:_:
_ I
3 B
UIL
DIN
G H
NO
RT
H E
LEV
AT
ION
A
3.8
SC
ALE
. 1/
8""'
1'-0
"
!~ i~ :!1:
,~ i
~--------------------++~
~---------------------+*!--~
==ll
I -
--
--
--
-----Lf-~
~1iil?
2'\
BUI~DING H
~E~:r E
LEV
AT
ION
S
CA
... .::
1/
8":1
'-0"
----------------------++~
--------
--------
------!u
l~ :
---Lt-~
----------------------~~
4 B
UIL
DIN
G H
SO
UT
H E
LEV
AT
ION
S
CA
LE
118"
=1'-0
"
N0
.2 R
OA
D
~)
I~~
:!::!:
~~
+-;.~~
I 20
19-0
7-26
--,1
I I
SS
UE
D F
OR
RE
ZO
NIN
G
I I
RE-SUBMI~ ~
CNCL - 210
lr=
IL
I C
'l (.;
) (.;
) c.>
Co
l Co
l :
t~..-!
1t""l
y W
.:z'"J
'.OSI
<l
y t!~~.lml
y :t~[t.J>Ml
y 21'
-Z'Ii~
II'J
y ::r
-r~-"'
<11
y l=~~i
i i
i i
i
--+-
-t~
~ ~l=:d ~ 1 t--
-----~-
=~=t~tw
.Lti
rU ]~
,~r---
------
--i
[ •
I
------+
-----J'f
d'=!:· '
'====F=~
i
'_r;;IL__j~-----------------i~-~
fl ~ ~
I~ ------------------n-~
----
---+
----
---j
_l~~
~~
l=~-=='g_~#==....;~~~=1f~~~~~=~t-----------------___J_+--"\\-.ilf""'
~~-
____
____
___ T
___
____
___ _
0P
.JW
"''0
i
~-
~
~I~
~i ~
BU
ILD
ING
A S
EC
TIO
N (
SIM
. T
O B
UIL
DIN
G B
& C
) ~
SCA
LE
1/
B"=
r..o
·
I ., .. ,
.. , <r
"'''~
><-
cr ""'"~
cr "~''~"·
11
IVI\TAAO~
fliO'ITTAAD~
0 o
PllO
'IIJS
l '
' '
....E
l!"lll
fll.
oa:
i i
i J
IM
. ---r
--------
--i
~
----
----
1---
----
----
---~
I --
----
--~-
----
----
--
i --
----
--i-
----
----
----~
~:::::::::r: ___
______
____ _
I
=:=:=:
=:r:=:
=:=:=:
:::::::0±
:~:;;::
; -~--
·~·"
'
I .__....
.. S
CA
LE
118"
=1'-0
" ~
SC
ALE
,_
-
t~
. ~
~
~
~
.~ j
1r-uuo
~-"~"l
•r
-rl'l
-'e'>
'l lo
·-u·
!/."
'1
J,:'-l"l
'~~"'l
tl.'J
! .. ~!
>"'l
jffi
IOIO
AA
II"O
HoC
MO
< ""
0'Tl
""'~
l5
3 '\
B
UIL
DIN
G A.?.~~SS S
EC
TIO
N
i --
l 1 ~
~ ~-
r---
--:
! !
! :
I I
I I
----
--+
----
----
----
0 ...... r-
----
---1
~---,~tl 6
"~~~ Fn~
' ___
___ T
______
_____ _
l
:IZ
4jU
11'J
I P/7
77
77
/1
//)//))]
~
------------------~1
I --
----
-r--
----
----
--
i --
----
-·-·
-
.![ II
1'1
.... .
., II
II I
II lf=
=il
f/.R
z"7
"'?
W/l
/JV
Z7
F/d
v
......
::::::::
:::J::::
::::::::
::::::::
::::: __
__ ~
4 B
UIL
DIN
G H
CR
OS
S S
EC
TIO
N
1/8"
:1'-
0"
118"
=1'..
0"
~
I 20
19--
07-2
6 I
I ISS
UE
D F
DR
RE
ZO
NIN
G i
I R
E-S
UB
MIS
SIO
N
i
~0-~ R
OA.
V TO
WN
HO
US
E D
EV
ELO
PM
EN
T (R
Z-1
7-79
4300
!
=-_j
CNCL - 211
" 0 U1 S.
R.V
, Pl
cn 5
8634
" 0 ro " 0 ..
0
POC
KET
PlA
NTI
NG
#1
POT
ON
LY W
ITH
IN T
PZ A
ND
EN
CR
OAC
HM
ENT
ZON
ES T
O B
E H
A.t\D
DU
G O
NLY
WIT
HIN
EXI
S1J.
NG S
ITE
SOIL
; NO
TR
ENC
HIN
G
s;: B
(SEE
OFF
-SIT
E C
IVIL
DES
IGN
NO
. 2
RKS
WIT
HIN
TH
E TP
Z AR
EA:
REF
ER T
O A
RB
OR
IST
REP
OR
T G
UID
ELIN
ES
TREE
PR
OTE
CTI
ON
.-
-W
OR
KS W
ITH
IN n
ZO
~ErO
FT. ~
OOD
SCR
EEN
/ /
~,
~·~~----~--~~~,----------r--------~---------,,-----
--~-
----
---~
r---
----
--~--~~--~----------------~----------~--
----
-,r-
----
~~----~--
----
--'$1
..1'
Cr~~~/F
·.P.s
·.Pd'
·,p
11
·.g.P
·o.
.. ·o.
.,. Cr~:lF
·o,.
'<?o,.;
> ·O,.
;o ·o~
..:'o"
·o
....
CC.O
n•lf
;"''
...,.W."'II"'"'"Itta•<e~onlf;otlr""
pro
por
tyo!
M:U
nd
u.l
po
....
....
,oru
aod
,..!
OD
IIIo
.. .,
._ .....
.... , ....
"'"'""
'-"'' __
,......~ .....
IJ
TOW
NH
OU
SE D
EV
ELO
PM
EN
T J:
J231
-103
97 N
o.2
Roa
d R
idv
no
nd
,BC
SIT
E
PL
AN
(s
ou
th}
DA
TE:
:oi.
!I-.L
t.Y
-o!
ID
RA
WIN
GN
UM
BU
:
L2
O
FB
L-------
----
--------------------
------------------------------------------------------------------------------------------------------
--------------------------------.c~~-
~·~0~~::~!:
..1 M
lLA~~C
IJECTN
UI!IIU
R: JS
OS
[)
CNCL - 212
,---
-vvu
KI\
;) W
ITH
IN T
HE
TPZ
AREA
: REF
ER T
O A
RB
OR
IST
REP
OR
T G
UID
ELIN
ES
TREE
PR
OTE
CTI
ON
,--
--W
OR
KS W
ITH
IN T
HE
TPZ
AREA
: R
EFER
TO
AR
BO
RIS
T R
EPO
RT
GU
IDEL
INES
ENC
RO
ACH
MEN
T SI
TE S
OIL
;
(SEE
OFF
-SIT
E C
IVIL
DES
IGN
NO
. 2
ZON
E .J.
I.
;-5
FT. v
pOO
D S
CR
EEN
~"
' I
_§_F
T. W
OO
D S~REEN
~ ~RITICAL R
OO
T ZO
NE
ro
~ -:,.>-)'~ ~
''~
6FT.
WO
OD
F'E
N~~f
h:- 3
0 ..
·..P 0
·o....
·o.J>
Cr~~~lF
·ov
'<?a..:>
·o.,
·o.,
..:'0" ~0;
~}rz
~~lr
----
;;:0 .
.t ..;>
o..t
..:'a.?
'<?
a"
!l.~
~•u<
-wrW
"'IY
STR
UC
TUR
E
o6
\ -:.
9~
-:.>"
~o,.,.
~'
? ~o,.
;:.
0CoOV"~''"'"""dlnl<dr.>loOn•••<ld"'fC"I<t~o
p<nportyofMZI.ond>O>P~.>.nt;toru•ndmoynott>o
"'""'""""""'""'"loroth•r,.,J•ct>wlll>o"tt~•~p•rm"''""
LAND
SCAP
E AR
CHITE
CTUR
E #
22
0 •
26
Lo
rne
!VIe
ws
New
Wes
tmin
ster
, Bri
tish
Col
umbi
a V
3M
3L
7
Tel
: 60
4.55
3.00
44
Fax:
604
.553
.004
5 Em
ail:
offic
e@m
21a.
com
I)
TO
WN
HO
US
E D
EV
EL
OP
ME
/Iff
10
231-
1039
7 N
o.2
Roa
d F
<ct
mon
d.B
C
SIT
E
PL
AN
(n
ort
h)
20
/t\-
.J.t
.Y-o
<! IDRA\\~NGNUMSER:
~
D!!
AW
N:O
'(
I L
3
Of'
S
'------------------------------------------------------------------------------------'~:::-"'!!:.'•~=::;:;•:;:»'~ M
2lA
PR
OJE
CT
NU
MB
ER
: '1
8050
CNCL - 213
~
Ul -;l
~
CD
~ '"'
~
~
~
~
0 0
A
w
"'
~ .. ~,~~!
ii?.
:!Jj
•'Z!
EEH!
Brit
!iii
"' "'
'"' <il
'"' I ~
. ~~ ~
s--, ......
.:,.., .:.,
~ ,f9
.:~.30
~ ••
!o
0
-~!
.:,"
' '->
·-.~~, -=.
:..,.
. 11•
Crem
pF
"'-
"1.
11,..
'.!'
, ·Q~
·q,
c.-.>.
,!'!!.,o
r 0.
. ·~
'<?
"<?
~c,
·c,..
·c.,C
r::;,
l' C.
r ~"
" ... 0
.,.
'v.,.
ito
....
~,:>
'I?.
:''?
eto
ovtl
fM ''""~ T
il~ ~n<wJn£ """ "
"'''"
~ t~o
o«>~<tyo!"Zl>ndtoop•Af<llln":n•,.,...,.YOOtl><
"'""'<!=.dor•t•d!<>rotl\•rp"')o<Uw"h'""th•~p•tmh"on
LAND
SCAP
E AR
CHITE
CTUR
E #2
20 •
26
Lo
rne
Mew
s:
New
Wes
tmin
ster
, Bri
tish
Col
umbi
a V
3M
3l7
T
el:
604.
553.
0044
Fa
x: 6
04.5
53.0
045
Em
ail:
offi
ce@
m21
a.co
m
~
TOW
NH
OU
SE D
EV
ELO
PM
EN
T 10
231-
1039
7 N
o.2
Roa
d J<
dvno
nd.B
C
SH
RU
B
PL
AN
L4
O
FB
'-----------------------------------------------------------------------------------...:~::.~::::.:•!_oo>o-::::::;"::'l'!:.J M
21.A
PRO
JEC
TN
UM
5ER
: J8
050
CNCL - 214
p A
T
S
CH
ED
UL
E
M2
JO
B
NU
MB
ER
: 1
8-0
50
CO
MM
ON
N
AM
E
PL
AN
TE
D
SIZ
E
I R
EM
AR
KS
2 A
BIE
S G
RA
ND
IS
GR
AN
D F
IR
2.5M
HT;
B<
B
8 A
CE
R C
IRC
INA
TUM
V
INE
MA
PLE
1.
5M H
T; B
aB
; 3
STE
M C
LUM
P
'1 A
CE
R G
RIS
EU
M
PA
PE
RB
AR
K M
AP
LE
&C
M C
AL
; 1.
8M S
TD
; B
OB
4 A
CE
R M
AC
RO
PH
YLL
UM
B
IGL
EA
F M
AP
LE
&C
M C
AL
; 2
M S
TD
; B
4B
14
CO
RN
US
NU
TT
ALL
II 'E
DD
IEII'
P
AC
IFIC
DO
GN
OO
D
5CM
CA
L;
1.8M
HT;
B4
B
81
C
HO
ISY
A T
ER
NA
TA
M
EX
ICA
N M
OC
K O
RA
NG
E
#2 P
OT
; 4
0C
M
2&
5
CO
RN
US
AL
BA
'E
LEG
AN
TIS
SIM
A'
VA
RIE
GA
TE
D S
HR
UB
DO
GN
OO
D
#I P
OT
128
EU
ON
YM
US
AL
A T
A
HIN
GE
D B
UR
NIN
G B
USH
#2
PO
T;
30
CM
35
H
YD
RA
NG
EA
MA
CR
OP
HY
LL
A
BIG
LE
AF
HY
DR
AN
GE
A
#I
PO
T
13'1
LON
ICE
RA
PIL
EA
TA
P
RIV
ET
HO
NE
YS
UC
KLE
#I
P
OT
; 3
0C
M
42
0
PRU
NU
S LU
SIT
AN
ICA
P
OR
TUG
ES
E L
AU
RE
L #
3 P
OT
; &
OC
M
85
R
HO
DO
DE
ND
RO
N '
SC
AR
LET
NO
ND
ER
' R
HO
DO
DE
ND
RO
N;
SC
AR
LET
; E
. A
PR
IL
#3 P
OT
: 3
0C
M
'10
S
PIR
AE
A X
JA
PO
NIC
A L
ITT
LE P
RIN
CE
SS
' LI
TT
LE P
RIN
CE
SS
SP
IRA
EA
; P
INK
#2
PO
T;
40
CM
35
S
PIR
AE
A X
JA
PO
NIC
A '
SH
IRO
BA
NA
' S
HIR
OB
AN
A S
PIR
AE
A;
NH
ITE
-RO
SE
#2
PO
T;
40
CM
82
P
AC
HY
SA
ND
RA
TE
RM
INA
LIS
JA
PA
NE
SE
SP
UR
GE
#I
P
OT
; 15
CM
NO
TES
, *P
LA
NT
SIZ
ES
IN
TH
IS L
IST
AR
E S
PE
CIF
IED
AC
CO
RD
ING
TO
TH
E B
C L
AN
DS
CA
PE
ST
AN
DA
RD
, LA
TE
ST
ED
ITIO
N.
CO
NT
AIN
ER
SIZ
ES
SP
EC
IFIE
D A
S P
ER
C
NT
A S
TA
ND
AR
DS
. B
OTH
PLA
NT
SIZ
E A
ND
CO
NT
AIN
ER
SIZ
E A
RE
TH
E M
INIM
UM
AC
CE
PT
AB
LE
SIZ
ES
. *R
EF
ER
TO
SP
EC
IFIC
AT
ION
S F
OR
DE
FIN
ED
CO
NT
AIN
ER
M
EA
SU
RE
ME
NTS
AN
D O
THE
R P
LAN
T M
AT
ER
IAL
RE
QU
IRE
ME
NTS
. *S
EA
RC
H A
ND
RE
VIE
N,
MA
KE
PLA
NT
MA
TE
RIA
L A
VA
ILA
BL
E F
OR
OP
TIO
NA
L R
EV
IEN
BY
LA
ND
SC
AP
E A
RC
HIT
EC
T A
T S
OU
RC
E O
F S
UP
PLY
. A
RE
A O
F S
EA
RC
H T
O I
NC
LUD
E L
ON
ER
MA
INLA
ND
AN
D F
RA
SE
R V
AL
LE
Y.
• S
UB
STI
TUTI
ON
S,
OB
TA
IN N
RIT
TE
N
AP
PR
OV
AL
FR
OM
TH
E L
AN
DS
CA
PE
AR
CH
ITE
CT
PR
IOR
TO
MA
KIN
G A
NY
SU
BS
TITU
TIO
NS
TO
TH
E S
PE
CIF
IED
MA
TE
RIA
L. U
NA
PP
RO
VE
D S
UB
STI
TUTI
ON
S H
ILL
BE
R
EJE
CT
ED
. A
LL
ON
A M
INIM
UM
OF
FIV
E D
AY
S P
RIO
R T
O D
EL
IVE
RY
FO
R R
EQ
UE
ST
TO S
UB
STI
TUTE
. S
UB
STI
TUTI
ON
S A
RE
SU
BJE
CT
TO
BC
LA
ND
SC
AP
E
ST
AN
DA
RD
-D
EF
INIT
ION
OF
CO
ND
ITIO
NS
OF
AV
AIL
AB
ILIT
Y.
AL
L P
LA
NT
MA
TE
RIA
L M
US
T B
E P
RO
VID
ED
FR
OM
CE
RT
IFIE
D D
ISE
AS
E F
RE
E N
UR
SE
RY
. P
RO
VID
E C
ER
TIF
ICA
TIO
N U
PO
N R
EQ
UE
ST
.
CO
NC
RE
TE
ED
GE
RE
ST
RA
INT
A
QU
A P
AV
ER
S
5MM
(~'
~ C
LEA
R C
RU
SH
O
PE
N G
RA
DE
D B
ED
DIN
G
CO
UR
SE
2X
2 C
ON
CR
ETE
PA
VE
RS
SC
.AL
E,
1'=
1'-D
'
GE
OT
EX
TIL
E-
INB
ITE
X
18"
RIV
ER
Ro
cK
r
11
~---
20
MM
(~"
) C
LEA
R C
RU
SH
OP
EN
GR
AD
ED
A
GG
RE
GA
TE
SU
B-B
AS
E
'------
AP
SC
/00
0 H
OV
EN
NO
TE:
-IN
ST
AL
LA
TIO
N A
S P
ER
MA
NU
FAC
TUR
ING
S
PE
C/F
ICA
TIO
N
-D
RA
INA
GE
NE
ED
S T
O C
OO
RD
INA
TE
D
H/T
H C
IVIL
EN
GIN
EE
R
GE
OT
EX
TIL
E O
N B
OT
TO
M
AN
D S
IDE
S O
F O
PE
N
GR
AD
ED
BA
SE
PE
RM
AA
BLE
PA
VE
RS
::C
.ALE
, 3
/4'=
1'-
0'
DR
IP S
TR
IP
SC.A
LE
, 1'
=1'
-0'
FO
OT
ING
/ D
RA
INA
GE
; S
EE
AR
CH
.
0C<>P!Iiil~1 "'
"'"'":
!. T~
~ dr>-""~
•nd
~o<'Jn
I< tO
. pr~>p<rtyofM<!Wntl•"'+'•"fthiiKt>•odm>y"o'b•
"'P"'<I"""<!orU<odlorotllorpr<>l•<l>•"lhm41h•~P<"'"'"""·
lANDS
CAPE
ARC
HITEC
TURE
#
22
0-
26
Lor
ne M
ew
s N
ew W
estm
inst
er,
Brit
ish
Col
umbi
a V
3M
3L
7
Tel
: 60
4.55
3.00
44
Fax:
604
.553
.004
5 Em
ail:
offi
ce@
m2!
a.co
m
IJ
TOW
NH
OU
SE
DE
VE
LOP
ME
NT
1023
1-10
397
No
.2 R
oad
F<cl
vnon
d.BC
LAN
DSC
AP
E
DE
TAIL
S L6
O
FB
'-----------------------------------------------------------------------------------.:."'~-"'~"~'-="::!'•:.J M
Z!.A
PIIO
JEC
TN
UM
SER
: 18
05(}
CNCL - 215
24
"X2
4"
CO
NC
RE
TE
ST
EP
PIN
G
.---
---S
TO
NE
RE
FE
R T
O M
UTU
AL
MA
TE
RIA
LS F
OR
SP
EC
.
lbfi\llfi~~~f~~hfl)NI
I" S
ILIC
A S
AN
D S
ETT
ING
BE
D
/>;»
';;
'7)/t
,, 4
" D
EN
SE
GR
AD
E A
GG
. B
AS
E
%
NO
N-W
OV
EN
FIL
TE
R F
AB
RIC
~,
PR
EP
AR
ED
SU
BG
RA
DE
1------------K
AX
8'-D
" O
.G
.-----------1
HO
OD
PO
ST
CA
P
:::f=
mlll
llllll
llllll
ll' +
-
2x4
NA
ILE
R
~' 5'
-o
2x2
NA
ILE
R
lx6
B
OA
RD
S
2x6
KIC
K B
OA
RD
~
I t+-t
I
I 2 l ~ D
RA
IN 6
RA
VE
L
CO
MP
AC
TE
D
SU
B6
RA
DE
B
EL
OH
TY
PIC
AL
PO
ST
FO
OT
/N6
NO
TES
, I.
AL
L H
OO
D P
.T.
HE
M/F
IR
2.
ST
AIN
TH
O C
OA
TS
PR
EM
IUM
HE
AT
HE
RP
RO
OF
IN6
ST
AIN
, TO
MA
TC
H A
RC
HIT
EC
TU
RA
L T
RIM
(C
OLO
UR
TO
BE
PR
EA
PP
RO
VE
D B
Y O
WN
ER
) 3
. A
LL
HA
RD
WA
RE
HO
T D
IPP
ED
6A
LV
AN
/ZE
D.
PIC
KE
TS
TO
BE
AT
TA
CH
ED
US
/N6
CO
UN
TER
SU
NK
SC
RE
WS
. 4.
6
A TE
HA
RD
HA
RE
TO
BE
PR
EA
PP
RO
VE
D B
Y O
HN
ER
. 5
. H
AR
DH
AR
E T
O B
E H
EA
VY
6A
U6
E.
6.
HIN
6ES
, LA
TC
HE
S T
O B
E S
CR
EH
ED
IN
TO P
LAC
E,
5'
HO
OD
SC
RE
EN
SC
.AI..
.E ,
3/4
'=1
'-Q
'
24
"X2
4"
CO
NC
RE
TE
ST
EP
PIN
G
~-~-STONE R
EF
ER
TO
MU
TUA
L /
MA
TE
RIA
LS F
OR
SP
EC
.
\h~\
M~~~
,~~~4P§)fi
I" S
ILIC
A S
AN
D S
ET
TIN
G B
ED
/~
.. ~·~
· ...
. -~~f' ,,
4"
DE
NS
E G
RA
DE
AG
G.
BA
SE
~ ;
: ;:
;..;
;: ;
..; ;:
;:<
(; N
ON
-HO
VE
N F
ILT
ER
FA
BR
IC
~%%%%%(%,'0'
PR
EP
AR
ED
SU
BG
RA
DE
2X
2 C
ON
CR
ET
E P
AV
ER
S
SC..A
LE ,
1'=
1'-Q
'
DO
NO
T C
UT
LEA
DE
R
/00
0
II 6
AU
6E
6A
L V
. H
IRE
IN
13m
m
RU
BB
ER
HO
SE
ST
AK
E T
RE
E N
/TH
OU
T D
AM
A6
E T
O R
OO
T B
AL
L
SC
AR
IFY
SID
ES
AN
D
BO
TT
OM
OF
TR
EE
PIT
P
RIO
R T
O P
LAN
TIN
6.
UN
TIE
AN
D F
OL
D B
AC
K T
OP
1/3
RD
OF
B
UR
LAP
.
TRE
E P
LAN
TIN
G D
ET
AIL
S
CA
LE
, N
T5.
k
FO
R T
RE
ES
LA
R6
ER
TH
AN
65m
m
CA
LIP
ER
USE
75 ~ S
TA
KE
S
FO
R S
MA
LLE
R T
RE
ES
USE
50
~
ST
AK
ES
.
~
SE
T T
RE
E P
LUM
B.
USE
2
RO
UN
D
ST
AK
ES
, E
AC
H S
ET
50
0m
m
BE
LOH
6R
AD
E 4
/O
OO
mm
A
BO
VE
6R
AD
E.
SE
T T
RE
E P
LUM
B.
ST
AK
E T
RE
E A
S S
PE
CIF
IED
P
OS
ITIO
NIN
6 S
TA
KE
H/T
HO
UT
DA
MA
6E
TO
RO
OT
B
AL
L
TO
PS
OIL
DE
PT
H A
S P
ER
SP
EC
. O
N S
CA
RIF
IED
S
UB
6R
AD
E
FIL
L H
ITH
TO
PS
OIL
2/3
RD
S F
ULL
A
ND
RE
MO
VE
ST
RA
PP
IN6
AN
D 1
13 T
OP
Of
BU
RLA
P.
50m
m B
AR
K M
ULC
H I
N A
LL
PL
AN
TIN
6 A
RE
AS
UN
LES
S
OT
HE
RH
ISE
SP
EC
IFIE
D (
SE
E P
LA
NT
IN6
PLA
N).
6R
AD
E T
O
TO
PS
Of
CU
RB
S,
NA
LK
S,
AN
D
DR
/VE
NA
YS
ETC
.
ON
SIT
E (
INS
TA
LL A
S R
EQ
UIR
ED
AT
EX
TR
A C
OS
T)
INFO
RM
LA
ND
SC
AP
E A
RC
H.
PR
IOR
TO
PR
OV
IDIN
6.
lANDS
CAPE
ARC
HITEC
TURE
#
22
0-
26lO
J!ll:
: lV
lt::
w:.
New
Wes
tmin
ster
, Bri
tish
Col
umbi
a V
3M 3
l7
Tel
: 60
4.55
3.00
44
Fax:
604
.553
.004
5 Em
ail:
offic
e@m
21a.
com
IJ
TOW
NH
OU
SE
DE
VE
LOP
ME
NT
1023
1-10
397
No. 2
Roa
d R
iclrr
torr
d,EJ
C
LA
ND
SC
AP
E
DE
TA
ILS
MTE:~_u.•f...:;>q
L7
C
HK
'D:
lfl
I O
FB
1------------------------------------------------------------------------------------'"'"'-""!!:"~·-~><~'1'~ M
21.Af~
OJECT~
UMBER:
f8
()5
0
CNCL - 216
City of Richmond
Development Application Data Sheet Development Applications Department
RZ 17-794300 Attachment 3
Address: 10231,10251,10351,10371,10391,10395 and 10397 No. 2 Road
Applicant: Konic Development Ltd.
Planning Area(s): Steveston (Schedule 2.4)
Existing Proposed
Owner: Forest International Real Estate No Change
Investment Company Ltd.
Site Size (m2): 4,868.0 m2 4,857.6 m 2
Land Uses: Single-Family Residential Multiple-Family Residential
OCP Designation: Low-Density Residential No Change
Area Plan Designation: Steveston Area Plan: Multiple-Family No Change
702 Policy Designation: N/A No Change
Zoning: Single Detached (RS1/E) Low Density Townhouses (RTL4)
Number of Units: 7 22
Other Designations: N/A No Change
On Future I Bylaw Requirement I Proposed I Variance
Subdivided Lots
Floor Area Ratio: Max. 0.60 0.60 Max. none permitted
Lot Coverage- Building: Max. 40% 40% Max. none
Lot Coverage - Non-porous Max. 65% 65% Max. none
Surfaces:
Lot Coverage- Landscaping: Min. 25% 25% Min. none
Setback- Front Yard (m): Min. 6.0 m 4.5 m Min. Variance
Requested
Setback- North Side Yard (m): Min. 3.0 m 3.0 m Min. none
Setback- South Side Yard (m): Min. 3.0 m 3.0 m Min. none
Setback- Rear Yard (m): Min. 3.0 m 6.0 m Min. none
12.0 m (3 storeys) Max.
Height (m): Max. 12.0 m (3 storeys) along No. 2 Road and
none 9.0 m (2 storeys) Max.
along west property line
Lot Width: Min. 50.0 m 110.0 m none
Lot Depth: Min. 35.0 m 44.6 m none
6245187
CNCL - 217
September 4, 2019 - 2 - RZ 17-794300
On Future I Bylaw Requirement Proposed I Variance
Subdivided Lots Off-street Parking Spaces-
2 (R) and 0.2 (V) per unit 2 (R) and 0.2 (V) none Regular (R) I Visitor (V):
Off-street Parking Spaces- Total: 44 (R) and 5 (V) 44 (R) and 7 (V) none
Max. 50% of proposed
Tandem Parking Spaces: residential spaces in 0 none
enclosed garages (44 x Max. 50% = 22)
Max. 50% when 31 or more Small Car Parking Spaces spaces are provided on-site 16 none
(51 x Max. 50%= 25) Min. 2% when 11 or more
Handicap Parking Spaces: spaces are required 1 none (49 x 2% = 1 spaces)
Bicycle Parking Spaces- Class 1 1.25 (Class 1) and 1.5 (Class 1) and none
I Class 2: 0.2 (Class 2) per unit 0.2 (Class 2) per unit
Off-street Parking Spaces- Total: 28 (Class 1) and 33 (Class 1) and none
5 (Class 2) 5 (Class 2)
Amenity Space -Indoor: Min. 70 m2 or Gash-in-lieu Gash-in-lieu none
Amenity Space- Outdoor: Min. 6 m2 x 22 units = 132
240m2 none m2
Other: Tree replacement compensation required for removal of bylaw-sized trees.
6245187
CNCL - 218
ATTACHMENT 4
~~~~ 10211 No.2 Road
KCNIC OEV ELOI'MENT
Richmond, BC V7E 5M6
Mar 6, 2019
HAND DELIVERED
To : Occupants of 10211 No.2 Road, Richmond .
We are the developer to the south of your property developing townhouses located at 10231, 10251, 10351,
10371, 10391, 10395 and 10397 No.2 Road, Richmond. We are sending you information to notify and keep you
informed of this upcoming project. Kindly find attached the current draft developing plans for your reference
(ATTACHMENT A).
The proposed development consists of approximately 22 townhouse units. The design of the proposal is in full
compliance with various requirements with City of Richmond. The land use of the proposed development
complies with Official Community Plan (OCP); the density and building height comply with Zoning Bylaw
requirement. The front buildings are 3 storeys in height with both south and north end of buildings reduced to 2
storeys to adept our neighbour's single-family homes. The rear buildings are all proposed to be 2 storeys. We will
, have more information to communicate after Planning Committee.
Should there be any questions or concerns about the project, please do not hesitate to email me at
[email protected] or contact my direct line at 604-242-1062. Thank you for your valuable time in reading this
notice.
Sincerely,
Michelle Lee
Development Director
Konic Development Ltd.
1135-13700 Mayfield Place Richmond, BC V6V 2E4
. '
[email protected] \. 604-295-3700 Q 604-295<1702
CNCL - 219
10
23
1,1
02
51
,10
35
1,1
03
71
,10
39
1,1
03
95
,10
39
7 N
o.2
Roa
d, R
ichm
ond
DRAF
T A
TT
AC
HM
EN
T A
~ CJ
CJ [
J [] [
J ,-
---J
I
1032
0 1
02
86
l
1028
0 10
266
10
32
6
'--
22J
DC
lDD
D _
_r-
-----j
~
0 <(
5951
0 0:
: w
10
211
1019
1
Jl a
(.)
<(
_jl~
-Jl
--'
~
I ~
'----1
I)
\ /
Z"§
N02
RO
AD
l\~
~)
__ [\
i r
--
--
---
----
--
MA
RC
H 0
6, 2
01
9
CNCL - 220
De
velo
pm
en
t pro
ject
: 10
231,
102
51,
1035
1, 1
0371
, 10
391,
103
95 a
nd
103
97 N
o.2
Roa
d, R
ichm
ond.
I ha
nd
-dliv
ere
d t
he
No
tific
atio
n e
nve
lop
e c
on
tain
ing
a le
tte
r an
d si
te p
lan
prop
osal
{A
tta
chm
en
t A)
to th
e m
ail b
ox
of t
he
follo
win
g n
eigh
bour
s:
Nei
gh
bo
uri
ng
Pro
per
ties
No
tifi
ca
tio
n s
um
ma
ry
Ne
igh
bo
ur A
ddre
ss
De
velo
pe
r R
epre
sent
ativ
e D
ate
Tim
e F
eedb
ack
S)g
f!atu
re
1 10
211
No.
2 R
oad,
Ric
hmon
d Je
nny
Lau
{Kon
ic)
8-M
ar-1
9 6
:55
PM
N
o co
mm
en
ts
\.__,j
,._..,
2 59
71 W
alla
ce R
oad,
Ric
hmon
d Je
nny
Lau
{Kon
ic)
8-M
ar-1
9 6
:40
PM
N
o co
mm
en
ts
........._
l' l
3 59
51 W
alla
ce R
oad,
Ric
hm
on
d
Jenn
y La
u {K
onic
) 8
-Ma
r-1
9
5:2
0P
M
No
com
me
nts
~.
l I
4 59
31 W
alla
ce R
oad,
Ric
hmon
d Je
nny
Lau
(Kon
ic)
8-M
ar-
19
5
:30
PM
N
o co
mm
en
ts
;--\ ~
' J.
5 10
380
San
difo
rd D
r, R
ichm
ond
Jenn
y La
u (K
onic
) 8-
Mar
-19
5:3
8P
M
No
com
me
nts
ll
l
me
t one
of l
an
dlo
rd,
his
nam
e is
Bill
at t
he
pro
pe
rty
of 1
0366
~
San
difo
rd D
r R
ichm
ond.
He
tha
nke
d f
or
us t
o d
eliv
er t
he
6 10
366
San
difo
rd D
r, R
ichm
ond
Jenn
y La
u (K
onic
) 8
-Ma
r-1
9
5:4
5P
M
up
da
te p
roje
ct in
form
ati
on
and
site
pla
n to
him
for
refe
renc
e,
as h
e kn
ew t
ha
t his
hou
se is
loca
ted
at t
he
bac
k o
f ou
r p
roje
ct
site
; th
ere
fore
, he
car
es w
ha
t sta
tus
of o
ur
pro
ject
is n
ow,
and
the
est
. ti
me
fra
me
fo
r co
nst
ruct
ion
. n
7 10
360
San
difo
rd D
r, R
ichm
ond
Jenn
y La
u (K
onic
) 8
-Ma
r-1
9
5:5
0P
M
No
com
me
nts
/"
'<l..
.l 8
1034
6 S
andi
ford
Dr,
Ric
hmon
d Je
nny
Lau
(Kon
ic)
8-M
ar-1
9 5
:58
PM
N
o co
mm
en
ts
( l
9 1
03
40
San
difo
rd D
r, R
ichm
ond
Jenn
y La
u (K
onic
) 8-
Mar
-19
6:0
5P
M
No
com
me
nts
'/
f\ (
__...
10
10
326
San
difo
rd D
r, R
ichm
ond
Jenn
y La
u (K
onic
) 8-
Mar
-19
6:1
0P
M
No
com
me
nts
\.
,-1
11
10
320
San
difo
rd D
r, R
ichm
ond
Jenn
y La
u (K
onic
) 8-
Mar
-19
6:2
0P
M
No
com
me
nts
~I (
\
12
1028
6 S
andi
ford
Dr,
Ric
hmon
d Je
nny
La u
(K
onic
) 8
-Ma
r-1
9
6:2
8P
M
No
com
me
nts
\)
...,_
l
13
1028
0 S
andi
ford
Dr,
Ric
hmon
d Je
nny
Lau
(Kon
ic)
8-M
ar-
19
6
:33
PM
N
o co
mm
en
ts
I( "
\
CNCL - 221
ATTACHMENT 5
N--+ ~q---------~~~--------~~~r-------~~~----~--~~~r-----~~~~---------r----~~~~--~
If any existing fence within any TPZ is to be removed & replaced, removal must be performed manually. The new fence must be placed In the same footprint using
the existing post holes. Any excavation for any proposed landscaping that encroaches into any TPZ
must be performed manually; if large roots (1.5" diameter and larger) are encountered, then the
plantings must be shifted to accommodate. No more than 3" of additional good quality landscape soil (not
construction grade fill) may be added into these Zones.
Approx. location of existing retaining wall & sheds. Demolition & removal of
the existing shed within the CRZ of Tree #8 & TPZ of Trees #16 & #17 must be performed manually or under the supervision of a Certified Arborist if
performed with equipment.
Absolutely no grade changes are to occur within any TPZ; the grade cannot be altered (raised or lowered). All pre
loading, retaining walls, perimeter drainage & silt fencing must be
installed outside of these Zones.
Tree Retention & Removal Plan for Lots 981, 982, 713, 712 & 711, Scale 1/32" = 1'
Page 29 of33 CNCL - 222
NEWBFTWOOD FENCE, SEE LANDSCAPE
'-1 0 ._o
Absolutely no grade changes are to occur within any TPZ; the grade cannot be altered (raised or lowered). All pre
loading, retaining walls, perimeter drainage & silt fencing must be
installed outside of these Zones.
If any existing fence within any TPZ is to be removed & replaced, removal must be performed manually. The new fence must be placed in the same footprint using
the existing post holes. Any excavation for any proposed landscaping that encroaches into any TPZ
must be performed manually; if large roots (1.5'' diameter and larger) are encountered, then the
plantings must be shifted to accommodate. No more than 3" of additional good quality landscape soil (not
construction grade fill) may be added Into these Zones.
Tree Retention & Removal Plan for Lots 710, 711 & 211, Scale 1/32" = 1'
Page 30 of33 CNCL - 223
I TR
#EE
SP
EC
IES
D
BH
S
PR
EA
D I
~
SP
EC
IES
l!
!lli
SP
RE
AD
1
(em
) (e
rn)
{mes
t.)
(m~.--st)
Plu
m
Che
rry
~Prunus
sp.)
21
7m
27
(P
nmus
se,.
) 23
7m
Che
rry
Ced
ar
(Pru
nus ~p
.)
52
8m
(flJ
Uja
30
per
28
oc
cide
mal
is)
surv
ey
6m
Che
rry
27
Ced
ar
(Pru
nus
sp.)
co
mbi
ned
6m
(Thu
ja
28 p
er
29
occi
dent
alis
) su
rve:
z:
5m
Plu
m
47 p
er
Ced
ar
(Pru
nus
sp.)
co
mbi
ned
6m
(Thu
ja
25 p
er
30
occi
dem
alis
) su
rvex
5m
Cur
ly W
illo
w
58
Ced
ar
(Sal
ixse
..J
com
bine
d 6m
(T
huja
21
per
Fig
30
31
oc
cide
nta/
is)
surv
e;t
5m
(Fic
us s
p.)
com
bine
d 6m
C
edar
Cyp
ress
(f
hu
ja
25 p
er
32
occi
dent
al is
) su
rvey
5m
(C
ham
aecy
pari
s 40
per
C
edar
se
.·!
surv
e;t
5m
Pea
r 32
est
. (7
huja
26
per
(Pyr
us s
e..J
co
mbi
ned
4m
33
occi
dem
alis
) su
rvey
5m
Ced
ar
Ced
ar
(11m
ia p
lica
l a}
3m
{lh1~ia
33 p
er
34
occi
dem
alis
) su
rvex
5m
O
ak
67 p
er
Ced
ar
10
(Oue
rcus
se,
.) su
rvey
15
m
Plu
m
60
(Thu
ja
22 p
er
35
occi
dem
alis
) 5m
II
(P
rwm
s se
,.J
com
bine
d 6m
su
rvey
C
edar
W
alnu
t 18
per
(7
huja
26
per
12
(J
ugla
ns s
e,.)
surv
ey
6m
36
occi
dent
al is
) 5m
su
rvey
F
ig
Ced
ar
13
(fic
us
se,.)
O
ver
100
6m
(Thu
ja
21 p
er
Che
rry
55
37
occi
dent
a/is
) su
rvex
5m
14
(P
runu
s se
·2
com
bine
d 6m
C
edar
C
herr
y 45
(T
huja
21
per
15
(P
ruJ1
US
se.J
co
mbi
ned
5m
38
occi
dem
alis
2 su
rvey
4.
4m
Pin
e 80
per
C
edar
16
(P
inus
se.
) su
rve:
i 18
m
(fh
uja
24
per
Ja
pane
se M
aple
25
per
39
oc
cide
ntal
is)
surv
e:l:
4.4m
17
(A
cer
ealm
atum
) su
rve;
t !O
m
Ced
ar
Plu
m
24
(Thu
ja
25 p
er
18
(!ru
nu
s se
,.J
com
bine
d 3m
40
oc
cide
ntal
is2
surv
e:z:
4.
4m
Ced
ar
Ced
ar
(Thu
ja
(lh
uja
25
per
19
oc
cide
ntab
s)
2.8m
41
oc
cide
nral
is)
surv
ey
4.4m
P
ear
57
Ced
ar
20
(Pyr
ussp
.)
com
bine
d 6m
(f
lwja
24
per
A
pple
40
42
oc
cide
mal
is)
surv
ey
4.4m
21
(M
alus
se..J
co
mbi
ned
5m
Ced
ar
Tam
aris
k (7
huja
33
per
22
(!
am
ari
x se
,.J
22
4m
43
occi
dent
alis
) su
rve:
i 4.
4m
Mag
noli
a 34
S
mok
ebus
h 22
23
(!:
:!..a
&:!.
o/ia
sp.
) co
mbi
ned
6m
44
(Cot
inus
se,
.) co
mbi
ned
3.9m
C
edar
C
edar
(f
hu
ja
(!h
uja
34
24
oc
cide
ntal
is)
lm
45
occi
dent
alis
) co
mbi
ned
3m
Japa
nese
Map
le
50 e
st.
Ced
ar
25
(Ace
r pa
lmat
um)
com
bine
d 3m
(T
huja
36
M
ount
ain
Ash
26
46
oc
cide
ntal
is)
com
bine
d 5m
26
(S
orbu
s ~p
.)
com
bine
d 6m
47
C
edar
41
3.
6m
Page
35
of3
8
Page
36
of3
8
CNCL - 224
I TR
EE
S
PE
CIE
S
rili
H
SP
RE
AD
I
# (e
m)
{ro
es\)
P
ap
erb
ark
ma
ple
(A
cer
gri
seu
m)
(!h
uja
co
mbi
ned
occi
den5
1tal
is)
Th
rea
d le
af C
ypre
ss (
Cha
mae
cypa
ris
pis
ifera
'Fili
fera
'}
Ced
ar
(Jhu
ja
18
Se
ntin
el C
olu
mn
ar
pine
(P
inus
nig
ra 's
en
tin
el')
48
oc
cide
ntal
is)
com
bine
d 3m
Ced
ar
Pic
ea o
mo
rika
(S
erbi
an s
pru
ce)
(Jhu
ja
19
49
occi
dent
a!is
) co
mbi
ned
3m
Ced
ar
(Ih
uja
18
50
oc
cide
ntal
is)
com
bine
d 3m
C
edar
(T
huja
51
oc
cide
ntal
is)
10
2m
Ced
ar
(Jhu
ja
26
52
occi
dent
alis
) co
mbi
ned
4.4m
C
edar
(I
hu
ja
66
53
occi
dent
alis
) co
mbi
ned
4.4m
F
ig
40
54
(f_i
cus
se,.)
co
mbi
ned
3m
Win
dmil
l pa
lm
(Tra
chyc
arpu
s 55
(p
rtun
ei)
21
3m
Lil
ac
28
56
(Syr
ingp
p_.
) co
mbi
ned
5m
Che
rry
29
57
(Pru
nus
sp.)
co
mbi
ned
5m
Ced
ar
(Jhu
ja
22 p
er
58
occi
dent
afis
) surve~
2m
Che
rry
59
(PrU
JlU
S se
,.)
27
4m
Lil
ac
65 p
er
60
(Syr
in!(
a sp
.)
surv
ey
3m
Sui
tabl
e R
epla
cem
ent T
ree
Spe
cies
Pur
ple
Fo
un
tain
Eur
opea
n B
eech
(F
agus
syl
vatic
a 'P
urp
le F
ou
nta
in')
Japa
nese
Tre
e L
ilac
'Ivo
ry S
ilk' {
Syr
inga
re
ticu
late
'Iv
ory
Silk
')
Japa
nese
ma
ple
(A
cer
pa
lma
tum
sp.
)
Per
sian
Iro
nw
oo
d (
Pa
rro
tia p
ersi
ca)
Ste
wa
rtia
{S
tew
art
ia p
seu
do
cam
elli
a]
Gin
kgo
'Pri
nce
ton
Se
ntr
y' (
Gin
kgo
biJo
ba '
Pri
nce
ton
Se
ntr
y'}
Dik
's W
ee
pin
g C
ypre
ss (
Cha
mae
cypa
ris
law
son
ian
a 'D
ik's
We
ep
ing
'}
Ser
vice
berr
y (A
me
lan
chie
r x
gra
nd
if/o
ra 'A
utu
mn
Bri
l!anc
e')
Ori
en
tal D
og
wo
od
(C
omus
kou
sa)
Pag
e 37
of3
8
Page
38
of3
8
CNCL - 225
rp . -· C1ty of
Richmond
ATTACHMENT 6
Rezoning Considerations Development Applications Department
6911 No. 3 Road, Richmond, BC V6Y 2C1
Address: 10231,10251,10351 I 10371 I 10391 I 10395 and 10397 No. 2 Road File No.: RZ 17-794300
Prior to final adoption of Richmond Zoning Bylaw 8500, Amendment Bylaw 10088, the developer is required to complete the following: 1. Consolidation of all the lots into one development parcel (which will require the demolition ofthe existing dwellings).
2. Approximately 0.09 m road dedication along the entire No. 2 Road frontage to accommodate a new 1.5 m wide treed/grassed boulevard and a new 1.5 m wide concrete sidewalk; exact width is to be confirmed with survey information to be submitted by the applicant.
3. Registration of a statutory right-of-way (SR W), and/or other legal agreements or measures; as determined to the satisfaction of the Director of Development, over the entire area of the proposed entry driveway from No.2 Road and the internal nmih-south manoeuvring aisle, in favour of future residential developments to the nmih and south. Language should be included in the SR W document that the City will not be responsible for maintenance or liability within the SRW and that utility SRW under the drive aisle is not required.
4. Registration of a cross-access easement agreement over the garbage/recycling/organic waste collection facility (design as per Development Permit for 10231,10251,10351,103 71,10391,10395 and 10397 No. 2 Road), in favour of the future residential (townhouse) development at 10211 No.2 Road, allowing access to/from the garbage/recycling/ organic waste collection facility at the development site.
5. Registration of a flood indemnity covenant on title.
6. Registration of a legal agreement on Title to ensure that Registration of a legal agreements on Title or other measures, as determined to the satisfaction of the Director of Development, to ensure that:
a) No final Building Permit inspection is granted until four secondary suites are constructed on site, to the satisfaction of the City in accordance with the BC Building Code and the City's Zoning Bylaw.
b) The secondary suites cannot be stratified or otherwise held under separate title.
7. Registration of a legal agreement on title identifYing that the proposed development must be designed and constructed to meet or exceed EnerGuide 82 criteria for energy efficiency and that all dwellings are pre-ducted for solar hot water heating. Language should be included in the legal agreement that if an acceptable Building Permit application for the proposed development is not submitted to the City by December 31, 2019, the proposed development would be subject to the Energy Step Code requirements expected to be in place at the time of the proposed project's Building Permit application.
8. Submission of a Contract entered into between the applicant and a Cetiified Arborist for supervision of any on-site works conducted within the tree protection zone of the trees to be retained on the neighbouring propetiies. The Contract should include the scope of work to be undetiaken, including: the proposed number of site monitoring inspections, and a provision for the Arborist to submit a post-construction assessment report to the City for review.
9. Submission of a Tree Survival Security to the City in the amount of $1,000 for the Mountain Ash tree (specifically tag# 26) located at the southwest corner of the site to be retained on site. No Tree Survival Security will be returned until the post-construction assessment report, confirming the protected trees survived the construction, prepared by the Arborist, is reviewed by staff.
10. City acceptance of the developer's offer to voluntarily contribute $7,500.00 to the City's Tree Compensation Fund for the planting of 15 replacement trees within the City. If additional replacement trees (over and beyond the 3 7 replacement trees as proposed at the rezoning stage) could be accommodated on-site (as determined at Development Permit stage), the above cash-in-lieu contribution would be reduced in the rate of$500 per additional replacement trees to be planted on-site.
11. City acceptance of the developer's offer to voluntarily contribute $50,000.00 towards the future upgrade of the special crosswalk at the intersection of No.2 Road and Goldsmith Drive.
12. Contribution of $25,000.00 in-lieu of on-site indoor amenity space.
Initial: ---
CNCL - 226
- 2 -
13. City acceptance of the developer's offer to voluntarily contribute $8.50 per buildable square foot (e.g. $266,662.53) to the City's Affordable Housing Reserve Fund.
14. City acceptance of the developer's offer to voluntarily contribute $0.85 per buildable square foot (e.g. $26,666.25) to the City's Public Ati fund.
15. Enter into a Servicing Agreement* for the design and construction of frontage improvements. A Letter of Credit or cash security for the value of the Service Agreement works, as determined by the City, will be required as pati of entering into the Servicing Agreement. Works include, but may not be limited to,
Water Works: a) Using the OCP Model, there is 334 Lis of water available at a 20 psi residual at the No 2 Road frontage. Based on
your proposed development, your site requires a minimum fire flow of220 Lis.
b) The Developer is required to:
1. Submit Fire Underwriter Survey (PUS) or International Organization for Standardization (ISO) fire flow calculations to confirm development has adequate fire flow for onsite fire protection. Calculations must be signed and sealed by a Professional Engineer and be based on Building Permit Stage building designs.
ii. Provide an additional hydrant notih of the proposed driveway to meet City hydrant spacing requirements for multi-family land use.
iii. Provide a right-of-way for the water meter. Minimum right-of-way dimensions to be the size of the meter box (from the City of Richmond supplementary specifications)+ any appurtenances (for example, the bypass on W2o-SD) + 0.5 m on all sides. Exact right-of-way dimensions to be finalized via the servicing agreement process.
c) At Developer's cost, the City is to:
i. Cut, cap, and remove the existing water service connections and meters to the development site.
11. Install a new water service connection off the water main on the east side ofNo 2 Road, complete with meter and meter box off. Meter to be located onsite in a right of way.
Storm Sewer Works:
a) The Developer is required to:
1. Provide an erosion and sediment control plan for all on-site and off-site works, to be reviewed as pati of the servicing agreement design.
11. Provide a right-of-way for the proposed inspection chamber. Exact right of way dimensions to be finalized in the servicing agreement review process.
iii. Confirm, by video inspection, the location of the service connection for 10211 No 2 Road and reconnect to the box culveti per Richmond specifications following the removal of the connection serving 10231 No 2 Road. Connection to be done by City forces at Developer's cost.
IV. Remove the existing perimeter drain along the common property line of 10251 and 103 51 No 2 Road. Following the removal of the perimeter drain, developer may apply to the City to discharge the potiion of right-of-way plan 58634 that contained the removed drain. The Developer is responsible to coordinate with BC Hydro, Tel us, Shaw, Fortis BC, and other private utility companies to confirm that there are no existing private utilities within the right of way prior to right of way discharge. Additional rights of ways may be required by those companies if private utilities exist within the City right of way.
b) At Developer's cost, the City is to:
1. Cut, cap, and remove the existing storm service connections to the development site.
ii. Install a new storm service connection complete with inspection chamber to serve the proposed development. Inspection chamber to be located onsite in a right-of-way. Where possible, an existing hole in the box culvert shall be reused.
Initial: ---
CNCL - 227
- 3 -
Sanitary Sewer Works:
a) The Developer is required to not stmi on-site excavation or building construction prior to completion of rear-yard sanitary works by City crews.
b) At Developer's cost, the City is to:
1. Cut, cap, and remove the existing sanitary connections to the development site. The existing inspection chamber at the notihwest corner of the development site (SIC13826) shall be retained to serve 10211 No 2 Road.
ii. Install a new sanitary service connection complete with inspection chamber to serve the proposed development. Where possible, the connection shall be made to a manhole.
Frontage Improvements:
a) No.2 Road Frontage Improvements
1. Sidewalk, boulevard and curb/gutter:
• Remove the existing sidewalk and construct a new 1.5 m wide concrete sidewalk next to the new propetiy line.
• Construct a new 1.5 m wide grass/tree boulevard over the remaining width between the new sidewalk and the existing west curb of No.2 Road.
• The new sidewalk and boulevard are to transition to meet the existing frontage treatments to the north and south of the subject site.
ii. All existing driveways along the No.2 Road development frontage are to be closed permanently. The Developer is responsible for the removal of the existing driveway let-downs and the replacement with barrier curb/gutter, grass/tree boulevard and concrete sidewalk per standards described under Item 1 above.
iii. Consult Engineering on lighting and other utility requirements as pati of the frontage works. There are utility poles that will need to be relocated.
iv. Vehicle Access
• All existing driveways along the No.2 Road development frontage are to be closed permanently. Vehicle access to the subject development is to be provided by a single driveway located on No. 2 Road directly across from Goldsmith Dr. and restricted to right-in/right-out movement only. As pati of the functional road plan, the driveway design showing a raised centre median in the driveway with adequate width to allow for SU9 truck turning movements in and out of the site without crossing the lane lines on No. 2 Rd. is required.
• City design standards for driveways are to be met; however, due to the turn restrictions, the driveway on No.2 Rd. will be wider than 7.5m. From the PL the drive aisle width can reduce to 6.7m with a 5:1 taper.
v. The Developer is required to:
• Coordinate with BC Hydro, Telus and other private communication service providers:
o Before relocating/modifying any of the existing power poles and/or guy wires within the propetiy frontages.
o To relocate the existing Hydro poles in conflict with the proposed sidewalk into a right-of-way onsite along the back of the proposed sidewalk.
o To underground overhead service lines.
o To locate/relocate all above ground utility cabinets and kiosks required to service the proposed development, and all above ground utility cabinets and kiosks located along the development's frontages, within the developments site (see list below for examples). A functional plan showing conceptual locations for such infrastructure shall be included in the development design review process. Please coordinate with the respective private utility companies and the project's lighting and traffic signal consultants to confirm the requirements (e.g., statutory right-of-way dimensions) and the locations for the aboveground structures. If a private utility company does
Initial: ---
CNCL - 228
- 4 -
not require an aboveground structure, that company shall confirm this via a letter to be submitted to the City. The following are examples of statutory right-of-ways that shall be shown on the architectural plans/functional plan, the servicing agreement drawings, and registered prior to SA design approval:
• BC Hydro PMT- 4.0 x 5.0 m
• BC Hydro LPT- 3.5 x 3.5 m
• Street light kiosk- 1.5 x 1.5 m
• Traffic signal kiosk- 2.0 x 1.5 m
• Traffic signal UPS - 1.0 x 1.0 m
• Shaw cable kiosk- 1.0 x 1.0 m
• Tel us FDH cabinet- 1.1 x 1.0 m
• Review street lighting levels along the No 2 Road frontage and upgrade as required.
General Items: a) The Developer is required to:
( 1) Not encroach into City rights-of-ways with proposed trees, retaining walls, non-removable fences, or other non-removable structures.
(2) Provide, prior to start of site preparation works or within the first servicing agreement submission, whichever comes first, a preload plan and geotechnical assessment of preload, dewatering, and soil preparation impacts on the existing utilities fronting the development site and provide mitigation recommendations.
(3) Provide a video inspection repoti of the existing sanitary sewer along the west propetiy line prior to stmi of site preparation works or within the first servicing agreement submission, whichever comes first. A follow-up video inspection, complete with a civil engineer's signed and sealed recommendation letter, is required after site preparation works are complete (i.e. pre-load removal, completion of dewatering, etc.) to assess the condition of the existing utilities and provide recommendations to retain, replace, or repair. Any utilities damaged by the pre-load, de-watering, or other ground preparation shall be replaced or repaired at the Developer's cost.
(4) Monitor the settlement at the adjacent utilities and structures during pre-loading, dewatering, and soil preparation works per a geotechnical engineer's recommendations, and report the settlement amounts to the City for approval.
(5) Enter into, if required, additional legal agreements, as determined via the subject development's Servicing Agreement(s) and/or Development Permit(s), and/or Building Permit(s) to the satisfaction of the Director of Engineering, including, but not limited to, site investigation, testing, monitoring, site preparation, dewatering, drilling, underpinning, anchoring, shoring, piling, pre-loading, ground densification or other activities that may result in settlement, displacement, subsidence, damage or nuisance to City and private utility infrastructure ..
Prior to a Development Permit* being forwarded to the Development Permit Panel for consideration, the developer is required to: 1. Complete a proposed townhouse energy efficiency repoti and recommendations prepared by a Certified Energy
Advisor which demonstrates how the proposed construction will meet or exceed the required townhouse energy efficiency standards (EnerGuide 82 or better), in compliance with the City's Official Community Plan.
Prior to a Development Permit* issuance, the developer is required to complete the following: 1. Submission of a Landscaping Security based on 100% of the cost estimate provided by the landscape architect.
Initial: ---
CNCL - 229
- 5 -
Prior to Demolition Permit Issuance, the developer must complete the following requirements: 1. Installation of appropriate tree protection fencing around all trees to be retained as part of the development prior to
any construction activities, including building demolition, occurring on-site.
Note: Should the applicant wish to begin site preparation work after third reading of the rezoning bylaw, but prior to final adoption of the rezoning bylaw and issuance of the Development Permit, the applicant will be required to obtain a Tree Permit and submit landscaping security (i.e. $26,000 in total) to ensure the replacement planting will be provided.
Prior to Building Permit Issuance, the developer must complete the following requirements: 1. Remove the existing perimeter drain along the common property line of 10251 and 103 51 No. 2 Road and apply to
the City to discharge the portion of Right-of-Way Plan 58634 that contained the removed drain prior to Building Permit issuance. The developer will be responsible to coordinate with BC Hydro, Telus, Shaw, Fotiis BC, and other private utility companies to confirm that there are no existing private utilities within the right of way prior to the right of way discharge.
2. Submission of a Construction Parking and Traffic Management Plan to the Transpotiation Department. Management Plan shall include location for parking for services, deliveries, workers, loading, application for any lane closures, and proper construction traffic controls as per Traffic Control Manual for works on Roadways (by Ministry of Transpotiation) and MMCD Traffic Regulation Section 01570.
3. Incorporation of accessibility measures in Building Permit (BP) plans as determined via the Rezoning and/or Development Permit processes.
4. Obtain a Building Permit (BP) for any construction hoarding. If construction hoarding is required to temporarily occupy a public street, the air space above a public street, or any pati thereof, additional City approvals and associated fees may be required as pati of the Building Permit. For additional information, contact the Building Approvals Depatiment at 604-276-4285.
Note:
* •
This requires a separate application.
Where the Director of Development deems appropriate, the preceding agreements are to be drawn not only as personal covenants of the property owner but also as covenants pursuant to Section 219 of the Land Title Act.
All agreements to be registered in the Land Title Office shall have priority over all such liens, charges and encumbrances as is considered advisable by the Director of Development. All agreements to be registered in the Land Title Office shall, unless the Director of Development determines otherwise, be fully registered in the Land Title Office prior to enactment of the appropriate bylaw.
The preceding agreements shall provide security to the City including indemnities, warranties, equitable/rent charges, letters of credit and withholding permits, as deemed necessary or advisable by the Director of Development. All agreements shall be in a form and content satisfactory to the Director of Development.
• Additional legal agreements, as determined via the subject development's Servicing Agreement(s) and/or Development Permit(s), and/or Building Permit(s) to the satisfaction of the Director of Engineering may be required including, but not limited to, site investigation, testing, monitoring, site preparation, de-watering, drilling, underpinning, anchoring, shoring, piling, pre-loading, ground densification or other activities that may result in settlement, displacement, subsidence, damage or nuisance to City and private utility infrastructure.
• Applicants for all City Permits are required to comply at all times with the conditions of the Provincial Wildlife Act and Federal Migratory Birds Convention Act, which contain prohibitions on the removal or disturbance of both birds and their nests. Issuance of Municipal permits does not give an individual authority to contravene these legislations. The City of Richmond recommends that where significant trees or vegetation exists on site, the services of a Qualified Environmental Professional (QEP) be secured to perform a survey and ensure that development activities are in compliance with all relevant legislation.
Signed Date CNCL - 230
City of Richmond
Richmond Zoning Bylaw 8500 Amendment Bylaw 10088 (RZ 17-794300)
Bylaw 10088
10231, 10251, 10351, 10371, 10391, 10395 and 10397 No. 2 Road
The Council of the City of Richmond, in open meeting assembled, enacts as follows:
1. The Zoning Map of the City of Richmond, which accompanies and forms part of Richmond Zoning Bylaw 8500, is amended by repealing the existing zoning designation of the following area and by designating it "Low Density Townhouses (RTL4)".
P.I.D. 003-995-879 Lot 981 Section 36 Block 5 North Range 7 West New Westminster District Plan 58183
and
P.I.D. 004-005-066 Lot 982 Section 36 Block 5 North Range 7 West New Westminster District Plan 58183
and
P.I.D. 003-897-095 Lot 713 Section 36 Block 4 North Range 7 West New Westminster District Plan 58349
and
P.I.D. 004-536-339 Lot 712 Section 36 Block 4 North Range 7 West New Westminster District Plan 58349
and
P.I.D. 001-897-004 Lot 711 Section 36 Block 4 North Range 7 West New Westminster District Plan 58349
and
P.I.D. 003-881-261 Lot 211 Except: Part Subdivided by Plan 58349, Section 36 Block 4 North Range 7 West New Westminster District Plan 48291
and
P.I.D. 004-323-653 Lot 710 Section 36 Block 4 North Range 7 West New Westminster District Plan 58349
2. This Bylaw may be cited as "Richmond Zoning Bylaw 8500, Amendment Bylaw 10088".
CNCL - 231
Bylaw 10088 Page 2
FIRST READING CITY OF
RICHMOND
APPROVED
A PUBLIC HEARING WAS HELD ON by
f; .L. SECOND READING APPROVED
by Director or Solicitor
THIRD READING ~ OTHER CONDITIONS SATISFIED
ADOPTED
MAYOR CORPORATE OFFICER
6257 175 CNCL - 232
City of Richmond
To: Planning Committee
From: Wayne Craig Director of Development
Report to Committee
Date: September 4, 2019
File: RZ 18-839945
Re: Application by Konic Development Ltd. for Rezoning at 4571, 4591, and 4611/4631 Steveston Highway from "Single Detached (RS1/E)" and "Two-Unit Dwellings (RD1 )"to "Low Density Townhouses (RTL4)"
Staff Recommendation
That Richmond Zoning Bylaw 8500, Amendment Bylaw 10081, for the rezoning of 4571, 4591, and 4611/4631 Steveston Highway from "Single Detached (RS 1/E)" and "Two-Unit Dwellings (RD1)" to "Low Density Townhouses (RTL4)," be introduced and given first reading.
) /'---// /~ /a u:.·• c;,r··
. v tl~ c
Wayne( Cr<ti( Director qf Develo ment
WC:jr Att. 6
ROUTED To:
Affordable Housing
6246089
REPORT CONCURRENCE
CONCURRENCE CONCURRENCE OF GENERAL MANAGER
CNCL - 233
September 4, 2019 - 2 - RZ 18-839945
Staff Report
Origin
Konic Development Ltd. has applied to the City of Richmond for permission to rezone 4571, 4591, and 4611/4631 Steveston Highway from the "Single Detached (RS1/E)" and "Two-Unit Dwellings (RD1)" zones to the "Low Density Townhouses (RTL4)" zone, in order to develop 16 townhouse units and one secondary suite with vehicle access from Steveston Highway. A location map and an aerial photo are provided in Attachment 1.
Findings of Fact
A Development Application Data Sheet providing details about the development proposal is provided in Attachment 2.
Subject Site Existing Housing Profile
The subject site contains two single family dwellings and one duplex, all of which would be demolished. The applicant has indicated that all four dwellings were previously owner-occupied.
Surrounding Development
Development immediately surrounding the subject site is generally as follows:
• To the Nmih: single family dwellings fronting Bonavista Drive on lots zoned "SingleDetached (RS1/B)."
• To the South, across Steveston Highway: single family dwellings on lots zoned "SingleDetached (RS 1/B)."
• To the East: a single family dwelling on a lot zoned "Single Detached (RS 1/E)."
• To the West: a single family dwelling on a lot zoned "Single Detached (RS1/E)."
Related Policies & Studies
Official Community Plan/Steveston Area Plan
The subject site is located in the Steveston planning area, and has an Official Community Plan ( OCP) designation of "Neighbourhood Residential." The land use designation in the Steveston Area Plan is "Multiple Family" (Attachment 3). The proposed rezoning is consistent with these designations.
Arterial Road Policy
The subject site is located on an arterial road identified in the Arterial Road Land Use Policy, and has a land use designation of"Arterial Road Townhouses." The proposed rezoning is consistent with this designation.
CNCL - 234
September 4, 2019 - 3 - RZ 18-839945
The proposed development involves three properties with a total frontage of 61.89 m on Steveston Highway, which is consistent with the minimum 50 m frontage suggested for major arterial roads in the Arterial Road Land Use Policy. Future lot consolidation to the east of the subject site would fall short of this minimum, at 48.47 m, however this should not be a barrier to future redevelopment.
Prior to final adoption of the rezoning bylaw, the applicant is required to grant a Statutory Rightof-Way for Public Rights-of-Passage across the entire drive aisle, which would allow future developments to the east and west the option to share the driveway access to Steveston Highway.
Affordable Housing Strategy
As per the City's Affordable Housing Strategy, townhouse rezoning applications are required to provide a cash-in-lieu contribution of$8.50 per buildable square foot towards the City's Affordable Housing Reserve Fund. The applicant proposes to make a cash-in-lieu contribution of $164,798, which is consistent with the Affordable Housing Strategy.
Public Art Program Policy
The applicant will be participating in the City's Public Art Program by making a voluntary contribution to the City's Public Art Reserve fund for City-wide projects on City lands. Since this rezoning was received in 2018, the applicable rate for the contribution is $0.85 per buildable square foot; for a total contribution in the amount of $16,480. This voluntary contribution is required to be submitted to the City prior to final adoption of the rezoning bylaw.
Floodplain Management Implementation Strategy
The proposed redevelopment must meet the requirements of the Richmond Flood Plain Designation and Protection Bylaw 8204. Registration of a flood indemnity covenant on Title is required prior to final adoption of the rezoning bylaw.
Public Consultation
A rezoning sign has been installed on the subject property. Staff have not received any comments from the public about the rezoning application in response to the placement of the rezoning sign on the property.
Should the Planning Committee endorse this application and Council grant 1st reading to the rezoning bylaw, the bylaw will be forwarded to a Public Hearing, where any area resident or interested pmiy will have an opportunity to comment. Public notification for the Public Hearing will be provided as per the Local Government Act.
Analysis
Built Form and Architectural Character
The applicant proposes nine three-storey townhouse units and seven two-storey townhouse units arranged on an L-shaped central drive aisle. Conceptual development plans are included in Attachment 4.
CNCL - 235
September 4, 2019 - 4 - RZ 18-839945
The proposed site layout consists of:
• two three-storey buildings, containing nine three-storey units and one two-storey unit, for a total often units, fronting Steveston Highway; and
• tlu·ee two-storey buildings, containing a total of six units, along the north end of the site.
The two proposed buildings fronting Steveston Highway each contain five units. Secondary eaves break up the vertical massing on the first and second storeys, and projecting gable ends highlighting the unit entries. Roof gables framing the upper storey windows and decorative elements pm1ray a strong traditional residential character. A secondary suite is proposed to be located in Unit 102.
The three proposed buildings at the rear of the site each contain two two-storey townhouse units in order to present a gradual transition to the adjacent single family neighbourhood. These building include similar architectural details as those on Steveston Highway, including secondary eaves above the first storey and use of gable ends to frame upper storey windows. Unit 111 is proposed to be a convertible unit. The provision of a second convertible unit will be included in the Development Permit review process.
Further refinement of the site plan, architectural character, and accessibility features will occur through the Development Permit process.
Variance Requested
The proposed development is generally in compliance with the "Low Density Townhouses (RTL4)" zone in Richmond Zoning Bylaw 8500, with the exception of a variance to decrease the front yard setback from 6.0 m to 4.92 m. The building face would be approximately 8.72 m from back of curb.
Staff is supportive of this variance as the shift in building massing towards Steveston Highway is a direct result of providing a 6.0 m rear yard setback to the adjacent single family properties. In addition to providing a sensitive interface with the adjacent properties, the deeper setback allows for an existing row of off-site trees to be retained.
Amenity Space
The applicant is proposing a cash contribution in-lieu of providing the required indoor amenity space on site, at the applicable rate established in the OCP (i.e. $1 ,600/unit for applications received prior to February 28, 2019). The total cash contribution for this 16-unit townhouse development is $25,600.
A common outdoor amenity space is proposed at the nm1hwest end of the site, directly across from the entry drive aisle. The size and dimensions of the proposed outdoor amenity space are consistent with the OCP. The proposal includes landscaping, seating, and a large play structure suitable for children. Further refinement of the common outdoor amenity space will occur through the Development Permit process.
CNCL - 236
September 4, 2019 - 5 - RZ 18-839945
Transportation and Site Access
Vehicle access is proposed from Steveston Highway, via a driveway located at the western edge of the subject site. The driveway crossing will be designed to restrict vehicle movements to a "right in, right out" turning pattern. The applicant is required to register a statutory right-of-way across the entire drive aisle in order to accommodate access to future developments to the east and west of the subject site.
Two parking spaces are provided for each unit consistent with the Zoning Bylaw. Seven of the sixteen units have parking in a tandem arrangement. The applicant is required to register a legal agreement on Title ensuring that the areas used for tandem parking are not converted to habitable space.
The applicant has agreed to provide a $5,700 cash-in-lieu contribution for upgrades to the existing special crosswalk at the Steveston Highway and Bonavista Gate intersection. Upgrades will include LED street light luminaire, intersection lighting, and Audio Pedestrian Signals.
Tree Retention and Replacement
The applicant has submitted a Certified Arborist's Report; which identifies on-site and off-site tree species, assesses tree structure and condition, and provides recommendations on tree retention and removal relative to the proposed development. The Report assesses four bylawsized trees on the subject property, six trees on a neighbouring property, and two street trees on City property.
The City's Tree Preservation Coordinator has reviewed the Arborist's Repmi and supports the Arborist's findings, with the following comments:
• Four trees (Tag# 927, 928, 929, and 930) located on the development site have either been historically topped, or exhibit structural defects such as cavities at the main branch union and co-dominant stems with inclusions. As a result these trees are in poor condition and are not good candidate for retention. Remove and replace.
• One Cedar windrow (Tag# NO 1) comprised of six trees located on an adjacent prope1iy to the north of the development site is to be retained and protected. Provide tree protection as per City of Richmond Tree Protection Information Bulletin Tree-03.
• Replacement trees should be specified at 2:1 ratio as per the OCP.
Parks staff have reviewed the Arborist's Report and support the Arborist's finding, with the following comments:
• One Black locust tree (Tag# COl) and one Western red cedar tree (Tag# C02) are in poor condition and have been topped to accommodate the overhead hydro lines. Removal is recommended. Replacement boulevard trees to be planted through the Servicing Agreement for frontage works.
• In addition to new trees planted through the Servicing Agreement, the developer is required to contribute $2,600 to the City's Tree Compensation Fund for the removal of these two trees.
CNCL - 237
September 4, 2019 - 6 - RZ 18-839945
Tree Protection
Six trees (Tag #NO 1) on a neighbouring property are to be retained and protected. In addition, a Cedar hedge located on a neighbouring property to the west of the subject site will be retained and protected. The applicant has submitted a tree protection plan showing the trees to be retained and the measures taken to protect them during development (Attachment 5). To ensure that the trees identified for retention are protected at development stage, the applicant is required to complete the following items:
• Prior to final adoption of the rezoning bylaw, submission to the City of a contract with a Ce1iified Arborist for the supervision of all works conducted within or in close proximity to tree protection zones. The contract must include the scope of work required, the number of proposed monitoring inspections at specified stages of construction, any special measures required to ensure tree protection, and a provision for the arborist to submit a postconstruction impact assessment to the City for review.
• Prior to demolition of the existing dwelling on the subject site, installation of tree protection fencing around all trees to be retained. Tree protection fencing must be installed to City standard in accordance with the City's Tree Protection Information Bulletin Tree-03 prior to any works being conducted on-site, and remain in place until construction and landscaping on-site is completed.
Tree Replacement
The applicant wishes to remove four on-site trees (Trees# 927-930). The 2:1 replacement ratio would require a total of eight replacement trees. The applicant has proposed to plant 21 trees on the development site. The required replacement trees are to be of the following minimum sizes, based on the size of the trees being removed as per Tree Protection Bylaw No. 8057.
No. of Replacement Trees I Minimum Caliper of Deciduous I Minimum Height of Coniferous Replacement Tree Replacement Tree
6 11 em 5.5 m
2 10 em 6m
In addition to the replacement trees planted on-site, the applicant will contribute $2,600 to the City's Tree Compensation Fund for the two City-owned trees being removed.
BC Energy Step Code
On July 26, 2018, Council adopted BC Energy Step Code requirements for all new residential developments. The proposed development consists of townhouses that staff anticipates would be designed and built in accordance with Part 9 of the BC Building Code. As such, this development would be expected to achieve Step 3 of the Energy Step Code for Part 9 construction (Climate Zone 4).
CNCL - 238
September 4, 2019 - 7 - RZ 18-839945
Existing Legal Encumbrances
There are two restrictive covenants registered on Title of 461114631 Steveston Highway. One covenant (RD85670) reserves a p01iion of the property for future lane construction by the City. This covenant was secured as a condition of the development of several prope1iies in 1979, and it was the intent at the time for a rear lane to be established from Ransford Gate and Bonavista Gate. However, the land use designation was revised on December 19, 2016, to allow A1ierial Road Townhouses with vehicle access from Steveston Highway. As the City is no longer pursuing a rear lane in this location the covenant should be discharged prior to adoption of the rezoning bylaw.
The second covenant (BF506485) restricts the property to a two-unit dwelling only. This covenant must be discharged prior to adoption of the rezoning bylaw.
In addition, there are several statutory rights-of-ways (SRW) for utilities registered on the Titles of each prope1iy. These SRWs will not be impacted by the proposed rezoning, and the applicant is aware that encroachment into the SRW areas is not permitted.
Site Servicing and Frontage Improvements
The applicant is required to enter into a Servicing Agreement at Building Permit stage for the design and construction of the required site servicing and frontage improvements, as described in Attachment 6. Frontage improvements include, but may not be limited to, the following:
• Removal of existing sidewalk and replacement with a new 1.5 m concrete sidewalk at the property line and minimum 1.5 m wide landscaped boulevard with street trees behind the existing curb;
• Removal of the existing driveway crossings and replacement with the frontage works described above; and
• Construction of a new driveway crossing designed to provide "right in, right out" access to the site.
Development Permit Application
A Development Permit application is required to be processed to a satisfactory level prior to final adoption of the rezoning bylaw. Further refinements to architectural, landscape, and urban design will be completed as part of the Development Permit application review process, including, but not limited to, the following:
• Compliance with the Development Permit Guidelines for multi-family developments and arterial road townhouses in the OCP.
• Refinement of the proposed building form and architectural character to achieve an engaging streetscape along Steveston Highway.
CNCL - 239
September 4, 2019 - 8 - RZ 18-839945
• Review of the size and species of on-site trees to ensure bylaw compliance and to achieve a mix of coniferous and deciduous species.
• Design ofthe common outdoor amenity space, including choice of play equipment and other features to ensure a safe and vibrant environment for children's play and social interaction.
• Review of accessibility features, including aging-in-place features in all units, and the provision oftwo convertible units.
• Review of a sustainability strategy for the development proposal, including steps to achieve Step 3 ofthe Energy Step Code for Pmi 9 construction (Climate Zone 4).
Financial Impact
This rezoning application results in an insignificant Operational Budget Impact (OBI) for off-site City infrastructure (such as roadworks, waterworks, storm sewers, sanitary sewers, street lights, street trees and traffic signals).
Conclusion
The purpose ofthis application is to rezone 4571, 4591, and 4611/4631 Steveston Highway from the "Single Detached (RS 1/E)" and "Two-Unit Dwellings (RD 1 )"zones to the "Low Density Townhouses (RTL4)" zone, in order to develop 16 townhouse units and one secondary suite with vehicle access from Steveston Highway.
The rezoning application complies with the land use designations and applicable policies contained within the OCP for the subject site. Further review of the project design will be completed as part of the Development Permit application review process.
The list of rezoning considerations is included in Attachment 6, which has been agreed to by the applicant (signed concurrence on file).
It is recommended that Richmond Zoning Bylaw 8500, Amendment Bylaw 10081 be introduced and given first reading.
Jordan Rockerbie Planning Technician Design (604-276-4092)
JR:rg
Attachment 1 : Location Map and Aerial Photo Attachment 2: Development Application Data Sheet Attachment 3: Steveston Area Plan Land Use Map
CNCL - 240
September 4, 2019
Attachment 4: Conceptual Development Plans Attachment 5: Tree Management Plan Attachment 6: Rezoning Considerations
- 9 - RZ 18-839945
CNCL - 241
N 0 c:i
"'
N 0 c:i
"'
City of Richmond
0 .... c:i
"'
RSI/B
co co N (")
1----+--·-f-- RSl/E
1-f--
~]_12.86 , 1?RR ~~ 14.48
0 N c:i ....
._12.00 _____ ~,00 12.00 12.39 12.00 12.00 20.12 15.43 15.43 12.66 12.66
1-
"' "' ~ N N !'- !'-!'- !'- 1.1) 1.1) 1.1) 1.1) .... .... .... .... m 4495 4511 4531 4551 4591
15.43 g_57 12.57 14.48
3 4475 4491
STEVESTON HWY
f---'9-:42 9.42 18.36
4500 4502 4506 9.29 9.29 9.29 9:33·--.---1-2-.50---.---30-.1-5 ---~l
4508 4520 4522 4528 4540 N ~ 0
0 0 "' .._t ~ N
RZ 18-839945
0 "l 0 ....
ATTACHMENT 1
I
1----f-RSI/E- ~
RCH2 l-----
I--RS!/<:: ~ _/
w v .~ 1--RSI/E ·> v -~ 1-"...J RTL4
~<( 'a::: CP2
--- -
JI -----
RTLI
RSII/E
~ <D .... :;:
18.00 ,_ (!)
20.12 .... 1'-c<i co N 0 ,_
28.35 --,_
NN 0)
~'-"' co '\.(') 0 ~~ .....
N
4651 \.(') 10895 1.1) 4611/4631
20.12 --
~ ~ 21.92 10.16 10.16 10.16
~ 4620 4622 4626 c<i
Original Date: 11/21/18
Revision Date: 11/21/18
Note: Dimensions are in METRES
CNCL - 242
City of Richmond
RZ 18-839945 Original Date: 11/21/18
Revision Date :
Note: Dimensions are in METRES
CNCL - 243
City of Richmond
Development Application Data Sheet Development Applications Department
RZ 18-839945 Attachment 2
Address: 4571, 4591, and 4611/4631 Steveston Highway
Applicant: Konic Development Ltd.
Planning Area(s): Steveston ----------------------------------------------------------
Luxor Homes & Developments, Ltd. 0780012 BC Ltd.
Owner: 2517294 Ontario Inc. To be determined Gurpreet Mann Narinder Mann
Site Size (m2): 3,002 m2 No change
Land Uses: Single-family and duplex dwellings Townhouse dwellings
OCP Designation: Neighbourhood Residential No change
Area Plan Designation: Multiple-Family No change
Zoning: Single Detached (RS1/E) Low Density Townhouses Two-Unit Dwellings (RD1) (RTL4)
Number of Units: 2 single-family dwellings 16 townhouse dwellings 1 duplex dwelling 1 secondary suite
Other Designations: Arterial Road Townhouses No change
On Future I Bylaw Requirement I Proposed I Variance Subdivided Lots
Floor Area Ratio: Max. 0.60 FAR 0.60 FAR none permitted
Buildable Floor Area (m\* Max. 1,801 m2 1,799 m2
none permitted (19,388 ft2) (19,373 ft2)
Building: Max. 40% Building: Max. 40% Non-porous Surfaces: Non-porous Surfaces:
Lot Coverage (% of lot area): Max. 65% Max. 65% none Live Landscaping: Live Landscaping:
Min. 25% Min. 25%
Lot Size: N/A 3,000 m2 none
Lot Dimensions (m): Width: 50.0 m Width: 61.89 m Depth: 35.0 m Depth: 45.70 m none
Front: Min. 6.0 m Front: 4.9 m
Setbacks (m): Rear: Min. 3.0 m Rear: 6.01 m Vary front Side (West): 7.05 m yard setback Side: Min. 3.0 m Side (East): 3.05 m
Height (m): 12.0 m 11.97 m none
6246089 CNCL - 244
- 2 -
On Future I Bylaw Requirement I Proposed I
Variance Subdivided Lots
Off-street Parking Spaces -2 (R) and 0.2 (V) per unit
2 (R) and 0.25 (V) per none
Regular (R) I Visitor (V): unit Off-street Parking Spaces -
36 (up to 50% small car) 36 (8 small car) none Total:
Tandem Parking Spaces: Permitted - Maximum of 14, i.e. 38% none 50% of required spaces
Amenity Space- Indoor: Min. 50 m2 or cash-in-lieu Gash-in-lieu ($25,600) none
Amenity Space- Outdoor: Min. 96m2 198.5 m2 none
Other: Tree replacement compensation required for loss of significant trees.
* Preliminary estimate; not inclusive of garage; exact building size to be determined through zoning bylaw compliance review at Building Permit stage.
CNCL - 245
City ofRichmond
Steveston Area Land Use Map
c::::::::J Single-Family
~ Single-Detached/Duplex/Triplex
c::::::::J Multiple-Family
- Commercial
- Public Open Space
Bylaw 9604 2016/12119
Institutional
c=J Conservation Area
Trail
- Steveston Area Boundary
Steveston Waterfront Neighbourhood Boundary
Original Adoption: April 22, 1985 I Plan Adoption: June 22, 2009
ATTACHMENT 3
Steveston Area Plan 9-70
CNCL - 246
lr----------------------------------~~
TOW
NH
OU
SE
DE
VE
LOP
ME
NT
(RZ
18-8
3994
5)
4571
, 45
91,
4611
STE
VE
STO
N H
IGH
WA
Y,
RIC
HM
ON
D,
BC
ISS
UE
D F
OR
RE
ZON
ING
RE
-SU
BM
ISS
ION
20
19-0
8-16
DR
AW
ING
LIS
T A2
.1
BUIL
DING
A F
LOO
R PL
ANS
AR
CH
ITE
CT
UR
AL:
A
22
BU
ILDI
NG B
FLO
OR
PLAN
S A2
.3
BUIL
DING
C, D
. E F
LOO
R PL
ANS
AO.O
CO
VER
SHEE
T A0
.1
COLO
R R
END
ERIN
G-E
YE L
EVEL
STR
EETS
CAPE
VIE
WS
A3.1
C
ON
TEXT
I RU
NNIN
G E
LEVA
TIO
NS
A0.2
CO
LOR
REN
DER
ING
· BIR
Q.E
YE V
IEW
S A
32
BU
ILD
ING
AELE
VATI
ON
S A0
.3
PRO
JEC
T DA
TA &
STA
TIST
ICS
A3.3
BU
ILDI
NG B
ELE
VATI
ON
S A0
.4
SITE
CO
NTE
XT A
ERIA
L IM
AGE
A3.4
BU
ILDI
NG C
ELE
VATI
ONS
AO
.S
SITE
CO
NTE
XT P
LAN
ISTR
EESC
APE
ELEV
ATIO
N A3
.5
BUIL
DING
0 &
E E
LEVA
TIO
NS
A0.6
SI
TE S
URVE
Y PL
AN
A4.1
BU
ILDI
NG S
ECTI
ONS
A
1.1
SITE
I LE
VEL
1 PL
AN
A1.2
SI
TE P
LAN
A.5 1
[Jb
"r r
vps
a 1 '~ (I
!QCI
< 9F
F) P
I:AIJS
A
1.3
FIR
EFIG
HTI
NG
PLA
N A
i,.1,
, t1
tHf +
¥PE
01 I
't£
o..AS.1
I 'ti
R''P
!PE
89 P
b'ttJ
S ,
'Qii.OCo'C''IJ+IQbiD~
A~lt
~li
lT 'P
PE ~: C
OW
FRD
R' E
) PL:
nJS
of i
'"II
X"N
:; C
' (op
e• S
'L61
:1b'
TIBt
J BJ
AGRA
:.'tt.
~i i0
~~~:
;gp '
!AfH
fE' C
I''I
R l:
lf"r"
SP
ES
IFI6
?I
BM
ri5
.Gi
-..s
~
CO
NTA
CT
LIS
T DE
VEL
OPE
R
KON
IC D
EVEl
OPM
ENT
L TO
. 11
35-1
370D
MA
YFia
DPl
AC
E.
RICH
MO
ND B
C, V
FN :Z
E4
CONT
ACT:
KEI
TH L
EUNG
, CEO
PH
ON
E604
-285
-370
0,FA
X60
4-2B
5-J7
02
EMAI
L: K
EITH
@KO
NIC.
CA
AR
CH
ITEC
T M
PERI
ALAR
CHO
ECTU
RE
nos F
RENC
H Sm
EET,
VA
NCO
WER
, BC,
V6P
4V5
CO
NTAC
T: J
lo'.N
G ZH
U,A
RCHI
TECT
AIB
C TE
l:nB
-83U
552
EMA
il: 1
1.\P
ERIA
LARC
HITE
CTUR
E@G
MAL
CO!d
SUR
VEYO
R
J.C.
TAM
& AS
SOCI
ATES
PR
OFE
SSIO
NAL
LAND
SUR
VEYO
RS
1115
-883
3 O
DU
N C
RESC
ENT,
RI
CHM
OND
. BC
VSX
3ZT
CONT
ACT:
JO
HNS
ON
TAM
, B.C
.LS.
TE
L:60
4-21
4-89
28
E-M
AIL:
OFA
CE@
JCTA
M.C
OM
ELEC
TRIC
AL
LAN
DSC
APE
Pt
.ffi L
ANDS
CAPE
ARC
HITE
CTS
CID
Om
SSll.
LCR
EEX
OIW
E BU
RNM
IY B
C V5
C 6G
9 CO
NTAC
T: L
1ARY
CHA
N YI
P, M
BCSL
A I M
CSLA
TE
l:6()¢
..294
..()0
1\
EWJL
: MAR
YC!!P
MGL
ANDS
CAPE
.COM
AR
BD
RIS
T AC
L G
ROUP
ARB
ORT
ECH
CONS
IJl.T
lNG
14
5-12
051
HORS
ESHO
E W
AY
RICH
MO
ND, B
C V7
A 4V
4 CO
NTAC
T: A
ELIC
IA O
TIC
, ARB
ORI
ST
TEL:
6Q4..
813-
3911
?:
6042
7534
84
EMA
il: A
ELIC
LA@
ACLG
ROUP
,CA
CIV
IL
....
....
....
w.~ ..
... ~ ..
--
·~ ..
....
.. .
..... -...
... . ._.
. .... ._
._
Atn
un
nl .
. ~
"""m
,.,.
,. """
"" C
oprr
iJh!
R.o<
m·cd
"'~
"""'
..... -......
... --~-
.... -.....
... .....
... _ ........
........ ._
......... -
...-..
. .. _.
..._ ..
_.,.. ___
.. ..,.._
~..;:::::
::_~~~ .. 7.
."'..:"
'_ ...
,.
I ..
~ ~ .
.... ""
' ..
....
u
. ...
. ~
~-
~ ~:=
ISS
UE
D F
OR
RE
ZON
ING
R
ESU
BMIS
SIO
N
(201
9.()
8-16
)
~- ST
EV
ES
TON
HW
Y T
OW
NH
OU
SE
D
EV
ELO
PM
EN
T FO
R
~ Alh
:::.!l~!?
. >-
-j 45
71,4
51 1\&
:461
1ST
EV
EST
ON
IIW
Y, >
1
,...,
R!CH
I>10
ND.
ac tR
Z 1&
-Al99
4SJ
(J
~II ""
•wm
m ·~'
""""'"~-
I I;;;,
, -"
·" ~
!Dft
lglb
. Sl
.ol
~
~.J
AO
.O
• ~ ~
CORE
CO
NCEP
T CO
NSUl
TING
LTO
. CM
L •
MEC
HANI
CAL
+ SU
RVEY
22
G--26
39 V
IKIN
G W
AY, R
ICHM
OND
V5V
JBT
CO
NTAC
T: B
RUCE
DUF
FY, D
IREC
TOR
TEL:604-24~040. FAA:SM-24~1
EMAI
L:SC
DUFF
V@CO
RECO
NCEP
TCO
NSLA
. TIN
G.C
OM
A1.4
PA
RKIN
G P
LAN
A 1.
5 PR
IVA
TE O
UTD
OO
R A
RE
& O
UTD
OO
R A
ME
NIT
Y A
RE
A O
VE
RLA
Y
A 1.
6 SI
TE C
OVE
RAG
E AR
EA O
VER
LAY
(BU
ILD
ING
& P
ORC
H)
A1.7
D
EV
ELO
PM
EN
T P
OTE
NTI
AL
PLAN
!51•
f!N
[JY
PFB'
P•60;/:BOte~eG~I:Al'leiiB~~·M
h21-~tllf+¥121i i1
api
A c
aL£!
1 •
_,_
b
ifle
l/ Q
IASR
AM
UEW
ENG
INEE
RING
LTD
, EL
ECTR
ICAL
CO
NSU
lTIN
G E
NGIN
EERS
10
6-11
121
HORS
ESHO
E W
AY, R
ICHM
OND
, BC
VTA
5G7
CONT
ACT:
RIC
HAAD
V. U
EW, P
. ENG
. TE
UFA
X:60
4-2n
.J15
7 EW
Jt: R
UEW
ENG
LTD
@Ta
US.
NET
~
AS 3
A !J
MtT
TYP
5 92
AR~ C
ALP
II A
JIQ
M Q
!AG
RAM
CO
VE
R P
AG
E
CNCL - 247
lr--------------------------------~~~
A•Oi
ii'"OCWM~
INTE
J.IO
I
U'fl
iK".
tl
""""
'~
~Jlo<med
.-.....
_, .... ~
......... ,
........ ..
. -.
........
.. ~ .. -a
DIM
n.c
.., .
....
....
-..
. _. .
. __
__
... _
..
. _ .
.....
... w.._
.. -4 ...
....
....
.. _
_._
....
. _-... ..
__
.. ___ .. ..
....,_
=-..
;:::
.·=:
t:-~
.... -..
~:... .. -
-
1
_,_
.
.,..
,...
.,
~·::""
~ ~:it :~
......
., _,.
_
ISS
UE
D F
OR
RE
ZON
ING
R
ES
UB
MIS
SIO
N
(20
19-IJ
B-1
6)
Oon
!Poo
;a
STE
VE
STO
N H
WY
TO
WN
HO
USE
D
EV
ELO
PM
EN
T FO
R
-~
.llh:
:<,!1
!'.lf.
4S71
,4S\
ll ~461
1 ST
EVES
TON
HW
Y,
RIC
HM
ON
D.
IIC tR
Z 1~3994Sl
CO
LOR
REN
DER
ING
#821
7 N
.T.S
. _ ..
L=
A 0.
1 ·
=-_j
CNCL - 248
tr=--------------------------------------------------~~~
I 1
45
88
14
60
I
4620
I
I I
I 10
831
BO
NA
VIS
TA
GA
TE
JlUll
I!LJ!
I lu
ll
Ill llu
l I
I BON~rTA 1
-6~0
N;~I
STA
B~~~
~IST
A I
I I
I II
II I
II II
II II
L___
____
__
I 45
80
I I
I 46
28
4646
46
60
4668
46
86
r--;
:: --
--j
I BON
AV
ISTA
1
I I
I B
ON
AV
ISTA
I B
ON
AV
ISTA
I B
ON
AV
ISTA
I BO
NA
VIS
TA I
BO
NA
VIS
TA
I I
DR
I
I I
L D
R
I D
R
I D
R
I D
R
I D
R
I I
: :
I 10
871
.---
'--r
_j_
__
_ _
__
j _
__
_j
__
__
_ L
__
j---
---
I
4551
S
TEV
ES
TON
1 B
ON
AV
ISTA
" i
GA
TE
! r-----------~1
I
~--------~
4651
S
TEV
ES
TON
I I
~ 1 10
891
1 B
ON
A V
ISTA
G
ATE
I 10
895
I
1 G
ATE
: uf---------~
! II
BO
NA
VIS
TA
I I
I .
I~ I'~
·==
==~~===
-J_
I
: _j_
___
_ j _
__
_j _
____
/ I
--
--
--
--
--
-----::-
__
__
__
_ L
_ ---
----
_ _)
ST
EV
ES
TO
N H
IGH
WA
Y
114.131.\ETER·DISTANCEFROMCENTERUNEOFNEWVEHK:l.EENTIIYTOI~SECTION
---
----
----
----
----
----
--,- z
l
J !;;(! ~I 51 ~I
I .----
--
! [ ,--- ~
r4:2~~-4::-r-
4528
-r-45:0-~-----------1
~TEV
ESTO
N~TE
VEST
ON:S
TEVE
STO~
S
TEV
ES
TON
:
1
:n:n:n:
n ~--~r
u-~:~':
___ ~
~~w
~~--
0:::1
<( ~
------l----,--,---1----,------
4620
1_
__ 46
22
_ ..1
_ 46
26
4628
1
___ 4
66o
: S
TEV
ES
TON
1S
TEV
ES
TON
1 S
TEV
ES
TON
1 STE
VE
STO
N 1
STEVESTON~
: TRI
M:~~GA
TE !ninininin~~
rr9
r --~ --
- 111@
~~~. 9
oNTEXT
_:~~
I LO
CAT
ION
PLA
N
~
4551
I I
BO
NA
VIS
TA :
P
RO
JEC
T S
ITE
I S
TEV
ES
TON
G
ATE
I
A•cwrecrt·~~
llo"
l'El
t10~
Cupyrigbt~ed
......... =.~!
.~~~..:..·:,;.s~~=
......
......
.. , ....
....... ~ ...
......
......
......
......
~"""'"f"""'_
....
.,,_
.,,"
'"""
,,""
...,
..,·
<>
JM1T
>l"
A<
f!>
OA
WIM
"
1
-··
,__
_
~ -;;:
-"""
""""
''"'""
,...,.
."""
'"...,
.,..
.I.L~.!!:!!:!!.
""""
''"'"
""
' u
. "'
-,._
, ...
. ~--·
., ~l
iiii
:ii
ISS
UE
D F
OR
RE
ZON
ING
R
ES
UB
MIS
SIO
N
(201
9-08
-16)
Chn
ll'roi
ocl
STE
VE
STO
N H
WY
TO
WN
HO
US
E
DE
VE
LOP
ME
NT
FOR
J 1 11 ,
~~~~
~~
4S71,45~1
&46
11 S
TEV
ESTO
N H
WY
, R
ICH
MO
ND
, B
C 1
RZ
1 &.S
3994
S)
SIT
E C
ON
TEX
T P
LAN
S
TRE
ES
CA
PE
ELE
VA
TIO
N
-·· #8217
1'=2
0'-0
"
L=
~
o<eA
Lo
r=<
u-u
A
0.5
•
:J
CNCL - 249
~
IL
:::i&
.,;n
.,~
0:
S.R.'w
'. P
lan
5626
4
GEN
ERAL
NO
TES:
1,AG
1NG
INPL
ACEF
EATU
RES
SUC
HAS
"S
TAIR
WaL
HAN
DR
AILS
, SO
UP
BLO
CKI
NG
IN
WAS
HR
OO
M W
ALLS
TO
FAC
!UTA
TE F
UTUR
E G
RAB
aAR
INST
AUAT
ION
BESI
DET
OIL
ET,
6A1H
TUBA
ND
SHO
WER
'AN
D"L
EVER
·TYP
E H
AN
OLE
SFO
RPLU
MBI
NG
F!X
lURE
SAN
OO
OO
R H
AN
DLE
S'W
ILLB
EP
RO
VID
ED
INA
LLU
NIT
S,
Z.U
N!T
111(
TYP
EC
1) I
STH
EC
OI#
ER
TIS
lE
UN
IT.
J.U
NIT
10Z[
TYf'E
A2)
1STH
ELO
CK
.OFf
UN
rT.
~.THEPROJECTW!LLPROVIOEAIRSOURCE
HEAT
PUM
P N
C U
NfT
WIT
H H
RV M
ECH
ANIC
AL
VEt
flllA
TIO
N S
YSTE
M T
O AC
HIEV
E ST
EP C
ODE
REQ
UIRE
MEN
TS.
FOLL
OW
ING
SUS
TAIN
ABLE
FE
ATU
RESW
ILLA
LSO
BEPR
OV
!OED
INTH
E PR
OJE
CT:
(A):
501.1
\R H
OT
WAT
ER R
EADY
REQ
UIRE
MEN
T (8
): EN
ERG
Y ST
AR A
PPUI
<.NC
ES A
ND U
GHT
BU
tBS
(C):
LOW
E D
OUB
LE G
lAZI
NG
WIN
DO
WS
(D):f
'OW
ERD
IJTL
ETIN
PRIV
ATE
GA
RAG
EFO
R CH
ARGI
NG E
LECT
RIC
CARS
5.THEMECHANICALHEATINGANDC~23
SYST
EM {A
IR S
OUR
CE H
EAT
PUM
P SY
STEM
) TO
COM
PLY
WIT
H RE
l.A liV
E RE
QUIR
EMEN
TS It
< BC
BC-Z
01SA
NO
ASH
AAE5
5REG
ARO
ING
THE
STAN
DAR
DS
OF
THER
MAL
CO
MFO
RT.
6.AN
AUTO
INI.T
EO!R
R!G
AT10
NSY
STEM
FOR
Fl
fTU
REO
N-G
O!N
G IM!NTE~NCEW!LL B
E IN
STA
LlE
D. S
EE L
AND
SCAP
E
@
SIT
E I
LEV
EL
1 F
LOO
R P
LAN
S
CA
LE
3/32
~=1'
..0"
~ " ~ ;;
41 ~~
R~m~1~
72
578
579
,r:.-o
~/0'
Woo
de-n
F
ence
,~'"'
Th<r
_...,
,,..,.
,. .....
........
... _, ..
........
. ,_"'
DD
"'l"
""'-'
" ,...,....,.,.,mr=~,~ ...
. , ... w.,r"·'"~''"""'
ISS
UE
D F
OR
RE
ZON
ING
R
ES
UB
MIS
SIO
N
(201
9-08
-16)
CNCL - 250
1: G
ENER
AL
NO
TES:
~~
"\~
S.R.
\1,
Plo
n 56
264
1.A
G!N
GIN
PlA
CE
FEA
TUR
ES
SU
CH
AS
'S
TAIR
WE
lL H
AND
RAI
LS, S
CU
D B
LOC
KIN
G IN
W
ASH
RO
OM
WAU
S TO
FAC
ILIT
ATE
FUTU
RE
GRA
BSA
R!N
STA
lLA
TIO
NSE
S1D
ETO
ILET
, BA
THTU
SAN
DSH
OW
ER"A
ND
'LEV
ER·T
YPE
~g~.
F~~~
~~~~
~~~~
b~N~
~t~~
2.
UN
!T11
1 [T
YPEC
1) I
S TH
E CO
NVER
TIBL
E U
NIT
.
3.U
NIT
10Z(
'T'IP
EA
2) I
STH
ELO
CK
.OFF
UN
IT.
4.TH
EPR
OJE
CTW
ILLP
RO
VlD
EAIR
SOU
RC
E H
EATP
UM
Pf>J
CU
NIT
WIT
HH
RVM
ECH
ANIC
AL
VEN
TilA
TIO
N S
YSTE
M T
O A
CHIE
VE S
TEP
CODE
RE
QUI
REM
ENTS
. FO
LLO
W!N
GSU
STAl
NABL
E FE
ATU
RES
WIL
LALS
OBE
PRO
VID
EOIN
1HE
PRO
JEC
T:
(A):
SOLA
R HO
T W
ATER
REA
DY R
EQUI
REM
ENT
(B);
ENER
GY S
TAR
APPL
IANC
ES A
ND U
GH
T BU
lBS
(C):
LOW
E DO
UBLE
GlA
ZIN
G W
INDO
WS
(D):
POW
ER O
UTLE
T IN
PRI
VATE
GAR
AGE
FOR
CHAR
GING
ELE
CTRI
C CA
RS
S.TH
E M
ECHA
NICA
L HE
ATIN
G A
ND C
OO
UNG
SY
STEM
(AIR
SO
URr.E
HEA
T PU
MP
SYST
EM) T
O
COM
PLY
WIT
H R
ElA
TNE
REQ
UIRE
MEN
TS IN
BC
BC. 2
018
AND
ASH
RAE
55
REG
ARDI
NG T
HE
STAN
DAR
DSO
FTH
ERM
ALC
OM
FOR
T.
S.AN
AVT
OIM
TED
IRR
IGAT
IO~
SYST
EM F
OR
FIJT
UR
EON
-GO
ING
MAI
NTE
NAN
CEW
ILLB
E !N
STAl
lEO
.SEE
LAN
DSC
APE
VAR
IAN
CE
REQ
UIRE
D:
TO A
LLO
W 4
.92M
FRO
NT
YARD
SET
BACK
TO
~
COM
PLY
WIT
H O
CP D
ESIG
~
GUI
DELI
NE
~ ~
@
PLAN
#1
(1
\ S
ITE
P
LAN
IL
~
SC
ALE
3/
32"=
1'..0
"
578
29'-5
118"
[8.9
7Mj
SID
EYAR
DSE
TEAC
KPR
OVI
DEO
-~~~
m~r.
72
579
,'Yo
? "?~
Woo
den
F"en
CI?
58
,?""
.. ::")·
1
-···
""'-
~ ~ ....
..
"""'"
'""""
'"'""
'"'...
.....
u.
.....
]§
[
:'~'
<""
~
.:.. ::
ISS
UE
D F
DR
RE
ZON
ING
R
ES
UB
MIS
SIO
N
(201
9.08
-16)
=-_j
CNCL - 251
lr
~
R
R
R
A
A
T
____
E:_...-
I!Il.1
C<UI
T
IC~l·~-T
''"
-":.f
l?l'_
, _ _I
····
·····''·
~:!:'_~~
--]' I
F"
---=
ffl'!
--~
--
I -"
"fil-1
--~-:
-~
..... :~
-:
u: -~
'
~::1
B
lDG
A
I I I
BU
ILD
ING
A L
EV
EL
1 F
LOO
R P
LAN
A
2.1
I S
CA
LE
1/8"
=1'
-0''
R
R
R
A
A
T
l.Y~'IIC
.IWI
T
14'~1U
2~ ...
T
1 <'-~
'"f•.m~
T
1~<i'W
OUI
______
___ T
I
, '
! -
---
!--
1 I I
I I
I I
-----------------..---------r-----___,....------~--
----
----
----
---t
----
--t-
----
-t--
----
1--
I ll
tH\D
l I
~fUW~
I ~
I
I ~~~~
I !"~
~~ !
~~~~
~ I
3\
BU
ILD
ING
A L
EV
EL
3 F
LOO
R P
LAN
2 B
UIL
DIN
G A
LE
VE
L 2
FLO
OR
PLA
N
A2
.1)
SC
ALE
1/
8"=
1'-0
"
GE
NE
RA
L N
OTE
S:
1. A
GIN
G IN
PLA
CE F
EATU
RES
SUC
H AS
"S
TAIR
WE
ll HA
NDRA
ILS,
SO
LID
BLO
CKIN
G IN
W
ASHR
OO
M W
ALLS
TO
FAC
ILIT
ATE
FUTU
RE
GRA
B BA
R IN
STAL
LATI
ON
BESI
DE T
OIL
ET.
BATH
TUB
AND
SHO
WER
" AND
"LE
VER
-TYP
E HA
NDLE
S FO
R PL
UMBI
NG F
IXTU
RES
AND
DOO
R H
AND
LES"
WIL
L BE
PRO
VIDE
D IN
All U
NITS
.
2.U
NIT
111
(TYP
EC1)
IS
THE
CO
NVE
RTI
BLE
UN
IT.
3. U
NIT
102
(TYP
E A2
) IS
TH
E LO
CK-
OFF
UN
IT.
4. T
HE P
RO
JEC
T W
ILL
PRO
VIDE
AIR
SO
URCE
HE
AT P
UMP
AIC
UN
IT W
ITH
HRV
MEC
HANI
CAL
VEN
TILA
TIO
N S
YSTE
M T
O A
CH
IEVE
STE
P CO
DE
REQ
UIRE
MEN
TS.
FOLL
OW
ING
SUS
TAIN
ABLE
FE
ATUR
ES W
ill A
LSO
BE
PRO
VIDE
D IN
THE
PR
OJE
CT:
(A):
SOLA
R H
OT
WAT
ER R
EADY
REQ
UIR
EMEN
T (B
): EN
ERG
Y ST
AR A
PPLI
ANCE
S AN
D LI
GHT
BU
LBS
(C):
LOW
E DO
UBLE
GLA
ZING
WIN
DOW
S (D
): PO
WER
OU
TLET
IN P
RIVA
TE G
ARAG
E FO
R CH
ARG
ING
ELE
CTR
IC C
ARS
5.TH
E M
ECH
ANIC
AL H
EATI
NG A
ND C
OO
LING
SY
STEM
(AIR
SO
URCE
HEA
T PU
MP
SYST
EM) T
O
CO
MPL
Y W
ITH
REL
ATIV
E R
EQU
IREM
ENTS
IN
BCBC
-201
8 AN
D AS
H RA
E 55
REG
ARDI
NG T
HE
STAN
DARD
S O
F TH
ERM
AL C
OM
FORT
.
SAN
AUT
OM
ATED
IRR
IGAT
ION
SYS
TEM
FO
R FU
TURE
ON-
GO
ING
MAI
NTE
NAN
CE
Will
BE
INST
ALLE
D. S
EE L
AND
SCAP
E @
IJe>
)(;,;
P~..
<mnm
~
·-'""
""'""
"""·
""""
"' .. "·
'""'
"""'"'"~~Uto'""""''"'"''ILrnll
C"l
'yrig
h!R
t:sen
ed
Dim
en,io
lt!'
n..r-"
"'''"""
"'"....
....,_.
..,.....
..,..,,_
..,...,"
'!'""""
"""'
""'""'"""''"""""~~-OOM)TS(">lfDO~WIMl\
"""w
'"'
"'"""
,.""'"
' .U
. ~ w
ail
'"
"'
"'"
"""'"
"""'
,Ll.
_
!:_
.!!!
!:!!
. ,,~
,.. 11
>1
,._.
. ': -;-::
ISS
UE
D F
OR
RE
ZON
ING
R
ES
UB
MIS
SIO
N
(201
9-08
-16)
Clloi.~<O~
STE
VE
STO
N H
WY
TO
WN
HO
US
E
DEV
ELO
PMEN
T FO
R
..1,;h
~.~.~.
?.-4
57
],4
5'l
l &
4611
ST
EV
EST
ON
HW
Y,
RIC
HM
ON
D,
BC tR
Z 18
-!!39
945)
BU
ILD
ING
A F
LOO
R P
LAN
S
l'nl)!
<ltiO
#821
7 1/
B"=
1'-0
" _,.
c ~
SC
ALE
1/
B"=
1'-D
" A
2.1
' =-_
j
CNCL - 252
IL
[I ~
00
c;)
(,;)
(.?)
(,0
(.?)
I ~~-~
-~-IOiq
I lf
-l"~
T
t~.:
O!<Xl!l
T
<C.;:
"[•.:>
."'l
I 13"..
1"1'"'~1
T
BU
ILD
ING
B L
EV
EL
1 F
LOO
R P
LAN
A
2.2
I S
CA
LE
118"
=1'
-0"
00
c;)
(,;)
(.?)
(,0
(,0
I ~~~~
-11'"1
I ... .:-IU
ZI'II
T
""
'll;m
<l
T
, .. """1'""
1'1
I ,r..~
-r-... "'1
T
! -+--
-I i I
I --
----
-+--
-1 I I I I I I I
--~
I
~-~-----~-----~-----~-----~-------L _
_
d -t
----
-i--
---i
----
-i--
---t
----
---t
--1
~1 ~I~ I~
I I
3\
BU
ILD
ING
B L
EV
EL
3 F
LOO
R P
LAN
A
2.2
I S
CA
LE
1/8"
=1'
-0"
00
c;)
(,;)
(.?)
(,0
(,0
T
~~~fl.!~
~~ T
H
".;:-[
U.'l.
!j T
1<".
;:-!Ul~l
T
, .. -"1
·~~~
T
·~.;;"[U
oWJ I
2 B
UIL
DIN
G B
LE
VE
L 2
FLO
OR
PLA
N
A2
.2)
SC
ALE
1/
8"=
1'-0
"
GE
NE
RA
L N
OTE
S:
1. A
GIN
G IN
PlA
CE
FEA
TURE
S SU
CH A
S "S
TAIR
WEL
L HA
NDRA
ILS,
SO
LID
BLO
CKIN
G IN
W
ASHR
OO
M W
ALLS
TO
FAC
ILIT
ATE
FUTU
RE
GRA
B BA
R IN
STAL
LATI
ON
BESI
DE T
OIL
ET.
BATH
TUB
AND
SHO
WER
" AND
'LEV
ER-T
YPE
HAND
LES
FOR
PLUM
BING
FIX
TURE
S AN
D DO
OR
HAN
DLE
S" W
ILL
BE P
ROVI
DED
IN A
LL U
NITS
.
2. U
NIT
111
(TYP
E C1
) IS
THE
CO
NVER
TIBL
E UN
IT.
3. U
NIT
102
(TYP
EA2)
IS
TIHE
LO
CK.Q
FF U
NIT
.
4. T
HE
PRO
JECT
WIL
L PR
OVI
DE A
IR S
OUR
CE
HEA
T PU
MP
NC
UN
IT W
ITIH
HRV
MEC
HAN
ICAL
VE
NTI
LATI
ON
SYS
TEM
TO
AC
HIE
VE S
TEP
CODE
RE
QUI
REM
ENTS
. FO
LLO
WIN
G S
UST
AIN
ABLE
FE
ATUR
ES W
ILL
ALSO
BE
PRO
VIDE
D IN
THE
PR
OJE
CT:
(A):
SOLA
R HO
T W
ATER
REA
DY R
EQU
IREM
ENT
(B):
ENER
GY
STAR
APP
LIAN
CES
AND
LIG
HT
BULB
S (C
): LO
W E
DO
UBL
E G
lAZI
NG
WIN
DO
WS
(D):
POW
ER O
UTL
ET IN
PR
IVAT
E G
ARAG
E FO
R CH
ARG
ING
ELE
CTRI
C CA
RS
5.TH
E M
ECHA
NICA
L HE
ATIN
G A
ND C
OO
LING
SY
STEM
(AIR
SO
UR
CE
HEAT
PUM
P SY
STEM
) TO
CO
MPL
Y W
ITIH
REL
ATIV
E RE
QUI
REM
ENTS
IN
BCBC
-201
8 AN
D AS
H RA
E 55
REG
ARDI
NG T
HE
STAN
DAR
DS
OF
TIHE
RMAL
CO
MFO
RT.
6.AN
AUTO
MAT
ED IR
RIG
ATIO
N S
YSTE
M F
OR
FUTU
RE O
N-G
OIN
G M
AINT
ENAN
CE W
ILL
BE
INST
ALLE
D. S
EE L
ANDS
CAPE
@
~
n.r
......
... ""
'''"
""~'
-"""
'-~_
,..,
,...
,...
,..,
.....
,....,
...
,.,,.,
,.,,..
. .. .
.,..
..,,
A ..
. .._
_tl
<JM
JT""
'HU
OA
W"O
l\
ISS
UE
D F
OR
RE
ZON
ING
R
ES
UB
MIS
SIO
N
(201
9-08
-16)
=-_j
CNCL - 253
lr
~
R
A
A
T
)\".Gt".«n
o~ T
_1
_<:.-;
"f".O
"'I .. T
I
BU
ILD
ING
C L
EV
EL
1 F
LOO
R P
LAN
A2
.:S
SC
ALE
1/
8n=1
'~0"
~ ~'
~ ~
~
tr..r~~Wl
u..;·r
r.oru
1
3 A2.
3
'11T
mH
.115
TY
PEC2
B
UlG
OtE
~~;~
~11~
B
I.OO
O&
€
BU
ILD
ING
D &
E L
EV
EL
1 F
LOO
R P
LAN
S
CA
LE
1/8"
=1 'w
O"
e-
R
A
A
T
, .... ~.EQ
U] I
:~->;>(l'.
O'~I T
'
----
,
I I
' '
I I I I _
j __
__
__
__
__
_ _
2 B
UIL
DIN
G C
LE
VE
L 2
FLO
OR
PLA
N
A2.
3 S
CA
LE
1/8"
=1'
-0"
~ ~
~ ~
~
:t-t
?fl
'..!
l\ll
__
__
__
__:t~_IT:"~-
4 B
UIL
DIN
G D
& E
LE
VE
L 2
FLO
OR
PLA
N
A2.
J S
CA
LE
1/8~
=1'-
0"
GE
NE
RA
L N
OTE
S:
1.AG
!NG
IN P
LACE
FEA
TURE
S SU
CH A
S "S
TAIR
WEL
L HA
NDRA
ILS,
SO
LID
BLO
CKIN
G IN
W
ASHR
OO
M W
ALLS
TO
FAC
ILIT
ATE
FUTU
RE
GRA
B BA
R IN
STAL
lATI
ON
BES
IDE
TOIL
ET,
BATH
TUB
AND
SHO
WER
" AND
"LE
VER
-TYP
E HA
NDLE
S FO
R PL
UMBI
NG F
IXTU
RES
AND
DOO
R HA
NDLE
S" W
ILL
BE P
ROVI
DED
IN A
ll U
NITS
.
2. U
NIT
111
(TY
PE
C1)
1S T
HE C
ON
VER
TIBL
E UN
IT.
3. U
NIT
102
(TY
PE
A2)
1S T
HE L
OCK
-OFF
UNI
T.
4. T
HE P
ROJE
CT W
ILL
PROV
IDE
AIR
SOU
RCE
HEAT
PUM
P NC
UN
IT W
ITH
HRV
MEC
HAN
ICAL
VE
NTI
LATI
ON
SYS
TEM
TO
ACH
IEVE
STE
P CO
DE
REQ
UIR
EMEN
TS.
FOLL
OW
ING
SU
STAI
NAB
LE
FEAT
URES
WIL
L AL
SO B
E PR
OVI
DED
IN T
HE
PRO
JECT
: (A
): SO
LAR
HOT
WAT
ER R
EADY
REQ
UIR
EMEN
T (B
): EN
ERG
Y ST
AR A
PPLL
ANCE
S AN
D LI
GH
T BU
LBS
(C):
LOW
E DO
UBLE
GLA
ZIN
G W
INDO
WS
(D):
POW
ER O
UTL
ET IN
PR
IVAT
E G
ARAG
E FO
R CH
ARG
ING
ELE
CTRI
C CA
RS
5.TH
E M
ECH
ANIC
AL H
EATI
NG A
ND C
OO
LING
SY
SiEM
(AI
R SO
URCE
HEA
T PU
MP
SYST
EM) T
O
COM
PLY
WIT
H RE
LATI
VE R
EQUI
REM
ENTS
IN
BCBC
· 201
8 AN
D AS
HR
AE 5
5 R
EGAR
DIN
G T
HE
STAN
DARD
S O
F TH
ERM
AL C
OM
FORT
.
SAN
AUT
OM
ATED
IRR
IGAT
ION
SYS
TEM
FO
R FU
TURE
ON-
GO
ING
MAI
NTEN
ANCE
WIL
L BE
IN
STAL
LED
. SEE
LAN
DSCA
PE
@ !J
E'>
!BN
"-"'·~
,,...,..,.,,..,".,"'"'·""'"".,.~or.l""'
DUI~I~!..,.U.tclllm."I'IU.O, ..
. Il.
rnll
C"'
'yng
h!lt
o<eJ
'Ied
r..r-•.n""~~•-cmo~-~<"1-~"'
"'""
""'"
"' ..
....
. )A""""'""'!>.nUT""AlEWIAWI~"\
1
-··
··
"' =
-.
.:--
.:=
r..
>uw'
"''"'.,.
...."''"
"'"'"'"
""
u.K~
'""
'""
u.
Ill.
. '1
1-1
=
·---<
., -;;
;;:-'T
iiii:iiO
ISS
UE
D F
OR
RE
ZON
ING
R
ES
UB
MIS
SIO
N
(2D
19-0
8-16
)
Olor
!l'~
>io<
l
STE
VE
STD
N H
WY
TO
WN
HO
US
E
DEV
ELO
PMEN
T FO
R
~fhJ
~f.'
.~~~
4S
71,4
S<JI
&46
11 S
TEV
ESTO
N 1
1\V
Y,
RIC
HM
ON
D.
BC 1
RZ 18..'!39~5)
BUIL
DIN
G C
, D, E
FLO
OR
PLA
NS
_ .. #8
21
7
1/8"
=1"-
0"
A2
.3
' ~
CNCL - 254
lr
~
llil .~ •& I~
I~ •&
.~
BU
ILD
ING
A
SO
UT
H E
LEV
AT
ION
B
UIL
DIN
G B
S
OU
TH
ELE
VA
TIO
N I~ .~
.~
h'! jl ~I ~ lj
li :~
BU
ILD
ING
B
NO
RT
H E
LEV
AT
ION
B
UIL
DIN
G A
N
OR
TH
ELE
VA
TIO
N
A~Cilii1£W~~
IN'!a!O~
C'..o
pyrlg
luJte
;:ent
d
Pim
rn<i
on<
,..,
.rtl
,.,n
i"'K
.,..
..,,
,.""
"o>
l.>
<.H
I'<
" ""
"''"
'"~u
ornm
rn~"
''"'
"""'
'
n..r-""'''"'"'""'.....-P~'.........,~..,..,"'f"""'-"'
""''~"'l"'r""'>K•o.,..,OOM>T""'lfOOA\OI"fh
\-···--··
~• a
-.;;
-=
>
"'"'"'"
''""'""
""'"'"
"'""""
....
....
. E
-;u;
:;;-
~~.,."
"'"
'"" ~ ~ :.
:
ISS
UE
D F
OR
RE
ZON
ING
R
ES
UB
MIS
SIO
N
(201
9-08
-16)
Olo
oll'm
io:l
STE
VE
STO
N H
WY
TO
WN
HO
US
E
DEV
ELO
PMEN
T FO
R
~;l,:;::,p,~~.s
4571
. 45'1
1 &
461
1 ST
EVES
TON
HW
Y.
RIC
HM
ON
D,
BC tl
tZ I
R-'1
3994
5)
CO
NTE
XT I
RU
NN
ING
ELE
VATI
ON
S
Pro)
o!:ll
io.
Sal
!
#821
7 1/
16"=
1'-0
"
L=
A3.
1 ,
:_j
CNCL - 255
lr=
IL
o, ~~~~
~ ~
I§ .I I
38'-1
0"[1
1.84
M[
AD
Dm
ON
AL
SE
TB
AC
K T
O L
:l F
RO
M W
ES
T P
L
BU
ILD
ING
A S
OU
TH E
LEV
AT
ION
~,') B"~:.:DING
A ~~
~-~_I.H
ELE
VA
TIO
N
::3;) ~~~;DING A
':':
:~ST
ELE
VA
TIO
N
AJ,
_ ··
-·1
'-0
"
--------~
29'-5
1/8"
[8.9
7MJ
--~
·um
.mo
tlf"
""\
•rm
mr-
-..
~lj U
ll'l
.ln
..C
:::I
"11<
ll" ---------~
.~,') ~~
~;DI
NGA~
.~lE
LEVA
TION
ISS
UE
D F
OR
RE
ZON
ING
R
ES
UB
MIS
SIO
N
(201
9-08
-16)
CNCL - 256
lr
29'-5
1/4"
[B.9
7M]
~ r-·
~ ~~-t;~
r"
\U!H
11
11
r'\
U:V
Im
~-------
,---
-,:-
----
----
~---
----
hADD
ITIO
NALS
ETBA
CK TO L
3 FR
OM
EA
ST
Pl~~ .g
n24'-7
3/B
"j7.5
0M]
~
~ I
BU
ILD
ING
B S
OU
TH
ELE
VA
TIO
N
SCA
LE
.n B.~
:.~DING
B ~,?.~;H E
LEV
AT
ION
.3"\
~~-~-~DING
B ~~~::ELEVATION
AJ.
J J
"''-"
"'-"'
,~
~~~ ~
~
~?l ~~
'~DI
NG B
~~~:.ELEVATION
-----------~
..........
,:>,;
;~~~
~.·,
=~~.
>.:;
·.~:
A"'
-"H
II">
Cll'
Kb
Jlil
U!O
ft
Copyri~h!Ro.;er.ed
" :.'.
:.":
'~~;
;>,:
;"..
,.~u
':t~
~=,.
., ...
... ~,.
I~"'"''"_
,,_ .
ll ~ .
.....
!S>U<
Df"'"
"'""""
'"'""""
.L
Z.
1U..
lt.o>
'.!>
"""'"
''""
..,...,.
,001
.... "'-~
··~~·
.. -,
..-D
o
ISS
UE
D F
OR
RE
ZON
ING
R
ES
UB
MIS
SIO
N
(201
9-08
-16)
Cillll~ro~
STEV
ESTO
N H
WY
TO
WN
HO
US
E
DE
VE
LOP
ME
NT
FOR
t~lh,1;,<,~~.~
457\
,45'
1\ &
461\
STE
VES
TON
HW
Y,
RIC
HM
ON
D,
BC
iRZ
Jg./1
.'199
45)
BUIL
DIN
G B
ELE
VATI
ON
S
-· #8217 1/
8"=1
'-0"
~
A3.
3
CNCL - 257
~
~ I~ ,~
~----------
'71
}]{"
\
. ~I~
·~•n
C"\
''"'
--u.
;u;
----------~
BU
ILD
ING
C S
OU
TH
ELE
VA
TIO
N
118"
=1·.{
)"
:n ~::
.1:-
DING
C ~~.
~:rH
ELE
VA
TIO
N
§I ~I ~I I
~------
.D ~;
!,!;
DING
C :.~
~~:E
LEVA
TION
~ :::1 r
· ;.1'
I~ ,~ ""'
f.l
-ml 1
1fl
.1tl
L:\
----------~'111lli?
4\ B
UIL
DIN
G C
WE
ST
ELE
VA
TIO
N
:~~;
;,.:
~~:u
fS<=
:~.'
"'""
"'~"
'
ISS
UE
D F
OR
RE
ZON
ING
R
ES
UB
MIS
SIO
N
(201
9-08
-16)
_jJ
CNCL - 258
1--:= I§ E
:~
IL I~ olE
~~
"'·'
"'"'
aQ
~' :!1 ~
,.~~7[\3\llf""""\
~'
11
fl.\
llf"
\
----------~
BU
ILD
ING
D &
E S
OU
TH
ELE
VA
TIO
N
2\
BU
ILD
ING
D &
E N
OR
TH
ELE
VA
TIO
N
,6,J
.4}
SC
AL
E
1/8"
•1'..
(1"
I~ ~~ ~
~' ~I
~ ,
----------~
I'l ~
~~;D
ING
D ~.-~_?S
T E
LEV
AT
ION
~I ~· [i
~----------
4\
BU
ILD
ING
D &
E W
ES
T E
LEV
AT
ION
A
3.4
) S
CA
LE
1/
8"•1
'..(1
"
1-'"'""-~
---u
~ ...,
...
~'"'"'"'"",..,.. ...
....
....
. """
..
..
IU.
;;:;
;:;;
:_:::"
""'
"' ~ ~ :.
::
ISS
UE
D F
OR
REZ
ON
ING
R
ESU
BMIS
SIO
N
(201
9.08
-16)
A3.
5 =-_
j
CNCL - 259
lr=
I~
5 .I
IL
lw
I:Z
: ,::
; I~
LU
10
. ,o
lg:
~---r------~
BU
ILD
ING
D S
EC
TIO
N
SC
ALE
11
8"=1
'-0"
~;') ~~'~DING A~
.~-~
~TIO
N
INT
ER
NA
L D
RIV
EW
AY
wl
:Z:I
::
il
~I
LU
0.
I o
. ---{ft------
'"'!l'
l/£1'
0 L.
L..I
II
•
2')
~~~
~DIN
G B
S~~~ION #
1
~rl
~c~I
,!-D
ING
B .:
~.s:
r10N
#2
'I' ~;, ""
Ll~
I~ --------\-
I I
O•J&f~1J
l'C\
·~ ,~
I,.,
"'-u~=
"""'"
'""""
'""""
"'"""
""
u.u.~
~~~"
""
'""
': :..
:.::
ISS
UE
D F
OR
RE
ZON
ING
R
ES
UB
MIS
SIO
N
(201
9-08
-16)
=-_j
CNCL - 260
,----
--
AC
ER
RU
BR
UM
t;:E
DS
UN
SIT
A
I.IE
tAN
Ctl
iER
xGR
A.N
DIF
lOR
A'A
UT
U>
.!N
8R
IU ..
. NC
E"
AV
l"V
!o\N
BR
ILU
AN
CE
SE
RV
lCE
!!E
RJ\
Y
CO
RN
US
KO
IJS
.A 'C
HIN
EN
SIS
" C
HIN
ES
E K
OU
SA
DO
GW
oO
D
UO
UIO
AI,\
B.O
.RS
TY
RJI
.CIF
LUA
WO
RP
LES
DO
N"
1/',Q
RI'L
ES
DO
NS
WE
fT(';
!Jio
l
SlO
E YA
RD
SET
BAC
K PR
OVI
DED
2.5
1o
10
1T
,BV
SH
FO
RI.
I,!!
&B
11C
... CAl..~I.ISTD
9411
SlO
E YA
RD S
ETSA
CK P
ROVI
DED
~
~ f:
>C
cpyr
'(ll1
1r=
<>
rv<
'd.T
hos<
lr.o
."""
9""'
d<l=
>g<
>!$
""'
pmp<
>!!y
al P
MG
u.~.,.. 1\r
ct."
"CI~
a!'l
d m
oy
no
t bo
o "'prmi<Jt:<'<!or..,..dlcr-•P"')IOcts...tMull~"''
~~=
Su~eC100
-41
8SS
III Cree~ D
"""
Bu
ma
by,
Bm
,.h
Ccl
um
b"'
,V5
C6
G9
p6
04:!
'34-
0011
t6
04
29
4-0
02
2
16
UN
IT T
OW
NH
OU
SE
D
EV
ELO
PM
EN
T
46
11
ST
EV
ES
TO
N H
IGH
WA
Y
RIC
HM
ON
D
LAN
DS
CA
PE
P
LA
N
ll
CNCL - 261
' N
~ !i l ;> ~ 0 ~
P' N
" .... ....I
Hl HI VI ~ ::>
l tic 0 ~
•<. ~~~ i.i K ~ ~ ~ ~
~j! H~ w i Swz ....
J,! o:oo 5~ ~~a
>-c..~ ' , ,
~~e I i ~ ~ i~~ I ~<(
! ~~~ ""~" zt;; ~ i 4)0.!' It ~ - g ~Q~ ~Q
I :!~-+-
"' I
::J
~~' uj ~ I!' I
~
" i ~
I ,_ ' ~I • ~ ~ ~
! ~ ! i
..J
..J
~ " 0 0 ..J Ill z
~ i "'
1---•-----1
l_ CNCL - 262
I S
..;>.V
. P!~ '6
2fr'
c;~ 1
SJ(
.V.
Pla
n
572!
0 ~o
;""'O.
'
-1
--
1.5m
[4
.9ff
J 'i
-J
y
.... :~
..... ~-:
. •
90
"18
'15
"'
<{,"
14
.47
'1
.0.3
<::·
Pl~~5
~21a
0fi
:e
sf,
'~1-, . T
--
-5
78
----~-----
-579--
-1
OFF
SITE
W
INDR
OW
N01
: AR
BOR
IST
MU
ST B
E C
ON
SULT
ED A
ND
ATT
END
ON
-SIT
E F
OR
AN
Y W
ORK
P
RO
POSE
D
OR
CO
NSI
DER
ED
WIT
HIN
THE
ffiE
E P
ROTE
CTIO
N ZO
NE.
PR
UN
ING
TH
E O
FF-S
ITE
ff
iEE
S M
UST
BE
UN
DER
TAKE
N
BY
AN
IS
A CE
RTIF
IED
ARBO
RIS
T W
ITH
DIRE
CTIO
N B
Y T
HE
PRO
JEC
T AR
BOR
IST
AND
C
OM
PLIA
NT
WIT
H AN
SI A
JOO
ST
AND
ARD
S.
EXCA
VATI
ON
AND
R
E-G
RAD
ING
"~~~
~~ ~~~MI~N~~~~:iE M
i:s~ :
E:J[f~%E:~6~R~EJE:PZ.
~~
~~~~~~~---?~~
t--
58o
1 58
1 OF
FSIT
E H
fDG
(S T
O fA
ST:
AN
EX
ISTI
NG
RETA
ININ
G
WAL
L AN
D
GRA
DE
DIFF
EREN
TIAL
R
ESff
iiCT
ROO
TS A
ND
NO
IM
PACT
S TO
TH
ESE
HED
GES
AR
E
EXPE
CTED
FR
OM
TH
E C
ON
Sffi
UC
TIO
N
OF
THIS
DE
VELO
PMEN
T.
LEG
EN
D-T
REE
MA
NA
GE
ME
NT
IN D
EV
ELO
PM
EN
T A
RE
A:
See
ab
..W
repo
r11a
fU
fther
de
lok.
'1-'{f.
. • 18! d
en
ote
s TA
G N
UM
lU: O
f ID
lff
EIE
HC
E
(~tree _
,ven
iOtY
oo
d m
sesY
OC
nt ls
tl
de
no
tes
am
NT
lON
tre
e (p
rote
ctio
n m
eo:s
vres
os sp
edr~
e<~J
de
no
tes
UN
DE
ISttE
nE
E th
at is~ th
em b
ylo
w d
elk
1e
d s
ize.
To
be-
tre
e te
d a
t o
wn
er
dsc
relio
n. If~ c
onsu
lt th
b o
ftlc
& fo
r pn~tKHon
meowres.11tobe~
apennJ!mayberequftdtrommun
lclp
olty.
den
ote
s IE
M.O
VA
L tro
o {T
AG
GE
D T
REE
) (r
t'!U
fid
pci
pe
rmit
or o
pp
rovc
!s m
cv b
e re
QL
ircd
)
OFF
S/T
f H
ED
G[
TO
WES
T:
F.Ff
'l't
tR'-
W.Mf300W'I---'~
-----1r-------
l------.-+-----
---l
X **
de
no
tes H
lGH
IW
: tr
ee-
to b
e ll
tMO
VE
D o
r MO
DIF
IED
1~ t
ree
inve
nto
ry Q
1d
rep
ort
-p
erm
it o
r a
pp
rovc
!s re
qu
i-cd
)
PRO
TEC
T W
ITH
BAR
RIE
R A
S SH
OW
N.
THE
PER
IMET
ER F
ENC
E SH
OU
LD
BE
TE
RMIN
ATED
O
N EA
CH
END
OF
THE
HED
GE
TO
AVO
ID S
IGN
IFIC
ANT
PRU
NIN
G
IMPA
CTS.
'W L D
T
. i ,.c
<!'
c .....
i l~j
:.:
·rrJ
I~~
1.:::0
I
,Y"'
;;--$?
,:'"
I IE
1--J~T
_j
,'!' ...
.
<')
,"}'
~
I 2
.:o"c,
' ,
6 9
.::: "''
"" f
l~
'ic "' ~,-.... -~
;/
~7'
'"' ';)
,
~-.....
~?>.. I'
~>: ... .>
,'?'
1':
~\~~
:"}'
,:~-
I~
.{;.f:
15..
·':yl
-i'
l~R~
G-4
~'')-~
,, C
O;
..,..;.>
0.2~0
_,_,
~
'',,,
I 2
' .·
''
6 9
1'".:;..
.;-·.-:~
·"'- .•.
3"
,~"1
::
~
_,·¥
L D
T
'.~
__ ... >""
'
c'
~:::-
;;-'.I,'•
'-
..... f· ,.
·'
1>
~' .::•
.;e,•i
'•'
,...
......
.. .-
t
3 .....
~ '
... 0
....
~
....
.....~
;
.... -'
... . ....
K,>") ~
fg~g
~
7 2 /.,
.._":!.'
... -·:~/
~~~
·"' ,r?
'"
,·Y.·
.-'-_."::
~~'~ ,'_
V'~
~?
,--: .. ·
Tot
al
Site
Are
at
3,00
2 n
1
,;~"
''·~;:
-
,. ... ~f·
'[_,t<-f
o
' ·~,
,.._...
., ..._
<!?
,k
,........
"r.
,. ... r::
.-'...._c
c
L D
T
,-
-~
-:-"~
_, ·/
......... "
')'
.... ~""!
:>
5 8
2
.. >""'
g~1.
, ,;
;,
•o
'\
io~
.·'" 1
·,"
'<:CP
..: ..._>
""'
._.">
(...
0 ,..
P.C
E:
..
~-~-~
.... r-,>
_,~~
l~v
...... .,__~~· ~
~'§61.~
·-:,.~.3
:-\)~
.. ;-'~''
K,rJ"
::-'1-'
IJ -
_ced
ar
lie'd
ge
.• /'~
'.;,,,
,'_;,'~
,~-
~''9"1.,
,>" __
,'::-~
, .... ~~
,, .•·
.}'~
..... -i-"
to}
'-<:.&
.,
S.R
.V.
'·$-<
' A
cn
~SZ
S..C
... :?'
~
S.R.
V.
~s~0
~
n<:.n
.C
983t
,<II> [' .... ~ !
,.
" ~
>~.;..
.,.
.._'.~1
,n,"i-~
i.:;
;;
0~~
""'
. ..,
.:,:-
~Cn
..... -
.... ~~ c' _, .
.,cJ
::---:/
,"?'" ""<"?;
~;l .. r~ -0
... ~~l[l
o
f;ie
r·l.
;$
73
-
LEG
EN
D-T
RE
E P
RO
TE
CT
ION
:
O=~
c=:~~~~c:~~C::!~n
t.elc
Deno
tes l
OO
T P
IOTE
CTI
ON
ZO
NE
-IP
Z ~ec
:iPe
d b
y pro
fec:l o
tbo
rist
T
Mi1
.1he
cig
nm
cn
t to
r n:n
no
n:c
no
N I
AII
IBS
fdi~ons to~ o
t ~r
un~t
:
de
no
tes
WO
IKIN
G S
PAC
E S
fiiA
Cl-
WSS
O
llse
t fr
om I
!Pl o
s sp
eci
fie
d b
y P
roje
c:t
Arb
ori
st-S
IIE
I w
orts
wit
hin
WSS
re
qu
ies a
ppro
val a
id o
Mil
c ~pcNislon b
y th
e P
roje
ct A
lt)or
lsl
~enotes
SPECIALMlA.SUWre
quired
en
ote
s R
EfE
RE
NC
E f
to
:Jee
pro
tect
ion
sp
ed
liccr
tion
s S
ee I
EP
OI1
or
LOU
for
fu
rth
er
dckl
iiS
. Pro
ject
Arb
Ofis
l to
cfr
cct
or
rnp
!cm
cn
t.
TR
EE
PROTECTION~ D
ET
AL
-S
AI.
FfE
FE
NC
ES M
UST
f)(C
EE
D M
UN
ICIP
AL
STA
ND
AR
DS
N
OT
TO S
CA
LE
Pt.A
SnC
SN
OW
FE
NC
E F
IRM
LY A
FFIX
ED
TO
WO
OD
FEN
CE
PO
ST
S2.
Sm
0.C
. ~
~2X4
Im;n
}WOO
DPOS
T va4
: ......... ,.,.
.... ::.':Z2
:~~"'"'~
:::::::
" ~
.... ...,
" "
" ...
::;;=
" ~
'
Tl.
Ef P
IIO
ncT
ION
ZO
NE
IIE
STR
!CnO
NS
: T
rcm
!h
ot
oro
sp
ccif
ted
to
be
re
toi"
lod
mu
'' 0
0 p
roto
clc
d fr
om
do
ma
go
du
rin
g o
tt pt
.ose
s o
f d
oY
clo
pm
erl
l ret
e te
d w
ort
on
th
o ~te.
My o
cce
n o
r construc~on r
ela
ted
wo
rk w
ith
in t
he
TP
l (C
PZ.
R
PZ a
nd
/or
WS
S)
requ
ifeJ
ad
va
nce
ap
pro
val.
gu
ida
nce
an
d o
n-s
ite d
ire
ctio
n <
X ~upe~ b
y t
he
p
rojo
ct a~
l. G
en
era
l res
tric
tions
In
the
Wl
ore
os
follo
ws:
N
o \O
il d
"?tu
rtxm
ce o
f an
y s
cop
e o
r to
on
y d
ep
th I
Of
cvts
at
fils..
i"ld
v<:f
ng
bu
t n
ot !
imit
ed
to:
tre
nch
iog
. str
ippi
n.J
of
oY
er·
bvr
de
n. b
1Jk
exe
oY
olio
n. l
ilt p
loce
me1
11.
site
Pfe
pol"
Otio
n. g
rad
e
tron
Uiio
ns. topso~ p
lace
me
nt.
ole
..
~or o
pe
rati
on
of
mo
chin
ery
.lfV
d:s
. Ych
idcs
orc
-qu
lpm
cnlji
nci
ud
lng
sm
ol t
rack
rn
och
ine
1.1
kid
)te
en
. li~.
etc
). e
J<C
ePt
O) o
po
rove
d o
nd
di!e
cloe
d b
y th
e p
roje
ct O
lbor
'nl.
on
d s
ub
ject
to
sp
ed
ol m
eosu
reJ.
~ o
l s-o
il. ~o
i..
go
Ye
l. c
orn
tru
ctio
n m
ate
ria
ls. w
mte
mo
tmio
ll. e
tcH
~ 0
1 w
crsl
ing
of
co
ncr
ele
. 1
lucc
o. d
ryw
cll.
po
int o
r oth
er
po
t on
Gol
ly h
crm
lui
ma
teri
els
, ~OficmpolarySIIVC!UfCSO!~CS.
~ ft
ghts
. si!J
riS..
cabl
e-s
or a
rty
oth
er
de
Yice
-ro
re
tain
ed
!Jee
s.
~or c
ulli
ng
of
re-t
aine
d tre
es.. exc~t o
s ap
pro-
o-cd
en
d d
icc
tad
by
th
e p
!ojc
ct
mbo
ri51.
on
d p
erf
orm
ed
by
a q
vo
ffie
d ll
"ee
Jcrv
ice
Crm
em
plo
yin
g IS
A C
ertm
ed A
rbcr
ists
on
d
wor
\:ing
to
""-
'SI A
XO
on
d A
NS
ill3
J S
tond
otds
..
~~~t~j
'"~:;~.,
'':.:·
~-
"''"'' ;
~,,
,,,~.~~~
;:--~·"'
'"'" <
~Ji~:;>:-
-~{.f_
v£.._"ti£!l<_j
.€_Cr>!...J....._~
""'?
Ciut"l"~r!tn
.• "0
."!"
Y ":><
o ... tt<
-'1'!"
""" ~
...,.r;.~
NO
RT
H1
:300
Np
tgn
dw
cp
e:
froj
\hin
g su
ch 0
1 b
ut
no
! lim
ite
d t
o: ir
.slo
aing
re
tain
ing
wol
l1. d
igg
ing
pta
nfl
ng
h
ole
s. p
laci
ng
gro
win
g m
edk.
tm.ln
stc:
€1tlg
irrl
go
llon
or
co
nd
uit
etc
•• e
xce
pt 0
5 o
pp
roY
cO o
r.d
cf
"ecte
d b
y th
e p
roje
ct
orbo
risl
.
' '
s T
E v
E s
T 0
N
H
I
G H
'W A
y
' .
-~ ' ~
TREE
MA
NA
GE
ME
NT
DET
AIL
AP
PE
ND
IX C
: TR
EE M
AN
AG
EM
EN
T D
RA
WIN
G-
SHEE
T 2~
[IDnn
acl
gro
up
.ca
P
RO
JE
CT
: P
RO
PO
SE
DTO
WN
HO
US
ED
EV
ELO
PM
EN
T ...
..,
AD
DR
ES
S:
4571
,459
1,4
611
STEV
ESTO
N H
IGH
WA
Y
;l>
AR
BO
RT
EC
H
CLI
EN
T:
KO
NIC
DE
VE
LOP
ME
NT
g
C 0
N
S
U L
TIN
G
CIT
Y R
EF:
A
CL
FIL
E:
1828
4 7
SUrT
E lA
S-
12
05
1 H
OR
SE
SH
OE
WA
Y,
RIC
HM
ON
D.
BC
V
7A
4V
4
604
27
5 3
48
4
PLO
T SI
ZE:
11"X
17" I R
EV #
: 11
I DA
TE:I
JUN
20
.2
01
9 ~ ~ ....., Vl
CNCL - 263
City of Richmond
Address: 4571, 4591, and 4611/4631 Steveston Highway
ATTACHMENT 6
Rezoning Considerations Development Applications Department
6911 No. 3 Road, Richmond, BC V6Y 2C1
File No.: RZ 18-839945
Prior to final adoption of Richmond Zoning Bylaw 8500, Amendment Bylaw 10081, the developer is required to complete the following: 1. The submission and processing of a Development Permit* completed to a level deemed acceptable by the Director of
Development.
2. Consolidation of all the lots into one development parcel (which will require the demolition of the existing dwellings).
3. Discharge of restrictive covenant RD85670, which reserves a portion of the property for future road construction.
4. Discharge of covenant BF506485, which restricts the property to a two-unit dwelling only.
5. City acceptance of the developer's offer to voluntarily contribute $2,600 to the City's Tree Compensation Fund for the planting of replacement trees within the City.
6. Submission of a Contract entered into between the applicant and a Certified Arborist for supervision of any on-site works conducted within the tree protection zone of the trees to be retained. The Contract should include the scope of work to be unde11aken, including: the proposed number of site monitoring inspections, and a provision for the Arborist to submit a post-construction assessment rep011 to the City for review.
7. Registration of a flood indemnity covenant on title (Area A).
8. Registration of a statutory right-of-way (SRW), and/or other legal agreements or measures, as determined to the satisfaction of the Director of Development, over the entire area of the proposed driveway entry from Steveston Highway and the interior drive aisle, in favour of future residential development to the east and west. Language should be included in the SRW document that is City will not be responsible for maintenance or liability within the SRW area.
9. City acceptance ofthe developer's offer to voluntarily contribute $0.85 per buildable square foot (e.g. $16,480) to the City's public art fund.
1 0. Contribution of $1,600 per dwelling unit (e.g. $25,600) in-lieu of on-site indoor amenity space to go towards development of City facilities.
11. City acceptance of the developer's offer to voluntarily contribute $8.50 per buildable square foot (e.g. $164, 798) to the City's affordable housing fund.
12. Registration of a legal agreement on Title prohibiting the conversion of the tandem parking area into habitable space.
13. Registration of a legal agreement on Title to ensure that the secondary suite cannot be stratified or otherwise held under separate title.
14. City acceptance of a$5, 700 cash contribution towards the upgrade of the existing special crosswalk at the Steveston Highway and Bonavista Gate intersection.
Prior to a Development Permit* being forwarded to the Development Permit Panel for consideration, the developer is required to: 1. Submission of a Landscape Plan, prepared by a Registered Landscape Architect, to the satisfaction of the Director of
Development. The Landscape Plan should:
• comply with the guidelines of the OCP's Arterial Road Policy and should not include hedges along the front prope11y line;
• include a mix of coniferous and deciduous trees; • include the dimensions of tree protection fencing as illustrated on the Tree Retention Plan attached to this report;
and • include the 8 required replacement trees with the following minimum sizes:
Initial: ---
CNCL - 264
- 2 -
No. of Replacement Trees Minimum Caliper of Deciduous Tree Minimum Height of Coniferous Tree
6 11 em 5.5m
2 10 em 6m
If required replacement trees cannot be accommodated on-site, a cash-in-lieu contribution in the amount of $500/tree to the City's Tree Compensation Fund for off-site planting is required.
2. Complete a proposed townhouse energy efficiency repmi and recommendations prepared by a Certified Energy Advisor which demonstrates how the proposed construction will meet or exceed Step 3 of the Energy Step Code for Part 9 construction (Climate Zone 4), in compliance with the Richmond Building Regulation Bylaw 7230.
Prior to Development Permit* being forwarded to Council for issuance, the developer is required to: 1. Deposit of a Landscaping Security based on 100% of the cost estimate provided by the Landscape Architect,
including installation costs and a 10% contingency.
2. Installation of appropriate tree protection fencing around all trees to be retained as pa1i of the development prior to any construction activities, including building demolition, occurring on-site.
Prior to Building Permit Issuance, the developer must complete the following requirements: 1. Submission of a Construction Parking and Traffic Management Plan to the Transpmiation Depa~iment. Management
Plan shall include location for parking for services, deliveries, workers, loading, application for any lane closures, and proper construction traffic controls as per Traffic Control Manual for works on Roadways (by Ministry of Transpmiation) and MMCD Traffic Regulation Section 01570.
2. Incorporation of accessibility measures in Building Permit (BP) plans as determined via the Rezoning and/or Development Permit processes.
3. Obtain a Building Permit (BP) for any construction hoarding. If construction hoarding is required to temporarily occupy a public street, the air space above a public street, or any pa1i thereof, additional City approvals and associated fees may be required as pa1i of the Building Permit. For additional information, contact the Building Approvals Depa~iment at 604-276-4285.
4. Enter into a Servicing Agreement* for the design and construction of engineering infrastructure improvements. A Letter of Credit or cash security for the value of the Service Agreement works, as determined by the City, will be required as pa!i of entering into the Servicing Agreement. Works include, but may not be limited to:
Water Works:
a) Using the OCP Model, there is 714.0 Lis of water available at a 20 psi residual at the Steveston Highway frontage. Based on your proposed development, your site requires a minimum fire flow of 220 Lis.
b) At Developer's cost, the Developer is required to:
(1) Submit Fire Underwriter Survey (PUS) or International Organization for Standardization (ISO) fire flow calculations to confirm development has adequate fire flow for onsite fire protection. Calculations must be signed and sealed by a Professional Engineer and be based on Building Permit Stage building designs.
(2) Review hydrant spacing on Steveston Highway frontage and install new fire hydrants as required to meet City spacing requirements for the proposed land use.
(3) Provide a right-of-way on site for the water meter. Exact right-of-way dimensions to be finalized via the servicing agreement process.
c) At Developer's cost, the City will:
( 1) Cut, cap, and remove existing water service connections along Steveston Highway frontage.
(2) Complete all tie-ins for the proposed works to existing City infrastructure.
Storm Sewer Works:
a) At Developer's cost, the City will:
(1) Cut, cap, and remove existing storm connections at Steveston Highway frontage.
Initial: 6246089
---
CNCL - 265
- 3 -
(2) Install a new storm service connection to serve the proposed development.
Sanitary Sewer Works:
a) At Developer's cost, the Developer is required to:
(1) Not stmi onsite excavation or foundation construction until completion ofrem·-yard sanitary works by City crews.
(2) Install a new sanitary service connection, location to be determined through the Servicing Agreement review process.
b) At Developer's cost, the City will:
(1) Cut and cap at main all existing sanitary connections along prope1iy' s rear-yard.
(2) Complete all tie-ins for the proposed works to existing City infrastructure.
Frontage Improvements:
a) At Developer's cost, the Developer is required to:
6246089
(1) Coordinate with BC Hydro, Telus and other private communication service providers:
(a) To pre-duct for future hydro, telephone and cable utilities along all road frontages.
(b) Before relocating/modifying any of the existing power poles and/or guy wires within the prope1iy frontages.
(c) To underground overhead service I ines.
(2) Locate/relocate all above ground utility cabinets and kiosks required to service the proposed development, and all above ground utility cabinets and kiosks located along the development's frontages, within the developments site (see list below for examples). A functional plan showing conceptual locations for such infrastructure shall be included in the development design review process. Please coordinate with the respective private utility companies and the project's lighting and traffic signal consultants to confirm the requirements (e.g., statutory right-of-way dimensions) and the locations for the aboveground structures. If a private utility company does not require an aboveground structure, that company shall confirm this via a letter to be submitted to the City. The following are examples of statutory right-of-ways that shall be shown on the architectural plans/functional plan, the servicing agreement drawings, and registered prior to SA design approval:
(a) BC Hydro PMT 4.0 x 5.0 m
(b) BC Hydro LPT- 3.5 x 3.5 m
(c) Street light kiosk- 1.5 x 1.5 m
(d) Traffic signal kiosk- 2.0 x 1.5 m
(e) Traffic signal UPS- 1.0 x 1.0 m
(f) Shaw cable kiosk- 1.0 x 1.0 m
(g) Telus FDH cabinet- 1.1 x 1.0 m
(3) Review street lighting levels along all road and lane frontages, and upgrade as required.
(4) Complete the following frontage improvements as per Transp01iation's requirements:
(a) Remove existing sidewalk and replace with a new 1.5 m wide concrete sidewalk at the prope1iy line and a new minimum 1.5 m wide boulevard with street trees;
(b) Removal of existing driveways and replacement with concrete barrier curb/gutter and frontage works as described above; and
(c) Construct a new driveway crossing to the development site to provide right-in/right-out access only.
Initial: ---
CNCL - 266
- 4-
General Items: a) At Developer's cost, the Developer is required to:
6246089
( 1) Provide, prior to stmi of site preparation works or within the first servicing agreement submission, whichever comes first, a preload plan and geotechnical assessment of preload, dewatering, and soil preparation impacts on the existing utilities fronting the development site and provide mitigation recommendations.
(2) Provide a video inspection rep01i of the adjacent existing storm and sanitary sewers prior to stmi of site preparation works or within the first servicing agreement submission, whichever comes first. A follow-up video inspection, complete with a civil engineer's signed and sealed recommendation letter, is required after site preparation works are complete (i.e. pre-load removal, completion of dewatering, etc.) to assess the condition of the existing utilities and provide recommendations to retain, replace, or repair. Any utilities damaged by the pre-load, de-watering, or other ground preparation shall be replaced or repaired at the Developer's cost.
(3) Conduct pre- and post-preload elevation surveys of all surrounding roads, utilities, and structures. Any damage, nuisance, or other impact to be repaired at the developer's cost. The post-preload elevation survey shall be incorporated within the servicing agreement design.
( 4) Monitor the settlement at the adjacent utilities and structures during pre-loading, dewatering, and soil preparation works per a geotechnical engineer's recommendations, and rep01i the settlement amounts to the City for approval.
(5) Submit a proposed strategy at the building permit stage for managing excavation de-watering. Note that the City's preference is to manage construction water onsite or by removing and disposing at an appropriate facility. If this is not feasible due to volume of de-watering, the Developer will be required to apply to Metro Vancouver for a permit to discharge into the sanitary sewer system. If the sanitary sewer does not have adequate capacity to receive the volume of construction water, the Developer will be required to enter into a de-watering agreement with the City to discharge treated construction water to the storm sewer system.
(6) Not encroach into City rights-of-ways with any proposed trees, retaining walls, or other non-removable structures.
(7) Coordinate the servicing agreement design for this development with the servicing agreement(s) for the adjacent development(s), both existing and in-stream (if applicable). The developer's civil engineer shall submit a signed and sealed letter with each servicing agreement submission confirming that they have coordinated with civil engineer(s) of the adjacent project(s) and that the servicing agreement designs are consistent. The City will not accept the 1st submission if it is not coordinated with the adjacent developments. The coordination letter should cover, but not be limited to, the following:
(a) Corridors for City utilities (existing and proposed water, storm sewer, sanitary and DEU) and private utilities.
(b) Pipe sizes, material and slopes.
(c) Location of manholes and fire hydrants.
(d) Road grades, high points and low points.
(e) Alignment of ultimate and interim curbs.
(f) Proposed street lights design.
(8) Enter into, if required, additional legal agreements, as determined via the subject development's Servicing Agreement(s) and/or Development Permit(s), and/or Building Permit(s) to the satisfaction of the Director of Engineering, including, but not limited to, site investigation, testing, monitoring, site preparation, dewatering, drilling, underpinning, anchoring, shoring, piling, pre-loading, ground densification or other activities that may result in settlement, displacement, subsidence, damage or nuisance to City and private utility infrastructure.
Initial: ----
CNCL - 267
- 5 -
Note:
* •
This requires a separate application.
Where the Director of Development deems appropriate, the preceding agreements are to be drawn not only as personal covenants of the property owner but also as covenants pursuant to Section 219 of the Land Title Act.
All agreements to be registered in the Land Title Office shall have priority over all such liens, charges and encumbrances as is considered advisable by the Director of Development. All agreements to be registered in the Land Title Office shall, unless the Director of Development determines otherwise, be fully registered in the Land Title Office prior to enactment of the appropriate bylaw.
The preceding agreements shall provide security to the City including indemnities, warranties, equitable/rent charges, letters of credit and withholding permits, as deemed necessary or advisable by the Director of Development. All agreements shall be in a form and content satisfactory to the Director of Development.
• Additional legal agreements, as determined via the subject development's Servicing Agreement(s) and/or Development Pennit(s), and/or Building Permit(s) to the satisfaction of the Director of Engineering may be required including, but not limited to, site investigation, testing, monitoring, site preparation, de-watering, drilling, underpinning, anchoring, shoring, piling, pre-loading, ground densification or other activities that may result in settlement, displacement, subsidence, damage or nuisance to City and private utility infrastructure.
• Applicants for all City Permits are required to comply at all times with the conditions of the Provincial Wildlife Act and Federal Migratory Birds Convention Act, which contain prohibitions on the removal or disturbance of both birds and their nests. Issuance of Municipal permits does not give an individual authority to contravene these legislations. The City of Richmond recommends that where significant trees or vegetation exists on site, the services of a Qualified Environmental Professional (QEP) be secured to perform a survey and ensure that development activities are in compliance with all relevant legislation.
[signed concurrence on file]
Signed Date
6246089
CNCL - 268
City of Richmond Bylaw 10081
Richmond Zoning Bylaw 8500 Amendment Bylaw 10081 (RZ 18-839945)
4571, 4591, and 4611/4631 Steveston Highway
The Council ofthe City of Richmond, in open meeting assembled, enacts as follows:
1. The Zoning Map of the City of Richmond, which accompanies and forms part of Richmond Zoning Bylaw 8500, is amended by repealing the existing zoning designation of the following area and by designating it "LOW DENSITY TOWNHOUSES (RTL4)".
P.I.D. 002-088-665 The East Half of Lot 69 Section 35 Block 4 North Range 7 West New Westminster District Plan 30342
P.I.D. 003-790-355 Lot 72 Section 35 Block 4 North Range 7 West New Westminster District Plan 32545
P.I.D. 003-752-119 Lot 582 Section 35 Block 4 North Range 7 West New Westminster District Plan 56263
2. This Bylaw may be cited as "Richmond Zoning Bylaw 8500, Amendment Bylaw 10081".
FIRST READING
A PUBLIC HEARING WAS HELD ON
SECOND READING
THIRD READING
OTHER CONDITIONS SATISFIED
ADOPTED
MAYOR CORPORATE OFFICER
6252684
CITY OF RICHMOND
APPROVED
J?--APPROVED by Director or Solicitor
/
CNCL - 269