lgo goudron field summary 11.11

9
1 Trinidad – Goudron ISPC Summary Presenta.on to Shareholders 9 th November 2011

Upload: lgo-energy

Post on 17-Mar-2016

225 views

Category:

Documents


6 download

DESCRIPTION

Summary Presenta.on to Shareholders 9 th November 2011 1   Basin complexity increases, but well understood Goudron Moruga North   Moving progressively eastwards from Icacos Icacos   Ideal area to exploit LGO’s experience and resources   Staying largely onshore   Ic 2 3

TRANSCRIPT

Page 1: LGO Goudron Field Summary 11.11

1

Trinidad – Goudron ISPC Summary Presenta.on to Shareholders 

9th November 2011 

Page 2: LGO Goudron Field Summary 11.11

2

LGO’s Trinidad Footprint 

  Ic 

Newly  acquired leases 

Under nego.a.on 

  Moving progressively eastwards from Icacos 

  Staying largely onshore 

  Basin complexity increases, but well understood 

  Number of commercial opportuniGes 

  Ideal area to exploit LGO’s experience and resources 

Icacos

Moruga North

Goudron

Page 3: LGO Goudron Field Summary 11.11

3

Goudron ‐ Overview 

  OpGon to acquire a Petrotrin Incremental ProducGon Service Contract (IPSC) to the Gourdon Field through Sorgenia InternaGonal BV  

  Field acGve since late 1920’s, 154 wells, >95 wells available, ~30 wells open 

  Comprehensive due diligence, studies and development plan done by Sorgenia 

  ExisGng producGon averages approximately 100 bopd 

  EsGmated P50 Oil in Place 166 mmbbls P1 = 1.9 mmbbls, P1+P2 = 8 mmbbls, P3 = 22 mmbbls, plus ConGngent Resources, plus ExploraGon (Source: Sorgenia) 

  Work‐overs, hydraulic fraccing and new infill wells over a period of 2‐3 years necessary to bring producGon to approximately 1800‐2000 bopd 

  UlGmate potenGal for approximately 20‐30 mmbbls of incremental reserves 

  OpportuniGes for deeper reservoirs, new exploraGon areas, water flood, EOR and gas development, and for improved terms 

Page 4: LGO Goudron Field Summary 11.11

4

Goudron Field – Brief History 

  1927 – Discovered by Trinidad Leaseholders Limited (BriGsh private company) 

  1956 – Acquired by Texaco   Major development phase, 150 wells, hydraulic fraccing 

  1986 – Relinquished to PetroGn   Ligle acGvity and field remains dormant, some studies work 

  2009 (December) – IPSC  awarded to Cameron Oil and Gas Ltd   Restarts field operaGons 

  2011 (February) – OpGon acquired by Sorgenia (in Goudron E&P Limited)   Carried out extensive work incl. temporary installaGon of three PCP 

pumps 

  2011 (September) – Gourdon E&P Limited acquired by LGO   Including all studies, PCP pumps and range of other equipment 

Page 5: LGO Goudron Field Summary 11.11

5

ProducGon StaGon 134, Tanks  

Page 6: LGO Goudron Field Summary 11.11

6

Well GY‐188, 190 Pumping OperaGon 

Page 7: LGO Goudron Field Summary 11.11

7

Well GY‐288 – Natural flow 

Page 8: LGO Goudron Field Summary 11.11

8

•  In Southern Basin three main reservoirs (   ): 

–  Goudron Sands –  Gros Morne 

Sands –  Cruse Sands 

•  Seals are intra‐forma.onal 

•  Source rock (   ) is Cretaceous age, Naparima Hill and Gau.er forma.ons 

Generalised StraGgraphy 

Page 9: LGO Goudron Field Summary 11.11

9

The seismic line D‐4 shows an extensional fault (yellow line).  The  hanging wall is deformed with a roll over.  The depression created by the extensional movement was filled by the Goudron sands (yellow fill).   

The Goudron Fm is deposited in a fluvial marine sejng. 

100 m

Goudron Structural Sejng