2/5
For more than 50 years, CB&I has been a leader in
the design and construction of LNG facilities. CB&I
provides an integrated EPC solution for regasicationfacilities, performing the work from concept to
completion. Our services include conceptual
design, detailed engineering, material procurement,fabrication, project management, construction,
permitting support, commissioning, start-up and
operator training.
More than a century of project management
experience has given us the expertise to developspecialized solutions for our customers. CB&I
designed and built the rst marine LNG storage facility and distribution terminal in the United
States, and over the years, CB&I has developed a number of proprietary processes and technologiesthat benet our LNG customers. C B&I is the only contractor that direct performs both LNG
mechanical and tank work. This direct perform model allows CB&I to control the critical path of LNGprojects, helping to minimize schedule and reduce risk.
With our knowledge of LNG related services, CB&I has the extensive capabilities to meet any
customer need. Our employees are highly skilled in the full scope of design and construction ofLNG regasication terminals.
Our integrated services include:
Local Knowledge Around The Globe
Recognized and respected globally, CB&I has the resources to engineer and construct LNG regasication facilitanywhere in the world. CB&I has designed and built marine import terminals for LNG customers in Puerto Ric
Turkey, Dominican Republic, the Peoples Republic of China, Chile, the UK and the United States.
CB&I can provide complete design, engineering, fabrication and construction of terminal receiving, storage, va
handling and sendout syste ms. Due to our extensive experience in LNG projects, CB&I has an in-depth undersof our customers business.
CB&I has the people and expertise to perform the entire project from start to nish with our own integrated reworldwide. Our in-house operations include procurement oces, fabrication facilities and specialized constru
crews located around the world. Whenever possible, CB&I direct-hires and trains local labor.
Loading and ooading systems
Boil-o and ash vapor handling systems
Storage tanks and secondary containment
Primary and secondary pumping
Regasicati on process systems
Fire/hazard detection and protection
Communication and security-monitori ng
systems
Civil structure and foundations
Process controls
Piping systems and power distribution
mprehensive LNG Regasifcation Solutions
-
7/27/2019 LGN Regasification.pdf
3/5
LNG Regasifcation and Storage Capac
CB&I has provided integrated technology and EPC solutions f
LNG import terminals throughout the world. No job is too bigsmall. Our project experience encompasses a broad scope, ra
from 93 million standard cubic feet per day (MMSCFD) or 2,6
thousand standard cubic meters per day (103Sm3/d) of sendocapacity to more signicantly sized terminals with sendout ca
as high as 2,100 MMSCFD (59,500 10 3Sm3/d). In addition, CB
provided LNG storage tanks for these facilities with capacitie60,000 to 200,000 cubic meters (377,400 to 1,258,000 barrels
-
7/27/2019 LGN Regasification.pdf
4/5
BTU Reduction Process
Imported LNG can contain ethane, pand heavier components, which pre
the gas from meeting quality speci
and compromise interchangeability.CB&Is family of patented BTU reduct
processes address these compositio
and combustion characteristic issuesOur innovative cryogenic processes
completely integrated with the LNG
and regasication facilities and can bdesigned to remove any desired qua
of heavier hydrocarbons, which can be sold or transferred into the marke
BTU reduction process does not con
additional energy beyond what is re
for regasication.
Inlet Air Cooling Loop
A recent and uniquelydeveloped system
technology is the thermal
integration of an LNGterminal with a power
generation plant, improving
both its operating eciencyand capacity. The LNG
terminal recovers some of
the refrigeration from theLNG as it is vaporized to cool
the combustion (i.e., inlet)
air to the power plants gas turbines and other utilitie s. In turn the power plant provides heat to vaporize the The system is designed as a closed loop, exchanging heat and refrigeration between the LNG terminal and the
plant. CB&I has used this technology on integrated receiving terminals in conjunction with power generation of up to 300 MW.
Recondenser Design
Our customized system includes a recondenser that provides an ecientand economical method of managing vapor generated during unloading
and tank boil-o. The recondenser design minimizes capital and
operating costs required to manage gas that vaporizes during variousplant operating scenarios.
B&I has developed innovative LNG solutions that include numerous proprietary processes and designs.
ecent technological advances:
Processes for recondensing boil-o gas more economically
Semi-automatic ultrasonic equipment and test procedures for examining tank welds
CB&Is proprietary recondenser design and technology to manage vapor recovery
Patented BTU reduction processes that are seamlessly integrated into the design of regasication facilities
Patent pending vaporizers that can thermally integrate an LNG terminal with a power generation plant
hese innovations allow us to design and build terminals that provide low total cost of ownership while
nabling our customers to meet quality and safety standards.
LNGInlet Gas-Ethane- Propane-OtherHeavy
Hydrocarbons
TankPumps
Boil-o Gas
PipelineSendoutPumps
OutletDesired LNGCompositionTo SalesPipeline
Boil-o Gas(Optional)
LNGVaporizers
MarketableByproducts- Ethane- Propane- LP G- GasolineLiquidsTo PipelineorStorage
BTU Reduction Process
Technological Innovations
-
7/27/2019 LGN Regasification.pdf
5/5
Corporate Ofce:The Hague, Netherlands
Worldwide Administrative Ofce:The Woodlands, Texas USA
Engineering Solutions
Delivering Results
Concept to Completion
Founded in 1889, CB&I has evolved into an EPC leader providing single-point services for all aspects
of the design and construction of LNG regasication facilities worldwide. Working on a self-performbasis, CB&I delivers solutions that encompass conceptual design, detailed engineering, material
procurement, fabrication, project management, construction, permitting support, commissioning,
start-up and operator training. For more than half a century, CB&I has provided an integrated EPC
solution to the LNG industry.
Since building the rst marine import terminal in the United States in 1971, CB&I has designed and
constructed facilities in Puerto Rico, Turkey, Dominican Republic, the Peoples Republic of China, Chile,
the UK and the United States. With operations, oces and resources worldwide, CB&I has rst-hand
local knowledge necessary to perform an entire project from start to nish around the globe. Over
the years CB&I has also developed a number of proprietary designs and technologies that benet our
LNG customers.
In addition to LNG regasication facilities, CB&I can provide full EPC services for the entire LNG value
chain. We are ready with the experience, people and skills to safely deliver your next LNG project. Visit
us at www.CBI.com.
Only employees, agents, or representatives authorized under and pursuant to written
agreement with CB&I are authorized to distribute this brochure to an actual o
potential client of CB&I. Copyright 20 11 by Chicago Bridge & Iron Company
All rights reserved. Printed in USA. B8650-5