LEVERGING MODELING & SIMULATION TO INFORM
PROGRAM DECISION MAKING
Mr. James Kelly and Mr. Justin Woulfe
F-35 Multi-Mission Capability
Critical to U.S. and Allied Air Dominance for the Next 50 Years
+ +Maneuver at Will Throughout Battlespace Provides Superb Battlespace Awareness Makes Everyone in Battlespace Smarter
Survivable Against World’s Most Sophisticated Threats Now and in the Future
• Stealth◦ Ability to go undetected
Destroy Targets Deep in Enemy Territory
Protect Ground Troops Engaged in Combat
“Knock Down the Door” for Other Platforms
Clear the Skies of Enemy Aircraft
Strategic Attack Close Air Support Suppression/Destruction of Enemy Air Defenses
Air Superiority
• Sensor Fusion◦ Combine many sources of info
• Interoperability◦ Pass vital information and data to
legacy platforms
What’s Different From Legacy Aircraft
F-35 Weapon System Overview
F-35 Program More than Just the Aircraft
F-35AAir Force - 1763
F-35BMarine Corps - 353
F-35CNavy - 273 & Marine Corps - 67
Internal Gun Boom Refueling
1 Program / 3 Variants / 15 Customers / 3,359 AircraftBig, Complicated Program with Significant Allied Participation
StrongerGear & Tailhook
Wingfold & Ailerons
Larger Wing &Tail Area
Basket Refueling
Centerline Gun Pod
3-Bearing Swivel Nozzle
Lift Fan
Roll Posts
Basket Refueling
Conventional Take-off & Landing Short Take-off Vertical Landing Aircraft Carrier Variant
Partners - 168Partners - 464
Air Vehicle
Operational Flight
Program
JSF Reprogram-
mingEnterprise
MissionData File
Full Mission Simulators Threat
DatabaseOff-board Mission Support
FMS – 166*
Autonomic Logistics
InformationSystem
Centerline Gun Pod
* Japan’s latest National Defense Program Guidelines states that Japan will procure an additional 105 F-35s over the next 10+ years. MOU signing Fall 2019; 63 F-35As and 42 F-35Bs, taking the overall total to 147
Performance Modeling Results
• Only 25 of 68 Depot Workloads Established- 28 of 68 By Dec 2018- 6 at <90 Day RCT (Full Demand Repair Rate)
• Extremely high Repair Cycle Time (RCT)1
- Lack of Repair Materiel- Repair Manuals- Equipment, Tooling, & Training
• Resulting in 3,900+ repair parts in backlog
Current State RCT at 180 Days
Future State RCT at 60 Days
NMCM
NMCS
MC
1 RCT = Admin disposition, aircraft removal, shipping, repair, back on shelf
NMCM
NMCS
MC
• Achieve Full Demand Repair Rate- 68 of 68 at <60 Days- No Backlog; Natural Work in Progress- Lack of Repair Materiel- Repair Manuals- Equipment, Tooling, & Training
• OEM Repair – PBLs & MRAs
• 90-Day RCT = 11% increase in MC• 60-Day RCT = 17% increase in MC
• Memorandum from Secretary of Defense, dated 17 Sept 2018, directs a 80% Mission Capable (MC) rate for F-35 by 30 Sept 2019.
• F-35 Enterprise is utilizing a 4 phased approach:• Phase 1: Combat Coded 80% MC; Training 15-18 UTE (monthly) Sept 2019• Phase 2: Combat Coded 80% MC; Improve Training 60% MC Feb 2020• Phase 3: All LRIP 6+ Aircraft to 80% MC Jun 2020• Phase 4: Total Fleet 80% MC Sept 2020
• Current Program spares are funded to a 20% NMCS• 80% MC would require an investment in spares beyond the PBR issue team.
• NMCM is currently ~20%. A reduction in maintenance task length is needed.
• Flying 20% fewer hours reduces cost and allows the program to achieve an 80% MC. Simulator development is key.
F-35 Path to 80% Mission Capable – US Services
Fleet Cumulative MC to Date01 May - 31 Sep 2018
CTOL=F-35ASTOVL=F-35BCV=F-35C
Lockheed Martin • Airframe system configurations (39)• Airframe components Reliability by LCN
(MFHBR/MFHBME/MFHBCF)• Scheduled Inspections/events (PM)• Maintainability by LCN (CM MTTR, PM
MTTR)• Reliability Growth Curves• Maintainability Learning Curves• Airframe components PLT, Condemnation
Rate, DRCT/RTAT
Pratt & Whitney
Rolls-Royce
• Propulsion system configurations (3)• Propulsion Components Reliability by LCN• Maintainability by LCN (CM MTTR) • PLT, DRCT
F-35 Joint Program Office
• DD250 Delivery dates• Depot Flow Plan (modification schedule)
A/C: Aircraft; CM: Corrective Maintenance; DRCT: Depot Repair Cycle Time; LCN: Logistics Control Number; MFHBME: Mean Flight Hours between Maintenance Event; MFHBR: Mean Flight Hour Between Removal; MFHBCF: Mean Flight Hour Between Critical Failure; MTTR: Mean Time To Repair; PLT: Procurement Lead Time;
PM: Preventive Maintenance; RTAT: Repair Turn Around Time;
Complex Analysis Requires Consolidating Multiple Data Sources
Services/ Partners
• Aircraft location• Aircraft utilization• Operational Profiles (Average Sortie
Durations, # of A/C, abort policy…) • Flying Window• Maintenance window
SIMLOX
Course of Action 1: Accelerate Depot Standup Dates
JPO plans most repair lines to be transitioned to
Depots by 2021
Course of Action 2: Optimize Spares to Actual DRCTs and PLTsC/E-Curve Diagram
0.0E9 0.5E9 1.0E9
Life Support Cost
0.97
0.98
0.99
1.00Availability
JPO_ACE_FY25_BlendedRates_actualDRCT with Assets
JPO_ACE_FY25_BlendedRates_defaultDRCT with Assets
226340699
226340699 226340699
0.9881 0.9881
A=0.9881
LSC=226340699
Point: 24 Case: JPO_ACE_FY25_BlendedRates_defaultDRCT with Assets
A=0.9881 LSC=226340699 Point: 24 Case: JPO_ACE_FY25_BlendedRates_defaultDRCT with Assets
Unique P/N Total Qty CostFY19 default DRCT 2069 63355 $ 907,610,231 FY19 actual DRCT 2069 66994 $ 1,256,863,286 FY20 default DRCT 2069 73389 $ 392,361,085 FY20 actual DRCT 2069 76955 $ 394,637,744 FY21 default DRCT 2069 82950 $ 367,845,089 FY21 actual DRCT 2069 87008 $ 423,229,833 FY22 default DRCT 2069 89790 $ 271,041,246 FY22 actual DRCT 2069 94265 $ 311,981,530 FY23 default DRCT 2069 98336 $ 330,545,742 FY23 actual DRCT 2069 103169 $ 378,522,536 FY24 default DRCT 2069 105834 $ 291,494,343 FY24 actual DRCT 2069 111299 $ 349,705,636 FY25 default DRCT 2069 113722 $ 316,682,602 FY25 actual DRCT 2069 119448 $ 356,936,556
TOTAL default DRCT $ 2,877,580,338 TOTAL actual DRCT $ 3,471,877,121 % Increase 21%
Fleet Readiness-By Tail Number Failure Mode Model
System States Rate –Baseline
49.62 %
31.16 %3.73 %
12.91 %
Total over all Systems
Total over all Units
JSF-Joint-Negotiation Model-18-19-v6.WSPD.Utilization.CollectAVA
0 %
20 %
40 %
60 %
80 %
100 %
120 %
Num
be
r o
f S
yste
ms
On Mission
Ready
Awaiting Items
Active PM
Active Repair
System StatesUnits: Total, Systems: Total
49.62 %
31.16 %3.73 %
12.91 %
Total over all Systems
Total over all Units
JSF-Joint-Negotiation Model-18-19-v6.WSPD.Utilization.CollectAVA
0 %
20 %
40 %
60 %
80 %
100 %
120 %N
umb
er
of
Sys
tem
s
On Mission
Ready
Awaiting Items
Active PM
Active Repair
System StatesUnits: Total, Systems: Total
NMCS-MC
MISSION CAPABLE
NMCM-MC
5.71 %
43.5
5 %
32.6
9 %
3.40 %
12.26 %
5.90 %
46.4
8 %
28.62 %
3.67 %
12.84 %
JSF
-Jo
int-
...
JSF
-Jo
int-
...
Total over selected UnitsTotal over all Systems
0 %
20 %
40 %
60 %
80 %
100 %
120 %
Num
ber
of S
yste
ms
On Mission
Mission Assigned
Ready
Awaiting Items
Awaiting Resources
Active PM
Active Repair
System StatesUnits: AMENDOLA - CTOL; BEAUFORT - STOVL; BURLINGTON - CTOL; CHEONGU - CTOL; ..., Systems: Total
++
+
30 40 50 60 70 80 90 100 110 1200
200
400
600
800
1,000
1,200
1,400
1,600
Time [months]
Num
ber
of S
yste
ms
Active Repair
Active PM
Awaiting Resources
Awaiting Items
Ready
Mission Assigned
On Mission
System States
Units: Total, Systems: AF1; AF2; AF3; AF4; AL2; AL3; AL4; AM2; AM3; AM4; AN4; AP4; AS3; AS4...
Baseline production, baseline depot performance, baseline spares package
Mission Capability Rate – Excursion 1
49.62 %
31.16 %3.73 %
12.91 %
Total over all Systems
Total over all Units
JSF-Joint-Negotiation Model-18-19-v6.WSPD.Utilization.CollectAVA
0 %
20 %
40 %
60 %
80 %
100 %
120 %
Num
be
r o
f S
yste
ms
On Mission
Ready
Awaiting Items
Active PM
Active Repair
System StatesUnits: Total, Systems: Total
49.62 %
31.16 %3.73 %
12.91 %
Total over all Systems
Total over all Units
JSF-Joint-Negotiation Model-18-19-v6.WSPD.Utilization.CollectAVA
0 %
20 %
40 %
60 %
80 %
100 %
120 %N
umb
er
of
Sys
tem
s
On Mission
Ready
Awaiting Items
Active PM
Active Repair
System StatesUnits: Total, Systems: Total
NMCS-MC
MISSION CAPABLE
NMCM-MC
5.71 %
43.5
5 %
32.6
9 %
3.40 %
12.26 %
5.90 %
46.4
8 %
28.62 %
3.67 %
12.84 %
JSF
-Jo
int-
...
JSF
-Jo
int-
...
Total over selected UnitsTotal over all Systems
0 %
20 %
40 %
60 %
80 %
100 %
120 %
Num
ber
of S
yste
ms
On Mission
Mission Assigned
Ready
Awaiting Items
Awaiting Resources
Active PM
Active Repair
System StatesUnits: AMENDOLA - CTOL; BEAUFORT - STOVL; BURLINGTON - CTOL; CHEONGU - CTOL; ..., Systems: Total
++
+
Baseline production with depot stand-up and baseline spares package
30 40 50 60 70 80 90 100 110 1200
200
400
600
800
1,000
1,200
1,400
1,600
Time [months]
Num
ber
of S
yste
ms
Active Repair
Active PM
Awaiting Resources
Awaiting Items
Ready
Mission Assigned
On Mission
System States
Units: Total, Systems: AF1; AF2; AF3; AF4; AL2; AL3; AL4; AM2; AM3; AM4; AN4; AP4; AS3; AS4...
Mission Capability Rate - Excursion 2
49.62 %
31.16 %3.73 %
12.91 %
Total over all Systems
Total over all Units
JSF-Joint-Negotiation Model-18-19-v6.WSPD.Utilization.CollectAVA
0 %
20 %
40 %
60 %
80 %
100 %
120 %
Num
be
r o
f S
yste
ms
On Mission
Ready
Awaiting Items
Active PM
Active Repair
System StatesUnits: Total, Systems: Total
49.62 %
31.16 %3.73 %
12.91 %
Total over all Systems
Total over all Units
JSF-Joint-Negotiation Model-18-19-v6.WSPD.Utilization.CollectAVA
0 %
20 %
40 %
60 %
80 %
100 %
120 %N
umb
er
of
Sys
tem
s
On Mission
Ready
Awaiting Items
Active PM
Active Repair
System StatesUnits: Total, Systems: Total
NMCS-MC
MISSION CAPABLE
NMCM-MC
5.71 %
43.5
5 %
32.6
9 %
3.40 %
12.26 %
5.90 %
46.4
8 %
28.62 %
3.67 %
12.84 %
JSF
-Jo
int-
...
JSF
-Jo
int-
...
Total over selected UnitsTotal over all Systems
0 %
20 %
40 %
60 %
80 %
100 %
120 %
Num
ber
of S
yste
ms
On Mission
Mission Assigned
Ready
Awaiting Items
Awaiting Resources
Active PM
Active Repair
System StatesUnits: AMENDOLA - CTOL; BEAUFORT - STOVL; BURLINGTON - CTOL; CHEONGU - CTOL; ..., Systems: Total
++
+
Baseline production with depot stand-up and spares package based on CAPE DRCTs
30 40 50 60 70 80 90 100 110 1200
200
400
600
800
1,000
1,200
1,400
1,600
Time [months]
Num
ber
of S
yste
ms
Active Repair
Active PM
Awaiting Resources
Awaiting Items
Ready
Mission Assigned
On Mission
System States
Units: Total, Systems: Total
Detailed Cost Analysis
Current Path: System States over the FYDP
Jan
2023
Jan
2021
Jan
2022
Jan
2019
Jan
2020
Jan
2024
Jan
2025
49.62 %
31.16 %3.73 %
12.91 %
Total over all Systems
Total over all Units
JSF-Joint-Negotiation Model-18-19-v6.WSPD.Utilization.CollectAVA
0 %
20 %
40 %
60 %
80 %
100 %
120 %
Num
be
r o
f S
yste
ms
On Mission
Ready
Awaiting Items
Active PM
Active Repair
System StatesUnits: Total, Systems: Total
49.62 %
31.16 %3.73 %
12.91 %
Total over all Systems
Total over all Units
JSF-Joint-Negotiation Model-18-19-v6.WSPD.Utilization.CollectAVA
0 %
20 %
40 %
60 %
80 %
100 %
120 %
Num
be
r o
f S
yste
ms
On Mission
Ready
Awaiting Items
Active PM
Active Repair
System StatesUnits: Total, Systems: Total
NMCS-MC
MISSION CAPABLE
NMCM-MC
5.71 %
43.5
5 %
32.6
9 %
3.40 %
12.26 %
5.90 %
46.4
8 %
28.62 %
3.67 %
12.84 %
JSF
-Jo
int-
...
JSF
-Jo
int-
...
Total over selected UnitsTotal over all Systems
0 %
20 %
40 %
60 %
80 %
100 %
120 %
Num
ber
of S
yste
ms
On Mission
Mission Assigned
Ready
Awaiting Items
Awaiting Resources
Active PM
Active Repair
System StatesUnits: AMENDOLA - CTOL; BEAUFORT - STOVL; BURLINGTON - CTOL; CHEONGU - CTOL; ..., Systems: Total
+
+
+
Baseline production with depot stand-up and additional spares from PBR issue team ($482M)
30 40 50 60 70 80 90 100 110 1200
200
400
600
800
1,000
1,200
1,400
1,600
Time [months]
Num
ber
of S
yste
ms
Active Repair
Active PM
Awaiting Resources
Awaiting Items
Ready
Mission Assigned
On Mission
System States
Units: Total, Systems: Total
System States in %
Jan
2023
Jan
2021
Jan
2022
Jan
2019
Jan
2020
Jan
2024
Jan
2025
49.62 %
31.16 %3.73 %
12.91 %
Total over all Systems
Total over all Units
JSF-Joint-Negotiation Model-18-19-v6.WSPD.Utilization.CollectAVA
0 %
20 %
40 %
60 %
80 %
100 %
120 %
Num
be
r o
f S
yste
ms
On Mission
Ready
Awaiting Items
Active PM
Active Repair
System StatesUnits: Total, Systems: Total
49.62 %
31.16 %3.73 %
12.91 %
Total over all Systems
Total over all Units
JSF-Joint-Negotiation Model-18-19-v6.WSPD.Utilization.CollectAVA
0 %
20 %
40 %
60 %
80 %
100 %
120 %
Num
be
r o
f S
yste
ms
On Mission
Ready
Awaiting Items
Active PM
Active Repair
System StatesUnits: Total, Systems: Total
NMCS-MC
MISSION CAPABLE
NMCM-MC
5.71 %
43.5
5 %
32.6
9 %
3.40 %
12.26 %
5.90 %
46.4
8 %
28.62 %
3.67 %
12.84 %
JSF
-Jo
int-
...
JSF
-Jo
int-
...
Total over selected UnitsTotal over all Systems
0 %
20 %
40 %
60 %
80 %
100 %
120 %
Num
ber
of S
yste
ms
On Mission
Mission Assigned
Ready
Awaiting Items
Awaiting Resources
Active PM
Active Repair
System StatesUnits: AMENDOLA - CTOL; BEAUFORT - STOVL; BURLINGTON - CTOL; CHEONGU - CTOL; ..., Systems: Total
++
+
Baseline production with depot stand-up and additional spares from PBR issue team ($482M)
30 40 50 60 70 80 90 100 110 1200 %
10 %
20 %
30 %
40 %
50 %
60 %
70 %
80 %
90 %
100 %
Time [months]
Num
ber o
f Sys
tem
s Active Repair
Active PM
Awaiting Resources
Awaiting Items
Ready
Mission Assigned
On Mission
System States
Units: Total, Systems: Total
30 40 50 60 70 80 90 100 110 1200 %
10 %
20 %
30 %
40 %
50 %
60 %
70 %
80 %
Time [months]
Num
ber o
f Sys
tem
s
Available
Lower Percentile (85.0 %)
Number of Systems Available
Units: Total, Systems: Total
Current Path Mission Capability Rates in %
Jan
2023
Jan
2021
Jan
2022
Jan
2019
Jan
2020
Jan
2024
Jan
2025
Baseline production with depot stand-up and additional spares from PBR issue team ($482M)