leveraging olympic investments at the 2008 beijing olympic park
TRANSCRIPT
Leveraging Investments
From the 2008 Beijing OlympicsAnnie Bidgood
Mercedes HaXinlin HuangRachel WatsonLeah WhitesideAlan Baker YuCory ZimmermanHasan Zuhairy
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
REMEMBER THE OPENING CEREMONY?UNPRECEDENTED SPECTACLE, AN “OUTSTANDING ACHIEVEMENT”
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
BY THE NUMBERSTHE LARGEST GAMES EVER
10,942 athletes
Competing in 302 events
In 31 sports
(All record highs, unlikely to be matched in the future)
Across 37 venues
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
THE BIG SPENDERSHOW DO THE COSTS COMPARE?
As a share of GDP 5% 0.5% 0.7%
Total investment
Per capita $1300 $30 $275
ATHENS BEIJING LONDON
$14B $40B $17B
2004 2008 2012
(ALL FIGURES IN 2012 USD)
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
OLYMPIC INVESTMENTSHOW DO THE COSTS BREAK DOWN?
Venues + Facilities$4 billion
Environmental$10 billion
Transportation$27 billion
$40 billiontotal
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
OLYMPIC INVESTMENTS11 RENOVATED VENUES
Cost: $4 billion total
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
OLYMPIC INVESTMENTS12 NEW VENUES
Cost: $4 billion total
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
OLYMPIC INVESTMENTSA CLOSER LOOK AT THE OLYMPIC GREEN
1½ Kilometer0
Forest Park
Olympic Green
Bird’s NestWater Cube
0 1km
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
OLYMPIC INVESTMENTSPLANNED GREENBELT
0 10km
Olympic Green
Forest Park
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
700,000 Gallons
200,000 Gallons
Constructed wetland treats 700,000 gallons of reclaimed greywater per day
From Forest Park 200,000 gallons of water is naturally returned to the groundwatersupply per year
=50,000 Gallons
constructed wetland in Olympic Forest Park
Collection Treatment Reuse
wetland greenhouse exhibition courtyardinfiltration through pervious surfaces
2008: 51% recycled wastewater2012: 81% recycled wastewater
2015 goal: 100% recycled wastewater
OLYMPIC INVESTMENTSWATER RECYCLING IN FOREST PARK
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
Cost: $10 billion
OLYMPIC INVESTMENTSSUBWAY NETWORK
2001
0 10km
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
OLYMPIC INVESTMENTSSUBWAY NETWORK
20012008
Cost: $10 billion
0 10km
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
OLYMPIC INVESTMENTSSUBWAY NETWORK
200120082012
Cost: $10 billion
0 10km
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
OLYMPIC INVESTMENTSSUBWAY NETWORK
2001200820122016
Cost: $10 billion
0 10km
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
HISTORICAL CONTEXT
BeijingMunicipality
ShanghaiMunicipality
Hong KongSpecial administrative region
GuangzhouSub provincial city
400 mile
s
BEIJING IS ONE OF CHINA’S LARGEST CITIES
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
HISTORICAL CONTEXT
Imperial city
Ming Dynasty city wall
Forbidden City Built 1406-20
THEN: A WALLED CITY
Outer city
0 5km
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
HISTORICAL CONTEXTTHEN: A WALLED CITY
Central Axis
Temple of Heaven
Bell and Drum Towers
0 5km
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
HISTORICAL CONTEXTTHEN: A WALLED CITY
Second Ring Road
0 5km
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
9.2 million
HISTORICAL CONTEXTTODAY: A SPRAWLING MEGA CITY
1982
Population:
Ring + radial roads
Subways
0 20km
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
10.8 million
HISTORICAL CONTEXTTODAY: A SPRAWLING MEGA CITY
19911982
Population:
0 20km
Ring + radial roads
Subways
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
13.6 million
HISTORICAL CONTEXTTODAY: A SPRAWLING MEGA CITY
19912001
1982
Population:
0 20km
Ring + radial roads
Subways
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
2012
20.7 million
HISTORICAL CONTEXTTODAY: A SPRAWLING MEGA CITY
19912001
1982
Population:
0 20km
Ring + radial roads
Subways
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
HISTORICAL CONTEXTGROWING TOWARD TIANJIN
TIANJIN
BEIJING
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECONOMIC CONTEXTTHE ECONOMY IS OUTPACING POPULATION GROWTH
Mill
ions
of p
eopl
e
25.0
20.0
15.0
10.0
5.0
Population
GDP per capita CN ¥
100 000
80 000
60 000
40 000
20 000
2009 201220112010 20082007200620052004200320022001
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GROWING PAINSADDING MORE CARS EVERY DAY
+ 425,000 new cars per yearOR
+ 1,165 new cars per day
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
January 13, 2013: 755 Air Quality Index on a scale of 0 to 500
AIR POLLUTION IS OFF THE CHARTSGROWING PAINS
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
CLEAR SKIES PEAKED DURING THE OLYMPICSGROWING PAINS
20%
15%
10%
5%
0%
20002003
20022001
20042007
20062005
20102009
2008
Percent of days with Grade-1 quality air
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GROWING PAINSBEIJING IS DRYING UP
0m
12m
24m
2002
2012
3%
20%
38%
39%
Urban Environment
Domestic
Industrial
Agriculture
Groundwater Table Level
Water Usage
Tonghui Stormwater Channel
Olympic Green Canal
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GROWING PAINSBUILDING TALLER AND DENSER
SCALE OF BUILDING TYPOLOGY IN BEIJING
100’
200’
300’
NORTH || OFFICE
SANLITUN VILLAGE MIXED-USE
THE LINKED-HYBRID MIXED-USE
400’
500’
600’
700’
800’
900’
1000’
1100’
CHINA WORLD TRADE CENTER TOWER 3 || OFFICE - HOTEL
HUTONG
CCTV || OFFICE
residential retail + office + art + culture residential + retail office
SOUTH || RETAIL
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GROWING PAINSHIGHER DENSITY AND LESS OPEN SPACE
Courtyard hutong
trafficopenplaza traffic
35 % open space of 30,400 SF
22 % open space of 30,400 SF
interior courtyard
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GROWING PAINSBEIJING IS NOT A WALKABLE CITY
London Beijing CBD
Manhattan Olympic Green
(1 square km area)
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GROWING PAINSSUMMARY
Air Q
ualit
yLa
ck o
f Qua
lity O
pen
Spac
e
Wat
er S
carc
ityPo
or P
ublic
Rea
lm
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
SITE SELECTIONOLYMPIC GREEN IS ON THE CULTURAL AXIS
0 10km
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
SITE SELECTIONOLYMPIC GREEN HAS A CONCENTRATION OF ICONIC VENUES
0 10km
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
SITE SELECTIONOLYMPIC GREEN IS CONNECTED TO TRANSIT
0 10km
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
SITE SELECTIONFOREST PARK IS THE KEYSTONE OF THE GREENBELT
0 10km
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
SITE SELECTIONOLYMPIC GREEN IS THE INTERSECTION OF THE MAJOR INVESTMENTS:
0 10km
Cultural Axis
Iconic Venues
Transit Connections
Greenbelt
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
SITE SELECTION
National Aquatics Center
National Convention Center
National Stadium
Science & Tech Museum
Olympic Observation Tower
National Indoor Stadium
Olympic Forest ParkOLYMPIC GREEN IS A HIGHLY VISIBLE DESTINATION
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
EXISTING CONDITIONSAN ENORMOUS CITY PARK
National Mall, Washington DC Central Park, New York City Olympic Green and Forest Park
775 hectares 843 hectares 1,159 hectares
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
OLYMPIC GREEN IS NOT VERY “GREEN”EXISTING CONDITIONS
0 500m
Accessible Green Space
InaccessibleGreen Space
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
INCONSISTENT PROGRAMMINGEXISTING CONDITIONS
Winter Wonderland
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
BUILT FOR OLYMPIC CROWDSEXISTING CONDITIONS
90 meters
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
INSUFFICIENT WATERSHED MANAGEMENTEXISTING CONDITIONS
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
UNFRIENDLY PARK EDGEEXISTING CONDITIONS
fence
barriers
wide bicycle lane
Olympic Green
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
BEIJING’S PROPOSED DEVELOPMENT SCHEMEEXISTING CONDITIONS
Commercial
Retail / Mixed Use
Cultural
0 500m
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
We envision the Olympic Green as...
A public, performative green space that takes advantage of and enhances the ecological features of the site.
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
MASTERPLAN
100m
WEB + ECOLOGY + REPURPOSED VENUES + ECOPARK
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
MASTERPLAN
100m
WEB + ECOLOGY + REPURPOSED VENUES + ECOPARK + MEGABLOCK
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
DIAGRAM OF PROPOSALS
Access
Ecological Framework
Economy
Livability
Culture
Visibility
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKWATERSHED AND WATER FLOW MANAGEMENT
Existing Watershed Proposed Watershed and Water Flow
Water From Mountains
Flows to the Bohai Sea
Canal as Watershed
Perforated Pipes distribute water to southern canal and allows water to seep into groundwater table
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKCANAL PERFORMANCE AND MATERIALITY
Existing Canal
Wet Meadow Terraced Grass Shoreline Terraced Concrete Boardwalk Extension
Water FluctuationEcosystem
performance material
Stormwater Runoff
Public RealmStormwater Runoff
Public Realm
performance performance performance
Dwarfs human scale and does not allow water flow
material material
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKPERFORMATIVE LANDSCAPE SYSTEMS
Ecological Landscapes
Productive Landscapes
Blue + Green Infrastructures
Community Open Spaces
Transitional Landscapes
Landscapes that capture and treat stormwater + greywater
Detention PondsConstructed WetlandLiving MachineSwales
Landscapes that generate food and provide education
Urban FarmGreenhouseHydroponics
Provide a protected habitat for biodiverse species
Spaces that are used for recreation and social gatherings
Temporary landscapes that clean soil and allow for new lanscapes
Playing FieldsPlazasFormal ParkExhibition SpacePavilionRecreation and Fitness
Nature ParksDemonstration + Research
Remediation FieldsMulti-Functional Space
TYPE
PRO
GRA
MPE
RFO
RMA
NCE
Type
Prog
ram
Perfo
rman
ce
Ecological Landscapes
ProductiveLandscapes
Blue + GreenInfrastructures
Community OpenSpaces
Transitional Landscapes
Provide a protected habi-tat for biodiverse species
Landscapes that gener-ate food and provide education
Landscapes that capture and treat storm water + greywater
Spaces that are used for recreation and social gatherings
Temporary landscapes that clean soil and al-low for new landscapes
Nature ParksDemonstration + Research
Urban FarmGreenhouseHydroponics
Detention PondsInfiltration BasinConstructed WetlandLiving MachineSwales
Playing FieldsFormal ParkExhibition SpacePavilionRecreation + Fitness
Remediation FieldsMulti-Functional Spaces
Biodiversity PhasingContribute to China’s 550 natural reserves
Crop Yields1 deciduous fruit trees yields 50-150 fruits1 Acre can produce two-three tons of fruit
Infiltration BasinPermeability rate of 0.5-3inches per hour and slope of basin floor close to 0%
Public RealmA public space re-quires 3m2-9m2 per person
PhytoremediationRemoves up to 97% of contaminated soil or groundwater
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKALLOCATION OF LANDSCAPE SYSTEMS
Ecological Landscapes
Productive Landscapes
Blue + Green Infrastructures
Community Open Spaces
Transitional Landscapes
Landscapes that capture and treat stormwater + greywater
Detention PondsConstructed WetlandLiving MachineSwales
Landscapes that generate food and provide education
Urban FarmGreenhouseHydroponics
Provide a protected habitat for biodiverse species
Spaces that are used for recreation and social gatherings
Temporary landscapes that clean soil and allow for new lanscapes
Playing FieldsPlazasFormal ParkExhibition SpacePavilionRecreation and Fitness
Nature ParksDemonstration + Research
Remediation FieldsMulti-Functional Space
TYPE
PRO
GRA
MPE
RFO
RMA
NCE
Ecological Landscapes
ProductiveLandscapes
Blue + GreenInfrastructures
Community OpenSpaces
Transitional Landscapes
Ecological Landscapes
Productive Landscapes
Blue + Green Infrastructures
Community Open Spaces
Transitional Landscapes
Landscapes that capture and treat stormwater + greywater
Detention PondsConstructed WetlandLiving MachineSwales
Landscapes that generate food and provide education
Urban FarmGreenhouseHydroponics
Provide a protected habitat for biodiverse species
Spaces that are used for recreation and social gatherings
Temporary landscapes that clean soil and allow for new lanscapes
Playing FieldsPlazasFormal ParkExhibition SpacePavilionRecreation and Fitness
Nature ParksDemonstration + Research
Remediation FieldsMulti-Functional Space
TYPE
PRO
GRA
MPE
RFO
RMA
NCE
Ecological Landscapes
Productive Landscapes
Blue + Green Infrastructures
Community Open Spaces
Transitional Landscapes
Landscapes that capture and treat stormwater + greywater
Detention PondsConstructed WetlandLiving MachineSwales
Landscapes that generate food and provide education
Urban FarmGreenhouseHydroponics
Provide a protected habitat for biodiverse species
Spaces that are used for recreation and social gatherings
Temporary landscapes that clean soil and allow for new lanscapes
Playing FieldsPlazasFormal ParkExhibition SpacePavilionRecreation and Fitness
Nature ParksDemonstration + Research
Remediation FieldsMulti-Functional Space
TYPE
PRO
GRA
MPE
RFO
RMA
NCE
Ecological Landscapes
Productive Landscapes
Blue + Green Infrastructures
Community Open Spaces
Transitional Landscapes
Landscapes that capture and treat stormwater + greywater
Detention PondsConstructed WetlandLiving MachineSwales
Landscapes that generate food and provide education
Urban FarmGreenhouseHydroponics
Provide a protected habitat for biodiverse species
Spaces that are used for recreation and social gatherings
Temporary landscapes that clean soil and allow for new lanscapes
Playing FieldsPlazasFormal ParkExhibition SpacePavilionRecreation and Fitness
Nature ParksDemonstration + Research
Remediation FieldsMulti-Functional Space
TYPE
PRO
GRA
MPE
RFO
RMA
NCE
Ecological Landscapes
Productive Landscapes
Blue + Green Infrastructures
Community Open Spaces
Transitional Landscapes
Landscapes that capture and treat stormwater + greywater
Detention PondsConstructed WetlandLiving MachineSwales
Landscapes that generate food and provide education
Urban FarmGreenhouseHydroponics
Provide a protected habitat for biodiverse species
Spaces that are used for recreation and social gatherings
Temporary landscapes that clean soil and allow for new lanscapes
Playing FieldsPlazasFormal ParkExhibition SpacePavilionRecreation and Fitness
Nature ParksDemonstration + Research
Remediation FieldsMulti-Functional Space
TYPE
PRO
GRA
MPE
RFO
RMA
NCE
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKPERFORMATIVE TREES + PLANTS
Larg
e Tr
ees
Med
ium
Tree
sSm
all T
rees
Gingko White Poplar London Planetree
Chinese Juniper Scholar Tree Persimmon
Peach Kaido Crabapple Goldenrain Tree
Performance:- Drought tolerant- Salt tolerant- Range of soil types- Air pollutant tolerant- Treats contaminated soils and groundwater
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKFOSTERING DEVELOPING ECOLOGIES
Wetland
Woodland
2013 2014 2015 2016 2017 2018
Initial Propagation Increasing Self Organization Continued Adaptation
Mixed
Grassland
water hyacinthreedcattail
ryegrass
juniperwhite poplarginkgolondon plane-tree
weeping willow
Hummingbird Hawk Moth
hummingbird hawk moth
Moused-Eared Bat
Schrenck’s Bittern
Malayan porcupine
Pere David Deer
Common Duckweed
Yulan Magnolia
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKWASTE WATER TREATMENT WETLANDS
Surface WaterDetritus
Soil
Plant uptake
Plant storage
N2
Adsorption Precipitation
CO2, CH4
DenitrificationDecompositionOrganic C
Volatilization
NH3
Sedimentation
Burial (Soil Storage)
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKCONSTRUCTED WETLAND SYSTEM
Surface Flow Wetland
Rain Water
Grey Water
Pretreatment (forebay)
Infiltration to ground waterMultiple treatment cells
Canal
Fully Vegetated
Open water Sur-face
Treatment Capacity: 40000 gallon per acre
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKBEIJING’S PLAN FOR MUSEUM DISTRICT
China Science and Technology Musuem
National Art Museum of China
China National Arts and Crafts Museum
National Center of Chinese Traditional Culture
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKLACKING ECOLOGICAL RESPONSE TO THE CANAL
Road Network
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKVISUAL BARRIER
Bird’s NestWater Cube
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKPROPOSING A CONSTRUCTED WETLAND TESTING GROUND
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKSITE APPROACH - VIEW AND MOVEMENT
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
SITE APPROACH - SITING MUSEUMSECOLOGICAL FRAMEWORK
National Art Museum of China
China National Arts and Crafts Museum
National Center of Chinese Traditional Culture
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKSITE APPROACH - TREATMENT NEAR WASTE WATER SOURCE
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKSITE APPROACH - FOREBAY LOCATION AND TOPOGRAPHY
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKSITE APPROACH - ACCESSES AND CONNECTIONS
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKPROPOSED MUSEUM DISTRICT AND WETLANDS
100m
Peninsular Constructed Wetland
Waster Side Pavilion Constructed Wet-land
Wetland for Education and Exhibi-tion
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKPENINSULAR CONSTRUCTED WETLAND - PLAN
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKPENINSULA SITE SECTION
ForebayConstructedWetland
Sunken PlazaInterior CourtyardRain GardenAxis
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKPENINSULA CONSTRUCTED WETLAND PERSPECTIVE
Extending Open Green Space
Fostering Emergent EcologiesProviding
Sustainable Water Management
Reactivating the Public Realm
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
WATERSIDE PAVILION WETLAND - PLANECOLOGICAL FRAMEWORK
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKWATERSIDE PAVILION WETLAND - WATER TREATMENT PROCESS
Pre-treament forebay
Infiltration to ground water
Overflow into canal
Constructed water treatment wetland
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKWATERSIDE PAVILION WETLAND - BAMBOO WALK
Pre-treament forebay
Infiltration to ground water
Overflow into canal
Constructed water treatment wetland
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKWATERSIDE PAVILION WETLAND - BAMBOO WALK
Floating treatment plants
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORKDESIGN INTENT RECAP
1. Olympic Green becomes more self sustaining so it does not rely heavily on existing infrastructure
2. Creates a model for a more sustainable and resource conscious Beijing
Methods
1. Canal becomes connective tissue of the site and the main focus of the ecological framework
2. The Canal is part of a performative landscape system - Responds to water scarcity, air pollution and lack of open space - Ecological Landscapes - Productive Landscapes - Blue + Green Infrastructure - Community Open Space - Transitional Landscapes
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
ECOLOGICAL FRAMEWORK IN EXISTING VENUES & ENTERTAINMENTDISTRICT - PERFORMANCE LANDSCAPE SYSTEM
Leveraging investments from the Beijing Olympics sPring 2013
ECOlOGICal fRaMEWORKpERfoRMativE lanDSCapE SyStEMS
Ecological Landscapes
Productive Landscapes
Blue + Green Infrastructures
Community Open Spaces
Transitional Landscapes
Landscapes that capture and treat stormwater + greywater
Detention PondsConstructed WetlandLiving MachineSwales
Landscapes that generate food and provide education
Urban FarmGreenhouseHydroponics
Provide a protected habitat for biodiverse species
Spaces that are used for recreation and social gatherings
Temporary landscapes that clean soil and allow for new lanscapes
Playing FieldsPlazasFormal ParkExhibition SpacePavilionRecreation and Fitness
Nature ParksDemonstration + Research
Remediation FieldsMulti-Functional Space
TYPE
PRO
GRA
MPE
RFO
RMA
NCE
Type
Prog
ram
Perfo
rman
ce
Ecological landscapes
Productivelandscapes
Blue + GreenInfrastructures
Community OpenSpaces
Transitional landscapes
provide a procted habitat for biodiverse species
landscapes that generate food and provide education
landscapes that capture and treat stormwater + greywater
spaces that are used for recreation and social gatherings
temporary landscapes that clean soil and al-low for new landscapes
nature parksDemonstration + Research
urban farmgreenhousehydroponics
Detention pondsInfiltration BasinConstructed wetlandliving MachineSwales
playing fieldsformal parkExhibition SpacepavilionRecreation + fitness
Remediation fieldsMulti-functional Spaces
biodiversity phasingContribute to China’s 550 natural reserves
Crop yields1 deciduous fruit trees yields 50-150 fruits1 acre can produce two-three tons of fruit
Infiltration Basinpermeability rate of 0.5-3inches per hour and slope of basin floor close to 0%
public Realma public space re-quires 3m2-9m2 per person
phytoremediationRemoves up to 97% of contaminated soil or groundwater
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
EXISTING VENUES REPURPOSETHE NEW NATIONAL BIOME FOR EVERYONE
An integrated ecological and global spatial experience.
The two most significant and iconic monumental buildings during the Olympics is now recreated to invite visitors to get closer to nature; with-out the need of traveling oversesas to experience other parts of the world.
A local to global experience right in the City of Beijing.
0 30m
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
Making use of the exisiting structure & material, it is now a planted landscape which provides integrated spatial functions;
1. Herbs retail2. Tea house3. Museum4. Exhibition space5. Education center6. Indoor herbs agricultural farm7. Research office
EXISTING VENUES REPURPOSEWATER CUBE - THE ACADEMY OF CHINESE HERBS | LOCAL
12
34
56
7
0 30m
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
BIRD NEST - THE NATIONAL BIOME | GLOBAL
Bird Nest to The National Biome | Global
1. Flexbile space under structure (Farmer’s market, exhibition space, art jam)2. A retreat place (bamboo walk)3. Performance Stage and seating4. Two biomes (Tropical rain forest, Mediterranean biome)5. Obersvation deck in TRF biome6. Event space at the Mediterranean biome
EXISTING VENUES REPURPOSE
1 2 3
4A4B 56
1
0 30m
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
EXISTING VENUES REPURPOSEECOLOGICAL FRAMEWORK - BLUE INFRASTRUCTURE (N - S)
Forest Park
Olympic Green
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
EXISTING VENUES REPURPOSEECOLOGICAL FRAMEWORK - BLUE INFRASTRUCTURE
Two branches created for irrigation of plants and filtration
Bird nest location
Infiltration basin terminus
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
EXISTING VENUES REPURPOSEECOLOGICAL FRAMEWORK - ECOLOGICAL & PRODUCTIVE LANDSCAPE
Planted vegetation
Retention basin
Infiltration basin terminus
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
EXISTING VENUES REPURPOSEECOLOGICAL FRAMEWORK - ECOLOGICAL LANDSCAPE & COMMUNITY SPACE
Mediterranean biome with ETFE mate-rial
Tropical rainforest biome with ETFE material
Infiltration basin terminus
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
EXISTING VENUES REPURPOSEECOLOGICAL FRAMEWORK - COMMUNITY SPACE
Pedestrian pathway to performance stage
Performance stage/ Event space
Bamboo walk
Flexible space
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
EXISTING VENUES REPURPOSEECOLOGICAL FRAMEWORK - ECOLOGICAL LANDSCAPE, BLUE & GREEN INFRASTRUCTURE & COMMUNITY SPACE
An integrated ecological and global open space
Ecological landscape
Blue & green infrastructure
Community open space
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
OVERLOOKING EVENT SPACE AND TWO BIOMESEXISTING VENUES REPURPOSE
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
OBSERVATION DECK AT TROPICAL RAINFORESTEXISTING VENUES REPURPOSE
Observation Deck
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
EVENT SPACE AT MEDITERRANEAN BIOMEEXISTING VENUES REPURPOSE
Event Space
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
PROGRAM MATRIX - LOCAL & GLOBAL EXPERIENCESEXISTING VENUES REPURPOSE
Sandarac Tree
Blue Throatwort
Widow Iris
Rattan Palm
Gallery Catasetum Orchid
Strangler Fig
Baical Skullcap
Chinese Snake Gourd
Chinese Senna
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
WATER CUBE - EXISTING CONDITIONSEXISTING VENUES REPURPOSE
Water Cube Plan
ETFE Skin Air Pillow
Current Water Playground LocationETFE Skin
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
BIRD NEST - EXISTING CONDITIONS
27m - 34m
EXISTING VENUES REPURPOSE
Two independent structural systems
Primary Steel Structure
Secondary Steel Structure
Concrete Bowl for Seating
Steel structure scattered around the perim-eter
ETFE Panels at Roof
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
THE NATIONAL BIOME - THE CANAL - THE ENTERTAINMENT DISTRICT
CanalBird Nest Entertainment District
CROSS SECTION BETWEEN BIOME AND THE ENTERTAINMENT DISTRICT
0 30m
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
NEIGHBOURHOOD CONNECTION
Neighbourhood Connection
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
THE ENTERTAINMENT DISTRICTWATER FEATURE SITE DIAGRAM
bridging between buildings
water
buildings
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
THE ENTERTAINMENT DISTRICTTHE WETLAND MACHINE - SUBSURFACE FLOW
Distribution of filtered water back
to the water system in the city
RAIN
RAIN
GRE
YW
ATER
GRE
YW
ATER
FILTERED WATERFILTERED WATER
pre-treatment tankrainwater cistern
green roof
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
CULTURAL AXISSCALE OF DISTANCES
2.8 km
5.6 km
0.2 km
2.5 km1.7 km
Olympic Forest Park
National Stadium & Aquatics Center
Zhonglou
Gulou
Forbidden City
Mao’s Mausoleum
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
CULTURAL AXISSCALE OF SITES
Olympic Green
GulouOlympic Forest Park (~680 hectares)
Zhonglou & Gulou
Forbidden City (~74 hectares)
Tiananmen Square (~44 hectares)
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
CULTURAL AXISTHEMATIC PLAN
Green Showcase -orchards (productive) -highlight canal -emphasis on performative green landscapes
Nature -dense foliage -heavy landscaping
Public Space -small plazas -seating/benches -light landscaping
Houtan Park, Shanghai
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
CULTURAL AXISSECTION 1: “PUBLIC SPACE”
BEFORE:
AFTER:
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
CULTURAL AXISSECTION 2: “GREEN SHOWCASE”
BEFORE:
AFTER:
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICTGOVERNMENT-DEFINED ECONOMIC CENTERS
Airport
Finance Street
Zhongguancun Science Park
Olympic Park
1
2
3
4
5
CBD
Transportation & Logistics
HospitalityConvention Center
High-TechResearch and DevelopmentUniversity links
Business & Finance center1,500 financial institutions
Secondary core finance areaMedia centerConsulting & Service industries
12
34
5
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICT
“The building industry should extend green buildings and green construction, and focus on the optimization of the structure...with advanced building techniques, materials, and information technology.”
12th Five-Year Plan, Part III, Chapter 9, Section 1
CHINA’S TARGETED INDUSTRIES
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICT
“In the energy conservation and environmental protection industry, focus on the development of key technical equipment for efficient energy conservation, advanced environmental protection and resource recycling, products and services.”
“...carry out trials of intelligent power grid construction...”
12th Five-Year Plan, Part III, Chapter 10, Section 1
CHINA’S TARGETED INDUSTRIES
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICTPROPOSED PROGRAM OF INDUSTRIES
Prototype manufacturing
Design firms
IT service providers
Smart grid implementation
Construction companies
Small-scale manufacturing
Eco-friendly products development
Implementation firms
Craft producers
Sales
Consulting to other cities
BUILDING SYSTEMS DESIGN
GREEN HIGH-TECH
WATER TREATMENT AND SUPPLY
MATERIALS RESEARCH
Electronic Product Design
Nanotechnology
Smart Grid Technology
Intelligent Systems Design
Agricultural Materials
Testing of Building Materials
Plastics R&D
Cement R&D
Water Treatment Research
Water Testing
Implementation Research
Purification Systems
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
20 minutes to Zhonguanncun and universities
Central to 2, possibly 3 subway connections
Northwest corner
Surrounding blocks can accommodate office towers
45 minutes to CBD and Finance Street
GREEN RESEARCH DISTRICTSITE SELECTION
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICTSITE SELECTION
Incorporate industries that actively use ecological features of Forest Park and Olympic Park
Water recycling in Forest Park one of most important Olympic investments
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICTDESIGN CONCEPT
1. Take advantage of the surrounding wetlands and the canal2. To maintain integrated green public space3. Exhibit performative building design4. Bring development into Olympic Green, while keeping a park landscape
FOUR GOALS...
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICTDESIGN CONCEPT
BLOCKS DEFINED BY PATHS RADIATING FROM NATIONAL STADIUM
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICTDESIGN CONCEPT
BUILDINGS ADDED BETWEEN PATHS AND AROUND CANAL
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICTDESIGN CONCEPT
COURTYARDS ADDED FOR DAYLIGHTING
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICTDESIGN CONCEPT
ADJUST TOPOGRAPHY FOR WATER MANAGEMENT & INTEGRATION WITH SURROUNDING PARK
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICTDESIGN CONCEPT
APPLY PERFORMATIVE ROOFSCAPE
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICTDESIGN CONCEPT
MAINTAIN ACCESS TO PUBLIC OPEN SPACE
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICTLANDSCAPE TYPES
0 100m
Blue + Green Infrastructure
Ecological Landscape
Community Open Space
Public Plazas
Extended Canal
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICTROOF FEATURES
0 100m
Sedum
Maintained turf for park
Water-absorbent grasses
Beds for use by on-site researchers
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICTGROUND FEATURES
IN PROGRESS
0 100m
Wetlands
White Poplar
Bamboo
Local Wildflowers
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICT
MATERIALS RESEARCH
BUILDINGDESIGN
RESEARCH
HIGH-TECH
WATER TREATMENT / SUPPLY RESEARCH
INDUSTRY SECTORS
0 100m
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICTURBAN OFFICE CENTER
0 100m
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICTURBAN OFFICE CENTERCONNECTIONS
0 100m
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
GREEN RESEARCH DISTRICTCIRCULATION
Automobile
Pedestrian/Bike
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
URBAN DESIGN + PUBLIC REALMEXISTING CONDITIONS
Development ignoresOlympic Green assets
Long distances betweenIntersections
Missed opportunities at transit stations
0 500m
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
URBAN DESIGN + PUBLIC REALMPOOR FRONTAGE ON THE PARK
Olympic Green Low-density residential development
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
URBAN DESIGN + PUBLIC REALMLONG DISTANCES
Olympic GreenBlank façades
Barriers to entry
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
URBAN DESIGN + PUBLIC REALMTALL BUILDINGS CAST LONG SHADOWS
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
URBAN DESIGN + PUBLIC REALMMISSED OPPORTUNITIES AT TRANSIT STATIONS
Blank façade Auto oriented
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
URBAN DESIGN + PUBLIC REALMA BETTER ALTERNATIVE: WANGJING STATION
Active streets
Pedestrian-friendly
Dense development
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
URBAN DESIGN + PUBLIC REALMRECOMMENDATION: PERFORMATIVE ZONING
1. Porosity and a complete street network2. Land use intensity that responds to spatial forces3. Continuous street frontage4. Natural sun lighting
Also, at least 30% open space will be maintained on all blocks
FOUR MAIN COMPONENTS
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
URBAN DESIGN + PUBLIC REALMPERFORMATIVE ZONING: COMPLETE STREETS
Maximum 180 metersBetween intersections
Maximum 60 metersbetween intersections
Pedestrian paths
0 500m
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
URBAN DESIGN + PUBLIC REALMPERFORMATIVE ZONING: LAND USE RESPONDS TO FORCES
high density commercialmixed use on podium
medium densityresidential mixed use
low density residential or civic use
neighborhood parksand constructed wetlands
0 500m
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
URBAN DESIGN + PUBLIC REALMPERFORMATIVE ZONING: CONTINUOUS STREET FRONTAGE
good
bad
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
URBAN DESIGN + PUBLIC REALMPERFORMATIVE ZONING: STREET DEFINITION
minorroad15 m
parcel60 m
path8 m
majorroad38 m
majorroad38 m
path8 m
1:1 1:11:1
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
URBAN DESIGN + PUBLIC REALMPERFORMATIVE ZONING: NATURAL LIGHT
minorroad15 m
parcel60 m
neighborhood park+ pedestrian paths
78m
minorroad15 m
parcel60 m
27° 27° 27°
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
URBAN DESIGN + PUBLIC REALMRECOMMENDATION: PERFORMATIVE ZONING
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
URBAN DESIGN AND PUBLIC REALMEXISTING CONDITIONS ADJACENT TO OLYMPIC GREEN
Olympic Green
Low Density Park Frontage
Towers in the Park
Long Distances between
Intersections
Lack of Public Open Space
Future Line 15 Subway Station
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
URBAN DESIGN AND PUBLIC REALMPERFORMATIVE ZONING REGULATIONS TRANSFORM THE MEGABLOCK TYPOLOGY
Olympic Green
Future Line 15 Subway Station
High Density Park Frontage
Low Density Civic fronting
Open Space
Porosity through Fishbone structure
Minor Streets Exposed to Sun
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
URBAN DESIGN + PUBLIC REALMA PERSPECTIVE VIEW OF PERFORMATIVE ZONING REGULATIONS
Taller buildings may front the Green
Path and road network create porosity and visual access to Olympic venues
Limited building heights on block interior streets allow sun to
penetrate
Street canyons with a maximum height-to-
width ratio of 1:1 create strong street definition
and human scale
Interior streets have a maximum width of ten meters
Bird’s Nest
Convention Center
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
URBAN DESIGN + PUBLIC REALMA PERSPECTIVE VIEW OF PERFORMATIVE ZONING REGULATIONS
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
We envision the Olympic Green as...
A public, performative green space that takes advantage of and enhances the ecological features of the site.
Conclusions
BEIJING LEVERAGING OLYMPIC INVESTMENTS SPRING 2013
IN CONCLUSION
Water Scarcity
Air Pollution
Lack of Open Space
Poor Public Realm Subway
Natural Environment
Olympic Green
Combat environmental issues by fostering green industry
Recreate Olympic Green as a model of sustainability
Improve water management and open space provision
through venue repurposing
Enhance the public realm through performative zoning
BY TARGETING THESE PERVASIVE ISSUES:
AND BY LEVERAGING THESE OLYMPIC INVESTMENTS:
OUR PROPOSALS WILL:
Venues