leuze web design project
DESCRIPTION
Mock presentation for Project Management class. Worked as a group to propose solutions for a start-up web designs company. I was Assistant PM. We made little and gigatanic mistakes, but still got a good grade.TRANSCRIPT
Leuze Web Design Project
Prospective overview by:
Since its creation in 2003, Project Solutions’ key goal has been to provide the best service possible to our client base and to spread that
passion for network design and implementation.
• Certified Staff• High success rate• Prompt Completion• Lasting Relationships
Project Solutions
Perform site survey Design a network that meets/exceeds
requirements Select appropriate network devices Install requested software Test connectivity, troubleshoot Complete promptly Maintain an open line of communication Optional Add-ons
Objectives
Schedule
Microsoft Office Project 2003
Distribution-Cisco WS-C3750-48PS-S Catalyst 3750-48PS Cisco SGE2010 48-port Gigabit SwitchLinksys SRW 2008P 8-port
Access-Cisco Catalyst 3560-48TS 48-PortCisco 2960 48-port switchCisco SLM2048 48-port Gigabit Smart Switch
Network Devices -Switches
Wired – Cisco 2821 Sec/k9Cisco 2811Cisco - 1811 - CISCO1811/K9
Wireless – Linksys WRT160N Ultra RangePlus Wireless N
Router Cisco WRT160NL Wireless-N Broadband Router Linksys WRT610N Wireless N Router
Network Devices- Routers
500ft UTP Cat5e cabling Cables To Go 25-Foot Cat5e Crossover Patch
Cable Cables To Go 100-Foot Cat5e Assembled
Patch Cable
Network Devices- Cabling
A VLAN is a Virtual Local Area Network Configure a network for basic roles Ports cannot communicate with each other VLANs allow us to divide a network without
the use of more equipment To make ports communicate between VLANs
they need to be routed with a router.
What is a VLAN?
VLAN Assignments VLAN 34 Sales VLAN 58 Development VLAN 67 Marketing VLAN 78 Administration VLAN 1-1001 Management (Network)
Logical Topology
Acquire Software◦ Vista OS◦ MS Office Standard 2007◦ Adobe ACS4
Install and Image Laptop◦ Connect to PCs
Daisy Chain 10 PCs then Remaining 75◦ Connect to Laptops
Daisy Chain 10 Laptops then Remaining 40 Test Software
Operating System & Software
50 Blackberry Phones◦ Purchased with service contract◦ Leased with Support Included
Adobe ASC4◦ Support
Additional Training
Optional Services
Hacking & Other Security Breaches Network Failure Faulty Equipment Location of Network Equipment Client Hardware Early Close Out
Risk Analysis
WEEK 1 Begin LWD ProjectResearch and obtain OS and software licenses
Arrival and Installation of hardware
WEEK 2 Network Preparation and Configuration Our IT staff will configure network devices based on department
needs
WEEK 3 Diagnostics/Installation of Software Troubleshooting (if needed)
Using a common practiced system to install software on all PC’s and Laptops
WEEK 4 Walkthrough/meet with existent IT staff/Close OutWalkthrough with LWD IT Team, discuss changes if needed, reviseWhen the entire network is working, software is installed properly
Schedule
Monday through Friday 9pm to 5 pm No weekends Equipment fees based on our suggestions
Budget