T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 1-17 (4 Wk) Page 1 of 1 Version: 1/10/2020
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
1*
3802-22 38018
1 CSAH 2 to 0.36 Mi SE of CSAH 2 - Approach Grading, Bit. Surfacing, Replace Bridge over the Stoney RiverFrom 12/18/19 Trans 12/16/19
2,200,000State Funds
12% Min.9% Women
Start 3/2/20End 5/31/21
2*
3107-513107-53
31X13T
6 1.6 Mi N CR 136 to 0.9 Mi N TH 286 - M&O, Minimal Bit. Reclaim., Lighting, and 23.2 Mi N of Deer River - Replace Bridge over Little Too Much Lake, ApproachesFrom 12/18/19 Trans 12/16/19
ELLA
3,000,000STPF 3120(093)
SLAFO
12% Min.9% Women
Start 7/6/2040 Working
Days
3*
4812-914811-74048-070-012
169 At CSAH 11, CSAH 12, and CSAH 13 - Construct Reduced Conflict IntersectionsFrom 12/18/19 Trans 12/16/19
2,500,000HSIP 4820(008)
SAFO
15% Min.12% Women
Start 3/1/20End 6/26/20
6*
8826-230 xxx Districtwide - Pavement Striping at Various LocationsFrom 12/18/19 Trans 12/16/19
IDIQ
500,000State Funds
Process A
15% Min.9% Women
Start 5/1/2010/15/21
7 0710-113 68 Moved to 1/24/20
LETTING DATE: JANUARY 17, 2020
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 1-24 (3 Wk) Page 1 of 1 Version: 1/10/2020
PROJECTS GO ON SALE: 1/3/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
7*
0710-113 68 0.8 Mi W of CSAH 45 (480th Ln) to 1 Mi W of TH 169 - Slope Repair and Culvert RepairsFrom 1/17/20 Trans: 12/12/19
650,000State Funds
15% Min.9% Women
Start 3/2/2030 Working
Days
LETTING DATE: JANUARY 24, 2020
3 WEEK AD
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 1-31 (4 Wk) Page 1 of 2 Version: 1/10/2020
PoDI SUBMITTAL TO FHWA: 12/16/19PROJECTS GO ON SALE (4 WEEK AD): 1/3/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
1 0901-84 23 Moved to 3 Week Ad
1 6912-79 135 Moved to 2/28/20
2*
3107-49 31X123102-48
62
TH 2 to CR 128 in Deer River and on TH 2 fr. 0.15 Mi W of TH 6 to 1st St SE - M&O, ADA, Lighting and 4.5 Mi N of Deer River - Replace Bridge over StreamFrom 12/18/19 Trans 11/26/19
4,000,000STPF 3120(094)
SAFO
12% Min.9% Women
Start 5/18/2098 Working
Days
2*
3904-24 39X04
172 TH 11 to 0.92 Mi N of CR 8 - M&O, New Box Culvert
3,200,000STPF 3920(117)
SLAFO
12% Min.9% Women
Start 8/3/2050 Working
Days
2 6810-11 313 Moved to 3/27/20
3 3304-27 47 Moved to 2/28/20
4 0302-81 10 Moved to 3/27/20
4*
7503-38 75X01 75X02 75X03
28 350' W of 4th St W in Chokio to Lyndale Ave in Morris - Bit. Mill, CIR, Bit. Surfacing, Replace 3 Box Culvert Bridges, Snow Fence
5,200,000State Funds
12% Min.9% Women
Start 3/20/2040 Working
Days
6 5503-46 14 Moved to 3/27/20
6 5509-84 63 Moved to 2/28/20
LETTING DATE: JANUARY 31, 2020
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 1-31 (4 Wk) Page 2 of 2 Version: 1/10/2020
PoDI SUBMITTAL TO FHWA: 12/16/19PROJECTS GO ON SALE (4 WEEK AD): 1/3/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
LETTING DATE: JANUARY 31, 2020
6*
8504-82 61 1025' SE of TH 43 to 1275' SE of TH 43 - Construct 3/4 Intersection
160,000State Funds
15% Min.9% Women
Start 5/4/2016 Working
Days
6 8508-38 74 Moving to: TBD
7*
3206-20 32X021705-123205-38
71 1400' S of CSAH 38 in Jackson to S Jct TH 60 in Windom - CIR, M&O, Replace Bridge, Culvert Extensions & Lining, Guardrail, LightingFrom 12/18/19 Trans 11/20/19
9,000,000NHPP 0071(327)
SAFO
15% Min.9% Women
Start 3/15/20End 8/7/20
8*
4203-501211-898701-37 87007 87X03 87X04 87X058712-33087-622-009
23212
0.1 Mi N of CSAH 24 in Cottonwood to TH 212 in Granite Falls - Bit. Milling, Conc. & Bit. Paving, ADA, RWIS, Signal System, Lighting, Replace 3 Bridges, and on TH 212 fr. TH 23 to Jefferson Ave - 2.9 Mi of 4 Lane and 0.5 Mi of ADA
29,000,000NHPP-HSIP 0023(324)
SAFO
15% Min.9% Women
Start 3/16/20End 10/31/20
M*
2771-450217-26
610 TH 169 in Brooklyn Park to TH 10 in Coon Rapids - Sign Replacement
350,000State Funds
Var % Min.Var % Women
Start 7/13/2035 Working
Days
M*
2772-119 169 Bren Rd to 7th St in Hopkins - Landscaping 100,000State Funds
32% Min.20% Women
Start 4/7/20 End 7/15/22
M*
2782-343 35W 0.1 Mi N of 7th St to 66th St in Richfield - Conc. Pvmt Rehab, Repair Drainage Structures, Signal Revisions
370,000NHPP I35W(015)
SAFO
32% Min.20% Women
Start 5/4/20End 6/19/20
M*
6216-138 51 At Roselawn Ave in Falcon Heights and at Ramsey CR C2 in Roseville - Signal Replacement
800,000State Funds
32% Min.20% Women
Start 4/29/2145 Working
Days
C*
8816-2627 xxx Statewide - Replace Dynamic Message SignsFrom 10/25/19 Trans 8/13/19
1,250,000STPF 8820(132)
SAFO
Var. % Min.Var. % Women
Start 8/24/20End 11/13/20
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 1-31 (3 Wk) Page 1 of 1 Version: 1/10/2020
PROJECTS GO ON SALE: 1/10/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
1*
0901-84 09841 99209
23 1.5 Mi N of CSAH 8 to 1.69 Mi N of CSAH 8 - Repair Roadway, Replace Bridge at S Fork Nemadji RiverFrom 4 Week Ad Trans 1/31/19
3,300,000ER MN18(410)
SLAFO
12% Min.9% Women
Start 3/23/20End 10/2/20
4*
1401-189 10 EB fr. Partridge Ave to 305' E of Andrews Ave - Grading, Conc. & Bit. Paving
500,000State Funds
Process A
12% Min.9% Women
Start 7/13/20End 8/14/20
LETTING DATE: JANUARY 31, 2020
3 WEEK AD
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 2-28 (5 Wk) Page 1 of 1 Version: 1/10/2020
PROJECTS GO ON SALE: 1/24/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
8*
4304-534304-96T
15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, LightingAnd fr. 490' N of CSAH 115 to 100' S of 5th Ave SE - Conc. & Bit. Milling, UTBWC, ADA, Revise Signal SystemFrom 4 Week Ad Trans 11/21/19
10,000,000NHPP-STPF
0015(309)
SAFO
15% Min.12% Women
Start 4/13/20End 10/30/20
LETTING DATE: FEBRUARY 28, 2020
5 WEEK AD
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 2-28 (4 Wk) Page 1 of 3 Version: 1/10/2020
PoDI SUBMITTAL TO FHWA: 1/14/20PROJECTS GO ON SALE (4 WEEK AD): 1/31/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
1 3101-376901-29 691066931-016920-56T
173
E Jct TH 65 to N Jct TH 53 and on TH 73 fr. TH 1 to TH 53 - M&O, and on TH 53 at Jct TH 1/CSAH 115-Ashawa Rd - Const. Reduced Conflict Intersection
10,000,000STPF
SLAFO
12% Min.9% Women
1*
6912-79 135 CSAH 715/Pike-Biwabik Rd to 0.6 Mi E of CSAH 4 - Bit. Surfacing, M&O, C&G, Storm Sewer, Lighting, Utilities, ADAFrom 1/31/20 Trans 10/11/19
5,600,000STPF 6920(073)
SLAFO
12% Min.9% Women
Start 5/26/20End 9/30/21
1 6931-01 73 Associated with SP 3101-37 . .
1 6982-331 69816
35 At Lake Ave - Repair Bridge, ADA 2,100,000NHPP I350(128)
SAFO
12% Min.9% Women
3*
0503-90005-601-011005-08-010
23 0.1 Mi W of CR 1 to 0.12 Mi E of TH 95 - M&O, Revise Signal System, ADA. Lighting, and at CSAH 8 E of St Cloud - Construct Reduced Conflict Intersection
3,500,000STPF-HSIP 0520(072)
SAFO
15% Min.12% Women
Start 9/8/20End 10/28/20
3*
3304-27 33010 330114815-15
47 TH 23 in Ogilvie to TH 27 in Isle - Full Depth Reclaim, Bit. Surfacing, Lighting, and 5 Mi N of Ogilvie - Replace Bridge over Stream and Bridge over Little Ann RiverFrom 1/31/20 Trans 11/18/19
14,000,000STPF 3320(059)
SLAFO
15% Min.12% Women
Start 3/30/20End 6/15/21
4*
5601-33 210 2.1 Mi W of CR 21 to 0.4 Mi W of TH 94 - Reconstruction, Bit & Conc. Surfacing, Snow Fence, Lighting
8,100,000NHPP 0210(311)
SAFO
12% Min.9% Women
Start 5/26/20End 10/2/20
4*
7806-29 78006
75 5th St to Bridge over Mustinka River - M&O, Grading, Replace Bridge over Mustinka River
2,400,000STPF 7820(024)
SLAFO
12% Min.9% Women
Start 6/15/2065 Working
Days
6*
2408-23 248015010-09
251 1040' W of TH 35 in Freeborn Co to TH 218 in Mower Co - M&O, Pipe Culverts, ADA, Lighting, and End Posts on Bridge
6,500,000STPF 2420(155)
SLAFO
15% Min.9% Women
Start 5/4/206/4/21
LETTING DATE: FEBRUARY 28, 2020
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 2-28 (4 Wk) Page 2 of 3 Version: 1/10/2020
PoDI SUBMITTAL TO FHWA: 1/14/20PROJECTS GO ON SALE (4 WEEK AD): 1/31/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
LETTING DATE: FEBRUARY 28, 2020
6*
2482-775080-172
90 EB fr. CSAH 46 in Petran to 0.04 Mi E of TH 105 - Bit. Mill & Surfacing, Unbonded Conc. Overlay, Lighting
12,700,000NHPP I900(131)
SAFO
15% Min.9% Women
Start 5/4/2090 Working
Days
6*
2509-242511-52
57 At TH 60 in Wanamingo - Roundabout, Milling, Bit. & Conc. Surfacing, ADA, Lighting
1,750,000HSIP-STPF 2520(121)
SLAFO
15% Min.9% Women
Start 5/4/2040 Working
Days
6*
2514-124 61 NB fr. 0.51 Mi E of TH 316 to 0.23 Mi E of Aspen Ave - High Tension Cable Median Barrier at Various Locations
1,100,000NHPP 0061(340)
SAFO
15% Min.9% Women
Start 9/14/2025 Working
Days
6*
5509-84 55821 558225580-95
63 At TH 90 - Replace 2 Bridges over TH 90, Interchange Improvements, Conc. & Bit. Surfacing, Lighting, TMS, Cable Median BarrierFrom 1/31/19 Trans 11/14/19
12,000,000NHPP 0063(308)
SAFO
15% Min.9% Women
Start 4/20/20End 10/30/21
6*
5580-968580-176
90 0.58 Mi W of CSAH 10 to 0.55 Mi E of TH 74 - High Tension Cable Median Barrier
700,000NHPP I900(130)
SAFO
15% Min.9% Women
Start 9/14/206/19/21
6*
7402-347408-51
14 TH 35 to 0.61 Mi E of CSAH 43 - Install TMS 500,000NHPP 0014(341)
SAFO
15% Min.9% Women
Start 6/1/20End 9/19/20
6 8508-39 74 Moving to: TBD
6*
8508-40 85029
74 0.3 Mi NE of CSAH 30 to 0.35 Mi NE CSAH 30 - Replace Bridge over Beaver Creek
500,000STPF 8520(112)
SLAFO
15% Min.9% Women
Start 5/4/20End 7/17/20
7 0713-80 169 Dropped
7 0804-1185202-59
14 Broadway St to CSAH 21 - Landscaping 21,000State Funds
15% Min.9% Women
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 2-28 (4 Wk) Page 3 of 3 Version: 1/10/2020
PoDI SUBMITTAL TO FHWA: 1/14/20PROJECTS GO ON SALE (4 WEEK AD): 1/31/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
LETTING DATE: FEBRUARY 28, 2020
7*
1701-27 30 CSAH 7 to TH 71 - Bit. M&O, Guardrail, Drainage
ELLA
5,200,000STPF 1721(009)
SLAFO
15% Min.9% Women
Start 7/6/20 - 7/27/20
60 Calendar Days
8 4304-53 15 Moved to 5 Week Ad
M 0283-32 35 Moved to 5/19/20
M 1012-24 212 Moved to 3/27/20
M 1921-102 3 Moved to 4/24/20
M*
1982-205 35E Mendota Heights Rd to TH 55 in Mendota Heights - Lighting
1,000,000State Funds
SAFO
22% Min.15% Women
Start 4/12/21End 10/29/21
M*
6242-86 280 Energy Park Dr in St Paul to 0.2 Mi N of Como Ave in Lauderdale - Replace Lighting
310,000State Funds
32% Min.20% Women
Start 8/3/20End 6/5/21
M*
8212-31 97 At North Shore Trail/Keswick Ave in Forest Lake - Construct EB and WB Left Turn Lane and Install Lighting System
1,100,000HSIP 8220(097)
SLAFO
22% Min.15% Women
Start 4/27/20End 10/17/20
M 8825-611 xxx Moved to 3/27/20
M*
8825-629027-639-008027-661-056181-030-003
xxx On Flying Cloud Dr (CSAH 61) fr. Pioneer Tr (CSAH 1) to Valley View Rd (CSAH 39) and on Valley View Rd fr. Prairie Center Dr to Flying Cloud Dr, and on Prairie Center Dr fr. Technology Dr to Valley View Rd - ATMS Installation and Signal Optimization
1,800,000CMAQ 8820(100)
SLAFO
Var % Min.Var % Women
Start 5/4/20End 9/11/20
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 2-28 (3 Wk) Page 1 of 1 Version: 1/10/2020
PROJECTS GO ON SALE: 2/7/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
2 6002-75 2 Moved to 3/27/20
6 8826-195 xxx Dropped
6*
8826-201 xxx Districtwide - Rout and Seal at Various Locations
IDIQ
700,000State Funds
Process A
15% Min.9% Women
Start 5/4/20End 2/28/22
M 2781-447 27859 27861 27V28
94 WB Exit Ramp and EB Entrance Ramp over LRT, S 17th Ave, and Hiawatha Bike Tr just E of TH 55 in Minneapolis - Rehab 3 Bridges
2,200,000NHPP
Process A
32% Min.20% Women
LETTING DATE: FEBRUARY 28, 2020
3 WEEK AD
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 3-27 (4 Wk) Page 1 of 3 Version: 1/10/2020
PoDI SUBMITTAL TO FHWA: 2/11/20PROJECTS GO ON SALE (4 WEEK AD): 2/28/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
1 3116-149 169 Moved to 5/19/20
1 3608-48 53 Moved to 4/24/20
1 6933-100 194 Central Entrance in Duluth - Twin Ports Interchange Local Traffic Mitigation, and fr. Anderson Rd to Mesaba Ave - Mill & Inlay
600,000State Funds
12% Min.9% Women
2 5701-315706-13057-070-019170-010-007
1 At W Jct TH 59 W of Thief River Falls, At Brooks Ave, and at Barzen Ave - Roundabouts, and fr. CSAH 16 to Kinney Ave - Bit. Surface, and fr. Ruby Ave to Westside Motors - New Frontage Rd, and fr. Ruby Ave to Brooks Ave - Overlay Frontage Rd, and fr. RR tracks to TH 59 – New Pedestrian/Bike Path
6,600,000HSIP-NHPP-STPF
5720(146)
SLAFO
12% Min.9% Women
2*
5702-47 1 CSAH 18 in Thief River Falls to TH 219 - Full-Depth Bit. Reclaim., Bit. Mill and Surfacing
ELLA
6,400,000STPF 5721(005)
SLAFO
12% Min.9% Women
2*
6003-346004-28
2 WB fr. 0.19 Mi E of CSAH 44 to 0.98 Mi W of TH 32 - Mill, Crack and Seat, Overlay
ELLA
3,300,000NHPP 0002(340)
SAFO
12% Min.9% Women
2 6810-11 313 TH 11 to US/Canadian Border - M&OFrom 1/31/20 Trans 11/22/19
2,000,000CBI 6820(162)
SLAFO
12% Min.9% Women
3 1110-11 84 Moved to 2/26/21
3*
8601-61086-603-024
12 0.2 Mi W of Sunset Ave to 7th St SE in Cokato - Bi. M&O, Conc. Surfacing, ADA, Lighting,Traffic Signal System
2,400,000NHPP-STPF-HSIP
0012(317)
SAFO
15% Min.12% Women
Start 7/6/20End 6/15/21
LETTING DATE: MARCH 27, 2020
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 3-27 (4 Wk) Page 2 of 3 Version: 1/10/2020
PoDI SUBMITTAL TO FHWA: 2/11/20PROJECTS GO ON SALE (4 WEEK AD): 2/28/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
LETTING DATE: MARCH 27, 2020
4*
0302-81003-070-013117-070-001
10 At CSAH 54/E Shore Dr and at Kris St in Detroit Lakes - Intersection and Signal RevisionsFrom 1/31/20 Trans 11/12/19
2,500,000HSIP-STPF 0420(056)
SAFO
12% Min.9% Women
Start 7/6/20End 8/31/20
4*
8824-155 xxx Districtwide - Culvert Replacement at Various Locations
700,000State Funds
12% Min.9% Women
Start 8/17/20End 10/9/20
4 8824-196 xxx Aggregate Shouldering
IDIQ
500,000State Funds
Var % Min.9% Women
6*
5503-46 55X26
14 In Chester - Replace Bridge over Stream and Culvert WorkFrom 1/31/19 Trans 11/18/19
600,000STPF
SLAFO
15% Min.9% Women
6 7911-01 79000
60 At Wabasha Bridge - Paint Bridge and Replace Expansion Joint at East End
3,000,000STPF
SLAFO
15% Min.9% Women
6*
8580-174 85862 85863
90 EB over TWP 231 - Replace Bridges 6,600,000NHPP I900(132)
15% Min.9% Women
8*
3703-250607-223702-36
75 Twp 127 to TH 7 (except in Madison) - CIR & Overlay, ADA, Culvert Liners, Guardrail
8,100,000State Funds
15% Min.9% Women
M 1012-24 212 Moved to 4/24/20
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 3-27 (4 Wk) Page 3 of 3 Version: 1/10/2020
PoDI SUBMITTAL TO FHWA: 2/11/20PROJECTS GO ON SALE (4 WEEK AD): 2/28/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
LETTING DATE: MARCH 27, 2020
M 1905-41 52 S End of Cannon River Bridge in Cannon Falls to 0.2 Mi N of CR 86/280th St in Hampton Twp - Unbonded Conc. Overlay, Guardrail, Signal, Cable Barrier, and Joint Repair on Bridges
ELLA
8,300,000NHPP-HSIP 0052(342)
SAFO
22% Min.15% Women
M 2755-103 27962
100 At TH 694/94 in Brooklyn Center - Rehab Bridge, Bit. M&O, Conc. Pvmt. Rehab., and Drainage Repair on TH 100 and Ramps from TH 694 and TH 252, Guardrail
ELLA
3,600,000NHPP 0100(319)
SAFO
32% Min.20% Women
M 2781-468 94 Nicollet Ave in Minneapolis to TH 280 in St. Paul - Bit. M&O, TMS, ADA, Striping
3,900,000NHPP I940(038)
SAFO
32% Min.20% Women
M*
6217-44 9036
52 At TH 3 (Robert St) at the Mississippi River and RR 0.7 MIi SE of TH 35E and TH 94 in St Paul - Bridge Rehab.
2,100,000STPF 6220(178)
SAFO
32% Min.20% Women
M 6282-231 94 Moved to 11/20/20
M 8209-109 95 Moved to 4/24/20
M 8286-906286-61
694 TH 61 in Vadnais Heights/White Bear Lake to CSAH 10 in Oakdale - Install Continuous Freeway Lighting
2,000,000HSIP 8220(187)
SAFO
22% Min.15% Women
M 8825-611 xxx Metrowide - Replace Shelters, Cameras and CablesFrom 2/28/20 Trans 1/10/20
900,000State Funds
Var % Min.Var % Women
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 3-27 (3 Wk) Page 1 of 1 Version: 1/10/2020
PROJECTS GO ON SALE: 3/6/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
2 6002-756003-37
2 0.2 Mi W of CSAH 9 to 1.0 Mi E of TH 9 - M&OFrom 2/28/20 Trans 11/22/19
1,000,000State Funds
Process A
12% Min.9% Women
LETTING DATE: MARCH 27, 2020
3 WEEK AD
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 4-2 Page 1 of 1 Version: 1/10/2020
2-Step Prequalification LettingPROJECTS GO ON SALE: 2/3/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
2*
1106-16 200 Whipholt Roadside Parking Area - Restoration 450,000State Funds
12% Min.9% Women
LETTING DATE: APRIL 2, 2020
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 4-8 Page 1 of 1 Version: 1/10/2020
2-Step Prequalification LettingPROJECTS GO ON SALE: 2/10/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
6*
7906-100 61 Reads Landing Overlook and Lake City Concourse - Rehabilitation
700,000State Funds
15% Min.9% Women
LETTING DATE: APRIL 8, 2020
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 4-24 (4 Wk) Page 1 of 2 Version: 1/10/2020
PoDI SUBMITTAL TO FHWA: 3/11/20PROJECTS GO ON SALE (4 WEEK AD): 3/27/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
1 1604-45 16011 16X101603-53
61 Reservation Bay Rd to US/Canadian Border - Bit. Reclamation, Const. 2 Bridges
14,000,000NHPP 0061(341)
SAFO
12% Min.9% Women
1 3608-483606-563606-633615-06036-645-009036-648-011134-080-005134-103-005134-124-004
5311
0.2Mi S of CSAH 7/Memorial Dr in International Falls to TH 11/TH71/3rd St and on TH 11 fr. TH 53/4th St to TH 11/2nd Ave and on TH 53 fr. TH 11/2nd Ave to 0.1 Mi N of 2nd St, Boise MD&W RR - Mill/Inlay, ADA, Drainage, Signal Revisions, Remove Signals, Intersection Lighting
13,000,000NHPP-STPF
0053(327)
SAFO
12% Min.9% Women
1 6914-19 37 TH 53 to TH 135, incld. Broadway Ave Thru Gilbert - M&O
6,500,000STPF 6920(083)
SLAFO
12% Min.9% Women
2 1102-703102-50
2 1.4 Mi E of Cass CSAH 91 to Itasca CSAH 18 - Bit M&O at 4 Locations
ELLA
5,800,000NHPP
12% Min.9% Women
2 1502-281503-32
2 EB fr. CSAH 25 (Park Ave) in Bagley to 1.2 Mi E of TH 92 and WB fr. Park Ave to 0.2 Mi E of TH 92 - ADA, M&O, Multi-Use Trail Along N Side of TH 2 fr. Park Ave to Sunset Ave
2,300,000NHPP 0002(339)
SAFO
12% Min.9% Women
6 5501-38 14 CSAH 5 in Byron to W Circle Dr in Rochester - TMS
ELLA
600,000NHPP
15% Min.9% Women
M 0208-160 65 At MSAS 103 (Klondike Dr) in East Bethel - Construct Reduced Conflict Intersection
ELLA
1,200,000HSIP
SAFO
22% Min.15% Women
LETTING DATE: APRIL 24, 2020
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 4-24 (4 Wk) Page 2 of 2 Version: 1/10/2020
PoDI SUBMITTAL TO FHWA: 3/11/20PROJECTS GO ON SALE (4 WEEK AD): 3/27/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
LETTING DATE: APRIL 24, 2020
M 1007-21 25 Moved to 5/19/20
M 1012-24 10X211013-97010-591-0011006-32010-633-047T
212 0.1 Mi W of W Jct TH 5/CR 131 to 0.1 Mi W of CSAH 36 - Bit. M&O, CIP Recycling, Pvmt. Reconstruction, Signal Replacements, Reduced Conflict Intersections at Morse St and CSAH 34, ADA, Drainage, Pedestrian Underpass and Trails in Norwood Young AmericaFrom 3/27/20 Trans 1/10/20
13,000,000NHPP-HSIP-TA
0212(325)
SAFO
22% Min.15% Women
M 1301-126 8 Moved to 7/24/20.
M 1921-102 3 Chesterfield Way to TWS 58 (170th St) in Empire Twp - Access Closure, Const. 3 Left-Turn Lanes and Roundabout, and at 209th St in Farmington - Const. Left-Turn LanesFrom 2/28/20 Trans 1/10/20
3,600,000HSIP 1920(099)
22% Min.15% Women
M*
8209-109 95 5th Ave in Bayport to Quant Ave in W Lakeland Twp - Repair/Replace Drainage Infrastructure, GuardrailFrom 3/27/20 Trans 1/10/20
700,000STPF 8220(149)
SLAFO
M 8825-776 xxx Districtwide - Enforcement Beacons for State Patrol Use with MnPASS Lanes
400,000State Funds
Var % Min.Var % Women
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 5-19 (4 Wk) Page 1 of 1 Version: 1/10/2020
PoDI SUBMITTAL TO FHWA: 4/3/20PROJECTS GO ON SALE (4 WEEK AD): 4/21/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
1 3116-149 169 At TH 65 in Nashwauk - Construct Reduced Conflict IntersectionFrom 3/27/20 Trans. 1/10/20
430,000HSIP
SAFO
12% Min.9% Women
1 6918-94098-080-053171-222-005171-217-009
53 At 13th St/Mt. Iron Dr and at 12th Ave W and at 2nd Ave W in Virginia - Construct Offset Turne Lane and Replace/Upgrade Signal System
1,600,000HSIP 6920(052)
SAFO
12% Min.9% Women
3 1803-40 18X08
18 2 Mi W of TH 6 - Replace Bridge over Portage Creek
700,000State Funds
12% Min.9% Women
3 7307-13 73X07
28 2.6 Mi W of TH 71 - Replace Bridge Over Stream
ELLA
600,000STPF 7321(001)
7 7201-1191001-17
5 5th St in Green Isle to TH 212 - CIR, Overlay, Lighting
ELLA
4,500,000STPF 7221(008)
SLAFO
15% Min.9% Women
8 8828-197 xxx Districtwide - Install Signs 1,100,000STPF
15% Min.Var % Women
8 8828-223 xxx Moved to 3 Week Ad
M 0283-328280-52
35 TH 35W/35E Split in Columbus to TH 8 in Forest Lake - Landscaping
300,000State Funds
22% Min.15% Women
M 1007-211006-29
25 0.1 Mi S of CSAH 30 in Mayer to State St in Watertown - Bit. M&O Add Right Turn Lane, ADA, Drainage Improvements, Extend Trail
5,800,000STPF
SLAFO
22% Min.15% Women
M 1982-200 35E NB fr. TH 77 Ramp to Safari Tr in Eagan - Noise Barriers
ELLA
2,900,000State Funds
22% Min.15% Women
LETTING DATE: MAY 19, 2020
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 5-19 (3 Wk) Page 1 of 1 Version: 1/10/2020
PROJECTS GO ON SALE: 4/28/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
8 4208-614202-285105-276401-40
xxx Repair Slide Areas at Various Locations 900,000ER PERM
15% Min.9% Women
8 8828-223 xxx Districtwide - Micro Mill and UTBWCFrom 4 Week Ad Trans. 1/10/20
ELLA
2,500,000STPF
Process A
15% Min.Var % Women
LETTING DATE: MAY 19, 2020
3 WEEK AD
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 6-5 (4 Wk) Page 1 of 1 Version: 1/10/2020
PoDI SUBMITTAL TO FHWA: 4/22/20PROJECTS GO ON SALE (4 WEEK AD): 5/8/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
3 8823-366 25 Districtwide - Lighting 125,000HSIP
SAFO
Var % Min.Var % Women
6 5508-129 55077 55078
52 1.3 Mi N of CSAH 12 over the Middle Fork of the Zumbro River In Oronoco - Repair Pier Foundations and Armoring on 2 Bridges
250,000NHPP
SAFO
15% Min.9% Women
M 2783-176 35W Under Pedestrian Bridge at 5th St SE in Minneapolis - Landscaping
90,000State Funds
32% Min.20% Women
LETTING DATE: JUNE 5, 2020
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)
T E N T A T I V E S C H E D U L E O F L E T T I N G S
Letting Date: 6-26 (4 Wk) Page 1 of 1 Version: 1/10/2020
PoDI SUBMITTAL TO FHWA: 5/12/20PROJECTS GO ON SALE (4 WEEK AD): 5/29/20
D SP No. TH
LocationType of WorkRemarks
Prelim. EstimateFunding
Fed. Proj. #
GoalsMinorityWomen
ProjectDuration
3 8602-528601-66
12 0.1 Mi E of Zephyr Ave in Montrose to 0.1 Mi N of Bridge Ave in Delano - M&O
3,100,000NHPP
SAFO
15% Min.12% Women
M 1004-34 7 0.05 Mi E of Merrywood Dr in Minnetrista to 0.21 Mi E of Smithtown Rd at Hawks Pointe Ln in Victoria - Drainage and Slope Correction
2,400,000State Funds
22% Min.15% Women
LETTING DATE: JUNE 26, 2020
Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)