T E N T A T I V E S C H E D U L E O F L E T T I N G S Letting Date: 1-17 (4 Wk) Page 1 of 1 Version: 1/10/2020 D SP No. TH Location Type of Work Remarks Prelim. Estimate Funding Fed. Proj. # Goals Minority Women Project Duration 1 * 3802-22 38018 1 CSAH 2 to 0.36 Mi SE of CSAH 2 - Approach Grading, Bit. Surfacing, Replace Bridge over the Stoney River From 12/18/19 Trans 12/16/19 2,200,000 State Funds 12% Min. 9% Women Start 3/2/20 End 5/31/21 2 * 3107-51 3107-53 31X13 T 6 1.6 Mi N CR 136 to 0.9 Mi N TH 286 - M&O, Minimal Bit. Reclaim., Lighting, and 23.2 Mi N of Deer River - Replace Bridge over Little Too Much Lake, Approaches From 12/18/19 Trans 12/16/19 ELLA 3,000,000 STPF 3120(093) SLAFO 12% Min. 9% Women Start 7/6/20 40 Working Days 3 * 4812-91 4811-74 048-070-012 169 At CSAH 11, CSAH 12, and CSAH 13 - Construct Reduced Conflict Intersections From 12/18/19 Trans 12/16/19 2,500,000 HSIP 4820(008) SAFO 15% Min. 12% Women Start 3/1/20 End 6/26/20 6 * 8826-230 xxx Districtwide - Pavement Striping at Various Locations From 12/18/19 Trans 12/16/19 IDIQ 500,000 State Funds Process A 15% Min. 9% Women Start 5/1/20 10/15/21 7 0710-113 68 Moved to 1/24/20 LETTING DATE: JANUARY 17, 2020 Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Upload: others

Post on 01-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 1-17 (4 Wk) Page 1 of 1 Version: 1/10/2020

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

1*

3802-22 38018

1 CSAH 2 to 0.36 Mi SE of CSAH 2 - Approach Grading, Bit. Surfacing, Replace Bridge over the Stoney RiverFrom 12/18/19 Trans 12/16/19

2,200,000State Funds

12% Min.9% Women

Start 3/2/20End 5/31/21

2*

3107-513107-53

31X13T

6 1.6 Mi N CR 136 to 0.9 Mi N TH 286 - M&O, Minimal Bit. Reclaim., Lighting, and 23.2 Mi N of Deer River - Replace Bridge over Little Too Much Lake, ApproachesFrom 12/18/19 Trans 12/16/19

ELLA

3,000,000STPF 3120(093)

SLAFO

12% Min.9% Women

Start 7/6/2040 Working

Days

3*

4812-914811-74048-070-012

169 At CSAH 11, CSAH 12, and CSAH 13 - Construct Reduced Conflict IntersectionsFrom 12/18/19 Trans 12/16/19

2,500,000HSIP 4820(008)

SAFO

15% Min.12% Women

Start 3/1/20End 6/26/20

6*

8826-230 xxx Districtwide - Pavement Striping at Various LocationsFrom 12/18/19 Trans 12/16/19

IDIQ

500,000State Funds

Process A

15% Min.9% Women

Start 5/1/2010/15/21

7 0710-113 68 Moved to 1/24/20

LETTING DATE: JANUARY 17, 2020

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 2: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 1-24 (3 Wk) Page 1 of 1 Version: 1/10/2020

PROJECTS GO ON SALE: 1/3/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

7*

0710-113 68 0.8 Mi W of CSAH 45 (480th Ln) to 1 Mi W of TH 169 - Slope Repair and Culvert RepairsFrom 1/17/20 Trans: 12/12/19

650,000State Funds

15% Min.9% Women

Start 3/2/2030 Working

Days

LETTING DATE: JANUARY 24, 2020

3 WEEK AD

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 3: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 1-31 (4 Wk) Page 1 of 2 Version: 1/10/2020

PoDI SUBMITTAL TO FHWA: 12/16/19PROJECTS GO ON SALE (4 WEEK AD): 1/3/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

1 0901-84 23 Moved to 3 Week Ad

1 6912-79 135 Moved to 2/28/20

2*

3107-49 31X123102-48

62

TH 2 to CR 128 in Deer River and on TH 2 fr. 0.15 Mi W of TH 6 to 1st St SE - M&O, ADA, Lighting and 4.5 Mi N of Deer River - Replace Bridge over StreamFrom 12/18/19 Trans 11/26/19

4,000,000STPF 3120(094)

SAFO

12% Min.9% Women

Start 5/18/2098 Working

Days

2*

3904-24 39X04

172 TH 11 to 0.92 Mi N of CR 8 - M&O, New Box Culvert

3,200,000STPF 3920(117)

SLAFO

12% Min.9% Women

Start 8/3/2050 Working

Days

2 6810-11 313 Moved to 3/27/20

3 3304-27 47 Moved to 2/28/20

4 0302-81 10 Moved to 3/27/20

4*

7503-38 75X01 75X02 75X03

28 350' W of 4th St W in Chokio to Lyndale Ave in Morris - Bit. Mill, CIR, Bit. Surfacing, Replace 3 Box Culvert Bridges, Snow Fence

5,200,000State Funds

12% Min.9% Women

Start 3/20/2040 Working

Days

6 5503-46 14 Moved to 3/27/20

6 5509-84 63 Moved to 2/28/20

LETTING DATE: JANUARY 31, 2020

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 4: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 1-31 (4 Wk) Page 2 of 2 Version: 1/10/2020

PoDI SUBMITTAL TO FHWA: 12/16/19PROJECTS GO ON SALE (4 WEEK AD): 1/3/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

LETTING DATE: JANUARY 31, 2020

6*

8504-82 61 1025' SE of TH 43 to 1275' SE of TH 43 - Construct 3/4 Intersection

160,000State Funds

15% Min.9% Women

Start 5/4/2016 Working

Days

6 8508-38 74 Moving to: TBD

7*

3206-20 32X021705-123205-38

71 1400' S of CSAH 38 in Jackson to S Jct TH 60 in Windom - CIR, M&O, Replace Bridge, Culvert Extensions & Lining, Guardrail, LightingFrom 12/18/19 Trans 11/20/19

9,000,000NHPP 0071(327)

SAFO

15% Min.9% Women

Start 3/15/20End 8/7/20

8*

4203-501211-898701-37 87007 87X03 87X04 87X058712-33087-622-009

23212

0.1 Mi N of CSAH 24 in Cottonwood to TH 212 in Granite Falls - Bit. Milling, Conc. & Bit. Paving, ADA, RWIS, Signal System, Lighting, Replace 3 Bridges, and on TH 212 fr. TH 23 to Jefferson Ave - 2.9 Mi of 4 Lane and 0.5 Mi of ADA

29,000,000NHPP-HSIP 0023(324)

SAFO

15% Min.9% Women

Start 3/16/20End 10/31/20

M*

2771-450217-26

610 TH 169 in Brooklyn Park to TH 10 in Coon Rapids - Sign Replacement

350,000State Funds

Var % Min.Var % Women

Start 7/13/2035 Working

Days

M*

2772-119 169 Bren Rd to 7th St in Hopkins - Landscaping 100,000State Funds

32% Min.20% Women

Start 4/7/20 End 7/15/22

M*

2782-343 35W 0.1 Mi N of 7th St to 66th St in Richfield - Conc. Pvmt Rehab, Repair Drainage Structures, Signal Revisions

370,000NHPP I35W(015)

SAFO

32% Min.20% Women

Start 5/4/20End 6/19/20

M*

6216-138 51 At Roselawn Ave in Falcon Heights and at Ramsey CR C2 in Roseville - Signal Replacement

800,000State Funds

32% Min.20% Women

Start 4/29/2145 Working

Days

C*

8816-2627 xxx Statewide - Replace Dynamic Message SignsFrom 10/25/19 Trans 8/13/19

1,250,000STPF 8820(132)

SAFO

Var. % Min.Var. % Women

Start 8/24/20End 11/13/20

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 5: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 1-31 (3 Wk) Page 1 of 1 Version: 1/10/2020

PROJECTS GO ON SALE: 1/10/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

1*

0901-84 09841 99209

23 1.5 Mi N of CSAH 8 to 1.69 Mi N of CSAH 8 - Repair Roadway, Replace Bridge at S Fork Nemadji RiverFrom 4 Week Ad Trans 1/31/19

3,300,000ER MN18(410)

SLAFO

12% Min.9% Women

Start 3/23/20End 10/2/20

4*

1401-189 10 EB fr. Partridge Ave to 305' E of Andrews Ave - Grading, Conc. & Bit. Paving

500,000State Funds

Process A

12% Min.9% Women

Start 7/13/20End 8/14/20

LETTING DATE: JANUARY 31, 2020

3 WEEK AD

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 6: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 2-28 (5 Wk) Page 1 of 1 Version: 1/10/2020

PROJECTS GO ON SALE: 1/24/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

8*

4304-534304-96T

15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, LightingAnd fr. 490' N of CSAH 115 to 100' S of 5th Ave SE - Conc. & Bit. Milling, UTBWC, ADA, Revise Signal SystemFrom 4 Week Ad Trans 11/21/19

10,000,000NHPP-STPF

0015(309)

SAFO

15% Min.12% Women

Start 4/13/20End 10/30/20

LETTING DATE: FEBRUARY 28, 2020

5 WEEK AD

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 7: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 2-28 (4 Wk) Page 1 of 3 Version: 1/10/2020

PoDI SUBMITTAL TO FHWA: 1/14/20PROJECTS GO ON SALE (4 WEEK AD): 1/31/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

1 3101-376901-29 691066931-016920-56T

173

E Jct TH 65 to N Jct TH 53 and on TH 73 fr. TH 1 to TH 53 - M&O, and on TH 53 at Jct TH 1/CSAH 115-Ashawa Rd - Const. Reduced Conflict Intersection

10,000,000STPF

SLAFO

12% Min.9% Women

1*

6912-79 135 CSAH 715/Pike-Biwabik Rd to 0.6 Mi E of CSAH 4 - Bit. Surfacing, M&O, C&G, Storm Sewer, Lighting, Utilities, ADAFrom 1/31/20 Trans 10/11/19

5,600,000STPF 6920(073)

SLAFO

12% Min.9% Women

Start 5/26/20End 9/30/21

1 6931-01 73 Associated with SP 3101-37 . .

1 6982-331 69816

35 At Lake Ave - Repair Bridge, ADA 2,100,000NHPP I350(128)

SAFO

12% Min.9% Women

3*

0503-90005-601-011005-08-010

23 0.1 Mi W of CR 1 to 0.12 Mi E of TH 95 - M&O, Revise Signal System, ADA. Lighting, and at CSAH 8 E of St Cloud - Construct Reduced Conflict Intersection

3,500,000STPF-HSIP 0520(072)

SAFO

15% Min.12% Women

Start 9/8/20End 10/28/20

3*

3304-27 33010 330114815-15

47 TH 23 in Ogilvie to TH 27 in Isle - Full Depth Reclaim, Bit. Surfacing, Lighting, and 5 Mi N of Ogilvie - Replace Bridge over Stream and Bridge over Little Ann RiverFrom 1/31/20 Trans 11/18/19

14,000,000STPF 3320(059)

SLAFO

15% Min.12% Women

Start 3/30/20End 6/15/21

4*

5601-33 210 2.1 Mi W of CR 21 to 0.4 Mi W of TH 94 - Reconstruction, Bit & Conc. Surfacing, Snow Fence, Lighting

8,100,000NHPP 0210(311)

SAFO

12% Min.9% Women

Start 5/26/20End 10/2/20

4*

7806-29 78006

75 5th St to Bridge over Mustinka River - M&O, Grading, Replace Bridge over Mustinka River

2,400,000STPF 7820(024)

SLAFO

12% Min.9% Women

Start 6/15/2065 Working

Days

6*

2408-23 248015010-09

251 1040' W of TH 35 in Freeborn Co to TH 218 in Mower Co - M&O, Pipe Culverts, ADA, Lighting, and End Posts on Bridge

6,500,000STPF 2420(155)

SLAFO

15% Min.9% Women

Start 5/4/206/4/21

LETTING DATE: FEBRUARY 28, 2020

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 8: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 2-28 (4 Wk) Page 2 of 3 Version: 1/10/2020

PoDI SUBMITTAL TO FHWA: 1/14/20PROJECTS GO ON SALE (4 WEEK AD): 1/31/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

LETTING DATE: FEBRUARY 28, 2020

6*

2482-775080-172

90 EB fr. CSAH 46 in Petran to 0.04 Mi E of TH 105 - Bit. Mill & Surfacing, Unbonded Conc. Overlay, Lighting

12,700,000NHPP I900(131)

SAFO

15% Min.9% Women

Start 5/4/2090 Working

Days

6*

2509-242511-52

57 At TH 60 in Wanamingo - Roundabout, Milling, Bit. & Conc. Surfacing, ADA, Lighting

1,750,000HSIP-STPF 2520(121)

SLAFO

15% Min.9% Women

Start 5/4/2040 Working

Days

6*

2514-124 61 NB fr. 0.51 Mi E of TH 316 to 0.23 Mi E of Aspen Ave - High Tension Cable Median Barrier at Various Locations

1,100,000NHPP 0061(340)

SAFO

15% Min.9% Women

Start 9/14/2025 Working

Days

6*

5509-84 55821 558225580-95

63 At TH 90 - Replace 2 Bridges over TH 90, Interchange Improvements, Conc. & Bit. Surfacing, Lighting, TMS, Cable Median BarrierFrom 1/31/19 Trans 11/14/19

12,000,000NHPP 0063(308)

SAFO

15% Min.9% Women

Start 4/20/20End 10/30/21

6*

5580-968580-176

90 0.58 Mi W of CSAH 10 to 0.55 Mi E of TH 74 - High Tension Cable Median Barrier

700,000NHPP I900(130)

SAFO

15% Min.9% Women

Start 9/14/206/19/21

6*

7402-347408-51

14 TH 35 to 0.61 Mi E of CSAH 43 - Install TMS 500,000NHPP 0014(341)

SAFO

15% Min.9% Women

Start 6/1/20End 9/19/20

6 8508-39 74 Moving to: TBD

6*

8508-40 85029

74 0.3 Mi NE of CSAH 30 to 0.35 Mi NE CSAH 30 - Replace Bridge over Beaver Creek

500,000STPF 8520(112)

SLAFO

15% Min.9% Women

Start 5/4/20End 7/17/20

7 0713-80 169 Dropped

7 0804-1185202-59

14 Broadway St to CSAH 21 - Landscaping 21,000State Funds

15% Min.9% Women

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 9: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 2-28 (4 Wk) Page 3 of 3 Version: 1/10/2020

PoDI SUBMITTAL TO FHWA: 1/14/20PROJECTS GO ON SALE (4 WEEK AD): 1/31/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

LETTING DATE: FEBRUARY 28, 2020

7*

1701-27 30 CSAH 7 to TH 71 - Bit. M&O, Guardrail, Drainage

ELLA

5,200,000STPF 1721(009)

SLAFO

15% Min.9% Women

Start 7/6/20 - 7/27/20

60 Calendar Days

8 4304-53 15 Moved to 5 Week Ad

M 0283-32 35 Moved to 5/19/20

M 1012-24 212 Moved to 3/27/20

M 1921-102 3 Moved to 4/24/20

M*

1982-205 35E Mendota Heights Rd to TH 55 in Mendota Heights - Lighting

1,000,000State Funds

SAFO

22% Min.15% Women

Start 4/12/21End 10/29/21

M*

6242-86 280 Energy Park Dr in St Paul to 0.2 Mi N of Como Ave in Lauderdale - Replace Lighting

310,000State Funds

32% Min.20% Women

Start 8/3/20End 6/5/21

M*

8212-31 97 At North Shore Trail/Keswick Ave in Forest Lake - Construct EB and WB Left Turn Lane and Install Lighting System

1,100,000HSIP 8220(097)

SLAFO

22% Min.15% Women

Start 4/27/20End 10/17/20

M 8825-611 xxx Moved to 3/27/20

M*

8825-629027-639-008027-661-056181-030-003

xxx On Flying Cloud Dr (CSAH 61) fr. Pioneer Tr (CSAH 1) to Valley View Rd (CSAH 39) and on Valley View Rd fr. Prairie Center Dr to Flying Cloud Dr, and on Prairie Center Dr fr. Technology Dr to Valley View Rd - ATMS Installation and Signal Optimization

1,800,000CMAQ 8820(100)

SLAFO

Var % Min.Var % Women

Start 5/4/20End 9/11/20

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 10: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 2-28 (3 Wk) Page 1 of 1 Version: 1/10/2020

PROJECTS GO ON SALE: 2/7/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

2 6002-75 2 Moved to 3/27/20

6 8826-195 xxx Dropped

6*

8826-201 xxx Districtwide - Rout and Seal at Various Locations

IDIQ

700,000State Funds

Process A

15% Min.9% Women

Start 5/4/20End 2/28/22

M 2781-447 27859 27861 27V28

94 WB Exit Ramp and EB Entrance Ramp over LRT, S 17th Ave, and Hiawatha Bike Tr just E of TH 55 in Minneapolis - Rehab 3 Bridges

2,200,000NHPP

Process A

32% Min.20% Women

LETTING DATE: FEBRUARY 28, 2020

3 WEEK AD

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 11: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 3-27 (4 Wk) Page 1 of 3 Version: 1/10/2020

PoDI SUBMITTAL TO FHWA: 2/11/20PROJECTS GO ON SALE (4 WEEK AD): 2/28/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

1 3116-149 169 Moved to 5/19/20

1 3608-48 53 Moved to 4/24/20

1 6933-100 194 Central Entrance in Duluth - Twin Ports Interchange Local Traffic Mitigation, and fr. Anderson Rd to Mesaba Ave - Mill & Inlay

600,000State Funds

12% Min.9% Women

2 5701-315706-13057-070-019170-010-007

1 At W Jct TH 59 W of Thief River Falls, At Brooks Ave, and at Barzen Ave - Roundabouts, and fr. CSAH 16 to Kinney Ave - Bit. Surface, and fr. Ruby Ave to Westside Motors - New Frontage Rd, and fr. Ruby Ave to Brooks Ave - Overlay Frontage Rd, and fr. RR tracks to TH 59 – New Pedestrian/Bike Path

6,600,000HSIP-NHPP-STPF

5720(146)

SLAFO

12% Min.9% Women

2*

5702-47 1 CSAH 18 in Thief River Falls to TH 219 - Full-Depth Bit. Reclaim., Bit. Mill and Surfacing

ELLA

6,400,000STPF 5721(005)

SLAFO

12% Min.9% Women

2*

6003-346004-28

2 WB fr. 0.19 Mi E of CSAH 44 to 0.98 Mi W of TH 32 - Mill, Crack and Seat, Overlay

ELLA

3,300,000NHPP 0002(340)

SAFO

12% Min.9% Women

2 6810-11 313 TH 11 to US/Canadian Border - M&OFrom 1/31/20 Trans 11/22/19

2,000,000CBI 6820(162)

SLAFO

12% Min.9% Women

3 1110-11 84 Moved to 2/26/21

3*

8601-61086-603-024

12 0.2 Mi W of Sunset Ave to 7th St SE in Cokato - Bi. M&O, Conc. Surfacing, ADA, Lighting,Traffic Signal System

2,400,000NHPP-STPF-HSIP

0012(317)

SAFO

15% Min.12% Women

Start 7/6/20End 6/15/21

LETTING DATE: MARCH 27, 2020

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 12: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 3-27 (4 Wk) Page 2 of 3 Version: 1/10/2020

PoDI SUBMITTAL TO FHWA: 2/11/20PROJECTS GO ON SALE (4 WEEK AD): 2/28/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

LETTING DATE: MARCH 27, 2020

4*

0302-81003-070-013117-070-001

10 At CSAH 54/E Shore Dr and at Kris St in Detroit Lakes - Intersection and Signal RevisionsFrom 1/31/20 Trans 11/12/19

2,500,000HSIP-STPF 0420(056)

SAFO

12% Min.9% Women

Start 7/6/20End 8/31/20

4*

8824-155 xxx Districtwide - Culvert Replacement at Various Locations

700,000State Funds

12% Min.9% Women

Start 8/17/20End 10/9/20

4 8824-196 xxx Aggregate Shouldering

IDIQ

500,000State Funds

Var % Min.9% Women

6*

5503-46 55X26

14 In Chester - Replace Bridge over Stream and Culvert WorkFrom 1/31/19 Trans 11/18/19

600,000STPF

SLAFO

15% Min.9% Women

6 7911-01 79000

60 At Wabasha Bridge - Paint Bridge and Replace Expansion Joint at East End

3,000,000STPF

SLAFO

15% Min.9% Women

6*

8580-174 85862 85863

90 EB over TWP 231 - Replace Bridges 6,600,000NHPP I900(132)

15% Min.9% Women

8*

3703-250607-223702-36

75 Twp 127 to TH 7 (except in Madison) - CIR & Overlay, ADA, Culvert Liners, Guardrail

8,100,000State Funds

15% Min.9% Women

M 1012-24 212 Moved to 4/24/20

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 13: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 3-27 (4 Wk) Page 3 of 3 Version: 1/10/2020

PoDI SUBMITTAL TO FHWA: 2/11/20PROJECTS GO ON SALE (4 WEEK AD): 2/28/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

LETTING DATE: MARCH 27, 2020

M 1905-41 52 S End of Cannon River Bridge in Cannon Falls to 0.2 Mi N of CR 86/280th St in Hampton Twp - Unbonded Conc. Overlay, Guardrail, Signal, Cable Barrier, and Joint Repair on Bridges

ELLA

8,300,000NHPP-HSIP 0052(342)

SAFO

22% Min.15% Women

M 2755-103 27962

100 At TH 694/94 in Brooklyn Center - Rehab Bridge, Bit. M&O, Conc. Pvmt. Rehab., and Drainage Repair on TH 100 and Ramps from TH 694 and TH 252, Guardrail

ELLA

3,600,000NHPP 0100(319)

SAFO

32% Min.20% Women

M 2781-468 94 Nicollet Ave in Minneapolis to TH 280 in St. Paul - Bit. M&O, TMS, ADA, Striping

3,900,000NHPP I940(038)

SAFO

32% Min.20% Women

M*

6217-44 9036

52 At TH 3 (Robert St) at the Mississippi River and RR 0.7 MIi SE of TH 35E and TH 94 in St Paul - Bridge Rehab.

2,100,000STPF 6220(178)

SAFO

32% Min.20% Women

M 6282-231 94 Moved to 11/20/20

M 8209-109 95 Moved to 4/24/20

M 8286-906286-61

694 TH 61 in Vadnais Heights/White Bear Lake to CSAH 10 in Oakdale - Install Continuous Freeway Lighting

2,000,000HSIP 8220(187)

SAFO

22% Min.15% Women

M 8825-611 xxx Metrowide - Replace Shelters, Cameras and CablesFrom 2/28/20 Trans 1/10/20

900,000State Funds

Var % Min.Var % Women

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 14: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 3-27 (3 Wk) Page 1 of 1 Version: 1/10/2020

PROJECTS GO ON SALE: 3/6/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

2 6002-756003-37

2 0.2 Mi W of CSAH 9 to 1.0 Mi E of TH 9 - M&OFrom 2/28/20 Trans 11/22/19

1,000,000State Funds

Process A

12% Min.9% Women

LETTING DATE: MARCH 27, 2020

3 WEEK AD

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 15: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 4-2 Page 1 of 1 Version: 1/10/2020

2-Step Prequalification LettingPROJECTS GO ON SALE: 2/3/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

2*

1106-16 200 Whipholt Roadside Parking Area - Restoration 450,000State Funds

12% Min.9% Women

LETTING DATE: APRIL 2, 2020

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 16: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 4-8 Page 1 of 1 Version: 1/10/2020

2-Step Prequalification LettingPROJECTS GO ON SALE: 2/10/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

6*

7906-100 61 Reads Landing Overlook and Lake City Concourse - Rehabilitation

700,000State Funds

15% Min.9% Women

LETTING DATE: APRIL 8, 2020

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 17: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 4-24 (4 Wk) Page 1 of 2 Version: 1/10/2020

PoDI SUBMITTAL TO FHWA: 3/11/20PROJECTS GO ON SALE (4 WEEK AD): 3/27/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

1 1604-45 16011 16X101603-53

61 Reservation Bay Rd to US/Canadian Border - Bit. Reclamation, Const. 2 Bridges

14,000,000NHPP 0061(341)

SAFO

12% Min.9% Women

1 3608-483606-563606-633615-06036-645-009036-648-011134-080-005134-103-005134-124-004

5311

0.2Mi S of CSAH 7/Memorial Dr in International Falls to TH 11/TH71/3rd St and on TH 11 fr. TH 53/4th St to TH 11/2nd Ave and on TH 53 fr. TH 11/2nd Ave to 0.1 Mi N of 2nd St, Boise MD&W RR - Mill/Inlay, ADA, Drainage, Signal Revisions, Remove Signals, Intersection Lighting

13,000,000NHPP-STPF

0053(327)

SAFO

12% Min.9% Women

1 6914-19 37 TH 53 to TH 135, incld. Broadway Ave Thru Gilbert - M&O

6,500,000STPF 6920(083)

SLAFO

12% Min.9% Women

2 1102-703102-50

2 1.4 Mi E of Cass CSAH 91 to Itasca CSAH 18 - Bit M&O at 4 Locations

ELLA

5,800,000NHPP

12% Min.9% Women

2 1502-281503-32

2 EB fr. CSAH 25 (Park Ave) in Bagley to 1.2 Mi E of TH 92 and WB fr. Park Ave to 0.2 Mi E of TH 92 - ADA, M&O, Multi-Use Trail Along N Side of TH 2 fr. Park Ave to Sunset Ave

2,300,000NHPP 0002(339)

SAFO

12% Min.9% Women

6 5501-38 14 CSAH 5 in Byron to W Circle Dr in Rochester - TMS

ELLA

600,000NHPP

15% Min.9% Women

M 0208-160 65 At MSAS 103 (Klondike Dr) in East Bethel - Construct Reduced Conflict Intersection

ELLA

1,200,000HSIP

SAFO

22% Min.15% Women

LETTING DATE: APRIL 24, 2020

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 18: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 4-24 (4 Wk) Page 2 of 2 Version: 1/10/2020

PoDI SUBMITTAL TO FHWA: 3/11/20PROJECTS GO ON SALE (4 WEEK AD): 3/27/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

LETTING DATE: APRIL 24, 2020

M 1007-21 25 Moved to 5/19/20

M 1012-24 10X211013-97010-591-0011006-32010-633-047T

212 0.1 Mi W of W Jct TH 5/CR 131 to 0.1 Mi W of CSAH 36 - Bit. M&O, CIP Recycling, Pvmt. Reconstruction, Signal Replacements, Reduced Conflict Intersections at Morse St and CSAH 34, ADA, Drainage, Pedestrian Underpass and Trails in Norwood Young AmericaFrom 3/27/20 Trans 1/10/20

13,000,000NHPP-HSIP-TA

0212(325)

SAFO

22% Min.15% Women

M 1301-126 8 Moved to 7/24/20.

M 1921-102 3 Chesterfield Way to TWS 58 (170th St) in Empire Twp - Access Closure, Const. 3 Left-Turn Lanes and Roundabout, and at 209th St in Farmington - Const. Left-Turn LanesFrom 2/28/20 Trans 1/10/20

3,600,000HSIP 1920(099)

22% Min.15% Women

M*

8209-109 95 5th Ave in Bayport to Quant Ave in W Lakeland Twp - Repair/Replace Drainage Infrastructure, GuardrailFrom 3/27/20 Trans 1/10/20

700,000STPF 8220(149)

SLAFO

M 8825-776 xxx Districtwide - Enforcement Beacons for State Patrol Use with MnPASS Lanes

400,000State Funds

Var % Min.Var % Women

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 19: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 5-19 (4 Wk) Page 1 of 1 Version: 1/10/2020

PoDI SUBMITTAL TO FHWA: 4/3/20PROJECTS GO ON SALE (4 WEEK AD): 4/21/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

1 3116-149 169 At TH 65 in Nashwauk - Construct Reduced Conflict IntersectionFrom 3/27/20 Trans. 1/10/20

430,000HSIP

SAFO

12% Min.9% Women

1 6918-94098-080-053171-222-005171-217-009

53 At 13th St/Mt. Iron Dr and at 12th Ave W and at 2nd Ave W in Virginia - Construct Offset Turne Lane and Replace/Upgrade Signal System

1,600,000HSIP 6920(052)

SAFO

12% Min.9% Women

3 1803-40 18X08

18 2 Mi W of TH 6 - Replace Bridge over Portage Creek

700,000State Funds

12% Min.9% Women

3 7307-13 73X07

28 2.6 Mi W of TH 71 - Replace Bridge Over Stream

ELLA

600,000STPF 7321(001)

7 7201-1191001-17

5 5th St in Green Isle to TH 212 - CIR, Overlay, Lighting

ELLA

4,500,000STPF 7221(008)

SLAFO

15% Min.9% Women

8 8828-197 xxx Districtwide - Install Signs 1,100,000STPF

15% Min.Var % Women

8 8828-223 xxx Moved to 3 Week Ad

M 0283-328280-52

35 TH 35W/35E Split in Columbus to TH 8 in Forest Lake - Landscaping

300,000State Funds

22% Min.15% Women

M 1007-211006-29

25 0.1 Mi S of CSAH 30 in Mayer to State St in Watertown - Bit. M&O Add Right Turn Lane, ADA, Drainage Improvements, Extend Trail

5,800,000STPF

SLAFO

22% Min.15% Women

M 1982-200 35E NB fr. TH 77 Ramp to Safari Tr in Eagan - Noise Barriers

ELLA

2,900,000State Funds

22% Min.15% Women

LETTING DATE: MAY 19, 2020

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 20: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 5-19 (3 Wk) Page 1 of 1 Version: 1/10/2020

PROJECTS GO ON SALE: 4/28/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

8 4208-614202-285105-276401-40

xxx Repair Slide Areas at Various Locations 900,000ER PERM

15% Min.9% Women

8 8828-223 xxx Districtwide - Micro Mill and UTBWCFrom 4 Week Ad Trans. 1/10/20

ELLA

2,500,000STPF

Process A

15% Min.Var % Women

LETTING DATE: MAY 19, 2020

3 WEEK AD

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 21: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 6-5 (4 Wk) Page 1 of 1 Version: 1/10/2020

PoDI SUBMITTAL TO FHWA: 4/22/20PROJECTS GO ON SALE (4 WEEK AD): 5/8/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

3 8823-366 25 Districtwide - Lighting 125,000HSIP

SAFO

Var % Min.Var % Women

6 5508-129 55077 55078

52 1.3 Mi N of CSAH 12 over the Middle Fork of the Zumbro River In Oronoco - Repair Pier Foundations and Armoring on 2 Bridges

250,000NHPP

SAFO

15% Min.9% Women

M 2783-176 35W Under Pedestrian Bridge at 5th St SE in Minneapolis - Landscaping

90,000State Funds

32% Min.20% Women

LETTING DATE: JUNE 5, 2020

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)

Page 22: LETTING DATE: JANUARY 17, 2020Project Duration. 8 * 4304-53 4304-96 T. 15 In Hutchinson fr. 100' S of 5th Ave SE to 2nd Ave NE - Reconstruct, Conc. Surfacing, ADA, Signals, Lighting

T E N T A T I V E S C H E D U L E O F L E T T I N G S

Letting Date: 6-26 (4 Wk) Page 1 of 1 Version: 1/10/2020

PoDI SUBMITTAL TO FHWA: 5/12/20PROJECTS GO ON SALE (4 WEEK AD): 5/29/20

D SP No. TH

LocationType of WorkRemarks

Prelim. EstimateFunding

Fed. Proj. #

GoalsMinorityWomen

ProjectDuration

3 8602-528601-66

12 0.1 Mi E of Zephyr Ave in Montrose to 0.1 Mi N of Bridge Ave in Delano - M&O

3,100,000NHPP

SAFO

15% Min.12% Women

M 1004-34 7 0.05 Mi E of Merrywood Dr in Minnetrista to 0.21 Mi E of Smithtown Rd at Hawks Pointe Ln in Victoria - Drainage and Slope Correction

2,400,000State Funds

22% Min.15% Women

LETTING DATE: JUNE 26, 2020

Asterisk (*) in column “D” indicates that plan has been turned in to CO. To request this document in an alternative format, contact the Affirmative Action Office at 651-366-4718 or 1-800-657-3774 or 1-800-627-3529 (Minnesota Relay) or by email to [email protected]. (Please request at least one week in advance.)