letter of intent/part i technical assistance workshop...technical assistance workshop 2016 continuum...
TRANSCRIPT
![Page 1: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/1.jpg)
Letter of Intent/Part I:Agency Administrative ReviewTechnical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE
1
![Page 2: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/2.jpg)
AgendaIntroduction
LOI/Part I Process Review
Submittal Sample
Exhibits Review
Attachments Review
One – on – One Technical Assistance
Questions
2
![Page 3: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/3.jpg)
IntroductionsNAME, TITLE, AGENCY
3
![Page 4: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/4.jpg)
LOI/Part I Process ReviewT EC H N I CA L R EQ U I R EM EN T S
D O C U M E N T P R ES E N TAT I O N R EQ U I R EM EN T S
P O I N T R E D U C T I O N S
R EA L LO CAT I O N O F U N S P E N T F U N D S
E VA LUAT I O N O F A P P L I C AT I O N CO M P O N E N T S
4
![Page 5: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/5.jpg)
Technical RequirementsPaper Submittal
◦ Original and Copy, both clearly labeled
◦ Dividers between each exhibit, attachment, and required documents.
◦ Diver must be labeled.
◦ Reference Submittal Sample
USB Submittal◦ Each Exhibit, Attachment, and Required
Documents must be its own file.
5
![Page 6: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/6.jpg)
USB Submittal Sample
6
![Page 7: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/7.jpg)
Document Presentation Requirements1. Clearly identify which version is the original and which is the copy on the cover page of the
submittal.
2. Tab Dividers will be clearly labeled between each exhibit and attachment.
3. All sections will be numbered separately within tab dividers, in accordance with the Supporting Documents Checklist.
4. Most recent documentation is submitted for each Exhibit and Attachment.
5. Complete all attachments and exhibits per LOI requirements. Do not leave any blank responses without an explanation (e.g., if the question is not applicable, indicate N/A).
6. All documents with a signature block must be signed by the authorized officer(s).
7. All supporting documents must be included in the submission.
8. All supporting documents must be legible.
9. Double-sided.
10. Timely submittal.
7
![Page 8: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/8.jpg)
Point ReductionsIn the event that the LOI/ Part I submittal does not meet the Technical Requirements and/or Document Presentation Requirements, the overall score of the Agency Administrative Review will be negatively impacted.
The following is a list of the possible reductions an Agency may receive in their overall submittal of LOI/Part I.
•3 point reduction for late applications.
•3 point reduction for not meeting the Technical and Document Presentation Requirements for original and copy submittal.
•3 point reduction for not meeting the Technical and Document Presentation Requirements for electronic copy on USB flash drive.
•3 point reduction for each incomplete or missing exhibit and/or attachment.
8
![Page 9: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/9.jpg)
ReallocationReallocation is a process allowed by HUD that allows CoC to improve its effectiveness by strategically aligning limited funding. The Commission to End Homelessness (C2eH) Executive Committee approved the following Reallocation Policy recommendations on Friday, April 22, 2016:
1. Reallocation from Agency Administrative Review – Projects not able to proceed to LOI/Part II
2. Reallocation of Unspent Funds (review of 3 years of funding/expenditures with 10% or more unexpended)
3. Reallocation of low performing projects – Permanent Supportive Housing (PSH), Rapid Rehousing (RRH), and Transitional Housing (TH)
9
![Page 10: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/10.jpg)
Evaluation of Application ComponentsEach project will be rated and ranked per the C2eH approved policy, HUD requirements, and guidelines from the 2016 HUD NOFA .
The following application components will be utilized in this scoring process:
1. Board of Director’s Roster and Resolution (Exhibit 1: Attachment 2)
2. HUD Monitoring letters (Exhibit 1: Attachment 6)
3. Project Performance Review (Exhibit 4)
4. Participation in Local Continuum of Care
5. Leverage & Match (LOI/Part II)
6. Agency Fiscal Audits (Exhibit 3: Attachment 8)
7. Housing First Model Assessment (Exhibit 5)
8. Other HUD requirements, as required by 2016 HUD CoC NOFA
10
![Page 11: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/11.jpg)
Submittal Sample
11
![Page 12: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/12.jpg)
Exhibits Review
12
![Page 13: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/13.jpg)
Exhibit 1: Lead Agency Information FormNumber of Projects
◦ Equivalent to the number of Project applications (e-SNAPs) submitted during 2015 HUD NOFA Cycle.
◦ Equivalent to the number of Project Information Charts to be completed
Total grant Amount for all Project Renewals◦ Equivalent to the grant amounts for all Project
applications (e-SNAPs) submitted during 2015 HUD NOFA Cycle.◦ Example:
Grant A $ 5
Grant B $ 6
Total $ 11
HMIS Agency Contact Person ◦ Person from your agency
◦ Not Rosa Durham or any 2-1-1 Orange County Staff
◦ Should be your Agency Administrator Information
13
![Page 14: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/14.jpg)
Exhibit 1: Lead Agency Information Form
Project Information Chart must be completed for each CoC project for which a Project application (e-SNAPs) submitted during 2015 HUD NOFA Cycle. Duplicate Project Information Chart as needed (copy and paste).
• Grant Name of Project and Grant Amount: Same as e-SNAP application
• Program Type: PSH, RRH, TH
• Primary Population Served/Population Preference: Same as e-SNAP application - 3b. Project Description, Question 3 and 3a.
14
![Page 15: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/15.jpg)
Exhibit 1: Lead Agency Information Form
There may be duplicate signatures ◦ Example: Person authorized to sign the HUD
application is also the Executive Director of the agency.
Page with signatures should be last page of Exhibit 1.
15
![Page 16: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/16.jpg)
Exhibit 2: Terms and Conditions
There may be duplicate signatures ◦ Example: Person authorized to sign the HUD
application is also the Executive Director of the agency.
16
![Page 17: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/17.jpg)
Exhibit 3: Financial Assessment
17
![Page 18: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/18.jpg)
Exhibit 3: Financial Assessment If No, no further action is required
If Yes, the chart must be completed for each CoC project in which funds were returned in the last 3 years.
◦ Example, if you returned funds in 2012 but not 2013 or 2014 the appropriate answer to select is Yes.
Duplicate charts as needed (copy and paste).
18
![Page 19: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/19.jpg)
Exhibit 4: Project Performance Review Acknowledgement
There may be duplicate signatures ◦ Example: Person authorized to sign the
HUD application is also the Executive Director of the agency.
19
![Page 20: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/20.jpg)
Exhibit 5: Housing First Model Assessment
Complete the chart for each CoC Project.
The same number of charts that are completed for Exhibit 1 should be completed for Exhibit 5.
These questions are a combination of questions from e-SNAPS from the 2015 CoC NOFA and other CoC in the country.
20
![Page 21: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/21.jpg)
Exhibit 5: Housing First Model Assessment
There may be duplicate signatures ◦ Example: Person authorized to sign the
HUD application is also the Executive Director of the agency.
21
![Page 22: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/22.jpg)
Exhibit 6: Letter of Intent to Participate in Request for Proposal for New Projects
If No, the following four questions may be left blank.
If Yes, please answer the following four questions.
Regardless of your answer to the first question, ensure that the signatures on the back are complete.
22
![Page 23: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/23.jpg)
Exhibit 6: Letter of Intent to Participate in Request for Proposal for New Projects
There may be duplicate signatures ◦ Example: Person authorized to sign the
HUD application is also the Executive Director of the agency.
23
![Page 24: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/24.jpg)
Attachments Review
22
![Page 25: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/25.jpg)
Attachment 1: Organizational ChartShould include:◦ Board of Directors (in relation to the
organization)
◦ Titles and Names of staff employed by the agency
25
![Page 26: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/26.jpg)
Attachment 2:Board of Director’s Roster and ResolutionRoster to include:◦ Name
◦ Position on the Board
◦ Note changes in key members
◦ Include and identify currently homeless or previously homeless individual per HEARTH Act requirement
Resolution must provide authorization to apply for and receive funding from your Board.
26
![Page 27: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/27.jpg)
Attachment 3: State Certificate of Status
27
![Page 28: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/28.jpg)
Attachment 4: Organization’s Code of ConductCode of Conduct should include HUD required information.
If Code of Conduct has been submitted to HUD prior to November 23, 2015
provide page number of the California look-up listing document
If no Code of Conduct has been submitted to HUD or if the name of the organization or authorized official has changed
include Code of Conduct as Attachment 4
28
![Page 29: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/29.jpg)
Attachment 5: 501 (c)3 Certification
29
![Page 30: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/30.jpg)
Attachment 6: HUD Monitoring Letter and Close Out Letter
Monitoring Letter lists out of compliance findings.
Close Out Letters list that out of compliance findings have been resolved.
30
![Page 31: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/31.jpg)
Attachment 7: A-133 auditApplicable if◦ Agency receives more than $750,000 in federal funding during a fiscal year
If not applicable◦ Still include a tab in the binder labeled Attachment 7 with a note stating “Not Applicable.”
31
![Page 32: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/32.jpg)
Attachment 8: Agency Financial Audits by Certified CPA
Exhibit 3 contains the information listed above. If there are no concerns in the financial audits, there is no need to write an explanation.
32
![Page 33: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/33.jpg)
Attachment 9: LOCCS screenshots for current Grant (per CoC Project)Include screenshot of Grant Portfolio General Grant Information
◦ Include screenshot for each CoC project for current grant year
33
![Page 34: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/34.jpg)
Attachment 9: LOCCS screenshots for current Grant (per CoC Project)
For assistance reference the eLOCCS Getting Started Guide, Section 4.0 eLOCCSScreens
◦ https://portal.hud.gov/hudportal/documents/huddoc?id=eloccsguide.pdf
If eLOCCS does not display the last three years then submit for the years available and indicate what years you were unable to submit.
eLOCCS is not accessible after 5:00pm PST.
34
![Page 35: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/35.jpg)
Attachment 10: Close- Out letters from HUD for (3) grants (per CoC Project)
35
![Page 36: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/36.jpg)
Attachment 11: Documents supporting Housing First ModelAgency must demonstrate a commitment to the Housing First Model and projects implement a Housing First Model. Please submit the following documents to demonstrate whether your program adheres to a Housing First Model: ◦ Program Rules
◦ Service Plans
◦ Applicable Documents
36
![Page 37: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/37.jpg)
One – on – One Technical AssistanceLOI/PART I DRAFT SUBMITTAL REVIEWS
37
![Page 38: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/38.jpg)
One – on – One Technical AssistanceCall or email Zulima Pelayo to make an appointment
◦ 714-589-2358
Appointments will not exceed 30 minutes.
Appointments are available on the following dates/time*:◦ Tuesday, May 3rd from 11:00am to 2:00pm
◦ Wednesday, May 4th from 8:00am to 11:00am
◦ Thursday, May 5th from 12:00pm to 3:00pm
*If all appointment slots are filled, we will schedule additional appointments outside of these timeframes.
One – on – One Technical Assistance does not guarantee invitation to participate in LOI/ Part II.
It is the agency’s sole responsibility to submit a complete and accurate LOI/Part I in accordance with the guidelines
38
![Page 39: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/39.jpg)
Deadline for LOI/Part IDeadline: Monday, May 9, 2016 by 3:00 pm Pacific Standard Time (PST)
Grace Period: Monday, May 9, 2016 from 3:00pm to 4:00pm PST
Late with Penalty: Monday, May 9, 2016 after 4:00pm PST
Hand delivered to 2-1-1 Orange CountyAttention: Zulima Pelayo1505 E. 17th Street, Suite 108Santa Ana, Ca 92705
LOI/Part I will not be accepted after the end of business day on Monday, May 9, 2016. 211OC’s hour of operation are 8:00am to 5:00pm
39
![Page 40: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/40.jpg)
More InformationEmail or call Zulima Pelayo◦ [email protected]◦ 714-589-2358
HUD Exchange:◦ https://www.hudexchange.info/
Specific questions regarding your HUD grant amount, HUD guidelines, etc. should be directed to your local HUD field office representative.
Do not contact the HUD office regarding Orange County’s local application deadlines or process.
40
![Page 41: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage](https://reader033.vdocuments.us/reader033/viewer/2022053118/609f2146ec7cce3b087f6f50/html5/thumbnails/41.jpg)
Questions
41