LET THE TRAIN TAKE YOU THERE…. SMART Operations Committee March 11, 2009 DMU Procurement Process. Presentation Overview. LET THE TRAIN TAKE YOU THERE…. 1. Procurement Process 2. Draft vehicle decision matrix 3. Tier 4 requirement 4. Next steps. SMART DMU PROCUREMENT PROCESS. - PowerPoint PPT PresentationTRANSCRIPT
LET THE TRAIN TAKE YOU THERE…
SMART Operations CommitteeMarch 11, 2009
DMU Procurement Process
LET THE TRAIN TAKE YOU THERE…
Presentation Overview
1. Procurement Process
2. Draft vehicle decision matrix
3. Tier 4 requirement
4. Next steps
LET THE TRAIN TAKE YOU THERE…
SMART DMU PROCUREMENT PROCESS
LET THE TRAIN TAKE YOU THERE…
SMART DMU PROCUREMENT PROCESS
LET THE TRAIN TAKE YOU THERE…
SMART DMU PROCUREMENT PROCESS
LET THE TRAIN TAKE YOU THERE…
Vehicle Options
Siemens: FRA compliant, married pair DMU rendering
Siemens:
Non-FRA compliant, articulated light DMU
(in Service at NCTD)
LET THE TRAIN TAKE YOU THERE…
Vehicle Comparison Table
LET THE TRAIN TAKE YOU THERE…
Vehicle Comparison Table
LET THE TRAIN TAKE YOU THERE…
Vehicle Comparison Table
LET THE TRAIN TAKE YOU THERE…
Vehicle Comparison Table
LET THE TRAIN TAKE YOU THERE…
EPA Emission Requirement Tier 4
• Tier 4 applicable for engines built after January 1st 2011
NTP is expected at the earliest in July 2010; too late to order Tier 3 engines
• Tier 4 implications on vehicle:
- Larger engine cooling equipment- Particulate filter in exhaust pipe- SCR equipment and urea tank to eliminate NOx emissions.
• Tier 4 is applicable to FRA and non-FRA compliant DMUs
• Expected engine replacement in 2020.
Replacement engines will have to be Tier 4 compliant. This means the DMUs would have to be substantially upgraded at that time after only 5 to 6 years in service.
LET THE TRAIN TAKE YOU THERE…
Vehicle Technology Selection Study Update
LET THE TRAIN TAKE YOU THERE…
Vehicle Technology Selection Study Update
LET THE TRAIN TAKE YOU THERE…
Vehicle Technology Selection Study Update
LET THE TRAIN TAKE YOU THERE…
Next Steps
1. Decision on temporal separation
2. Outreach to the FRA
3. Decision on operating schedule
4. Draft Vehicle specification and other RFP documentation