Page 1: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

Lessons Learned on Concrete Pavement Patching

Virginia Concrete ConferenceMarch 9, 2012

Thomas R. Tate, P.E.

Senior Pavement Engineer

Hampton Roads District Materials

Page 2: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

2

Project Development

• Determine needed patch types• How to set patch limits• Establish accurate(?) quantities• Include patch locations• Traffic control, lane closure considerations (MOT)

Page 3: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

3

Project Development

In the beginning:• Identify (see) need• Identify project limits• Pavement evaluation• Scoping meeting• Develop contract

Page 4: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

4

Project Development

Identify (See) Need• Low pavement rating (low CCI)• Rough pavement• Failing joint sealant• Visible distresses• Poor maintenance history• Customer complaints

Page 5: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

5

Project Development

Identify Project Limits• Original construction project limits• Change in pavement type• Change in pavement width• Limit by physical boundaries• Set limits by funding

Page 6: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

6

Project Development

Pavement Evaluation, Why?• Determine existing pavement thicknesses (mainline,

shoulders, concrete thickness/type, base thickness/type, subgrade condition, etc.)

• Determine cause of observed distresses• Determine structural capacity of existing pavement

layers• Condition of bases• Condition of subgrade• Material reactions?• Drainage issues?

Page 7: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

7

Project Development

Scoping Meeting

Bring all stake holders together• Funding (Maintenance or Construction)• Materials• Design• Construction• Traffic Engineering• Structure & Bridge• Operations• Others

Page 8: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

8

Project Development

Develop Contract• Determine needed patch types• How to set patch limits• Establish accurate(?) quantities• Include patch locations• Traffic control, lane closure considerations (MOT)

Page 9: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

9

Project Development

Determine Needed Patch Types

Patch Type JCP CRCP

Type I X

Type II X

Type III X

Type IV X

Anchor Slab X

Approach Slab X X

Page 10: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

10

Project Development

Patch Limits

Jointed Concrete Pavement (JCP) Types I & II• Minimum 6 ft long• Full lane width (12 ft)• Minimum 1 ft past/beyond distress (failed joint, pot

hole, failed crack, etc.)• Minimum 1 ft past/off existing joint• Minimum 10 ft between patches

Page 11: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

11

Project Development

Patch Limits

Continuously Reinforced Concrete Pavement (CRCP) Type IV

• Minimum 6 ft long• Full lane width (12 ft)• Minimum 1 ft past/beyond distress (punch out,

asphalt patch, cluster cracks, Y-cracks, etc.)• Minimum 1 ft past/off existing transverse crack• Minimum 10 ft between patches• Headers?

Page 12: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

12

Project Development

Accurate Quantities• Patching• Joint Sealing• Crack Sealing• Slab Jacking• Shoulder Rehab• Traffic Items (Guardrail, Pavement Markings, etc.)

Know Limits of Work!!!!

Page 13: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

13

Project Development

Accurate Quantities

Patching – Estimating Quantities• Shoulder survey (walk or in vehicle)• Video survey• Sample survey• Others?

Page 14: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

14

Project Development

Severity level 2 cluster cracking – patch.

Page 15: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

15

Project Development

Severity level 1 cluster cracking

Page 16: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

16

Project Development

Accurate Quantities

Patching• Work will be done one or more years after estimated• What is purpose of patching?• Will the concrete pavement be left exposed or will it

be overlaid?• Expect quantities to increase from time of estimate

until pavement is actually patched (how many more winters will pavement go through?)

Page 17: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

17

Project Development

Patch Locations• Near other patches• Near bridges or overpasses• Near or within interchanges• At pavement changes

Page 18: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

18

Project Development

Traffic Control/Lane Closure Considerations• Limitations of Operations (LOO)• Will a waiver of standard LOO be needed• Is there other work going on or planned in general

vicinity of project?• Operations (Tunnels, Bridges, TOC)

Page 19: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

19

Project Development

Special Provisions or Copied Notes for:• Concrete Patching• Concrete Grinding• Re-Sealing Joints• Sealing Joints or Cracks• Rideability• Asphalt Work• XJ-1 Joints

Page 20: Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012 Thomas R. Tate, P.E. Senior Pavement Engineer Hampton Roads District

20

Project Development

Questions?