    LEGIONELLA UPDATE

    Qubec 2012:Learned, Done & to Do

    Alain Trahan,

    P.Eng.

    20th of March

    2014

    http://cmpxshow.com/
  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    2/56

    Cooling towers are the outside

    heat sinks that exhaust the heat

    carried by the air conditioning

    cooling water circuit used inbuildings HVAC systems.

    www.h2obiotech.com

    What is a cooling tower?

    Pump

    HVAC

    Air

    conditioning

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    3/56

    www.h2obiotech.com

    What is a cooling tower?

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    4/56

    Step 1:

    www.h2obiotech.com

    How it works

    Step 2:

    Magic of evaporation

    Liquid water + energy Water vapor (with less energy remaining in the liquid)

    Evaporative cooling

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    5/56

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    6/56

    www.h2obiotech.com

    In the real dirty world

    Dry air Dry air

    WindBuilding fresh

    air intake louvers

    Building fresh

    air intake louvers

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    7/56

    Simple definition:

    An ubiquitous aquatic organism that causes Pontiac Fever

    and Legionnaires disease (lung infection) if inhaled.

    Thrives in temperatures between 77 and 122 F.

    Travels from infected water source through aerosolized water

    droplets.

    www.h2obiotech.com

    Legionella pneumophila

    In the United States

    10,000 to 20,000 people get infected by legionella every year.

    Various studies have shown that some 40 to 60% of tested cooling towers contained Legionella.

    Legionnaires disease mortality rate: 10 to 15% of those infected.

    Cooling tower drift

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    8/56

    www.h2obiotech.com

    Biofilms

    Form on surfaces in aquatic systems.

    Often resistant to biocides.

    Monitoring is difficult.

    Release organisms into bulk fluid.

    Cost the US nation billions of dollars yearly in equipment damage, product

    contamination, energy losses and medical infections.

    Bacteria

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    9/56

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    10/56

    Qubec 2012: Source?

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    11/56

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    12/56

    www.h2obiotech.com

    24% had Lp sp1!

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    13/56

    www.h2obiotech.com

    Before: ASHRAE 62.1-2010

    Specifies minimum distances between CTs vs

    Air Intakes & Kitchen exhausts.

    Not frequently applied especially by architect.

    Mitigation : UVGI of fresh Air: always when high risk

    occupants

    Project the CT plume higher

    Prevent food particles from reaching the CT.

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    14/56

    www.h2obiotech.com

    Before: Pesticide Regulatory System

    Pesticides need to be approved by HC for each

    use with application guidelines.

    Sellers & applicators need certification.

    Reality : Provincial application.

    No processes for CT biocides!

    >75% non compliance in commercial blds for

    concentration, contact time or hydraulics.

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    15/56

    www.h2obiotech.com

    Before: Guidelines not Standards

    ASHRAE 12-2000

    AWT 2003 (2008)

    CTI WTB-148 (2008)

    CDC

    Reality : Contradict each other.

    Incomplete.

    Control is left to water treatment as a last step

    in general. Voluntary: doesnt work.

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    16/56

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    17/56

    www.h2obiotech.com

    During

    Hopes of official that situation would go away

    by itself

    High dose oxidizing biocide only.

    CDC protocol ASSumes surfaces are clean &

    circulation in whole system. Plan created during crisis.

    Localisation & owners unknown.

    No early public communication.

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    18/56

    www.h2obiotech.com

    Lessons : Emergency planning

    Have a plan of action: If this then that, etc.

    What, Where, How, When, Who.

    Work upstream of Legionella. Do not ASSume or Hope-away.

    Legislate.

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    19/56

    www.h2obiotech.com

    Lessons : Immediate steps

    Stop the fans!

    Ultra High Efficiency drift eliminators

    Decontamination: Clean first to remove deposits. Circulate in whole system.

    Fast acting biocide that keeps its efficiency

    throughout the system.

    Know system volume.

    Analyze biocide concentration

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    20/56

    www.h2obiotech.com

    Lessons : Involve outside experts

    Interview with an official from the health agencyDSP followed by one with the building code

    agency, RBQ

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    21/56

    www.h2obiotech.com

    Lessons : Involve outside experts

    Interview with an official the RBQBuilding CodeAgency

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    22/56

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    23/56

    www.h2obiotech.com

    2013 Law: Form signed by Owner!

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    24/56

    www.h2obiotech.com

    4 Dimensions of Risk Management

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    25/56

    www.h2obiotech.com

    Interrelation of the 4 dimensions

    Law Description WaterTreatment

    Hydraulic Solids Drift

    402.1 Overwintering X X X X

    402.2 Operational stops X X

    402.3 Decontamination X X X X

    402.4Corrosion, Scale,

    OrganicsX X X

    402.5 Schematics X X X

    402.6 Water treatment quality X X X

    402.7 Chemicals X

    402.8 Mechanical Verification X X

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    26/56

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    27/56

    www.h2obiotech.com

    Law 2013, phase I: the Good

    LevelResult

    (logs/L)Action

    Normal < 4

    Intervene 4 - 6Identify causes. Validate efficiency of new

    measures.

    Sanitary Risk > 6

    Apply Decontamination. Identify root

    causes & correct maintenance plan.Validate efficiency of new measures.

    Test for Legionella pneumophila.

    Legionella pneumophila Test concentration & Action Levels

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    28/56

    www.h2obiotech.com

    2013 Phase I: Lessons

    Plans : copy-paste

    Schematics have or are:

    Not up-to-date No flow speed or materials of

    construction

    No zones of stand-by operation Inspectors have no powers.

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    29/56

    www.h2obiotech.com

    After: Coroners report, 2013-09

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    30/56

    www.h2obiotech.com

    After: Public Health Report

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    31/56

    www.h2obiotech.com

    After: Media reports

    Radio-Canada (CBC) had a 30

    minutes piece that showed

    delayed actions by officials.

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    32/56

    www.h2obiotech.com

    After: Workers Health & Safety

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    33/56

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    34/56

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    35/56

    www.h2obiotech.com

    After: Very Good CT Guide

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    36/56

    www.h2obiotech.com

    After: Excellent Full Day Training

    Michelle Merchat, Climespace

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    37/56

    www.h2obiotech.com

    Law 2014, phase II: the Excellent

    Specific cleaning step

    independant from

    decontamination Stop the fans if log 6 or more

    Identification of sampling points

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    38/56

    www.h2obiotech.com

    Law 2014, phase II: the Good

    Mandatory testing for Legionella

    p. every 30 days at most.

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    39/56

    www.h2obiotech.com

    Interrelation of the 4 dimensions

    Law Description WaterTreatment Hydraulic Solids Drift

    402.7a Sampling Points X

    402.8 Chemicals X

    402.9 Mechanical Verification X X

    406 Log book X X X

    407+

    408Sampling procedures X X

    417 4-6 logs Action Plan X X X X

    418 Interfering flora X x

    419 >6 logs, Action Plan X X X X

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    40/56

    www.h2obiotech.com

    Interrelation of the 4 dimensions

    Law Description WaterTreatment Hydraulic Solids Drift

    402.1 Overwintering X X X X

    402.2 Operational stops X X

    402.3 Decontamination X X X X

    402.4+

    402.9Preventive Cleaning X X X X

    402.5Corrosion, Scale,

    OrganicsX X X

    402.6 Schematics X X X

    402.7 Water treatment quality X X X

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    41/56

    www.h2obiotech.com

    Beyond: What we do

    Guidelines, Standards & Regulationsare a minimum

    ASHRAE 188 methodology

    Zero risk does not exist.Risk = Probability x Consequences

    Multiple barriers: if one fails we avoid

    an outbreak

    Non-oxydising biocide measurement

    On-site one hour Legionella

    measurement!

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    42/56

    www.h2obiotech.com

    Risk Assessment: beyond 62.1

    Risk = concentration x duration. Occupants: long exposition.

    High riks by Common Sense :

    Close to ground, next to parking, bld entrance. Next to roof terrasse, balconies.

    Adjacent to open windows.

    Mitigation: UHE eliminator, lower C, continuous

    or low tox or permanent biocide. Ex: Cu/Agionisation

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    43/56

    www.h2obiotech.com

    Beyond: Flow Speed

    Higher flow speed = less biofilm5+ fps up to 10 fps especially for

    horizontal lines.

    No dead legs: mitigation approach

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    44/56

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    45/56

    www.h2obiotech.com

    Beyond: Deposits & Corrosion

    Variable speed motors to avoid: Total evaporation deposits

    Stray current corrosion.

    Mechanical action to remove deposits. Zinc coatings are subject to white rust

    corrosion.

    Copper to steel surface ratio.

    Is it clean?

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    46/56

    www.h2obiotech.com

    Back-Flow Preventer

    Biocide means kill the biological

    Some are banned from hospitals!

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    47/56

    www.h2obiotech.com

    Water Meter & Level Control

    Towers purge water but take no make-

    up?!?

    No moving parts Water meter.

    Convert from continuous water MU to

    ON-OFF.

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    48/56

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    49/56

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    50/56

    www.h2obiotech.com

    Local Control: Average

    Most common currentlyT compensated conductivity by dual

    carbon probes

    Flow switch, Pre-bleed, Bleed block,

    Water meter input, permanent program.

    Toroidal Conductivity :

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    51/56

    www.h2obiotech.com

    Probe

    Toroidal Conductivity :deposits & chem.

    Valve

    Ball valve, not solenoid :

    plugging.

    Meter

    No moving parts & lowflow range.

    Level

    Chem inventory, water MU

    control.

    Wireless Meter, valve, level, etc.

    pH+ORP Oxydizing biocides dosing.

    Record

    Conductivity, T,Meter, etc.

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    52/56

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    53/56

    www.h2obiotech.com

    Beyond: Internal Tank

    Last in, last out: hydraulic factor closer to

    1

    PE instead of steel

    Easy to access

    Bottom does not favor accumulation

    Affects biocide selection & risk strategy

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    54/56

  • 8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show

    55/56

    Thank you!

    Alain Trahan, [email protected]

    (514) 943-9044Prepared [email protected]