legend - bridge city...typical road sections: legend: g-lta interlockers: bus lay bys and crossings...
TRANSCRIPT
Paved Bus Laybysand Walkways- RedG - LTA interlockers
Asphalt treatment onRoad surfaces anddesignated 1.5msidewalksPaved Sidewalksalong mainboulevard-220x220Bridge CityFlagstone
0.500m Hedgetreatment
Trees along Torvale Crecent at20m centres
Lawn Area
Bridge City DoubleOutreach Arm lightsalong main boulevard@ 10m centres
Bridge City SingleOutreach Arm lights@ 20m centres
Paved Islands -Corobrik pavers
Embankment
110 x 110 Cobblepavers
Trees in movable planter boxes alongBoulevard at 20 m centres
Informal tree planting
( Note: All trees to be specifiedby landscape architect)
Project Name:
Project Description:
Drawing Title:
Client:
Consultant:
Locality:
Revisions:
U R B A ND E S I G N P L A N
D E S I G N O F T H E S T R E E T S C A P E A N DP U B L I C S P A C E F O R B R I D G E C I T Y L O W E RP L A T F O R M
L O W E R P L A T F O R M S T R E E T S C A P ED E S I G N
Date:
Scale:
Designed:
Checked:
Approved:
Drawing Number:
16/03/2012
1:750 ( Main Drawing)
BC - LP - LAND - 10428 - 02
Cobble Pavers:Around Magistrates Court110mm X 110mm X 50mm :
Double Outreach Arm Light :
LIGHTS :
Special Notes
1. All areas and dimensions are approximate and subject to final survey.
General Notes:
1. These drawings are to be read in conjunction with structural, civilengineering drawings.2. Contractors to verify all levels , heights and dimensions on site and tocheck same against the drawing before any work is put in hand.3. Contractors to locate and identify all existing services on site andprotect these from damage throughout the duration of the works.4. Contractor is responsible for correct setting out of work with particularreference to boundaries, building lines etc.5. Any errors ,discrepancies or omissions to be reported to the architects/urban designers immeadiately and any queries arising to be reported tothe architects/urban designers for clarification before any work is put inhand.6. Contractor to check the details shown on this drawing for compliancewith the standards of good building practise with particular reference tospecial requirements necessistated by local and/or on site conditions andto report this to the architects/urban designers.
Corobrik Pavers :Centre Islands220mm x 110mm x 50mm(Herringbone Pattern):
1:200 ( Sections)
TYPICAL ROAD SECTIONS:
LEGEND:
G-lta interlockers:Bus lay bys and crossings220mm x 110mm x 80mm
PAVING:
Material- Glass fibre reinforced polyconctreteHeight - 900mmTop Widths - 1.2mBottom Widths - 1.1mWeight - 70kgAvailable variations - Any pot height between 100mm and 900mm from the base up / anypot ring between 100mm and 900m from the top edge down. 40mm pot return standard.Finish options - Silk screening, embossingNote: Trees to be specified by landscape architect
Smartstone:Sidewalks220mm X 220mm x 50mm
TREE PLANTERS: Along BoulevardQuantity: 21
IGNP004 -1.2m Square Planterby Igneous Concrete
C
C
B
B
AA
SH
AV
PTN 477 OF 433
PTN 1 OF ERF 6
ERF 2
ERF 1
PTN 2 OF ERF 5
ERF 4
PTN 477 OF 433PTN 537
PTN 541
PTN 468 OF 432
PTN 456 OF 432
PTN 455 (OF 432)
REM OF PTN 432
PTN 452 (OF 432)
PTN 506
PTN 486
PROPOSED PTN 115
3,00m S & D SERV.
2,00m Security and Cable Servitude
PROPOSED 3m SEWER SERV.
Embankment and Services Servitude
PTN 1 OF ERF 5
PTN 130 OF ERF 8
PTN 131 OF ERF 8
PTN 132 OF ERF 8
PTN 133 OF ERF 8
ERF 9
ERF 10
ERF 11
ERF 12
ERF 13
ERF 14
ERF 15
PTN 3 OF ERF 5
PTN 148 OF ERF 8
1,4908 Ha. gross
2,9545 Ha. gross
2646m`
1081m`
1078m`
1390m`
4748m`
4506m`
4619m`
857m`
38
74
26
26
26
23 74
57
57
59
18
17
17
17
17
17
13
2121
211216
106
16
16
1616
16
16
62
62
54
54
53
75
98
57
13
20
40
198
41
11
10
10
1010
11
66
76
8
11
9
9
99
9
3
7
70
20
30
70
47
24
23
23
24
36
9
19
15
74
14
15
15
15
15
13
46
22
41
27
69
4
REM OF ERF 16
REM OF ERF 173749m`
2581m`
15
15
180
41
1
9
10
14
40
50
75
50
79
15
7,50m NO PARKING LINE
10,00m BUILDING LINE
10,00m BUILDING LINE
B R I D G E C I T Y B O U L E V A R D ( 2 4 , 0 0 m )
T O R V A L E C R E S C E N T ( 2 4 , 0 0 m )
BRIDGE CITY BOULEVARD PROPOSED EMBANKMENT SERVITUDE
(IN FAVOUR OF THE MANAGEMENT ASSOCIATION)
PROPOSED EMBANKMENT SERVITUDE
(IN FAVOUR OF THE MANAGEMENT ASSOCIATION)
(ROAD)
2
8
21
11
12
21
7
8
39
4
65
65
65
65
65 65
65
67.5
67.5
50
50
50
50
52.5
52.5
52.5
52.5
47.547.5
47.5
47.5
55
55
55
55
57.5
57.5
57.5
57.5
60
60
60
62.5
62.5
62.5
42.5
42.542.545
45
45
45
45
37.5
40
40
42.5
42.5
42.5
45
1,1314 Ha. net
2,1628 Ha. net
52
43
43,5
43
43
43
44
46
47
48
46
47
48
45
44
44
45
44
44
44
46
46
47
48
49
43,5
44,5
44,5
45,5
46,5
48,5
50
3927 44
41
52
64248 18
31
PTN 504
73m`
1m`
61m`
30ERF 1874m`
79
53
10,00m
BUILDING LINE
7,50m NO PARKING LINE
3,1722 Ha. gross
2,7177 Ha. net
7,50m NO PARKING LINE
10,00m BUILDING LINE
95
6
11
28
16
46
36
217m`
1,2290 Ha. gross
1,0944 Ha. net
7768m` gross
7190m` net
7618m` gross
6854m` net
3689m`
1,1892 Ha. gross
7067m` net
11
97
40
59
70
45
25
91
101
44
10
44
54
33
36
102
40
18
30
28
41
4
14
PTN 149 OF ERF 8
(ROAD)
PTN 3 OFERF 6(ROAD)
PTN 1 OFERF 17
PTN 1 OFERF 16
PTN 147 OF ERF 8
PTN 2 OFERF 6
PROPOSED EMBANKMENT SERVITUDE(IN FAVOUR OF THE MANAGEMENTASSOCIATION)
PROPOSED PTN 48
PROPOSED PTN 47
PROPOSED PTN 46
PROPOSED PTN 49
43m
43m
44m
44m
44m
44m
44m
44m
46m
46m
46m
46m
46m
47m
43m
43m
45m
45m
45m
45m
45m
45m
42m
42m
43m
43m
44m
44m42m
43m
43m
46m
46m
47m47m
45m
45m
46m
47m
45m
46m
46m
47m
44.5m
46m
47m
48m
48m
49m
49m
46m
46m
45m
50m
50m
50m
50m
SECTION C-C
Lawn area5.5m
Sidewalk1.5m
Hedge1.2m
Ker
b0.
5m
Sidewalk1.5m
Hedge1.2m
Ker
b0.
5m
Lawn area5.3m
Lane3.4m
Lane3.4m
Asphalt Asphalt
SECTION A-A
Embankment
Side
wal
k
Ker
b Lane Lane
Ker
b Sidewalk Embankment6.4m 1.2m 0.
5m
0.5m
3.5m 4.0m 2.5m 5.4m
Asphalt
Asphalt
natural ground line
SECTION B-B
Sidewalk2.6m 0.
5H
edge
0.5
Ker
b Lane5.5m
Lane3.5m 0.
3K
erb
0.3
Ker
b
Med
ian
1.4mLane5.5m
Bus Lane3.0m
Sidewalk2.5m0.
5K
erb
Paved Paved
Preffered colour option :Soot