led center basket troffers

8
1 Beyond LED Technology | 1939 Parker Ct, Stone Mountain, GA, 30087 Due to continuous product improvement, information in this document is subject to change. LED Center Basket Troffers ZAT Series LED CENTER BASKET TROFFERS • Up to 130 Lumens per watt • Durable steel construction • White polyester powder-coat finish • Precision engineered polystyrene diffuse • Pre-installed driver ZAT Series • Installs into conventional grid ceiling • 0-10V dimming capabilities • Built-in Standard earthquake clips • Universal 100-277Vac 50-60Hz • DLC premium Beyond LED ZAT Series Basket troffers offer uniform illumination and excellent energy savings when you replace traditional T5, T8, or T12 fluorescent troffers. Our ZAT Series troffers deliver soft, glare-free, ambient lighting in a popular center-basket design. The slim profile and energy-saving LED technology make ZAT the ideal choice for renovation or new construction.

Upload: others

Post on 24-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LED Center Basket Troffers

1 Beyond LED Technology | 1939 Parker Ct, Stone Mountain, GA, 30087Due to continuous product improvement, information in this document is subject to change.

LED Center Basket TroffersZAT Series

LE

D C

EN

TE

R B

AS

KE

T T

RO

FF

ER

S

• Up to 130 Lumens per watt• Durable steel construction• White polyester powder-coat finish• Precision engineered polystyrene diffuse• Pre-installed driver

ZAT Series

• Installs into conventional grid ceiling• 0-10V dimming capabilities • Built-in Standard earthquake clips• Universal 100-277Vac 50-60Hz• DLC premium

Beyond LED ZAT Series Basket troffers offer uniform illumination and excellent energy savings when you replace traditional T5, T8, or T12 fluorescent troffers. Our ZAT Series troffers deliver soft, glare-free, ambient lighting in a popular center-basket design. The slim profile and energy-saving LED technology make ZAT the ideal choice for renovation or new construction.

Page 2: LED Center Basket Troffers

2(866) 786-1117 • www.BeyondLEDTechnology.comDue to continuous product improvement, information in this document is subject to change.

LED Center Basket TroffersZAT Series

LE

D C

EN

TE

R B

AS

KE

T T

RO

FF

ER

S

CORRELATED COLOR TEMPERATURE (CCT)

Specifications

PRODUCT DESCRIPTION

ORDER INFORMATIONEXAMPLE:TF22-DM-40P

Product category Size Dimming Fixture wattage CCT

TF= Troffer fixtureD=0-10v

Dimming22=2'X2' 40=4000k

50=5000k

PROJECT NAME

CATALOG NUMBER

NOTES

FIXTURE TYPE

Version

P=Premium

2'X2' CCT TunableLED Troffer Fixture

PERFORMANCE SUMMARY

Efficacy: 125LPW

Delivered Light Output: 4375lm

Input Power: 35Watts

CRI: Ra>80

Tunable CCT: 3000K/4000K/5000K with a selector switch

Input Voltage: 100-277 VAC

Input current: 0.30A

THD:<20%(at 277V)

Standard Warranty: 5 Years

Standard Lifetime: Designed to L70 minimum 50,000 hours

Mounting: Recessed

Dimensions: L 23.7” x W 23.8” x H 2.8”

Fixture measurement and weight are round up,pls contact your OKT representative for

Signal Current: <2mA

Power Factor: >0.9(277V)

Driver output: DC27-40V, 0.91A

exact data.

Recommended Dimmers:DIVA-DVTV(LUTRON),IP710-DL(LEVITON)

REGULATORY & VOLUNTARY QUALIFICATIONS

DLC Qualifications

UL Listed

Damp Rated Yes

YES

YES

LM79 Report YES

Shenzhen OKT Lighting Co LTD., . Tel: +86-755-61157553 Mail: [email protected] www.oktlighting.com

The 2X2FT LED troffers fixture are delivering high Lumen of exceptional 80+ CRI light

while achieve 125 lumens per watt. It is available in 3000k, 4000k, 5000k Tunable CCT

options and 0-10V dimming, which is perfect for new construction applications or

retrofitting existing fluorescent troffer fixtures with recessed installation, widely used in

office spaces, major retail stores, education, government, healthcare, and hospitality.

30=3000k

Dimension

23.8"

23.7"

2.8"

M=35WVersion

0-10V dimming (20%-100% smooth dimming)

2x2’ Models

SKU # Model # Watts Lumens CCT Dimmable Input Voltage Size Certifications

150145 BLT-TF22-DM-50P 35W 4600Lm 5000K Yes 100-277Vac 2X2’ UL & DLC

150146 BLT-TF22-DM-40P 35W 4500Lm 4000K Yes 100-277Vac 2X2’ UL & DLC

ZAT Series

CCT: 150145 5000K / 150146 4000K

Efficacy: 130Lm/W

Page 3: LED Center Basket Troffers

3 Beyond LED Technology | 1939 Parker Ct, Stone Mountain, GA, 30087Due to continuous product improvement, information in this document is subject to change.

Dimensions

Drawing

Due to continuous product improvement, information in this document is subject to change.Revision Date: 01/17/20191939 Parker Ct Suite C Stone Mountain, GA 30087 | Phone: (866) 786-1117 | www.beyondledtechnology.com

_______________________________________________________

Notice For User• Please turn off power before install or change assembly parts.• The input voltage and lamps should be matched, after connecting the power line,

Please make sure the wiring section is insulated• Licensed Electrician Installation ONLY.

PackageLamps Net Weight Qty/Carton Size Weight/Carton

14.11 lbs48.75” x 25.5” x 4”1 PCS

Indoor Lighting2’ x 4’ Troffer Lights

10.6 lbs

LED

TROFF

ER

LIG

HTS

LED Center Basket TroffersZAT Series

LE

D C

EN

TE

R B

AS

KE

T T

RO

FF

ER

S

2.76

23.7

4”

23.82”

2’ x 2’

Packing

SKU # Model # Pcs/Box Dimensions Weight Pallet Quantity Pallet Weight Pallet Dimensions

150145 BLT-TF22-DM-50P 1 25” X 25” X 3.54” 9.22 Lbs.

150146 BLT-TF22-DM-40P 1 25” X 25” X 3.54” 9.22 Lbs.

Page 4: LED Center Basket Troffers

4(866) 786-1117 • www.BeyondLEDTechnology.comDue to continuous product improvement, information in this document is subject to change.

Distribution Diagram

LED Center Basket TroffersZAT Series

LE

D C

EN

TE

R B

AS

KE

T T

RO

FF

ER

S

STANDARD-TECH Report No.:GZE1706040-A

Laboratory: Standard-Tech Co. Ltd Testing CenterNVLAPCODE: 201011-0

Report Format Number STD/QR4909-A/2Address:Standard-Tech Building, No.6 Guanhong Road,Guangzhou Science City, Guangzhou 510663, China

Tel: 8620-3229 0320 Fax: 8620-32290422 http://www.standard-tech.com6 / 12

Photometric Data

2x2’ Models

STANDARD-TECH Report No.:GZE1706040-A

Laboratory: Standard-Tech Co. Ltd Testing CenterNVLAPCODE: 201011-0

Report Format Number STD/QR4909-A/2Address:Standard-Tech Building, No.6 Guanhong Road,Guangzhou Science City, Guangzhou 510663, China

Tel: 8620-3229 0320 Fax: 8620-32290422 http://www.standard-tech.com6 / 12

Photometric Data

Page 5: LED Center Basket Troffers

5 Beyond LED Technology | 1939 Parker Ct, Stone Mountain, GA, 30087Due to continuous product improvement, information in this document is subject to change.

Installation

LED-(WHITE)

WHITE

WIRING DIAGRAM

LED Driver

Troffer Housing

LED Board

Ensure the power supply has been cut off before connecting the wire, and all wiring and installation of this product are required to be operated by professionals.

Electric Shock Attention

Shenzhen ZENITH Technology Co., Ltd.Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.

Huizhou ZENITH Technology Co., Ltd.Facory: 2/F Building 1,ChangFang LIGHT Industrial Psrk.No.6 DongXin Road,DONGjiang Hi-Tech Industrial Zoe,HUICHENG District,SHUIKOU Town,HUIZHOU CITY;CHINA. 516255

www.led-zenith.com

Step1 Step2

Step2-2

Step2-1

Step1-2Step1-1A B

90

90

INSTALLATION INSTRUCTION

Step 2: Lift the 4 buckles on the back of the panel up by 90° then bend the top part of the buckles 90° towards the direction where you can anchor the light fixture to the T-bar.

Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile that you need to install light fixture on. Then place the light fixture on the T-bar carefully and make sure it is correctly in place and secure.

Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)

AC-N

AC-L

GREEN

LED-LED+DIM-DIM+

PC Cover

CCT adjustmentPower regulation

Warning:Make sure all the power is off before installation. All the installations are required to be done by professionals.

LED-(WHITE)

WHITE

WIRING DIAGRAM

LED Driver

Troffer Housing

LED Board

Ensure the power supply has been cut off before connecting the wire, and all wiring and installation of this product are required to be operated by professionals.

Electric Shock Attention

Shenzhen ZENITH Technology Co., Ltd.Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.

Huizhou ZENITH Technology Co., Ltd.Facory: 2/F Building 1,ChangFang LIGHT Industrial Psrk.No.6 DongXin Road,DONGjiang Hi-Tech Industrial Zoe,HUICHENG District,SHUIKOU Town,HUIZHOU CITY;CHINA. 516255

www.led-zenith.com

Step1 Step2

Step2-2

Step2-1

Step1-2Step1-1A B

90

90

INSTALLATION INSTRUCTION

Step 2: Lift the 4 buckles on the back of the panel up by 90° then bend the top part of the buckles 90° towards the direction where you can anchor the light fixture to the T-bar.

Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile that you need to install light fixture on. Then place the light fixture on the T-bar carefully and make sure it is correctly in place and secure.

Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)

AC-N

AC-L

GREEN

LED-LED+DIM-DIM+

PC Cover

CCT adjustmentPower regulation

Warning:Make sure all the power is off before installation. All the installations are required to be done by professionals.

Warning

LED-(WHITE)

WHITE

WIRING DIAGRAM

LED Driver

Troffer Housing

LED Board

Ensure the power supply has been cut off before connecting the wire, and all wiring and installation of this product are required to be operated by professionals.

Electric Shock Attention

Shenzhen ZENITH Technology Co., Ltd.Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.

Huizhou ZENITH Technology Co., Ltd.Facory: 2/F Building 1,ChangFang LIGHT Industrial Psrk.No.6 DongXin Road,DONGjiang Hi-Tech Industrial Zoe,HUICHENG District,SHUIKOU Town,HUIZHOU CITY;CHINA. 516255

www.led-zenith.com

Step1 Step2

Step2-2

Step2-1

Step1-2Step1-1A B

90

90

INSTALLATION INSTRUCTION

Step 2: Lift the 4 buckles on the back of the panel up by 90° then bend the top part of the buckles 90° towards the direction where you can anchor the light fixture to the T-bar.

Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile that you need to install light fixture on. Then place the light fixture on the T-bar carefully and make sure it is correctly in place and secure.

Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)

AC-N

AC-L

GREEN

LED-LED+DIM-DIM+

PC Cover

CCT adjustmentPower regulation

Warning:Make sure all the power is off before installation. All the installations are required to be done by professionals.

LED Center Basket TroffersZAT Series

LE

D C

EN

TE

R B

AS

KE

T T

RO

FF

ER

S

Page 6: LED Center Basket Troffers

6(866) 786-1117 • www.BeyondLEDTechnology.comDue to continuous product improvement, information in this document is subject to change.

Installation

LED-(WHITE)

WHITE

WIRING DIAGRAM

LED Driver

Troffer Housing

LED Board

Ensure the power supply has been cut off before connecting the wire, and all wiring and installation of this product are required to be operated by professionals.

Electric Shock Attention

Shenzhen ZENITH Technology Co., Ltd.Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.

Huizhou ZENITH Technology Co., Ltd.Facory: 2/F Building 1,ChangFang LIGHT Industrial Psrk.No.6 DongXin Road,DONGjiang Hi-Tech Industrial Zoe,HUICHENG District,SHUIKOU Town,HUIZHOU CITY;CHINA. 516255

www.led-zenith.com

Step1 Step2

Step2-2

Step2-1

Step1-2Step1-1A B

90

90

INSTALLATION INSTRUCTION

Step 2: Lift the 4 buckles on the back of the panel up by 90° then bend the top part of the buckles 90° towards the direction where you can anchor the light fixture to the T-bar.

Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile that you need to install light fixture on. Then place the light fixture on the T-bar carefully and make sure it is correctly in place and secure.

Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)

AC-N

AC-L

GREEN

LED-LED+DIM-DIM+

PC Cover

CCT adjustmentPower regulation

Warning:Make sure all the power is off before installation. All the installations are required to be done by professionals.

LED-(WHITE)

WHITE

WIRING DIAGRAM

LED Driver

Troffer Housing

LED Board

Ensure the power supply has been cut off before connecting the wire, and all wiring and installation of this product are required to be operated by professionals.

Electric Shock Attention

Shenzhen ZENITH Technology Co., Ltd.Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.

Huizhou ZENITH Technology Co., Ltd.Facory: 2/F Building 1,ChangFang LIGHT Industrial Psrk.No.6 DongXin Road,DONGjiang Hi-Tech Industrial Zoe,HUICHENG District,SHUIKOU Town,HUIZHOU CITY;CHINA. 516255

www.led-zenith.com

Step1 Step2

Step2-2

Step2-1

Step1-2Step1-1A B

90

90

INSTALLATION INSTRUCTION

Step 2: Lift the 4 buckles on the back of the panel up by 90° then bend the top part of the buckles 90° towards the direction where you can anchor the light fixture to the T-bar.

Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile that you need to install light fixture on. Then place the light fixture on the T-bar carefully and make sure it is correctly in place and secure.

Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)

AC-N

AC-L

GREEN

LED-LED+DIM-DIM+

PC Cover

CCT adjustmentPower regulation

Warning:Make sure all the power is off before installation. All the installations are required to be done by professionals.

Warning

LED-(WHITE)

WHITE

WIRING DIAGRAM

LED Driver

Troffer Housing

LED Board

Ensure the power supply has been cut off before connecting the wire, and all wiring and installation of this product are required to be operated by professionals.

Electric Shock Attention

Shenzhen ZENITH Technology Co., Ltd.Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.

Huizhou ZENITH Technology Co., Ltd.Facory: 2/F Building 1,ChangFang LIGHT Industrial Psrk.No.6 DongXin Road,DONGjiang Hi-Tech Industrial Zoe,HUICHENG District,SHUIKOU Town,HUIZHOU CITY;CHINA. 516255

www.led-zenith.com

Step1 Step2

Step2-2

Step2-1

Step1-2Step1-1A B

90

90

INSTALLATION INSTRUCTION

Step 2: Lift the 4 buckles on the back of the panel up by 90° then bend the top part of the buckles 90° towards the direction where you can anchor the light fixture to the T-bar.

Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile that you need to install light fixture on. Then place the light fixture on the T-bar carefully and make sure it is correctly in place and secure.

Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)

AC-N

AC-L

GREEN

LED-LED+DIM-DIM+

PC Cover

CCT adjustmentPower regulation

Warning:Make sure all the power is off before installation. All the installations are required to be done by professionals.

LED Center Basket TroffersZAT Series

LE

D C

EN

TE

R B

AS

KE

T T

RO

FF

ER

S

Page 7: LED Center Basket Troffers

7 Beyond LED Technology | 1939 Parker Ct, Stone Mountain, GA, 30087Due to continuous product improvement, information in this document is subject to change.

Wiring

LED-(WHITE)

WHITE

WIRING DIAGRAM

LED Driver

Troffer Housing

LED Board

Ensure the power supply has been cut off before connecting the wire, and all wiring and installation of this product are required to be operated by professionals.

Electric Shock Attention

Shenzhen ZENITH Technology Co., Ltd.Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.

Huizhou ZENITH Technology Co., Ltd.Facory: 2/F Building 1,ChangFang LIGHT Industrial Psrk.No.6 DongXin Road,DONGjiang Hi-Tech Industrial Zoe,HUICHENG District,SHUIKOU Town,HUIZHOU CITY;CHINA. 516255

www.led-zenith.com

Step1 Step2

Step2-2

Step2-1

Step1-2Step1-1A B

90

90

INSTALLATION INSTRUCTION

Step 2: Lift the 4 buckles on the back of the panel up by 90° then bend the top part of the buckles 90° towards the direction where you can anchor the light fixture to the T-bar.

Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile that you need to install light fixture on. Then place the light fixture on the T-bar carefully and make sure it is correctly in place and secure.

Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)

AC-N

AC-L

GREEN

LED-LED+DIM-DIM+

PC Cover

CCT adjustmentPower regulation

Warning:Make sure all the power is off before installation. All the installations are required to be done by professionals.

LED-(WHITE)

WHITE

WIRING DIAGRAM

LED Driver

Troffer Housing

LED Board

Ensure the power supply has been cut off before connecting the wire, and all wiring and installation of this product are required to be operated by professionals.

Electric Shock Attention

Shenzhen ZENITH Technology Co., Ltd.Office:3rd floor,Building 6, Jing Hua Zhong Technology Park,No.2, Jin Long Rd, Baolong Industrial Pard,Long Gang District,Shenzhen,China.

Huizhou ZENITH Technology Co., Ltd.Facory: 2/F Building 1,ChangFang LIGHT Industrial Psrk.No.6 DongXin Road,DONGjiang Hi-Tech Industrial Zoe,HUICHENG District,SHUIKOU Town,HUIZHOU CITY;CHINA. 516255

www.led-zenith.com

Step1 Step2

Step2-2

Step2-1

Step1-2Step1-1A B

90

90

INSTALLATION INSTRUCTION

Step 2: Lift the 4 buckles on the back of the panel up by 90° then bend the top part of the buckles 90° towards the direction where you can anchor the light fixture to the T-bar.

Step 1: Make sure of all the power is off before installing. Remove the one ceiling tile that you need to install light fixture on. Then place the light fixture on the T-bar carefully and make sure it is correctly in place and secure.

Step 3: Open the driver’s junction box and connect the AC wire to the driver correctly (L=black & N=white)

AC-N

AC-L

GREEN

LED-LED+DIM-DIM+

PC Cover

CCT adjustmentPower regulation

Warning:Make sure all the power is off before installation. All the installations are required to be done by professionals.

LED Center Basket TroffersZAT Series

LE

D C

EN

TE

R B

AS

KE

T T

RO

FF

ER

S

Page 8: LED Center Basket Troffers

8(866) 786-1117 • www.BeyondLEDTechnology.comDue to continuous product improvement, information in this document is subject to change.

LED Center Basket TroffersZAT Series

LE

D C

EN

TE

R B

AS

KE

T T

RO

FF

ER

S