Agenda
• Drilling overview
• Underbalanced Drilling
– What is it? – Why to drill UBD?
– Evaluation Criteria
– Equipment
– Well Control
• Case Study
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
3/38
Conventional Drilling
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
4/38
What is Underbalanced Drilling?
• Low weight DrillingFluid
– Naturally
– Induced
Preservoir
> Pbore hole
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
5/38
Comparison
Preservoir
> Pbore hole
Preservoir
< Pbore hole
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
6/38
What is Underbalanced Drilling?
• Low weight DrillingFluid
– Naturally
– Induced
Preservoir
> Pbore hole
• Control
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
7/38
Why to Drill Underbalanced?
• To maximize hydrocarbon recovery
– Reduce formation damage
– Produce earlier
– Increase reservoir knowledge
– Enhanced oil recovery
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
8/38
Why to Drill Underbalanced?
• To minimize P related drilling problems
– Differential sticking – Minimal fluid losses
– Improve penetration rate
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
9/38
Why to Drill Underbalanced?
“Chip hold down effect”
• To minimize P related
drilling problems
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
10/38
Underbalanced Drilling
COST
UBD+30%
OBD
PRODUCTION
OBD
UBD300%
UBD is another tool in the box, not a Panacea
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
11/38
Limitations
• Technical
– Wellbore stability
– Water inflow – Directional drilling
– Unsuitable reservoir
• Economic
– Equipment
– Personnel• Expertise
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
12/38
Evaluation Criteria
• Determine BHP requirements
Preservoir - Pdrilling fluid > 200 psi
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
13/38
Evaluation Criteria
• Identify the drilling fluid system – Gas-air
– Gasified Fluid
– Stable Foam
– Drilling Fluid
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
14/38
Evaluation Criteria
• Identify the drilling fluid system – Gas-air
– Gasified Fluid
– Stable Foam
– Drilling Fluid
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
15/38
Evaluation Criteria
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
16/38
Evaluation Criteria• Identify the drilling fluid system
– Gas-air
– Gasified Fluid
– Stable Foam
– Drilling Fluid
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
17/38
Evaluation Criteria
• Determine BHP requirements
•
Identify the drilling fluid options• Well design and modelling
– Fluid (Compressibility)
– Cuttings removal
– Formation inflow – Rock integrity
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
18/38
Evaluation Criteria
• Determine BHP requirements
• Identify the drilling fluid system• Well design and modelling
• Select the surface equipment
– Productivity -> Capacity at surface
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
19/38
Case Study
• On-shore, New Mexico, 20 June 2006
• Spud date 17 May 2006
•Overbalanced drilling until @ 9,471 ft
• Expected formation pressure is 5,000 psi
• Drilling underbalanced 300 psi
• Hydrostatic pressure used was 4,700 psi• Mud weight: 9.5 ppg, diesel based
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
20/38
Case Study
• Highly permeable formation with large fluid
losses expected
• Objective was to avoid economical losses
due to the loss of drilling fluids and excess
rig time
• Objective to prevent differential sticking of
drill pipe
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
21/38
Case Study
• Drilling system: jointed pipe
• No gas generation equipment because the
chose liquid system: diesel
• Rotating head
• Basic mud gas separation
• Gas production sent to flair
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
22/38
Well site
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
23/38
Surface Equipment
• Drilling System
• Well control equipment• Gas-generation equipment
• Surface separation equipment
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
24/38
Drilling System
– Jointed Pipe drilling
–Coiled Tubing
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
25/38
Snubbing Unit
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
26/38
Rotating Head
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
27/38
Well site
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
28/38
Downhole Equipment
• Pressure-While-Drilling (PWD) sensors
• eMWD tools• Non return valves
• Deployment valves
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
29/38
Downhole Equipment
• Deployment valves
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
30/38
Well Control Mechanisms
Barrier
PrimarySecondary
UBD
Flow + P*BOP
PRESSURE CONTROL FLOW CONTROL
OBD
Hydrostatic PBOP
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
31/38
Well Control Mechanisms
FLOW CONTROL
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
32/38
Well Control Mechanisms
PRESSURE CONTROL FLOW CONTROL
OBD
– Hydrostatic
(Dynamic) – Friction
(Dynamic)
– BOP
UBD
– Hydrostatic (Passive
– Flow and pressurecontrol Friction
(Dynamic)
– Choke Pressure
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
33/38
Due Diligence
• Underbalanced
– “… that method of drilling whereby the terrastatic
pressure exceeds the pressure exerted by the
drilling fluid column in the bore of a well.”• Producing While Drilling
– “… those methods of drilling whereby the
formation fluids are deliberately allowed in the
bore of a Drilling Well and thence removed to the
surface while … Drilling activities are continued
…
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
34/38
Conditions
I. “… a blowout preventer configuration
including one rotating head …”
II. “… any sources of ignition are removed
… from any area … which operations are
being conducted …”
III. “all oil/gas separators … will be placed at
a safe distance from the drilling rig …”
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
35/38
Case Study
• On 20 June 2006 at 10,427 feet
• Well flowing in uncontrolled manner.Expected Pressure: 300 psi
Actual Pressure: 800 psi• Casing annular shut and killing operation
began with 10.7 ppg mud.
•
Gas bubble came in annular and Pressureincreased to 2400 psi POP
• Casing burst, Gas leaked at surface
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
36/38
Case Study
• Failure on the rotating head caused a gas
build up in the annular.
• Well control: increased drilling fluid to 11.2
ppg
• 25 June 2006 finally killed the well
-
8/19/2019 Lecture 89 Underbalanced Drilling 14 May 2015
37/38
Case Study
• Remedial measures
– Located the burst section and squeezed
• Remedial Casing 7 in and then continued
with plan UBD section
• Claim: 3.5 MM
• Deductible: 250 k
-