leap user manual

Upload: sudhindra-t-kumara

Post on 14-Apr-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/27/2019 LEAP User Manual

    1/13

    Confidential 1

  • 7/27/2019 LEAP User Manual

    2/13

  • 7/27/2019 LEAP User Manual

    3/13

  • 7/27/2019 LEAP User Manual

    4/13

    Confidential 4

    RACI Matrix LEAP

    For a detailed responsibility chart refer Annexure B.

    Step Tasks CSR-Level 1 CSR Supervisor ACM ASM MIS

    1 Download PO from mail to the shared folder R A

    2 Processing PDF from location R A

    3 Checking in LEAP processed PO R A4 Action, Error PO. R R,A

    5 PO is in IGATE status for a long. R A

    6 Despatching of Error PO to A/c in excel format R,A

    7 Checking status of PO R R R,A

    8 Price Updation Information including Promotion R,A

    9 Price upload LEAP R,A

    10 Article Code Updation information R,A

    11 Article Code Updation in LEAP R,A

    12 Bill to Customer Master updation R,A

    13 Ship to Master Information R A R,A

    14 Ship to Master updation R,A15 All Other Masters R,A

    16 Changes in PO pdf format by chain R,A

    17 CSA & Distributor Location PO download & circulation R,A

    18 Return Material Tracking R A

    R-Responsibility

    A-Accountability

    C-Consultant

    I-Informed

  • 7/27/2019 LEAP User Manual

    5/13

    3. DOCUMENT PURPOSE

    This document can be used as a

    Users can refer to this document

    4 DOCUMENT SCOPEThe scope of this document is re

    to Modern Trade for Consumer

    5. LOGGING IN TO LEAP

    Confidential

    eference or user manual by the supply chain &

    to help them navigate around the LEAP applica

    stricted to LEAP module only and the impleme

    Office Business.

    Provide your employee ID

    here, which starts with IN or

    A1.

    Provide your suphere, first time yo

    will be changeme

    with the same & t

    5

    business team.

    tion.

    tation specific

    lied passwordur password

    ,you must login

    hen change it.

  • 7/27/2019 LEAP User Manual

    6/13

    6. HOME PAGE

    LEAP Server is referred as back

    Things to Note in this scr

    LEAP ServerDisplays t

    POs from shaPOs saved

    schedule.

    Correct PO suPos once

    Pos and s

    Error Pos in tBy clickin

    scanner.

    My View in tYou can c

    maneuveri

    Message BoaMessage

    Confidential

    nd agent which is handling automation tasks.

    een:

    Status:

    he server status, whether LEAP is running or n

    ed folder to LEAP Server:

    in shared folder by CSR will be transferred by

    bmitted to Internet Gateway

    canned and submitted as correct, this batch run

    bmits to web gateway.

    e welcome bar

    g this, you can view the failed in scanning Pos

    e menu bar

    reate your regular menus to this menu,this will

    ng in LEAP application.

    doard displays messages & feeds by admin.

    6

    t.

    this batch

    extracts these

    y LEAP

    ase your

  • 7/27/2019 LEAP User Manual

    7/13

    7. TRANSACTION MENU

    Transaction Menu is the only op

    understand this menu in depth.

    Once the POS are scanned and v

    found in-correct.

    All the Error POs you can view

    Pending PO Screen

    In correct or error POs can view

    Post any changes in this page, y

    Confidential

    rational menu for CSR & Business, hence its v

    erified, its flagged as Order if found correct an

    by clicking Pending Pos Menu.

    d & tracked in this screen, things to observe in

    u must refresh the page using Refresh option.

    7

    ital to

    Errror if

    this screen.

  • 7/27/2019 LEAP User Manual

    8/13

    Header - Process Error PHeader shows numb

    From Date/To Date :You can filter/view i

    the pending incorrect

    You can do the same

    CustomerYou can filter further

    customer error Pos, y

    Action BarAction Bar will allow

    Action Bar also has c

    i. Revalidatthe respec

    ii. Delete Icorrect P

    number w

    duplicate.

    To View details of errors Action can be taken in er

    1. Ignore If user clexecution to ERP

    2. Override If thisdetail as per 3M r

    remarks popup.

    3. Change Stock Colinked stock code,

    Confidential

    s-Pending for action(2)

    r of incorrect PO(s).

    correct Pos based on date range too.For exam

    Pos, you want to view only todays or this wee

    using this field.

    based on Customer.For example, instead of vie

    ou want to view only Hypercity error Pos.

    you to Revalidate & Delete a PO.

    ontrols to view no of Pos in a screen,default is

    In case of changes made to the master post vive PO and use this button & then click Refres

    case you are expecting a new correct PO in lie

    , delete the current PO, so that the new PO wit

    ill be allowed by LEAP, else the new PO will b

    in PO, click on the PO Number.

    ror PO

    icks on this button, line will be ignored and wil

    .

    button is clicked, line will be executed conside

    ecord, while user clicks this option user will be

    e In case user want to use alternate stock cod, this option can be used.

    8

    le, instead of all

    s incorrect Pos.

    wing all

    POS.

    alidation, select.

    u of current in-

    the same PO

    considered as

    not be sent to

    ing the correct

    prompted with

    e instead of

  • 7/27/2019 LEAP User Manual

    9/13

    While you use thi

    present stock cod

    View PO Details Screen

    This screen provides all the detai

    various information you can get

    PO Execution Statuso Error PO is hao Order PO is co

    While the PO(s) a

    change the stock

    o XML Correct Po IGATE PO sen

    BPCS.

    o Billed PO has bOPEN.

    PO Status in pictorial format

    Type Filter Based on bio 3M Location 3

    locations.

    o CSA- 3M CSA lohowever for exec

    CSA.

    Confidential

    s option, please note, when you select alternate

    status will be changed to Inactive for the resp

    ls and information you need to know for a PO.

    in this screen

    ing some error and cant be executed.

    rrect, but still not sent for execution.

    re not sent for execution, at this point of time, i

    ode using Change Stock Code option.

    O got converted to XML.

    t to internet gateway through which it will be u

    een uploaded successfully into BPCS, it might

    lling location, this filter showsCFA Locations Pos will be auto executed f

    cations, POS will be only scanned and checked

    tion, ASM must download the POS and forwa

    9

    stock code,

    ctive w/h.

    hat are the

    user want they

    loaded to

    e in SAL or

    r these

    for correctness,

    d it to concern

  • 7/27/2019 LEAP User Manual

    10/13

    o Distributor POexecution, ASM

    Download POo You can downloa

    Tick(Figudownload

    Figure 1.1

    Figure 1.2

    DOWNLOAD

    To download incorrect Pos repor

    To download all POs status repo

    SETUP

    Use this menu to change your pa

    Confidential

    will be only scanned and checked for correctn

    ust download the POS and forward it to conce

    a single PO or multiple Pos, based on your tic

    re1.2) the Pos you want to download and then c

    Figure1.1)

    t in excel all at once, use the menu Error Pos

    rt with billed quantity, use the menu PO Downl

    ssword. From Setup Menu go to User Setup

    1

    ss, however for

    n Distributor.

    k.

    ick on

    eport.

    oad Report.

  • 7/27/2019 LEAP User Manual

    11/13

    Click on Change Password, now

    My View MENU

    This menu will be empty initiall

    which you want to do directly on

    browser.

    For example, checking pending

    want to add Pending PO under

    MyView place at the bottom rig

    Technical Help

    For any technical help on this ap

    [email protected]

    Confidential

    provide the new password 2 times.

    when you log in, as you need to fill the menus

    a regular basis. My View is equivalent of Favo

    O is one screen which you want to view freque

    y View, go to Pending PO screen and then clic

    t.

    plication, you may free to contact Amit Singha

    1

    or operation

    rites in your

    ntly. In case you

    Add to

    @

  • 7/27/2019 LEAP User Manual

    12/13

    Confidential

    1

    Curiosity corner - FAQs

    Q1. PO not getting uploaded to ERP(BPCS) even though its correct.

    Check the status of the PO in View PO Details screen, if its showing IGATE and its more than 3hours past, escalate the same to technical LEAP.

    Q2.Month end can I trigger the PO to scan from shared folder, instead of waiting for the

    server to run at the stipulated time?

    Yes, you can. Use the menu Schedulers under Transaction Menu & click on Process PDF files

    from location.

    Q3.What is the Lead time to update Price in LEAP?

    One must provide at least 4 working days to get the same registered in ERP & LEAP.Hence any

    promotional price to load from April 1st, admin MIS team should get the information not later

    than by March 27th

    .

    Q4.What is the Lead time to update Article Master in LEAP?

    MIS must be informed in advance of 4 working days to configure the same. Post PO generation if

    the new article code registration comes, it will not be entertained and the PO will be executed

    without the new article code.

    Q5.How the Customer Master & Ship to Master is updated in LEAP?

    Bill To Customer Master will be updated by admin MIS automatically at the time of newcustomer creation.

    But for new Shipto Master, respective location CSR must inform to admin MIS.

    Q6.What happens if any A/c change the PO format?

    As you know each A/c template is configured in LEAP and hence the same is recognized by the

    application, hence, any minor change in the PO Template must be informed to technical MIS at

    least a month in advance. You must communicate the same to A/c that any changes in pipeline

    technical MIS must be informed in advance.

  • 7/27/2019 LEAP User Manual

    13/13

    Confidential

    1

    Q7.I do not have direct billing, why should I follow LEAP?

    Even though your Pos are getting executed directly but still you must use LEAP to enjoy the

    following benefits :

    1. Absolutely correct Pos are only getting executed by your CSA or Distributor.2. You do not waste time in checking the correctness of the PO.3. You avoid any kind of Debit Note or Credit Note by the A/c in future by executing 100%

    correct PO.

    4. You can track & monitor the Pos are routing through LEAP.

    Q8.I am not able to save PDF to shared folder?

    You are not authorized to use the shared folder, contact technical MIS.

    Q9.If my reportee(CSR) is going on leave, how can I get the mail alerts of executed Pos?

    Go to Master, Warehouse Master & select the User Name for the respective warehouse.

    Q10. Can I(CSR) update Return material in LEAP?

    Yes, LEAP is having screen to update material return by A/c. Go to Transaction =>Update PO

    Qty & select the PO you want to update.

    Mention the delivery Qty & Remarks for Return.

    Q11.If I (ACM) want to block 1 or set of Article to block from being executed even though

    the PO has come, how can I do the same?

    Contact admin MIS and provide the article code, warehouse & A/c Name. Once the same isupdated by MIS these lines will be blocked by LEAP for being executed.

    ACM s, must inform back admin MIS to unlock the same.

    Q12.What are the important mail ids?

    Following are the important mail ids :

    1.Admin MIS [email protected]

    2.Tech MIS [email protected]

    Thank you.