© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Agile Product ManagementTel Aviv, January 2014
![Page 2: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/2.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Disclaimer: ‘VANITY SLIDES’
![Page 3: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/3.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Angel Medinilla
You killed my father, prepare to die
!
[email protected]/en/AngelMedinilla(Slides, Videos, Newsletter, Books, Blog, LinkedIn, Sketchnotes, Twitter...)
Twitter: @angel_m (would love some instant feedback!)
![Page 4: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/4.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 5: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/5.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 6: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/6.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 7: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/7.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 8: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/8.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 9: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/9.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 10: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/10.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
My pleasure!
![Page 11: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/11.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Free Shoulder Pain Check...
![Page 12: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/12.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Who do we have here today?
![Page 13: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/13.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Your goals for this seminar? (3 min)
![Page 14: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/14.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Intro...
![Page 15: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/15.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
THE framework!
![Page 16: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/16.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
????!
THE framework?
![Page 17: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/17.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Black holes in Agility
![Page 18: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/18.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
The Visionary Myth
![Page 19: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/19.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
The Hacker Myth
![Page 20: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/20.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 21: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/21.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 22: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/22.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Wrong products!
![Page 23: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/23.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Very wrong products!
![Page 24: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/24.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Very, very wrong products!
![Page 25: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/25.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Very, very, very wrong products!
![Page 26: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/26.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
“Double the Sh*t, Double fast”
![Page 27: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/27.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Agile Development vs Agility
![Page 28: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/28.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Lean Startup = CustDev + Agile
![Page 29: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/29.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 30: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/30.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 31: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/31.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 32: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/32.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 33: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/33.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
- C-P-S (Cliente-Problema-Solución)
- Validación hipótesis cliente / problema - User Personas
Criterio de éxito: - ¿Sabes quiénes son tus usuarios y clientes? - ¿Cuáles son los principales problemas de tus clientes? - ¿Cuánto pagarían por resolverlos? - ¿Tienes una solución? ¿Los clientes están de acuerdo?
MVP
Success Criteria: - Do you know who your customers are?- What’s their main problem?- Do you have a solution? Customer agree?- Would your customers use your product?- Killer question: if you gave your product for free, would your clients use it right now?
![Page 34: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/34.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
PM fit
Criterio de éxito: - Modelo de negocio testado - Hipótesis financieras válidas - Canales de venta testados - Primeros pedidos - Killer question: si entregases tu producto grátis, ¿lo instalarían y usarían tus clientes ahora mismo?
MVP
Success Criteria: - Validated business model- Validated financial assumptions- Tested sales channels- First orders / customers
![Page 35: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/35.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 36: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/36.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
1) Product Vision2) Business Model3) C-P-S Statement; User Personas4) Validating Assumptions: MVP - MVE5) Defining Products6) Product Development7) Metrics and Analytics
Workshop Structure
![Page 37: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/37.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
1) Product Vision2) Business Model3) C-P-S Statement; User Personas4) Validating Assumptions: MVP - MVE5) Defining Products6) Product Development7) Metrics and Analytics
Vote (1 min)
![Page 38: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/38.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
1) The Vision
![Page 39: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/39.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
It all starts with a vision...
![Page 40: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/40.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Memorable visions...As#a#company,#and#as#individuals,#we#value#integrity,#honesty,#openness,#personal#excellence,#constructive#self9criticism,#continual#self9improvement,#and#mutual#respect.#We#are#committed#to#our#customers#and#partners#and#have#a#passion#for#technology.#We#take#on#big#challenges,#and#pride#ourselves#on#seeing#them#through.#We#hold#ourselves#accountable#to#our#customers,#shareholders,#partners,#and#employees#by#honoring#our#commitments,#providing#results,#and#striving#for#the#highest#quality.#
![Page 41: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/41.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 42: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/42.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Verb, Target, Outcome..
“Organize world's information, make it universally accessible” “Find and discover anything you might want to buy online”
“ (Be) Worldwide Authority on Kids, Families and Fun” “Be #1 car company in America & one of the great American
brands” “(Find) my iPhone”
“File too big for email” “Put a Man on the moon and back alive before 1970”
“Run your own hospital online”
![Page 43: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/43.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Estructura básica:!
Verb, target, outcome!
“Creemos que un determinado porcentaje de Internautas querran comprar productos on-line para ahorrar tiempo y conseguir más variedad y mejores ofertas”!
“Creemos que un determinado porcentaje de nuestros usarios querran comprar con un solo click para ahorrar tiempo y hacer más fácil el proceso”!
We believe that a certain percentage of Internet users will want to buy on-line so they can save up time, money and
have more product options available
We believe that a certain percentage of our users will want to buy with just one click so they can save up time
and make the process easier
Basic Structure
![Page 44: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/44.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Exercise: Your Vision (10 min)
![Page 45: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/45.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Some sources of the vision...
![Page 46: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/46.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Benchmarking
![Page 47: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/47.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 48: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/48.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Customer requests...Carefully!
![Page 49: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/49.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
“What customer requested”
![Page 50: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/50.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
“What customer requested”
![Page 51: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/51.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Some wrong sources...
![Page 52: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/52.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Some problems with the vision
![Page 53: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/53.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Some problems with the vision
![Page 54: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/54.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
“Product Space”
![Page 55: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/55.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Products vs. Solutions
![Page 56: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/56.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Products vs. Solutions
![Page 57: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/57.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 58: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/58.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Revenue
![Page 59: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/59.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Costs reduction
![Page 60: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/60.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
- Algo que no podíamos hacer antes - Algo que ahora podemos hacer más rápido, más barato, más fácil, más bonito…
Functional Value
- Something we could not do before- Something we can now do faster, cheaper, easier, stronger...
![Page 61: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/61.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Emotional Value
- Control - Seguridad - Información - Diversión, entretenimiento - Interacción Social - Notoriedad, Status - Expresión - …
- Control- Security- Status- Fun- Entertainment- Social interaction- Expression- Information- ...
![Page 62: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/62.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Product Management
![Page 63: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/63.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Follow the pain!
![Page 64: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/64.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Lesson Learned: success is not to deliver something on time / budget...
Success means solve a problem and deliver some value!
![Page 65: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/65.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Clients who *love* our product
![Page 66: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/66.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
From “feature backlog” to...
Backlog...
![Page 67: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/67.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
2) Business Model
![Page 68: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/68.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
From vision to Business Model
Roman Pichler’s Vision Board
![Page 69: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/69.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
C-P-S Statement
![Page 70: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/70.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Visión
Product-Market Fit
C-P-S
Sketch Modelo Negocio
Core Hipótesis Caract.
personas
Validación C-P-S
“Elevator Pitch”
Pitch MVP 2
Id. Hipótesis
Valid. Personas
Refinar / redefinir/pivotar
MVP 1 Refinar / redefinir/pivotar
Refinar / redefinir/pivotar
…
MVP n
Refinar / redefinir
Validar resto hipótesis
Def. modelo negocio válido y escalable
Primeros clientes
![Page 71: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/71.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
‘C-P-S’ Statement as elevator pitch
![Page 72: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/72.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
C-P-S Statement as User Story
![Page 73: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/73.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Exercise: “Provide Parents With The Best Au-Pair” (10 min)
- Customer: Who are the clients? Who is involved? Who has a problem? How can you identify these people?- Problem: What’s the problem? How are they coping with it? Is there any Workaround? How important is it?- Solution: How can we help? What’s the value we provide? What’s our killer feature / advantage?
![Page 74: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/74.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 75: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/75.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 76: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/76.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Partners
Costs Revenues
Activities
Resources
Value Customers
Channels
Relationship
![Page 77: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/77.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Lean Canvas:
![Page 78: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/78.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 79: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/79.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 80: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/80.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 81: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/81.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Business Model vs Business Plan
![Page 82: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/82.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Partners
Costs Revenues
Activities
Resources
Value Customers
Channels
Relationship
Ex: MyAupair.com (45 min)
![Page 83: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/83.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
3) C-P-S Statement and Characterizing Users
![Page 84: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/84.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
‘C-P-S’ Statement
![Page 85: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/85.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
‘C-P-S’ StatementAssumption!
![Page 86: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/86.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Hipótesis
Hipótesis
Hipótesis
Hipótesis
Hipótesis Hipótesis Hipótesis Hipótesis
Hipótesis Hipótesis
Hipótesis
Hipótesis
Hipótesis
Hipótesis
Hipótesis Hipótesis
Hipótesis Hipótesis
Hipótesis
Hipótesis
Hipótesis
Hipótesis
Hipótesis
They are all assumptions!
![Page 87: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/87.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Be careful with your core hypothesis...
![Page 88: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/88.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Validate your assumptions
![Page 89: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/89.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Hipótesis
Hipótesis
Hipótesis
Hipótesis
Hipótesis Hipótesis Hipótesis Hipótesis
Hipótesis Hipótesis
Hipótesis
Hipótesis
Hipótesis
Hipótesis
Hipótesis Hipótesis
Hipótesis Hipótesis
Hipótesis
Hipótesis
Hipótesis
Hipótesis
Hipótesis
Validated Assumptions = PM Fit!
![Page 90: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/90.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
“The Customer”
![Page 91: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/91.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Roles: fine grain
Rol: Ponente en Conferencia
Role: Conference Speaker
![Page 92: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/92.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Roles: fine grain
Rol: Ponente en Conferencia
Usuario sistema de Submissions
Destinatario de convocatoria
Viajero
Consumidor de café
Ponente
Asistente a ponencias
Huesped de Hotel
Networker
Vendedor de libros
Vendedor de formación
Consumidor de Single Malt
Turista
Usuario de WiFi
Bloguero / Twittero
Ejemplo de Jeff Patton, “Personas, Profiles, Users and Roles” – Slideshare.net
Role: Conference Speaker
- Call for Papers receiver- Submission system user- Traveler- Coffee consumer- Speaker- Listener- WiFi User- Hotel guest
- Networker- Twitter / Blogger- Book seller- Training seller- Consultancy seller- Tourist- Single Malt consumer (two ice cubes, thank you...)
Jeff Patton, “Personas, Profiles, Users and Roles” - Slideshare.net
![Page 93: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/93.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
One person = Several relationships
Yo
Cliente
Asistente a curso Asesor Fiscal
Moteros
Mi casa
Aikidokas
Trainee
Client
Aikido Practitioner
Biker
Accountant
Home
Me
![Page 94: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/94.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Modelling Users and clients
![Page 95: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/95.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
“Jill”, suburban mom estresada
“Buzz”, joven varón activo y enfocado
“Ray”, hombre de familia, le gusta la tecnología práctica
BB4B – Best Buy 4 Business, comprador SOHO
“Barry”, profesional acaudalado que se deja 10.000$ en un Home Theater
Real Case
“Jill”, stressed Suburban Mom
“Buzz”, young active focused man
“Ray”, family guy, loves practical tech
![Page 96: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/96.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
“BB4B” – Best Buy 4 Business, comprador SOHO
“Barry”, profesional acaudalado que se deja 10.000$ en un Home Theater
Real Case:“BB4b”, SoHo buyer
“Barry”, wealthy pro, spends 10$K in a Home Theater
![Page 97: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/97.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
- Cada una de las 608 tiendas BestBuy se enfocó a uno o dos de estos cinco segmentos
- Por ejemplo, las tiendas que se centran en “Jill” tienen espacios para que los niños juegen, y en lugar de música electrónica hay un hilo musical familiar, instrumental o canciones infantiles
- Incremento de las ventas: 7%. Beneficios en primer año: $50M
Real Case: - Every BestBuy focused on one or two of these markets
- For instance, “Jill” stores have playground and relaxing music / child songs
- Sales increased by 7%. First year profits exceeded $50M.
![Page 98: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/98.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
A product for Gladys?
![Page 99: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/99.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Some familiar words:
![Page 100: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/100.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Some familiar words
Collaborative
![Page 101: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/101.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Some familiar words
Collaborative
Visual
![Page 102: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/102.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Some familiar words
Collaborative
Visual
Creative
![Page 103: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/103.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Personas
- Number- Priority, importance- Demographics
- Contacts- Interactions- Authority- Responsiblity
- Value proposition- Expectations
- Role- Tasks
- Profile- Background- Experience- Knowledge
- Motivation- Values and principles- Personality- Dislikes- Memorable quotes
- Problem- Limitations, boundaries, constraints- Workarounds- Outcomes
- Problem- Limitations, boundaries, constraints- Workarounds- Outcomes
- Product use- Context- Frecuency- Other products used
Not a planet any more... :(
![Page 104: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/104.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Personas
- Number- Priority, importance- Demographics
- Contacts- Interactions- Authority- Responsiblity
- Value proposition- Expectations
- Role- Tasks
- Profile- Background- Experience- Knowledge
- Motivation- Values and principles- Personality- Dislikes- Memorable quotes
- Problem- Limitations, boundaries, constraints- Workarounds- Outcomes
- Problem- Limitations, boundaries, constraints- Workarounds- Outcomes
- Product use- Context- Frecuency- Other products used
Not a planet any more... :(
BONUS: - Get me... Speed, performance, productivity, clients, success...- Help me... connect, find, reduce, innovate- Save me... time, risks, costs,
![Page 105: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/105.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
http://www.slideshare.net/tamirberkman/the-customer-learning-curve
Persona by engagement
![Page 106: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/106.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Primary Aspirational Secondary
Anti-persona
Family/Group
Target Personas
![Page 107: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/107.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Persona Canvas- Perfil demográfico - Background, experiencia - Aficiones, otros datos empático / sociales
- Motivación - Objetivos - Le gusta / no le gusta - Otros actores en contacto / interacciones
- Problema: - Contexto - Limitaciones, autoridad, responsabilidad - Consecuencias - Workaorunds actuales / cómo se enfrenta al problema
“Memorable Quote”
- Hipótesis de valor: curso de Agile Product Management - Expectativas, factores de diferenciación - Actividades / rol / interacción con la solución
- Consígueme: - Ayúdame a: - Ahórrame:
- Profile, demographics- Background, experience- Hobbies, any other empathy / social data
- Motivation- Goals- Values, principles- Likes / dislikes- Other actors / contacts / interactions
- Problem- Context- Consecuences, outcomes- Workarounds, other solutions- Boundaries, constraints, authority, responsibility
- Value proposition- Expectations, competitive advantage- Success criteria
Get me...Help me...Save me...
“Memorablequote”
![Page 108: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/108.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Exercise: “Au pair” (20 min)
![Page 109: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/109.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
“Au Pair” (20 min)- Perfil demográfico - Background, experiencia - Aficiones, otros datos empático / sociales
- Motivación - Objetivos - Le gusta / no le gusta - Otros actores en contacto / interacciones
- Problema: - Contexto - Limitaciones, autoridad, responsabilidad - Consecuencias - Workaorunds actuales / cómo se enfrenta al problema
“Memorable Quote”
- Hipótesis de valor: curso de Agile Product Management - Expectativas, factores de diferenciación - Actividades / rol / interacción con la solución
- Consígueme: - Ayúdame a: - Ahórrame:
- Profile, demographics- Background, experience- Hobbies, any other empathy / social data
- Motivation- Goals- Values, principles- Likes / dislikes- Other actors / contacts / interactions
- Problem- Context- Consecuences, outcomes- Workarounds, other solutions- Boundaries, constraints, authority, responsibility
- Value proposition- Expectations, competitive advantage- Success criteria
Get me...Help me...Save me...
“Memorablequote”
![Page 110: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/110.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
How it fails:- Ausencia de desarrollo real (“yo conozco a mis usuarios”) - Personas no basadas en datos reales No creibles - Falta de apoyo desde arriba
- Comunicación incorrecta - No se entiende cómo usar las personas (no se usan en especificaciones o requisitos, no se definen escenarios…) - No se entienden, así que nos sentimos “infantiles” usándolas
- No real development (“I know my users”) - No real data (not believable)- No managerial support- Bad communication- No real understanding on how to use personas (“Cargo Cult” personas)- Feels childish (because we don’t understand it)
![Page 111: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/111.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
4) Validating Assumptions: MVP / MVE
![Page 112: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/112.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Persona = Assumption
Mila, la DBA - Motivación: estar guapa y mejorar el rendimiento de sus bases de datos - Actividades: spinning, pilates, compras, refactorización de bases de datos, Oracle, MongoDB, MySQL, NoSQL - Le gusta: la cerveza, los programadores de C++, jugar a World of Warcraft - Aficiones: pasear en su unicornio rosa invisible
Mila Kunis, DBA- Motivation: look good, stay fit, improve database performace- Activities: Spinning, pilates, shopping, yoga, database refactoring, Oracle, MongoDB, MySQL, NoSQL- Likes: beer, World of Warcraft, Python developers- Hobbies: riding her invisible pink unicorn
![Page 113: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/113.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Persona = Assumption
Mila, la DBA - Motivación: estar guapa y mejorar el rendimiento de sus bases de datos - Actividades: spinning, pilates, compras, refactorización de bases de datos, Oracle, MongoDB, MySQL, NoSQL - Le gusta: la cerveza, los programadores de C++, jugar a World of Warcraft - Aficiones: pasear en su unicornio rosa
![Page 114: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/114.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
From Assumptions to FactsPre_MVP: - Entrevistas - Cuestionarios - Datos demográficos - Investigaciones y publicaciones - Redes sociales - Focus groups - Análisis de mercado / segmentación
Post MVP: - Historial de clientes - Ventas, marketing - Testing UX - Métricas - Dogfooding - Gamification - Beta testing, A/B Tests…
Pre-Product:- Surveys, interviews, polls- Demographical data- Research and publications- Social networks- Focus groups- Market analysis / segmentation- Benchmarking
![Page 115: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/115.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
From Assumptions to FactsPre_MVP: - Entrevistas - Cuestionarios - Datos demográficos - Investigaciones y publicaciones - Redes sociales - Focus groups - Análisis de mercado / segmentación
Post MVP: - Historial de clientes - Ventas, marketing - Testing UX - Métricas - Dogfooding - Gamification - Beta testing, A/B Tests…
Pre-Product:- Surveys, interviews, polls- Demographical data- Research and publications- Social networks- Focus groups- Market analysis / segmentation- Benchmarking
Post-Product- Client history / analysis- Sales, marketing- UX testing- Metrics- “DogFooding”- Gamification- Beta testing / AB testing
![Page 116: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/116.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
TTYFU!
![Page 117: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/117.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Comfort Zone
![Page 118: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/118.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 119: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/119.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Iterating your assumptions in the form of a product
![Page 120: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/120.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
MVP
“The minimum viable product is that version of a new product which allows a team to collect the maximum amount of validated learning about customers with the least effort.. […] We have to manage to learn something from our first product iteration. In a lot of cases, this requires a lot of energy invested in talking to customers or metrics and analytics.”
http://www.startuplessonslearned.com/2009/08/minimum-viable-product-guide.html
![Page 121: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/121.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Minimum
![Page 122: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/122.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Product
“...it’s not about creating minimal products.”
http://www.startuplessonslearned.com/2009/08/minimum-viable-product-guide.html
![Page 123: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/123.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
From MVP to MVE
- Hay que dejar de pensar en el producto final (y, por descontado, dejar de construir por bloques o fases) - En lugar de pensar en el “big picture’, pensar en crear valor AHORA (en un día, en un fin de semana, en una iteración…)
- Stop thinking “Final Product” (and, of course, stop building by phases or blocks)- Instead of “Big Picture”, try to find how to create value NOW (in one day, one weekend, one iteration)
![Page 124: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/124.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Celebrate failure?
![Page 125: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/125.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Celebrate LEARNING!
![Page 126: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/126.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Learn, not launch
![Page 127: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/127.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
MVP --> MVE
![Page 128: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/128.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Canonical MVP’s / MVE’s- Prototipado simple
- Prototipado hi-fi (MockUps) - Brochure, Power Point - Landing page / Signup - Survey - ¿Puedo resolverlo con una lista de correo? - ��El Mago de Oz (“Flintstoning”) - “Conserje” MVP- "Velotransfer"
�- Flash video �- Smoke test y 404 / 500 �- No pinche aquí - A/B test y Ghetto Testing
- Subcontrata - Amazon Mechanical Turk - Price batching �- Walled Garden y Focus Groups �- Maquetas y entornos alpha
- Simple prototype- HiFi prototype (MockUps)- Brochure, Slides, Storyboards- Survey- Wizard of Oz (Flinstoning, concierge )
- Flash video- Smoke test / 404- A/B testing, Ghetto testing- Batching- Outsourcing- Walled garden - Alpha environment
![Page 129: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/129.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
To whom?
“Just enough to deploy / test to early adopters and no more”
http://www.slideshare.net/jchyip/breaking-down-larger-initiatives-into-mmfs-mvps
![Page 130: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/130.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 131: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/131.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Listen to skeptics
![Page 132: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/132.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
There is no “One” MVP / MVE...
![Page 133: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/133.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Pivot
![Page 134: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/134.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 135: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/135.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Problems with MVP
![Page 136: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/136.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
False Negative
![Page 137: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/137.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Complejo de visionario!Visionary complex
![Page 138: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/138.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Too busy to learn
![Page 139: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/139.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
MMFS
![Page 140: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/140.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 141: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/141.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
“If Apple can launch a smartphone without Find or Cut-and-Paste, what can you cut out of your product requirements?”
Sramana Mitra
![Page 142: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/142.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
“In Many ways, it’s the things that are not there that we are most proud of”
Jony Ive, Apple Senior VP Design, on the iPad
![Page 143: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/143.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 144: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/144.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 145: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/145.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 146: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/146.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 147: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/147.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 148: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/148.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 149: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/149.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Evolutive Development
1 2 3
1 2 3
© 2006-2008 Jeff Patton, www.agileproductdesgin.com
![Page 150: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/150.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
MMFS and Quality
![Page 151: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/151.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
MMFS vs. Features
‘Does less’ is OK; ‘flaky/ugly/c0nfusing’ is not
@drewhouston, DropBox
$400.000.000
![Page 152: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/152.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
MMFS vs. Features
![Page 153: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/153.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Feature Creep
![Page 154: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/154.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Feature Creep
![Page 155: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/155.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Feature Creep
http://custdevday.com/pages/content/mvp/
![Page 156: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/156.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
“Kill a Feature”
Day
![Page 157: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/157.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Ex: MyAupair.com MVE (15 min)- Prototipado simple
- Prototipado hi-fi (MockUps) - Brochure, Power Point - Landing page / Signup - Survey - ¿Puedo resolverlo con una lista de correo? - ��El Mago de Oz (“Flintstoning”) - “Conserje” MVP- "Velotransfer"
�- Flash video �- Smoke test y 404 / 500 �- No pinche aquí - A/B test y Ghetto Testing
- Subcontrata - Amazon Mechanical Turk - Price batching �- Walled Garden y Focus Groups �- Maquetas y entornos alpha
- Simple prototype- HiFi prototype (MockUps)- Brochure, Slides, Storyboards- Survey- Wizard of Oz (Flinstoning, concierge )
- Flash video- Smoke test / 404- A/B testing, Ghetto testing- Batching- Outsourcing- Walled garden - Alpha environment
![Page 158: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/158.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
5) Defining your Product
![Page 159: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/159.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Remember...
![Page 160: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/160.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Garret
Ámbito
Estrategia
Estructura
Esqueleto
Superficie
Strategy
Structure
Skeleton
Surface
Scope
![Page 161: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/161.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Estrategia: diseño conceptual del producto. Objetivo, actores, contexto de uso…
Objetivo: proporcionar el mejor empleo posible a todos Actores: desempleados,
personas que quieren cambiar de empleo, RRHH, headhunters, formadores… Contexto de uso: desktop en
casa, desktop en trabajo, iPad en casa, movil en tren…
Strategy: Product concept, goals, actors, use context...
![Page 162: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/162.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Inception Deck
- Why are we here?- Vision / Pitch- Product Box- What it’s NOT- Meet your neighbours / Project community
- Show the solution- What doesn’t let us sleep- Estimate size- Trade-offs- How long it’s going to take
![Page 163: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/163.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Impact Mapping- ¿Por qué hacemos esto? ¿Cuáles son los
objetivos?- ¿Quién puede hacerlo? ¿Quién puede ayudar? ¿Quién puede obstaculizarlo?
- ¿Cómo podemos cambiar el comportamiento de esta persona? ¿Cómo
puede ayudarnos a alcanzar nuestro objetivo? ¿Cómo puede obstaculizarnos?- ¿Qué podemos hacer como equipo para conseguir los objetivos? ¿Qué podemos
entregar?
![Page 164: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/164.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Goal Modelling
Incrementar Ingresos
Reducir costes
Incrementar Servicio
Beneficio Emocional
Cliente: Mercado:
Incrementar ventas
Mejorar conversión
Abrir nuevos mercados
…
1. Identificar y priorizar objetivos 2. “¿Cómo sabemos si tenemos éxito?”, “¿Qué cambiará en
el negocio como resultado de conseguir este objetivo?” 3. Definir métricas para los objetivos
- Identify and prioritize business goals: revenue, sales, service, markets...- How can we tell if we are successfull? If we meet this goal, how would business change?- Define metrics for each goal
![Page 165: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/165.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Personas modelling- Perfil demográfico - Background, experiencia - Aficiones, otros datos empático / sociales
- Motivación - Objetivos - Le gusta / no le gusta - Otros actores en contacto / interacciones
- Problema: - Contexto - Limitaciones, autoridad, responsabilidad - Consecuencias - Workaorunds actuales / cómo se enfrenta al problema
“Memorable Quote”
- Hipótesis de valor: curso de Agile Product Management - Expectativas, factores de diferenciación - Actividades / rol / interacción con la solución
- Consígueme: - Ayúdame a: - Ahórrame:
- Profile, demographics- Background, experience- Hobbies, any other empathy / social data
- Motivation- Goals- Values, principles- Likes / dislikes- Other actors / contacts / interactions
- Problem- Context- Consecuences, outcomes- Workarounds, other solutions- Boundaries, constraints, authority, responsibility
- Value proposition- Expectations, competitive advantage- Success criteria
Get me...Help me...Save me...
“Memorablequote”
![Page 166: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/166.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Ámbito: tareas de usuario / roles
Candidato: crear perfil, buscar ofertas, apuntarse a oferta, revisar estado ofertas… RRHH: buscar candidatos,
publicar oferta, revisar candidatos, puntuar candidatos, contactar
candidatos…
Scope: Roles, Journeys, tasks...
![Page 167: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/167.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Ámbito: tareas de usuario / roles
Candidato: crear perfil, buscar ofertas, apuntarse a oferta, revisar estado ofertas… RRHH: buscar candidatos,
publicar oferta, revisar candidatos, puntuar candidatos, contactar
candidatos…
Scope: Roles, Journeys, tasks...
First clues on Epics! (refine to stories)
![Page 168: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/168.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Estructura: flowcharts, sitemap, navegación… Structure: journeys, flowcharts, sitemap, navigation...
![Page 169: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/169.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
StoryBoards
![Page 170: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/170.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Story Mapping!
(Jeff Patton tiene 86++ slides sobre el tema –
http://www.slideshare.net/nashjain/user-story-mapping)
![Page 171: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/171.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Exercise (15 min)
![Page 172: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/172.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Esqueleto: UX, User Flow, Interacción usuario Skeleton: UX, interface, user flow, user interaction
![Page 173: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/173.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Paper / LowFi Prototypes
![Page 174: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/174.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Superficie: Look&Feel, aspecto gráfico… Surface: Look&Feel, visual aspect
![Page 175: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/175.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Backlog Dimensions
![Page 176: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/176.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Iceberg Backlog
![Page 177: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/177.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Iceberg Backlog
![Page 178: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/178.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Walking Skeleton / Evolutionary
1 2 3
1 2 3
© 2006-2008 Jeff Patton, www.agileproductdesgin.com
![Page 179: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/179.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Walking Skeleton / Evolutionary
![Page 180: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/180.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
MMFS
![Page 181: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/181.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
MMFS
![Page 182: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/182.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
MMFS
![Page 183: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/183.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
MMFS
![Page 184: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/184.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
MMFS
![Page 185: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/185.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
MMFS
![Page 186: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/186.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
6) Product Development
![Page 187: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/187.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Backlog Management
![Page 188: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/188.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Iron Triangle
![Page 189: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/189.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Prioritization
- There are usually more options and ideas than capacity: the Backlog is a FUNNEL, not a TUNNEL
- There is an infinite amount of things we are NOT going to do: be cool with that
- Not everyone can be pleased: that’s a recipe for mediocracy
- If you can’t say “no”, your “yes” means nothing (Esther Derby)
![Page 190: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/190.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
“Focus is about
saying NO”
![Page 191: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/191.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Backlog grooming and trimming
![Page 192: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/192.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Orcs at The Gates
![Page 193: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/193.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Managing priorities: “The Muffins’ Oven”
?
![Page 194: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/194.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
“The Muffins’ Oven”
!!!!!
?
+3!!!??!
![Page 195: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/195.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
“The Muffins’ Oven”
?
!!
!!!!!
+8!
!!??!
![Page 196: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/196.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Prioritization Frameworks
![Page 197: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/197.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Kano Model
Must-have (minimum to use / be happy)
One dimensionals (the more, the better)
![Page 198: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/198.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Kano Model
Delighters (a.k.a. Sexy) !
![Page 199: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/199.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Satisfaction vs Importance
Necesidad no importante
Necesidad Importante
Cliente insatisfecho
Cliente satisfecho
No merece la pena
Oportunidad
Competencia
No merece la pena
![Page 200: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/200.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
“Buy a feature” / User Poll
![Page 201: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/201.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Urgent vs. Important
![Page 202: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/202.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Cost vs. Benefit
Beneficio
Semanas de desarrollo
![Page 203: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/203.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Risk vs. Opportunity
Oportunidad
Riesgo
![Page 204: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/204.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Goal Scoring
![Page 205: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/205.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Cost of Delay (David J. Anderson)
Normal Fecha Fija
Urgente Intangible
![Page 206: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/206.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Cost of Delay (Jeff Anderson)
![Page 207: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/207.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Bugs and Technical Stories
As a (blah) I want (blah) so we can handle 200 more support calls per day
As a (blah) I want (blah) so we can serve 1.000 more orders a day
As a (blah) I want (blah) so my boss stops bugging me about a comma missing somewherwe
As a (blah) I want (blah) so 1 out of every 1M users can still use the Mosaic browser
![Page 208: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/208.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
7) Metrics and Analytics
![Page 209: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/209.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
PM fit
Criterio de éxito: - Modelo de negocio testado - Hipótesis financieras válidas - Canales de venta testados - Primeros pedidos - Killer question: si entregases tu producto grátis, ¿lo instalarían y usarían tus clientes ahora mismo?
MVP
Success Criteria: - Validated business model- Validated financial assumptions- Tested sales channels- First orders- Killer question: if you gave your product for free, would your clients use it right now?
![Page 210: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/210.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Goals and Metrics
We assume that (customer segment) has (problem / need) that can be solved through (solution). We will
know that we are right when (cuantitative metric outcome) or
(cualitative metric outcome), which will contribute to (KPI)
![Page 211: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/211.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 212: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/212.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
http://www.slideshare.net/dan_o/early-stage-web-product-management-by-dan-olsen
![Page 213: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/213.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
http://www.slideshare.net/dan_o/early-stage-web-product-management-by-dan-olsen
![Page 214: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/214.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
“Pensamos que las personas tipo (usuario nuevo) tienen un problema para (completar el proceso de registro) que puede ser solucionado mediante (un proceso más sencillo y rediseñado pensando en la experiencia de usuario). Sabremos que tenemos razón cuando (porcentaje de drop-outs durante registro disminuya) y (satisfacción del cliente con el proceso de registro aumente), lo cual contribuirá a (aumentar el número de usuarios activados)”
We asume that (new users) have a problem with (registration process) that can be solved through (a better UX design). We will know we are right when (dropouts diminish) and (customer satisfaction rises) which will contribute to (number of activated users / conversion rate)
![Page 215: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/215.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 216: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/216.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
David Cancel’s Funnel, citado en http://www.slideshare.net/pathf/customer-acquisition-and-retention
Funnel
![Page 217: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/217.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Several possible funnels
- �Acquisition
- Retention - Engagement - Community - Reward
- �Acquisition
- Activation - Retention - Referral - Revenue
- �Suspect
- Lead - Prospect - Customer - Reference
- �Heard
- Arrived - Used - Engaged - Bought - Referred
![Page 218: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/218.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Acquisition
![Page 219: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/219.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Activation
![Page 220: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/220.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Retention
![Page 221: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/221.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Referral
![Page 222: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/222.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Revenue
![Page 223: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/223.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Critical Metrics (KPI)
![Page 224: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/224.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
What’s your strategy right now?
![Page 225: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/225.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Which is your funnel’s biggest problem?
Where does conversion drop?
![Page 226: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/226.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Activation
Acquisition
Retention
Referral
Revenue
CAC, Campaign efficiency, Channels, unique visitors, hits
Bounce rate, time per page, pages viewed, UX, A/B
Churn, time between visits, cohort analysis, lifespan
Virality, Net Promoter Score
LTV, ARPU, CAC
![Page 227: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/227.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Key is in CONVERSION
![Page 228: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/228.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
“2% is the average conversion rate in the USA, whether you’re selling elephants or iPods”
Avinash Kaushik – Analytics Evangelist Google
Two per cent!
![Page 229: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/229.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Retention is also KEY!
“5% improvement in customer retention rates will yield between a 25 to 100% increase in profits across a wide range of industries.” (Fred Reichheld, “The Loyalty Effect”)
1 to 2% retention DOUBLES LTV and HALVES CAC
![Page 230: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/230.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Other Metrics
- Usability- Performance- Comunity- Competitors- ...
![Page 231: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/231.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Drill Down
![Page 232: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/232.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Actionable Metrics
“An actionable metric is one that ties specific and repeatable actions to observed results”
Metrics should help us make decissions. Every thing we do should be an attempt to influence a metric. A variation in a metric should move us to do something
![Page 233: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/233.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Metrics should hurt!
![Page 234: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/234.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Problems with metrics
![Page 235: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/235.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Vanity Metrics
- Fans & Followers - Tráfico, pageviews - Email Open Rate - Keyword Ranking - …
![Page 236: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/236.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Moral Hazard
![Page 237: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/237.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Analysis Paralysis
![Page 238: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/238.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Dashboard: FAIL
![Page 239: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/239.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Dashboard: Better...
![Page 240: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/240.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Correlation is not cause
![Page 241: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/241.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Correlation is not cause
![Page 242: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/242.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
‘Post Hoc ergo Propter Hoc’
![Page 243: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/243.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Cargo Cult Metrics
![Page 244: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/244.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Tools
- Excel / Google Spreadsheets�
- Google Analytics - Google Website Optimizer - Kissmetrix - Mixpanel - Crazyegg Heatmap � Cool! - Performable - ¿Usercycle? - Adwords - Facebook Self Service Ads - Amazon Mechanical Turk - De pago: Coremetrix / Ommniture
![Page 245: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/245.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
![Page 246: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/246.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Wrap Up!1) Develop a simple vision: Why are you doing this?2) Link your product to a business model and outcome3) List your assumptions, specially C-P-S; know your customers4) Validate your assumptions iterating your MVP / MVE5) Once you have a PM Fit, refine your product from strategy to surface6) Develop your product in an Agile fashion - evolutive and with sense7) Set actionable metrics and use them to steer your product
![Page 247: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/247.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
Thank you and... BLOG IT!!
(Oh, yes, and buy the book!)http://www.proyectalis.com/en/AngelMedinilla
![Page 248: Lean Startup for Agile Product Management Workshop](https://reader030.vdocuments.us/reader030/viewer/2022020101/54b481794a7959ae188b45f5/html5/thumbnails/248.jpg)
© 2013 Proyectalis Gestión de Proyectos S.L. More at http://Slideshare.net/proyectalis
http://creativecommons.org/licenses/by-nc-nd/3.0/
This presentation is based upon the ideas and work of many people. And while I’ve tried to recognize copyrights and give credit and attribution where possible, I cannot possibly list them all, so if you feel like there’s something that should be added, changed or removed from this presentation, please drop me an e-mail at [email protected]