lean on me: a case study on using lean principles in an ... · outcomes •quantitative data july...
TRANSCRIPT
![Page 1: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/1.jpg)
Lean on Me: A case study on using lean principles in an outpatient mental health setting
Joshua Carlson, MSW, LCSW Clinical Supervisor- Family Solutions
![Page 2: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/2.jpg)
Lean Collaborative
• Teaching Lean principles
• Area not for profit business
• Aimed at capacity building
– Better use of limited resources
– Community learning environment
![Page 3: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/3.jpg)
Lean Collaborative
• Tracy Family Foundation
• Blessing Health System
• John Wood Community College
• 5 Participating organizations
![Page 4: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/4.jpg)
Lean Collaborative
• TFF Funded the project
• Blessing Health System- provided the trainers
• John Wood Community College provided space
• 5 Participating organizations
![Page 5: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/5.jpg)
Chaddock Team
• Vice President of Operations • Associate Director of Quality
Assurance • Associate Director of Finance • Clinical Supervisor of Family Solutions • Clinical supervisor of Foster and
Adoption Services
• Goal- Improve productivity levels at Family Solutions
![Page 6: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/6.jpg)
Family Solutions • Chaddock- social services agency
in Quincy, IL.
• Family Solutions outpatient program – 2 full and 2 part time therapists, 1
AA, and one supervisor
– 130 clients
– Providing onsite and offsite services
• Fee for services, Medicaid, EHR
![Page 7: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/7.jpg)
Family Solutions
• Choosing our project-
– Participation in leadership academy
– Improving systems at Family Solutions
– Increase productivity
– Become self sustaining
![Page 8: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/8.jpg)
Lean
Pre work readings
![Page 9: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/9.jpg)
Lean
Lean is a methodology to implement systematic process improvement
![Page 10: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/10.jpg)
Key Concepts
BTTWWADI
![Page 11: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/11.jpg)
Key Concepts
• A3
![Page 12: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/12.jpg)
Key Concepts
• A3
![Page 13: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/13.jpg)
Key Concepts
• A3
![Page 14: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/14.jpg)
Key Concepts
• A3
![Page 15: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/15.jpg)
Key Concepts
• A3
![Page 16: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/16.jpg)
Key Concepts
• A3
![Page 17: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/17.jpg)
Key Concepts
• A3
![Page 18: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/18.jpg)
Key Concepts
• A3
![Page 19: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/19.jpg)
Key Concepts
![Page 20: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/20.jpg)
Key Concepts
• A3
![Page 21: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/21.jpg)
Key Concepts
• Value Stream
– Value added
– Non value added
![Page 22: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/22.jpg)
Key Concepts
• The Race Track
![Page 23: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/23.jpg)
Key Concepts
• Data
– Quantitative data
• Target
• Productivity
• Capacity
• Utilization
• Cancellation/NS rate
– Qualitative data
• Focus group
• Waiting room observation
• Time study
![Page 24: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/24.jpg)
Key Concepts
• Quantitative
![Page 25: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/25.jpg)
Key Concepts
• Qualitative
![Page 26: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/26.jpg)
Personal Revelations
• Supply and demand – Training – Staffing patterns
• Perishable – Therapist time
• Conceptual Variables – Abstract concept
• Operationalize – Finding ways to quantify these
variables
• Internal stakeholders • External stakeholders
![Page 27: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/27.jpg)
Key Concepts
• Muda
![Page 28: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/28.jpg)
Key Concepts
• Muda 1. Value added 2. Required waste 3. Pure waste
• Finding the root cause can
lead to corrective action • Courage to call it waste
![Page 29: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/29.jpg)
Key Concepts
BTTWWADI
![Page 30: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/30.jpg)
Key Concepts
• Muda or Waste 1. Waiting
2. Over production
3. Rework
4. Motion
5. Processing
6. Inventory
7. Intellect
8. Transportation
![Page 31: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/31.jpg)
Key Concepts
• Muda or Waste
1. Waiting 2. Over production
3. Rework
4. Motion
5. Processing
6. Inventory
7. Intellect
8. Transportation
![Page 32: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/32.jpg)
Key Concepts
• Muda or Waste
1. Waiting Signature activity
![Page 33: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/33.jpg)
Key Concepts
• Muda or Waste 1. Waiting
2. Over production 3. Rework
4. Motion
5. Processing
6. Inventory
7. Intellect
8. Transportation
![Page 34: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/34.jpg)
Key Concepts
• Muda or Waste 1. Waiting
2. Over production
3. Rework 4. Motion
5. Processing
6. Inventory
7. Intellect
8. Transportation
![Page 35: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/35.jpg)
Key Concepts
• Muda or Waste 1. Waiting
2. Over production
3. Rework
4. Motion 5. Processing
6. Inventory
7. Intellect
8. Transportation
![Page 36: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/36.jpg)
Key Concepts
• Muda or Waste 1. Waiting
2. Over production
3. Rework
4. Motion
5. Processing 6. Inventory
7. Intellect
8. Transportation
![Page 37: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/37.jpg)
Key Concepts
• Muda or Waste 1. Waiting
2. Over production
3. Rework
4. Motion
5. Processing
6. Inventory 7. Intellect
8. Transportation
![Page 38: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/38.jpg)
Key Concepts
• Muda or Waste 1. Waiting
2. Over production
3. Rework
4. Motion
5. Processing
6. Inventory
7. Intellect 8. Transportation
![Page 39: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/39.jpg)
Key Concepts
• Muda or Waste 1. Waiting
2. Over production
3. Rework
4. Motion
5. Processing
6. Inventory
7. Intellect
8. Transportation
![Page 40: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/40.jpg)
Key Concepts
• Visual Management
– Visual tools make situations stand out quickly
– Problem solving ability by all staff
– Address problems immediately
– Create a culture where problems are addressed
![Page 41: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/41.jpg)
Key Concepts
• Visual Management
![Page 42: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/42.jpg)
Key Concepts
• Visual Management
• Real Time Feedback
![Page 43: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/43.jpg)
Key Concepts
• 5S
– Office supplies
– Theraplay supplies
Source: leanprocess.net
![Page 44: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/44.jpg)
Implementing and Sustaining
• Collaborative Documentation/EHR
• Inclusive Leadership
• Supervision
![Page 45: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/45.jpg)
Implementing and Sustaining
• Collaborative Documentation/EHR
![Page 46: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/46.jpg)
Implementing and Sustaining
![Page 47: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/47.jpg)
Implementing and Sustaining
• Clinical supervision • Team Meeting • Consultation
– Communicate the purpose – Communicate mutual goals – Use SMART goals
![Page 48: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/48.jpg)
Outcomes
• Quantitative Data
July August September October November December January Total
2015 117.4 132.43 151.03 185.37 158.85 197.65 232.8 1175.53
2016 150.82 215.93 237.63 193.98 245.14 101.72 265.06 1410.28
0
200
400
600
800
1000
1200
1400
1600
Clinical Services
2015 2016
![Page 49: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/49.jpg)
Outcomes
• Quantitative Data
25%
38%
Units of Services Revenue
![Page 50: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/50.jpg)
Outcomes
• Quantitative Data
11% 16%
Fulltime Staff Part time Staff
![Page 51: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/51.jpg)
Outcomes • Qualitative Data
• It made our jobs doable
• Things are more efficient
• I’m not as stressed
• All staff indicated that they felt moral has improved
![Page 52: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/52.jpg)
What’s next
• Chaddock selected for another project
• Invitation for additional training
• Working towards becoming a certified Lean Coach
![Page 53: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/53.jpg)
“A Leader is one that gets results by maximizing resources.”
-Tony Robbins
![Page 54: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/54.jpg)
Reading List
Womack, J. P., & Jones, D. T. (2010).
Lean thinking: banish waste and create wealth in your corporation. Simon and Schuster.
Liker, J. K. (2004). The toyota way. Esensi.
![Page 55: Lean on Me: A case study on using lean principles in an ... · Outcomes •Quantitative Data July August September October November December January Total 2015 117.4 132.43 151.03](https://reader033.vdocuments.us/reader033/viewer/2022053002/5f065a8f7e708231d4179250/html5/thumbnails/55.jpg)
Thank you. Family Solutions
Joshua Carlson, MSW, LCSW
Clinical Supervisor-
Family Solutions
217-223-7516
Connect with me on
LinkedIn at linkedin.com/in/joshcarlson9987