Lean for Internal AuditOverviewNovember 26, 2015
Copyright of this material is owned by Lean Agility Inc. Not for duplication or distribution without prior written consent.
Paul ChoquetteLean Six Sigma Black Belt, CIA, CCSA
Craig SzelestowskiMBA, Lean Black Belt
-
2
LEAN
less inventoryNOT
less people
-
The Challenge
With fewer resources :
you must still deliver as much, and maybe more to your clients
faster and better while increasing staff engagement
3
-
94 days 5 days
4
-
Retirements backlog reduction plan
0
50
100
150
200
250
300
350
400
450
15/0
1/20
13
16/0
1/20
13
17/0
1/20
13
18/0
1/20
13
21/0
1/20
13
22/0
1/20
13
23/0
1/20
13
24/0
1/20
13
25/0
1/20
13
28/0
1/20
13
29/0
1/20
13
30/0
1/20
13
31/0
1/20
13
01/0
2/20
13
04/0
2/20
13
05/0
2/20
13
06/0
2/20
13
07/0
2/20
13
08/0
2/20
13
11/0
2/20
13
12/0
2/20
13
13/0
2/20
13
14/0
2/20
13
15/0
2/20
13
18/0
2/20
13
19/0
2/20
13
20/0
2/20
13
21/0
2/20
13
22/0
2/20
13
18/0
4/20
13
Date
Cas
es i
n q
ueu
e
Planned reduction
In queue actual
New process start date
Retirements ReviewImprovement plan over three weeks
Stabilization(remaining cases too far in the future to process)
Plan and Actuals
362
370
378
375
378
410
416
423
421
427
404405
382383
368361
361339
338317
307295
283273
289251
260229
223207
175185
141163
117141
110119
10497
11075
9653
8750
6750
8350
&A
Page &P
New process start date
In queue actual
Planned reduction
Date
Cases in queue
Retirements backlog reduction plan
Retirement Volumes
DateDRAFTIn queue actualPlanned reductionIn TotalDRAFTIn queueIn Total
15/01/201332362923Baseline Avg (14th to 25th)23393958
16/01/201323370932
17/01/201323378949Plan to eliminate backlog in 20 days (as of 25th)
18/01/201314375950427 in the queue22per day
21/01/20131137895723 average new draft per day23per day
22/01/20134641099745per day total
23/01/201320416999
24/01/2013144231003
25/01/201330421916
28/01/201318427887
29/01/201330404405886
30/01/201329382383896
31/01/201346368361897
01/02/201362361339906
04/02/201367338317913
05/02/201375307295929
06/02/201387283273937
07/02/201392289251951
08/02/201398260229845
2/11/1385223207807
2/12/1361175185799
2/13/1350141163795
2/14/1337117141792
2/15/1330110119795
2/18/132610497918
2/19/134311075944
2/20/13309653974
2/21/1378750971
2/22/1336750888
4/18/13118350618
choqupp:All except validation & final validation
choqupp:All except validation & final validation
choqupp:Pay Cut Off
-
Reduce time to staff a position by 50%
Reduce claims and payments time: 87 14 days
Waiting time for a hearing: two years four months.
Top 35 companies to work for in Canada list Report on Business Magazine
6
-
7
Difficult to believeuntil you see how.
-
What is Lean?
A way of thinking + habits leading to speed, flow, effectiveness and efficiency
Find ways to stop doing things that are not necessary in the eyes of your Client/end user/key stakeholders.
Apply this found capacity to higher value added activities, creating speed and quality without working harder or adding resources.
8
-
Business System
People System LEAN
9
Processes that flow; constantly
makes problems
visible
Willing, able, and enabled people who constantly
solve these problems
Faster, better, more capacity with inspired
people
-
Elapsed Time: 90+ % non-value added
It takes us three weeks to process a file
but the time we spend actually touching it or working on it is only four hours.
10
-
Flow
11
If you took a file, put an imaginary video camera on it and sent it through your process, what would it see?
bottlenecks
chronic errors
missinginfo
backlogs
unbalancedwork
last-in,first-out
unnecessaryapprovals
too manyhandoffs
waitingwaiting
waiting
clarifications
unnecessarysteps
-
How backlogs often develop
12
MURA:Unevenness
MURI: Overburden
MUDA:Waste
createsmade
worse by
DefectsOverproductionWaitingNot using skillsTransportInventoryMotionExcessive Processing
-
THE CLASSIC EIGHT LEAN WASTESDOWNTIME
13
-
DefectsWhen something is missing, or must be: corrected, clarified, or adjusted/adapted in order to be used.
14
-
Overproduction
When The work is started too
early Too much work passed
to next step Too much work is taken
on
15
-
Waiting
When the work flow is stopped to wait for
16
-
Not fully utilizing people
When people are not used to their full potential
17
-
Transport
When material and information travels further than necessary
18
-
Inventory
When work piles up and stops flowing.
19
-
Motion
People move more than required to do their work
20
-
Excessive Processing
When the work is processed more than required.
21
Process DescriptionCreate blue file with Post-It notes
JOB TITLE File Creator
1- Create a file
10P/T: seconds
2CT: minutes
100 C&A: %Inv/WIP 52 Piece(s)
Batch: 3 Piece(s)
Process DescriptionAdd up the first line, sign
JOB TITLE Addition A Officers
2- Add Line A
20P/T: seconds
2CT: minutes
100 C&A: %Inv/WIP 5 Piece(s)
Batch: 3 Piece(s)
Process DescriptionAdd up the second line, subtotal, grand total, sign
JOB TITLE Addition B Officers
3- Add Line B and Grand Total
30P/T: seconds
72CT: seconds
99C&A: %Inv/WIP 6 Piece(s)
Batch: 3 Piece(s)
Process DescriptionVerify accuracy of file, sign
JOB TITLE Supervisor
4- Verify File
10P/T: seconds
5CT: minutes
60C&A: %Inv/WIP 31 Piece(s)
Batch: 3 Piece(s)
Process DescriptionVerify accuracy of file, sign
JOB TITLE Manager
5- Review & Approve
15P/T: seconds
29CT: seconds
50C&A: %Inv/WIP 6 Piece(s)
Batch: 3 Piece(s)
Department of Addition (DoA)Current State Value Stream Map (VSM)30 3030
Requestor30 3030
Requestor
FUTURE STATE
Minimum Lead Time: 21 weeks (5 months)Maximum Lead Time: 67 weeks (7 months)
Touch Time: 19 days
Reference ChecksDelegated Manager 0
CHRBP: Build templates, contact references, check logistics, evaluation of checks; 2 references/candidate
P/week Inv P0 0PT 15 minsCT 3 wks
C&A 0 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
OK 90%
NOT O
K 10%
Create forms and signDelegated Manager and Board 0
Board, candidates, exams, screening forms, (3X)
P/week Inv P0 0PT 1 hrsCT 2 days
C&A 0 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Follow Up if references not okDelegated Manager and Board 0
P/week Inv P0 0PT 0 hrsCT 0 days
C&A 0 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Check References Lead Time: 2-4 weeks BIZ Touch Time: 2-3 hours/candidate
Compile Assessment results/reportDelegated Manager and Board 0
P/week Inv P0 0PT 2 hrsCT 0 days
C&A 0 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Review Assessment results/report pkg & create pool
Delegated Manager and Board 0
P/week Inv P0 0PT 0 hrsCT 0 days
C&A 0 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Create Results Letters
HR Assistant 0
P/week Inv P0 0PT 1 hrsCT 1 days
C&A 30 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Review Results Letters
HR Advisor 0
P/week Inv P0 0PT 15 minsCT 1 wks
C&A 66 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Fill out Right Fit formDelegated Manager 0
CHRBP
P/week Inv P0 0PT 1 hrsCT 2 days
C&A 0 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Review Right Fit FormHR Advisor 0
P/week Inv P0 0PT 30 minsCT 2 days
C&A 50 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Verify Conditions of EmploymentHR Assistant 0
P/week Inv P0 0PT 5 minsCT 0 days
C&A 50 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Notify Candidate VerballyDelegated Manager 0
P/week Inv P0 0PT 15 minsCT 3 hrs
C&A 0 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Value Added Fill out Security Clearance FormDelegated Manager / Admin Asst 0
CHRBP
P/week Inv P0 0PT 5 minsCT 3 hrs
C&A 0 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Conduct Security Clearance (Reliability)Security 0
P/week Inv P0 0PT 0 minsCT 3 days
C&A 0 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Official Languages ProcessHR Assistant 0
P/week Inv P0 0PT 5 minsCT 0 days
C&A 50 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Security Lead Time: 1 day (existing clearance) 6 months (no existing clearance, Secret) Touch Time BIZ: 10-30 minutes
Touch Time HR: 5 minutes
Conduct Security Clearance (Secret)Security 0
P/week Inv P0 0PT 0 minsCT 26 wks
C&A 0 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Re-Verify Priority ClearanceHR Advisor 0
Occurs if more than 2-3 months from first priority clearance; Non-Value Added?
P/week Inv P0 0PT 0 minsCT 0 hrs
C&A 0 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Create Notice of ConsiderationHR Assistant 0
CHRBP
P/week Inv P0 0PT 20 minsCT 1 days
C&A 0 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Create Notice of AppointmentHR Assistant 0
CHRBP
P/week Inv P0 0PT 5 minsCT 1 wks
C&A 75 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
NO COMPLAINTS
COMP
LAIN
TSInformal Discussion
Delegated Manager 0CHRBP
P/week Inv P0 0PT 0 minsCT 0 wks
C&A 0 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Prepare Letter of OfferHR Assistant 0
P/week Inv P0 0PT 20 minsCT 1 days
C&A 75 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Review Letter of OfferHR Advisor 0
P/week Inv P0 0PT 10 minsCT 1 days
C&A 75 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Verify Letter of OfferDelegated Manager 0
P/week Inv P0 0PT 30 minsCT 2 wks
C&A 20 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Send letter to employeeHR Assistant / Coordinator 0
P/week Inv P0 0PT 0 minsCT 1 wks
C&A 0 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Candidate signs letter of offerCandidate 0
CHRBP
P/week Inv P0 0PT 0 minsCT 1 wks
C&A 0 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
Value Added
Enter signed letter into PeopleSoftHR Assistant 0
CHRBP
P/week Inv P0 0PT 0 minsCT 1 wks
C&A 80 %
Inv C 0Total 0Batch 1
Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand
WF Officer/Manager
PT: 2 minutesCT: 0.5 days
Issue request for HRSR
Clerk/Admin Coordinator
PT: 5-10 minutesCT: 0.5 - 1 day
Create HRSR
WF Officer / Manager
PT: 2 minutesCT: 0.5 day
Review HRSR and make changes (if required)
Regional Management Board(meets every 2 weeks); covers WMB challenge
PT: 2 minutesCT: 0.5 day
Regional Management Board Review
WF Officer or Coordinator
PT: 2 minutesCT: 0.5 day
Send Signed docs to HR
Can be done in parallel earlier in the process if appropriate eg. At initial screening
Can be done in parallel earlier in the process if appropriate
Can be done in parallel earlier in the process if appropriate
Eliminate expiration date on pools where posssible
Add local, regional, national and interdepartmental pools to website
Send written questions in advance to referees
-
Tools: Value Stream Mapping
22
-
Sustaining: Visual Management
23
-
Sustaining: Stand-Up Meetings
24
-
Typical Challenges to Implementing Lean Government
10% technical90% human
25
Typical Challenges
10% technical90% human
-
27
Autonomy
Purpose
Mastery
-
28
How does Lean apply to Internal Audit work?
-
Specific Lean Issues in IA Too much work taken on lowers
productivity and quality Audit plan not executed consistently
inconsistent data needs rework or re-collection
Documents: Audit Plan and Audit Reporting Too many edits, takes too long and too much effort to get to final version
29
-
TOO MUCH WORK TAKEN ON
Specific Lean Issues in IA
30
-
Too much work is taken on
When we multi-task*, we get less done.*actually, switch-task
31
-
Time Yourself
Scenario 1 (Focus-Tasking)1. Write:
Multitasking eats time1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
2. Note how long that took.
32
-
Time Yourself
Scenario 2 (Context Switching)1. Write one letter, then one number, one letter, one number, etc:
33
2. Write down how long that took.
Multitasking eats time1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
-
34
-
AUDIT PLAN NOT EXECUTED CONSISTENTLY INCONSISTENT DATA NEEDS REWORK OR RE-COLLECTION
Specific Lean Issues in IA
35
-
36
Visual warning
Predictive
Preventive
Poka Yoke Error Proofing
-
Sustaining: Stand-Up Meetings
37
-
Repeatability and Reproducibility Gage R&R
38
Assessment Agreement
Appraiser # Inspected # Matched Percent (%) 95.0% CI
Sally 50 3 6.0 ( 1.3, 16.5)
Joe 50 9 18.0 ( 8.6, 31.4)
Betty 50 1 2.0 ( 0.1, 10.6)
Bob 50 5 10.0 ( 3.3, 21.8)
Sue 50 4 8.0 ( 2.2, 19.2)
David 50 12 24.0 ( 13.1, 38.2)
# Matched: Appraiser's assessment across trials agrees with standard.
Individual accuracy
Assessment Agreement
Appraiser # Inspected # Matched Percent (%) 95.0% CI Sally 50 25 50.0 ( 35.5, 64.5) Joe 50 34 68.0 ( 53.3, 80.5) Betty 50 22 44.0 ( 30.0, 58.7) Bob 50 28 56.0 ( 41.3, 70.0) Sue 50 25 50.0 ( 35.5, 64.5) David 50 36 72.0 ( 57.5, 83.8)
# Matched: Appraiser agrees with him/herself across trials.
Repeatability
# Matched: Appraiser agrees with him/herself across trials.
David 50 36 72.0 ( 57.5, 83.8)
Sue 50 25 50.0 ( 35.5, 64.5)
Bob 50 28 56.0 ( 41.3, 70.0)
Betty 50 22 44.0 ( 30.0, 58.7)
Joe 50 34 68.0 ( 53.3, 80.5)
Sally 50 25 50.0 ( 35.5, 64.5)
Appraiser # Inspected # Matched Percent (%) 95.0% CI
Assessment Agreement
-
Gage R&R (contd)
39
Assessment Agreement
# Inspected # Matched Percent (%) 95.0% CI
50 0 0.0 ( 0.0, 5.8)
# Matched: All appraisers' assessments agree with each other.
Reproducibility
Assessment Agreement
# Inspected # Matched Percent (%) 95.0% CI
50 0 0.0 ( 0.0, 5.8)
# Matched: All appraisers' assessments agree with standard.
Overall accuracy Decisions routinely made using this data as a base 0% accuracy!
-
AUDIT PLAN & REPORTING TAKES TOO LONG, TOO MUCH EFFORT
Specific Lean Issues in IA
40
-
Creation of Spring project update (intranet article)
41
DM
ADM ADM EA
Project DG
Project DG EA
Project Director
Project Liaison
Project Manager
Comms.Liaison
DG Comms CIO CFO
CHRO COO
DM EA
Subject Matter Expert
Subject Matter Expert
Subject Matter Expert
Subject Matter Expert
Subject Matter Expert
Article approved
Article posted
on Intranet
FallTwo-page intranet article
Handoffs 97Lead Time 9 monthsEffort Time >100 hoursOrganizational Learning
?
-
Issues in document creation
work
42
Many reviewloops
Too much work in
progress
Unclear voice of client
Preventable work / 8 Lean
wastes
Waterfall Development
Workflow is invisible
-
SUMMARYLean for Internal Audit
43
-
Summary
1. Not a project a business approach and tools, create habits
2. Applies equally to your clients work as well as IA work
3. Makes Internal Auditors more effective and delivers better results to clients
44
-
Lean Internal Audit Yellow Belt Training
Ottawa, Feb. 22-24, 2016To register:
[email protected] or leanagility.com
Craig [email protected]
(613) 266 4653
Paul [email protected]
(819) 598 1426
45
mailto:[email protected]
Lean for Internal AuditOverviewSlide Number 2The ChallengeSlide Number 4Retirements ReviewImprovement plan over three weeksSlide Number 6Slide Number 7What is Lean?Slide Number 9Elapsed Time: 90+ % non-value addedFlowHow backlogs often developThe classic eight lean wastesDefectsOverproductionWaitingNot fully utilizing peopleTransportInventoryMotionExcessive ProcessingTools: Value Stream MappingSustaining: Visual ManagementSustaining: Stand-Up MeetingsTypical Challenges to Implementing Lean Government Slide Number 27How does Lean apply to Internal Audit work?Specific Lean Issues in IAToo much work taken onToo much work is taken onTime YourselfTime YourselfSlide Number 34Audit plan not executed consistently inconsistent data needs rework or re-collection Poka Yoke Error ProofingSustaining: Stand-Up MeetingsRepeatability and Reproducibility Gage R&RGage R&R (contd)Audit plan & Reporting takes too long, too much effortCreation of Spring project update (intranet article)Issues in document creation workSummarySummarySlide Number 45