  • Lean for Internal AuditOverviewNovember 26, 2015

    Copyright of this material is owned by Lean Agility Inc. Not for duplication or distribution without prior written consent.

    Paul ChoquetteLean Six Sigma Black Belt, CIA, CCSA

    Craig SzelestowskiMBA, Lean Black Belt

  • 2

    LEAN

    less inventoryNOT

    less people

  • The Challenge

    With fewer resources :

    you must still deliver as much, and maybe more to your clients

    faster and better while increasing staff engagement

    3

  • 94 days 5 days

    4

  • Retirements backlog reduction plan

    0

    50

    100

    150

    200

    250

    300

    350

    400

    450

    15/0

    1/20

    13

    16/0

    1/20

    13

    17/0

    1/20

    13

    18/0

    1/20

    13

    21/0

    1/20

    13

    22/0

    1/20

    13

    23/0

    1/20

    13

    24/0

    1/20

    13

    25/0

    1/20

    13

    28/0

    1/20

    13

    29/0

    1/20

    13

    30/0

    1/20

    13

    31/0

    1/20

    13

    01/0

    2/20

    13

    04/0

    2/20

    13

    05/0

    2/20

    13

    06/0

    2/20

    13

    07/0

    2/20

    13

    08/0

    2/20

    13

    11/0

    2/20

    13

    12/0

    2/20

    13

    13/0

    2/20

    13

    14/0

    2/20

    13

    15/0

    2/20

    13

    18/0

    2/20

    13

    19/0

    2/20

    13

    20/0

    2/20

    13

    21/0

    2/20

    13

    22/0

    2/20

    13

    18/0

    4/20

    13

    Date

    Cas

    es i

    n q

    ueu

    e

    Planned reduction

    In queue actual

    New process start date

    Retirements ReviewImprovement plan over three weeks

    Stabilization(remaining cases too far in the future to process)

    Plan and Actuals

    362

    370

    378

    375

    378

    410

    416

    423

    421

    427

    404405

    382383

    368361

    361339

    338317

    307295

    283273

    289251

    260229

    223207

    175185

    141163

    117141

    110119

    10497

    11075

    9653

    8750

    6750

    8350

    &A

    Page &P

    New process start date

    In queue actual

    Planned reduction

    Date

    Cases in queue

    Retirements backlog reduction plan

    Retirement Volumes

    DateDRAFTIn queue actualPlanned reductionIn TotalDRAFTIn queueIn Total

    15/01/201332362923Baseline Avg (14th to 25th)23393958

    16/01/201323370932

    17/01/201323378949Plan to eliminate backlog in 20 days (as of 25th)

    18/01/201314375950427 in the queue22per day

    21/01/20131137895723 average new draft per day23per day

    22/01/20134641099745per day total

    23/01/201320416999

    24/01/2013144231003

    25/01/201330421916

    28/01/201318427887

    29/01/201330404405886

    30/01/201329382383896

    31/01/201346368361897

    01/02/201362361339906

    04/02/201367338317913

    05/02/201375307295929

    06/02/201387283273937

    07/02/201392289251951

    08/02/201398260229845

    2/11/1385223207807

    2/12/1361175185799

    2/13/1350141163795

    2/14/1337117141792

    2/15/1330110119795

    2/18/132610497918

    2/19/134311075944

    2/20/13309653974

    2/21/1378750971

    2/22/1336750888

    4/18/13118350618

    choqupp:All except validation & final validation

    choqupp:All except validation & final validation

    choqupp:Pay Cut Off

  • Reduce time to staff a position by 50%

    Reduce claims and payments time: 87 14 days

    Waiting time for a hearing: two years four months.

    Top 35 companies to work for in Canada list Report on Business Magazine

    6

  • 7

    Difficult to believeuntil you see how.

  • What is Lean?

    A way of thinking + habits leading to speed, flow, effectiveness and efficiency

    Find ways to stop doing things that are not necessary in the eyes of your Client/end user/key stakeholders.

    Apply this found capacity to higher value added activities, creating speed and quality without working harder or adding resources.

    8

  • Business System

    People System LEAN

    9

    Processes that flow; constantly

    makes problems

    visible

    Willing, able, and enabled people who constantly

    solve these problems

    Faster, better, more capacity with inspired

    people

  • Elapsed Time: 90+ % non-value added

    It takes us three weeks to process a file

    but the time we spend actually touching it or working on it is only four hours.

    10

  • Flow

    11

    If you took a file, put an imaginary video camera on it and sent it through your process, what would it see?

    bottlenecks

    chronic errors

    missinginfo

    backlogs

    unbalancedwork

    last-in,first-out

    unnecessaryapprovals

    too manyhandoffs

    waitingwaiting

    waiting

    clarifications

    unnecessarysteps

  • How backlogs often develop

    12

    MURA:Unevenness

    MURI: Overburden

    MUDA:Waste

    createsmade

    worse by

    DefectsOverproductionWaitingNot using skillsTransportInventoryMotionExcessive Processing

  • THE CLASSIC EIGHT LEAN WASTESDOWNTIME

    13

  • DefectsWhen something is missing, or must be: corrected, clarified, or adjusted/adapted in order to be used.

    14

  • Overproduction

    When The work is started too

    early Too much work passed

    to next step Too much work is taken

    on

    15

  • Waiting

    When the work flow is stopped to wait for

    16

  • Not fully utilizing people

    When people are not used to their full potential

    17

  • Transport

    When material and information travels further than necessary

    18

  • Inventory

    When work piles up and stops flowing.

    19

  • Motion

    People move more than required to do their work

    20

  • Excessive Processing

    When the work is processed more than required.

    21

    Process DescriptionCreate blue file with Post-It notes

    JOB TITLE File Creator

    1- Create a file

    10P/T: seconds

    2CT: minutes

    100 C&A: %Inv/WIP 52 Piece(s)

    Batch: 3 Piece(s)

    Process DescriptionAdd up the first line, sign

    JOB TITLE Addition A Officers

    2- Add Line A

    20P/T: seconds

    2CT: minutes

    100 C&A: %Inv/WIP 5 Piece(s)

    Batch: 3 Piece(s)

    Process DescriptionAdd up the second line, subtotal, grand total, sign

    JOB TITLE Addition B Officers

    3- Add Line B and Grand Total

    30P/T: seconds

    72CT: seconds

    99C&A: %Inv/WIP 6 Piece(s)

    Batch: 3 Piece(s)

    Process DescriptionVerify accuracy of file, sign

    JOB TITLE Supervisor

    4- Verify File

    10P/T: seconds

    5CT: minutes

    60C&A: %Inv/WIP 31 Piece(s)

    Batch: 3 Piece(s)

    Process DescriptionVerify accuracy of file, sign

    JOB TITLE Manager

    5- Review & Approve

    15P/T: seconds

    29CT: seconds

    50C&A: %Inv/WIP 6 Piece(s)

    Batch: 3 Piece(s)

    Department of Addition (DoA)Current State Value Stream Map (VSM)30 3030

    Requestor30 3030

    Requestor

    FUTURE STATE

    Minimum Lead Time: 21 weeks (5 months)Maximum Lead Time: 67 weeks (7 months)

    Touch Time: 19 days

    Reference ChecksDelegated Manager 0

    CHRBP: Build templates, contact references, check logistics, evaluation of checks; 2 references/candidate

    P/week Inv P0 0PT 15 minsCT 3 wks

    C&A 0 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    OK 90%

    NOT O

    K 10%

    Create forms and signDelegated Manager and Board 0

    Board, candidates, exams, screening forms, (3X)

    P/week Inv P0 0PT 1 hrsCT 2 days

    C&A 0 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Follow Up if references not okDelegated Manager and Board 0

    P/week Inv P0 0PT 0 hrsCT 0 days

    C&A 0 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Check References Lead Time: 2-4 weeks BIZ Touch Time: 2-3 hours/candidate

    Compile Assessment results/reportDelegated Manager and Board 0

    P/week Inv P0 0PT 2 hrsCT 0 days

    C&A 0 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Review Assessment results/report pkg & create pool

    Delegated Manager and Board 0

    P/week Inv P0 0PT 0 hrsCT 0 days

    C&A 0 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Create Results Letters

    HR Assistant 0

    P/week Inv P0 0PT 1 hrsCT 1 days

    C&A 30 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Review Results Letters

    HR Advisor 0

    P/week Inv P0 0PT 15 minsCT 1 wks

    C&A 66 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Fill out Right Fit formDelegated Manager 0

    CHRBP

    P/week Inv P0 0PT 1 hrsCT 2 days

    C&A 0 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Review Right Fit FormHR Advisor 0

    P/week Inv P0 0PT 30 minsCT 2 days

    C&A 50 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Verify Conditions of EmploymentHR Assistant 0

    P/week Inv P0 0PT 5 minsCT 0 days

    C&A 50 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Notify Candidate VerballyDelegated Manager 0

    P/week Inv P0 0PT 15 minsCT 3 hrs

    C&A 0 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Value Added Fill out Security Clearance FormDelegated Manager / Admin Asst 0

    CHRBP

    P/week Inv P0 0PT 5 minsCT 3 hrs

    C&A 0 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Conduct Security Clearance (Reliability)Security 0

    P/week Inv P0 0PT 0 minsCT 3 days

    C&A 0 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Official Languages ProcessHR Assistant 0

    P/week Inv P0 0PT 5 minsCT 0 days

    C&A 50 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Security Lead Time: 1 day (existing clearance) 6 months (no existing clearance, Secret) Touch Time BIZ: 10-30 minutes

    Touch Time HR: 5 minutes

    Conduct Security Clearance (Secret)Security 0

    P/week Inv P0 0PT 0 minsCT 26 wks

    C&A 0 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Re-Verify Priority ClearanceHR Advisor 0

    Occurs if more than 2-3 months from first priority clearance; Non-Value Added?

    P/week Inv P0 0PT 0 minsCT 0 hrs

    C&A 0 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Create Notice of ConsiderationHR Assistant 0

    CHRBP

    P/week Inv P0 0PT 20 minsCT 1 days

    C&A 0 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Create Notice of AppointmentHR Assistant 0

    CHRBP

    P/week Inv P0 0PT 5 minsCT 1 wks

    C&A 75 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    NO COMPLAINTS

    COMP

    LAIN

    TSInformal Discussion

    Delegated Manager 0CHRBP

    P/week Inv P0 0PT 0 minsCT 0 wks

    C&A 0 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Prepare Letter of OfferHR Assistant 0

    P/week Inv P0 0PT 20 minsCT 1 days

    C&A 75 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Review Letter of OfferHR Advisor 0

    P/week Inv P0 0PT 10 minsCT 1 days

    C&A 75 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Verify Letter of OfferDelegated Manager 0

    P/week Inv P0 0PT 30 minsCT 2 wks

    C&A 20 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Send letter to employeeHR Assistant / Coordinator 0

    P/week Inv P0 0PT 0 minsCT 1 wks

    C&A 0 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Candidate signs letter of offerCandidate 0

    CHRBP

    P/week Inv P0 0PT 0 minsCT 1 wks

    C&A 0 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    Value Added

    Enter signed letter into PeopleSoftHR Assistant 0

    CHRBP

    P/week Inv P0 0PT 0 minsCT 1 wks

    C&A 80 %

    Inv C 0Total 0Batch 1

    Correction Demand % Time/ week0 0 mins1.0 0 mins2.0 0 mins3.0 0 mins4.0 0 minsTotal correction demand

    WF Officer/Manager

    PT: 2 minutesCT: 0.5 days

    Issue request for HRSR

    Clerk/Admin Coordinator

    PT: 5-10 minutesCT: 0.5 - 1 day

    Create HRSR

    WF Officer / Manager

    PT: 2 minutesCT: 0.5 day

    Review HRSR and make changes (if required)

    Regional Management Board(meets every 2 weeks); covers WMB challenge

    PT: 2 minutesCT: 0.5 day

    Regional Management Board Review

    WF Officer or Coordinator

    PT: 2 minutesCT: 0.5 day

    Send Signed docs to HR

    Can be done in parallel earlier in the process if appropriate eg. At initial screening

    Can be done in parallel earlier in the process if appropriate

    Can be done in parallel earlier in the process if appropriate

    Eliminate expiration date on pools where posssible

    Add local, regional, national and interdepartmental pools to website

    Send written questions in advance to referees

  • Tools: Value Stream Mapping

    22

  • Sustaining: Visual Management

    23

  • Sustaining: Stand-Up Meetings

    24

  • Typical Challenges to Implementing Lean Government

    10% technical90% human

    25

    Typical Challenges

    10% technical90% human

  • 27

    Autonomy

    Purpose

    Mastery

  • 28

    How does Lean apply to Internal Audit work?

  • Specific Lean Issues in IA Too much work taken on lowers

    productivity and quality Audit plan not executed consistently

    inconsistent data needs rework or re-collection

    Documents: Audit Plan and Audit Reporting Too many edits, takes too long and too much effort to get to final version

    29

  • TOO MUCH WORK TAKEN ON

    Specific Lean Issues in IA

    30

  • Too much work is taken on

    When we multi-task*, we get less done.*actually, switch-task

    31

  • Time Yourself

    Scenario 1 (Focus-Tasking)1. Write:

    Multitasking eats time1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    2. Note how long that took.

    32

  • Time Yourself

    Scenario 2 (Context Switching)1. Write one letter, then one number, one letter, one number, etc:

    33

    2. Write down how long that took.

    Multitasking eats time1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

  • 34

  • AUDIT PLAN NOT EXECUTED CONSISTENTLY INCONSISTENT DATA NEEDS REWORK OR RE-COLLECTION

    Specific Lean Issues in IA

    35

  • 36

    Visual warning

    Predictive

    Preventive

    Poka Yoke Error Proofing

  • Sustaining: Stand-Up Meetings

    37

  • Repeatability and Reproducibility Gage R&R

    38

    Assessment Agreement

    Appraiser # Inspected # Matched Percent (%) 95.0% CI

    Sally 50 3 6.0 ( 1.3, 16.5)

    Joe 50 9 18.0 ( 8.6, 31.4)

    Betty 50 1 2.0 ( 0.1, 10.6)

    Bob 50 5 10.0 ( 3.3, 21.8)

    Sue 50 4 8.0 ( 2.2, 19.2)

    David 50 12 24.0 ( 13.1, 38.2)

    # Matched: Appraiser's assessment across trials agrees with standard.

    Individual accuracy

    Assessment Agreement

    Appraiser # Inspected # Matched Percent (%) 95.0% CI Sally 50 25 50.0 ( 35.5, 64.5) Joe 50 34 68.0 ( 53.3, 80.5) Betty 50 22 44.0 ( 30.0, 58.7) Bob 50 28 56.0 ( 41.3, 70.0) Sue 50 25 50.0 ( 35.5, 64.5) David 50 36 72.0 ( 57.5, 83.8)

    # Matched: Appraiser agrees with him/herself across trials.

    Repeatability

    # Matched: Appraiser agrees with him/herself across trials.

    David 50 36 72.0 ( 57.5, 83.8)

    Sue 50 25 50.0 ( 35.5, 64.5)

    Bob 50 28 56.0 ( 41.3, 70.0)

    Betty 50 22 44.0 ( 30.0, 58.7)

    Joe 50 34 68.0 ( 53.3, 80.5)

    Sally 50 25 50.0 ( 35.5, 64.5)

    Appraiser # Inspected # Matched Percent (%) 95.0% CI

    Assessment Agreement

  • Gage R&R (contd)

    39

    Assessment Agreement

    # Inspected # Matched Percent (%) 95.0% CI

    50 0 0.0 ( 0.0, 5.8)

    # Matched: All appraisers' assessments agree with each other.

    Reproducibility

    Assessment Agreement

    # Inspected # Matched Percent (%) 95.0% CI

    50 0 0.0 ( 0.0, 5.8)

    # Matched: All appraisers' assessments agree with standard.

    Overall accuracy Decisions routinely made using this data as a base 0% accuracy!

  • AUDIT PLAN & REPORTING TAKES TOO LONG, TOO MUCH EFFORT

    Specific Lean Issues in IA

    40

  • Creation of Spring project update (intranet article)

    41

    DM

    ADM ADM EA

    Project DG

    Project DG EA

    Project Director

    Project Liaison

    Project Manager

    Comms.Liaison

    DG Comms CIO CFO

    CHRO COO

    DM EA

    Subject Matter Expert

    Subject Matter Expert

    Subject Matter Expert

    Subject Matter Expert

    Subject Matter Expert

    Article approved

    Article posted

    on Intranet

    FallTwo-page intranet article

    Handoffs 97Lead Time 9 monthsEffort Time >100 hoursOrganizational Learning

    ?

  • Issues in document creation

    work

    42

    Many reviewloops

    Too much work in

    progress

    Unclear voice of client

    Preventable work / 8 Lean

    wastes

    Waterfall Development

    Workflow is invisible

  • SUMMARYLean for Internal Audit

    43

  • Summary

    1. Not a project a business approach and tools, create habits

    2. Applies equally to your clients work as well as IA work

    3. Makes Internal Auditors more effective and delivers better results to clients

    44

  • Lean Internal Audit Yellow Belt Training

    Ottawa, Feb. 22-24, 2016To register:

    [email protected] or leanagility.com

    Craig [email protected]

    (613) 266 4653

    Paul [email protected]

    (819) 598 1426

    45

    mailto:[email protected]

    Lean for Internal AuditOverviewSlide Number 2The ChallengeSlide Number 4Retirements ReviewImprovement plan over three weeksSlide Number 6Slide Number 7What is Lean?Slide Number 9Elapsed Time: 90+ % non-value addedFlowHow backlogs often developThe classic eight lean wastesDefectsOverproductionWaitingNot fully utilizing peopleTransportInventoryMotionExcessive ProcessingTools: Value Stream MappingSustaining: Visual ManagementSustaining: Stand-Up MeetingsTypical Challenges to Implementing Lean Government Slide Number 27How does Lean apply to Internal Audit work?Specific Lean Issues in IAToo much work taken onToo much work is taken onTime YourselfTime YourselfSlide Number 34Audit plan not executed consistently inconsistent data needs rework or re-collection Poka Yoke Error ProofingSustaining: Stand-Up MeetingsRepeatability and Reproducibility Gage R&RGage R&R (contd)Audit plan & Reporting takes too long, too much effortCreation of Spring project update (intranet article)Issues in document creation workSummarySummarySlide Number 45