LEADING M&E BRAND
OUR EXPERIENCE DRIVES US FORWARD
REMEECOOver the years, COTECCONS GROUP has been known as a leader in the field of construction in Vietnam. We create different values and build sustainable belief and prestige based on a strong financial foundation together with the qualified, experienced and dedicated human resources and especially, the flexibility in mobilizing resources from member companies such as Unicons, Ricons, and FDC.Each member company of COTECCONS GROUP has its own M&E division to take part in the Group’s general contractor projects. Our M&E products are always fully trusted and highly appreciated by the investors. This has been shown in a number of large-scale projects such as the Grand Ho Tram, Masteri Thao Dien, Novotel, Hyatt Regency, etc. REMEECO brand was formed from the association of 4 M&E divisions of 4 member companies. This association has created comprehensive strength, helping REMECO with competitive advantages in large-scale projects that require high standards in technique, quality and progress. M&E operation contributes averagely 25% to 30% of total annual revenues of the Group. Particularly, in 2017, revenue from M&E activities reached more than 6,500 billion. M&E achievements in the past 15 years have proven the prestige and outstanding performance of REMEECO. That is considered a momentum for REMEECO to continue improving our capacity in all aspects to affirm the position as a leading M&E brand in Vietnam, ready to compete with international M&E contractors.
WHO IS ?
To become a trustworthy partner of investors in M&E consultancy, design and construction.
Provide best products with highest safety, quality and schedule satisfaction, contributing to the sustainable development of society.
VISION, MISSION AND CORE VALUES
Vision
Core values
To become a leading brand in professional M&E consultancy, design and
construction, meeting regional and international prestige and quality.
Mission
TransparencyTransparency is well-focused in every activity, from management, cooperation to end user’s benefit.
CreativityREMEECO puts a strong emphasis on non-stop creation and improvement of quality control system in response to increasingly high demand from clients.
Quality commitmentREMEECO is committed to constantly bringing highest quality and actively giving solutions to do better than commitment.
PioneerAlways to be the pioneer in applying improvement to bring customers best efficiency.
DisciplineSelf-discipline, commitment to the responsibility of each individual with the Company, with the partner and with ourselves.
Safety For health, safety and a green environment.
OVERVIEW Vision, mission and core valuesEstablishment and experience Scope of operationOrganizational structureKey personnelImpressive figures Competitive advantagesCommitment to quality and safety
0506081012182022
SUPPLY SERVICE Electrical systemWater systemACMV systemFire firefighting and prevention system
Housing projectsSchool and hospital projects Commercial center and office projectsResort and hotel projectsIndustrial projects
40505456
6074808898
2628323436
OPERATIONAL CAPABILITY
Construction improvementBIM applicationSupply chain of REMEECOHuman resourcesFinancial capacity
TYPICAL PROJECTS
CUSTOMERS & PARTNERS
Customers & partnersCustomer’s assessmemt
List of completed projectsList of on-going projects
110114
118129
M&E SECTORCONTENTS
4 5Remeeco profile Remeeco profile
PROJECTS
ANNUAL REVENUE INCREASE
LEADING M&E GENERAL
CONTRACTOR IN VIETNAM
ESTABLISHMENT AND EXPERIENCE
With strong foundation from 15 years of experience of COTECCONS GROUP’s M&E Division and right strategic orientations, REMEECO brings new energy and contributes to affirming the leading position of COTECCONS GROUP in the M&E market in Vietnam.
REASON for REMEECO establishment
PREDECESSOR of REMEECO
With the strong development of M&E sector,
COTECCONS GROUP decided to establish REMEECO in 2017. This brand represents M&E design
and construction of the whole Group, in order to: • Attach M&E operation of member companies of
COTECCONS GROUP together; • Standardize and synchronize construction process,
ensuring consistent construction quality of Mega projects according to international technical
standards. • Enhance competitiveness and expand M&E
system of COTECCONS GROUP, meeting the increasing demand
of customers.
Established in 2004 together with Coteccons, M&E
Division under Technical Department of COTECCONS GROUP had more than 10 members. Up to now, after nearly 15 years of operation, the Division has grown up to more than 870 employees, implementing more than 100 commercial, industrial, civil and infrastructure M&E projects in Vietnam and Southeast Asia (Laos, Cambodia). In 2017, the revenue from COTECCONS GROUP’s M&E Division reached VND6,627 billion. At present, more
than 40 large-scale M&E projects are being deployed across the country, promising
to bring breakthrough results to COTECCONS GROUP.
6 7Remeeco profile Remeeco profile
CHINA
LAOS
THAILAND
CAMBODIA
Vientiane
Phnom Penh
LAO CAI
QUANG NINH
THAI NGUYEN
HAI PHONGHA NOI
NGHE AN
QUANG NAM
BINH DINH
QUANG NGAI
DA NANG
Nha trang
DONGNAI
TAYNINH
BINHDUONG
BA RIA -VUNG TAU
HO CHI MINH CITY
LONG AN
KIENGIANG
PHU QUOC ISLAND
Hung
Bac Ninh
Ha Nam
Yen
CON DAOISLAND
HOANG SA ISLANDS
TRUONG SA ISLANDS
After nearly 15 years of development and implementation of M&E works meeting international standards, REMEECO has stepped into new journey with new opportunities and challenges. REMEECO continues to mobilize resources, expand market and maximally exploit potential advantages to be ready to conquer the goal to become one of the leading M&E brands in Vietnam.
Promote foundation - Continue to go further
SCOPE OF OPERATION
OPERATING IN
COUNTRIES IN THE WORLD03• Vietnam• Laos: Essilor factory, Vientiane Province• Cambodia: Siemreap Province,
Phnom Penh City
Areas REMEECO operates
In the North:• Ha Noi• Bac Ninh• Hung Yen• Thai Nguyen• Ha Nam• Hai Phong• Quang Ninh• Lao Cai• Nghe An
In the Central:• Da Nang• Quang Nam• Quang Ngai• Binh Dinh• Khanh Hoa
In the South:• Ho Chi Minh City• Binh Duong• Dong Nai• Long An• Tay Ninh• Ba Ria – Vung Tau• Kien Giang
8 9Remeeco profile Remeeco profile
BOARD OF MANAGEMENT
DIRECTOR OF M&E DIVISION
M&E TECHNICAL - PRODUCTION DIRECTOR
M&E DIVISION ECONOMIC DIRECTOR
M&E BIDDING CONSULTING DEPARTMENT
M&E PRICE CONTROL DEPARTMENT
M&E TECHNICAL DEPARTMENT
M&E CONSTRUCTION
DIRECTOR
CONSULTING TEAM (experts and specialists)
ORGANIZATIONAL STRUCTURE
M&E QUALITY CONTROL DEPARTMENT
HUMAN RESOURCES DEPARTMENT
CONSTRUCTION MANAGEMENT UNIT M&E BIM UNIT
M&E TRAINING - TECHNICAL UNIT
T&C - O&M
PRODUCTION R&D UNIT
QUANTITY CONTROL TEAM
PRICE CONTROL TEAM
PROCUREMENT CONTRACT TEAM
PROJECT TEAM
M&E D&B UNIT
M&E BIDDING UNIT
PROJECT DIRECTORS
SITE MANAGEMENT BOARD
10 11Remeeco profile Remeeco profile
KEY PERSONNEL
FOUNDERS
Mr. NGUYEN BA DUONG Chairman
He is the “Chief Architect” of Coteccons in particular and COTECCONS GROUP in general. He is determined, assertive and visionary. In business, he always attached importance to credit. Over than 30 years of experience in construction business management, he has trained and developed the qualified and prominent staff. He combines clever knowledge and soft skills in management. He made ultimate decision on the establishment of REMEECO.
Mr. NGUYEN SY CONG General Director
Mr. PHAN HUY VINH Deputy General Director
He graduated from Hanoi Construction University. After years working in the construction industry, he joined Coteccons in 2002 as a Project Director. He has held key positions at Coteccons and its subsidiaries such as BOD Member - Chairman of Ricons Construction Joint Stock Company; BOD Member cum CEO of Unicons Construction Investment Limited Company. With his experience, qualification and knowledge in M&E of the whole Group, together with the Chairman, he has given important policies in development orientation of REMEECO in new stage.
With a keen interest in learning, he has constantly researched more knowledge in consultancy, design and construction management of M&E projects from factories to modern high-rise buildings requiring high quality and timely construction progress. He has connected M&E sector with many potential customers and made considerable contributions in affirming position of COTECCONS GROUP in Vietnam’s M&E market.
MANAGEMENT PERSONNEL
Mr. DINH MINH HOANGDirector of M&E Division
Having joined Coteccons since the beginning, graduated in M&E major from one of the most prestigious universities in Vietnam, he is cautious, humble and brave. With 22 years of experience, he has worked in various positions such as Commander, Technical Specialist, and Bidding Manager and now is the Director of M&E Division. He has been building REMEECO to develop stronger and stronger.
MR. NGUYEN TAN TIENM&E Construction Director
His hard work, perseverance and loyalty have helped him to complete many important projects in various fields. Moreover, thanks to the experiences in more than 20 years working in human resource management and development, he has successfully built human resources of REMEECO. The strong human resources of REMEECO currently are resulted from his significant contributions. In the future, under his direction and management, the human resources of REMEECO will get more development and bring prominent achievements in M&E sector for the Group.
MR. QUAN NGUYEN CHI CUONGM&E Division Economic Director
He has more than 22 years of experience holding M&E management positions inside and outside the country from Site Manager, Bidding and Cost Manager to Design Manager. His management capability together with his easy-going and sociable manners have helped him build an effective team with high qualification and enthusiasm, marking success in a series of large-scale Design & Build projects across the country. That is the reason why he was assigned to be responsible for REMEECO’s Business Division.
12 13Remeeco profile Remeeco profile
MANAGEMENT PERSONNEL (cont.)
Mr. LU NGUYEN HAIDirector of Ricons M&E Division
Mr. NGUYEN SI QUOCDirector of FDC M&E Division
Mr. NGUYEN XUAN BINHM&E Construction Director
He has more than 15 years of experience in M&E field, managing many important projects as the role of Project Director. He is dynamic and brave, always wants to move forward and does not stop learning. With the motto “Win to Win”, he has managed and completed many projects and thereby, gaining success in image and finance, step-by-step building and developing REMEECO to become a prestigious and quality brand in the eyes of partners inside and outside the country.
With the motto “Well leading self and helping other lead themselves”, he increasingly perfects himself as well as accelerating and facilitating staff to work with highest performance and thereby, strongly develop REMEECO collective and brand to become a trustworthy and prestigious partner in providing M&E solutions for many projects in Vietnam.
With the experiences in many large-scale projects such as Liberty 6, Hyatt Regency Danang Resort and Spa, Diamond Island, etc., he is a qualified M&E manager and always motivates staff to learn, improve and apply advanced technologies in construction to enhance performance efficiency. Heading in right development orientation, he has led M&E Division to become one of the strongest divisions of FDC.
Mr. NGUYEN VAN THANHDirector of Unicons M&E Division
He is energetic, assertive and has wide vision. With more than 25 years of experience in M&E field together with the characteristics of keen-on-learning and endless passion, he has been researching new technical improvements, human resource management, and construction quality to build - develop a strong REMEECO team in both quality and quantity.
Mr. VO THANH CANGM&E Technical - Production Director
With more than 15 years of experience in M&E field, he is a good leader and is always trusted by colleagues and partners not only because of his steady qualification but also thanks to his enthusiasm in work. Graduated from University of Technology in Heat and Refrigeration Engineering major and joining many projects as various roles such as Technical Supervisor, Vice Commander, Commander, Deputy Manager of Bidding Dept., Project Director and current is M&E Technical - Production Director, he is trusted by Chairman and assigned to be responsible for Technical – Production of REMEECO.
KEY PERSONNEL
14 15Remeeco profile Remeeco profile
EXPATRIATE EXPERTS
Mr. KIM VALDBJORN JENSENMR. WAYNE J. HARRIS
With more than 16 years of experience in M&E design and build and holding key positions in many companies, for examples, Electrical Project Director - MTH Contractor (Denmark), MEP Deputy Director - Ramboll Oil & Gas (Denmark, Dubai, Qatar), E&I Director – IMCC Group (UAE), MEP Manager - Royal Haskoning Vietnam, etc., he has contributed to completing M&E design and build projects in Denmark, Spain, Middle East, North Africa, Macau, Vietnam, etc. Joining Coteccons in 2017, he has played an important role in researching and improving design and construction solutions as well as training engineer team in REMEECO, meeting the increasing demand of investors.
As a senior expert in HSE with more than 34 years of experience working in multicultural environment in many senior positions, he has a wide and deep knowledge in occupational health and safety, quality control and risk management in construction. He used to hold the position of Director of World Safety Organization (WSO) and now is the Chairman of International Safety Quality Environment Management Association (ISQEM). He has gained great successes in occupational safety management at Coteccons.
Mr. GEORGE WOOD Mr. MARTIN J F HURD
As an experienced project manager, he has joined many complicated international construction projects and iconic architectures, such as Marriott Hotel – London (England), Liberation Tower – Kuwait, Burj Al Alam Tower - Dubai (UAE), Jumeirah Hotel - Dubai (UAE), Garden City Shopping Centre - Perth (Australia), etc. With his rich experience, he has made significant contributions in enhancing efficiency of Coteccons’ projects.
Thanks to the experiences in more than 30 years undertaking the key positions in construction management of infrastructures, 5-star hotels, hospitals, office building, stadiums, etc. in the Philippines, Vietnam, Thailand, Hong Kong, Macau, Dubai and Britain, he has successfully completed project management at Coteccons.
KEY PERSONNEL
16 17Remeeco profile Remeeco profile
0 2,0001,000 4,000 5,000 6,000 7,000 8,0003,000
4,458
2,528
2,305
2,187 2013
2014
2015
2016
20176,627
IMPRESSIVE FIGURES
Revenue growth over the years
VND BILLION
Dedication to customers, excellent design and construction capacity as well as construction quality and schedule assurance are the factors creating great growth of REMEECO and showing the increasing development of REMEECO over the years.
REVENUE OF 2017
TOTAL PROJECTS IMPLEMENTED IN 2017
VND BILLION
PROJECTS
In 2017, with more than 40 projects done, REMEECO earned approximately VND6,627 billion of revenue, proving our outstanding professional capacity and commitment in M&E design and build.
6,62740+
18 19Remeeco profile Remeeco profile
COMPETITIVE ADVANTAGES
ADVANCED PROJECT MANAGEMENT PRACTICES
STRONG HUMAN RESOURCES
STRONG FINANCIAL FOUNDATION
The perfect combination between design and construction in an M&E package in charge by REMEECO will help optimize construction progress and bring benefits to investors.
• Maximally save project implementation time, shortening construction progress.
• Responsibility of contractor is clarified in both construction and M&E.
• Maximally save customer’s finance: optimize Prelim cost, streamline management structure for investors, considerable shorten project completion time and thereby, reducing project costs.
Design management center
REMEECO has a Design Management Center to provide design solutions that meet the technical requirements and have quick implementation and reasonable price for investors. At the same time, the application of M&E improvements in construction delivers good quality and cost savings for investors and customers.
BIM application
REMEECO is the pioneer in applying Building Information Model (BIM) in M&E design and build, bringing excellent effectiveness when the simulation of design and construction process is clearly observed, thereby timely remedying conflicts and mistakes.
With BIM, REMEECO can easily evaluate different design plans quickly and exactly to create quality and aesthetic products, shorten construction time and minimize costs for customers.
With more than 870 members including expatriate experts, specialists, masters, engineers, etc., who have international qualification, creativity and deep knowledge in M&E field, together with the skillful construction workforce from 4 member companies of COTECCONS GROUP, REMEECO is always ready for large-scale projects with appropriate and impressive designs at a reasonable price.
As a brand of Coteccons Group – the leader in Vietnam’s construction industry, REMEECO operates based on a firm financial foundation and strong human resources. In addition, REMEECO always has advantages in smooth coordination between construction and M&E works to create exceptional products for investors and customers.
PERFECT COMBINATION BETWEEN DESIGN AND CONSTRUCTION
Mark the difference with outstanding quality
With the team of expatriate experts, masters and engineers, who are qualified, experienced, determined and dedicated, the support from Design Center as well as successfully applying BIM model in M&E design and build, REMEECO is completely confident in competition with foreign contractors and international standard contractors.
20 21Remeeco profile Remeeco profile
COMMITMENT TO QUALITY AND SAFETY
Each work is a commitment on quality
REMEECO uses an effective and comprehensive management system that meets the international standards and ISO 9001:2015, ISO 14001:2015 & OHSAS 18001:2007 certificate verification.
Each project has its own type, features and functions that require different management and construction models. Quality control system of REMEECO is assessed and improved continuously to be suitable to the requirements of each project. This quality control system is applied throughout from the stage of ideal design, bidding, contract preparation and review, construction to completion and warranty in order to save costs and ensure best results for customers. In addition, we provide consulting opinions to the investors on the time, quality and budget of the project as well as evaluating and selecting the best subcontractors and suppliers for the project.
Our internal training programs ensure all employees have full knowledge about REMEECO’s management system so as to apply and maintain the system’s requirements for all projects. Customer satisfaction is the evaluation criteria upon project completion. REMEECO also conducts an internal assessment on the success of the project based on the criteria of progress, quality, occupational safety and economic efficiency of construction workforce. At the same time, we highly appreciate objective assessment from customers and partners on REMEECO’s design and construction capability.
Safety first
REMEECO always applies the occupational safety management system which is set up and developed by Coteccons to ensure absolute safety. The Group’s Safety Board always provides improvements to create the best working environment for employees as well as enhancing productivity and efficiency. Occupational safety force is continuously strengthened by REMEECO in both quantity and quality. Internal training is focused through international training courses provided by expatriate experts to improve skills in guiding, controlling, identifying and evaluating risks to give the safest solutions for employees.
One of the factors making the brand and position of the No.1 construction contractor in Vietnam is the ability to ensure absolute safety. As a brand under COTECCONS Group, REMEECO is not an exception.
22 23Remeeco profile Remeeco profile
Operational capability
CONSTRUCTION IMPROVEMENT
SUPPLY CHAIN OF REMEECO
BIM APPLICATIONHUMAN
RESOURCES
FINANCIAL CAPACITY
BIM
24 25Remeeco profile Remeeco profile
CONSTRUCTION IMPROVEMENT
Together with the development of Coteccons, REMEECO has been researching and developing new materials for application and improving construction methods for cost savings, better coordination with construction and shortening construction duration. This affirms professional and scientific work style of REMEECO.
90% of ceiling MEP works is constructed first.
Air duct installation after removing floor formworks.
Easy for checking and acceptance with subcontractors, consultants and investors.
Good overall image as constructing M&E first.
IMPROVEMENT TOPICS ARE SUCCESSFULLY APPLIED16+
Construct wall sleeve first.Sample construction to guide supervisors, subcontractors and workers.
Previously, M&E packages were contracted by the investors after the construction was completed; therefore, M&E construction faced many difficulties not only in progress but also quality. Understanding these obstacles, the Board of Management has instructed REMEECO’s R&D Unit to study new construction measures to meet the needs of investors/customers. At present, REMEECO has developed and applied successfully 16 improvement topics such as installing slab joints in structural stage, sleeve for technical box of apartments, duct sleeve, etc. and constructing 90% of M&E works before constructing walls, etc. This has not only helped meet the construction progress but also made customers satisfied with M&E products. We (REMEECO) continuously improve and give new solutions to satisfy high expectations of customers and investors by COTECCONS GROUP’s D&B.
THESE IMPROVEMENTS HELP REMEECO OPTIMIZE CONSTRUCTION PROGRESS AND QUALITY OF THE PROJECT AND THEREBY, BRINGNG ECONOMIC EFFICIENCY TO INVESTORS AND HIGHEST CUSTOMER SATISFACTION.
CRITERIA
PROGRESS
QUALITY ECONOMIC EFFICIENCY
28 29Remeeco profile Remeeco profile
CONSTRUCTION IMPROVEMENT
Together with the develop-ment of Coteccons, REMEE-CO has been researching and developing new materials for application and improv-ing construction methods for cost savings, better coordi-nation with construction and shortening construction dura-tion. This affirms profession-al and scientific work style of REMEECO.
90% of ceiling MEP works is constructed first.
Air duct installation after removing floor formworks.
Easy for checking and acceptance with subcontractors, consultants and investors.
Good overall image as constructing M&E first.
IMPROVEMENT TOPICS ARE SUCCESSFULLY APPLIED16+
Construct wall sleeve first.Sample construction to guide supervisors, subcontractors and workers.
Previously, M&E packages were contracted by the investors after the construction was completed; therefore, M&E construction faced many difficulties not only in progress but also quality. Understanding these obstacles, the Board of Management has instructed REMEECO’s R&D Unit to study new construction measures to meet the needs of investors/customers. At present, REMEECO has developed and applied successfully 16 improvement topics such as installing slab joints in structural stage, sleeve for technical box of apartments, duct sleeve, etc. and constructing 90% of M&E works before constructing walls, etc. This has not only helped meet the construction progress but also made customers satisfied with M&E products. We (REMEECO) continuously improve and give new solutions to satisfy high expectations of customers and investors by COTECCONS GROUP’s D&B.
THESE IMPROVEMENTS HELP REMEECO OPTIMIZE CONSTRUCTION PROGRESS AND QUALITY OF THE PROJECT AND THEREBY, BRINGNG ECONOMIC EFFICIENCY TO INVESTORS AND HIGHEST CUSTOMER SATISFACTION.
CRITERIA
PROGRESS
QUALITY ECONOMIC EFFICIENCY
30 31Remeeco profile Remeeco profile
CONSTRUCTION IMPROVEMENT
Together with the development of Coteccons, REMEECO has been researching and developing new materials for application and improving construction methods for cost savings, better coordination with construction and shortening construction duration. This affirms professional and scientific work style of REMEECO.
90% of ceiling MEP works is constructed first.
Air duct installation after removing floor formworks.
Easy for checking and acceptance with subcontractors, consultants and investors.
Good overall image as constructing M&E first.
IMPROVEMENT TOPICS ARE SUCCESSFULLY APPLIED16+
Construct wall sleeve first.Sample construction to guide supervisors, subcontractors and workers.
Previously, M&E packages were contracted by the investors after the construction was completed; therefore, M&E construction faced many difficulties not only in progress but also quality. Understanding these obstacles, the Board of Management has instructed REMEECO’s R&D Unit to study new construction measures to meet the needs of investors/customers. At present, REMEECO has developed and applied successfully 16 improvement topics such as installing slab joints in structural stage, sleeve for technical box of apartments, duct sleeve, etc. and constructing 90% of M&E works before constructing walls, etc. This has not only helped meet the construction progress but also made customers satisfied with M&E products. We (REMEECO) continuously improve and give new solutions to satisfy high expectations of customers and investors by COTECCONS GROUP’s D&B.
THESE IMPROVEMENTS HELP REMEECO OPTIMIZE CONSTRUCTION PROGRESS AND QUALITY OF THE PROJECT AND THEREBY, BRINGNG ECONOMIC EFFICIENCY TO INVESTORS AND HIGHEST CUSTOMER SATISFACTION.
CRITERIA
PROGRESS
QUALITY ECONOMIC EFFICIENCY
26 27Remeeco profile Remeeco profile
BIM APPLICATION
Apply information technology in construction market
Catching up the trend of IT application in construction industry, REMEECO has soon deployed BIM in design and construction management for all kinds of project from high-rise buildings to factories.
KẾT CẤU
TỪ CÁC REPORT THẢO LUẬN ĐỂ ĐƯA RA PHƯƠNG ÁNKHẮC PHỤC SAI SÓT ĐỂ CHỈNH SỬA MÔ HÌNH
TỪ ĐÓ XUẤT RA CÁC REPORT SAI SÓT
BIM KẾT HỢP 03 MÔN KẾT CẤU, KIẾN TRÚC VÀ CƠ ĐIỆN, XEM XÉT THIẾU SÓT
CƠ ĐIỆN
KIẾN TRÚC
REPORT
Together with architectural and structural subjects, REMEECO’s BIM team has worked with passion to apply BIM in design and construction management. As a result, REMEECO is able to combine information from the design stage among the subjects to minimize mistakes, ensure high feasibility upon construction, and improve quality throughout the life cycle of project. BIM provides an overall and clear view that helps the parties make right decisions, reducing risk and improving performance efficiency. BIM not only closely combines three subjects i.e. structure, architecture, and M&E in construction process but also helps timely meet the changes of site and improve cost calculation, limit expenses arisen and speed up construction progress. BIM will continue to be upgraded by REMEECO to meet the demand on quality management of complicated projects.
Application
BIM Benefits
Combine three subjects i.e. structure,
architecture, and M&E in construction
process.
Support visual design, helping optimize design,
preventing risks.
Control construction progress and
construction costs.
Investor
Enhance effectiveness of design options, easy to respond design consultant to meet the investor’s requirements. Quickly assess different options, making it easier to review and make decisions more accurately.
Project consultant/management
Minimize design mistakes and easily control construction. Make it easy to review and approve drawings. Integrate information in a model for easier management.
Contractor
Early detect “conflicts” and provide prior solutions to avoid risks arisen during the construction. Optimize the contractor’s resources. Deliver high quality products, ensuring schedule.
STRUCTURE M&E
ARCHITECTURE
REPORT
COMBINE THREE SUBJECTS STRUCTURE, ARCHITECTURE, AND M&E.
REVIEW MISTAKES
BASED ON THE REPORTS, DISCUSS TO FIND SOLUTIONS
THEREBY EXTRACT MISTAKE REPORTS
Manage assets and plan strategy for
easier operation and maintenance.
BIM
32 33Remeeco profile Remeeco profile
BIM application coordinates technical shaft to prevent mistakes.
BIM application in Sleeve coordination helps construct quickly and accurately.
Level of Development (LOD 350) ensures high accuracy and practicality.
Government Office project site
BIM APPLICATION
BIM application in developing SD construction drawings for Vinhomes Central Park 3.
34 35Remeeco profile Remeeco profile
Maximize benefits for partners
HUMAN RESOURCE OUTSOURCING PROVIDERS
100+LOCAL AND OVERSEAS SUPPLIERS OF
MATERIALS AND EQUIPMENT
400+
In addition to management capacity, construction experience and highly qualified human resources, we have a supply chain with more than 100 human resource outsourcing providers and more than 400 local and overseas suppliers of materials and equipment with quality assurance and reasonable price to bring the best benefit to customers.
SUPPLY CHAIN OF REMEECO
SOME SUPPLIERS OF REMEECO
Electrical system
Schneider, ABB, Siemen, Hager, Mitsubishi, Legrand, LS, Kohler, Cummins Generation, FG Wilson, Bosch, GE, Panasonic, Johnson control, Honeywell, KMC control, Philip, Simon, Thorn, SJ lite, Sunlight, Hai Nam, PowerWell, QTC, Truong Giang, 3C, Asia, VietStar.Taisin, Taihan, Taya, Thinh Phat, Cadivi.
Mechanical system
Trane, York, Carrier, Daikin, Toshiba, Climaveneta, Panasonic, Mitsubishi, Samsung, LG, Grundfos, Wilo Salmson, ITT Gould, Ebara, Mono flow, KSB, Wolter, Kruger, M&Y, Fantech, ToTo, Inax, Grohe, American Standard.Maflex, Aeroflex, Kflex, Trox, Asli, Kobelco, Hitachi, Ingersoll-rand, Atlas copco, Kohler, Moen, Tecofi, Danfoss, Rinco, KVS, Kitz, Toyo, Showa, TA, Herz, Oventrop, Seah, Hoa Phat, Kelen, Aquatherm, GF, Vesbo, Snow, Palling, Binh Minh, De Nhat, Tien Phong Plastic.
Elevator
Mitsubishi, Hitachi, Fuji, Otis, Kone, Thyssenkrupp, Schindler, Hyundai.
36 37Remeeco profile Remeeco profile
HUMAN RESOURCES
TRAINING
To improve the quality of human resources and performance efficiency, COTECCONS GROUP’s Training Center (CTA) is training all M&E personnel. Therefore, qualification and capability of REMEECO’s staff will be continuously improved and upgraded to finish the job in the best way. In addition, REMEECO regularly rotates staff among member companies for training and recruits more experts inside and outside the country to meet our development demand.
People are the key to success
REMEECO STAFF870
Human potential is a critical factor for the development of REMEECO. It is the innovation and creativity of the staff that is the key to the success of REMEECO.
WORKFORCE
Along with revenue growth, M&E workforce grows strongly in each project. At present, REMEECO has 870 employees, in which the age from 25 to 35 accounted for over 50%, mainly including engineers, architects, and bachelors from the most prestigious universities in the country. This shows that the youth and quality are the outstanding features of REMEECO’s human resources.
REMEECO’S HUMAN RESOURCE STRUCTURE
BY AGE BY QUALIFICATION
11%
57%32%
79%
17%
4%
From 25 to 35 years of ageFrom 35 to 45 years of ageFrom 45 to 60 years of age
CollegeUniversityMaster
38 39Remeeco profile Remeeco profile
FINANCIAL CAPACITY
ANNUAL REVENUE INCREASE
25-30%
Strong financial foundation from COTECCONS GROUP and outstanding design and construction capacity have helped REMEECO get trust from the big investors and win the large projects. Revenue from M&E operation averagely accounts for 25% -30% of total annual revenues of the Group.
Revenue from M&E operation gained a stable growth in three consecutive years i.e. 2013, 2014 and 2015, to be specific, VND2,178 billion (2013), VND2,305 billion (2014) and VND2,528 billion (2015). The year 2016 witnessed the breakthrough of M&E operation when its revenue reached VND4,458 billion - an impressive figure compared to other local M&E companies – increasing by 76.34% from 2015.
The highlight of the year 2017 was M&E general contractor contracts for large-scale projects from the big investors such as Vingroup, Masteri, TNR, etc., especially M&E package of Casino Hoi An with the value up to nearly VND 2,000 billion.
Based on that development momentum, REMEECO continues to make strong improvements to further perfect Design & Build model in M&E, boosting R&D activities to position itself in the M&E market.
M&E story of COTECCONS GROUP will be continued by REMEECO thanks to excellent construction capacity, financial strength, and the outstanding successes ahead, promising to go further in the M&E market in Vietnam and in the world.
Steady momentum to reach further
40 41Remeeco profile Remeeco profile
Supply service
WATER SYSTEMELECTRICAL SYSTEM
FIRE FIREFIGHTING AND PREVENTION
SYSTEM
ACMV SYSTEM
ELECTRICAL SYSTEM
Medium voltage system and transformer stations
Electrical cabinet system
44 45Remeeco profile Remeeco profile
Low voltage system
Lighting system
ELECTRICAL SYSTEM
CCTV system
CCTV CameraTV monitorNotebook
Internet
GPRS, Edge, 3G internet
Mobile phone
Notebook Wireless Camera PC IP Camera
CMS
Wireless
Wireless
Switch/hub
DVR
46 47Remeeco profile Remeeco profile
Generation system
ELECTRICAL SYSTEM
48 49Remeeco profile Remeeco profile
MÔ HÌNH KẾT NỐI
Telephone/Internet/Television system
ELECTRICAL SYSTEM
Door phone system
Access control system
Smart parking system
Sound system
50 51Remeeco profile Remeeco profile
Elevator system
ELECTRICAL SYSTEM
52 53Remeeco profile Remeeco profile
Water supply and drainage system
WATER SYSTEM
Waste water treatment system
Swimming pool system
54 55Remeeco profile Remeeco profile
Compressed gas system
Kitchen and sanitary appliances
WATER SYSTEM
56 57Remeeco profile Remeeco profile
ACMV SYSTEM
Air conditioning system
Ventilation system
58 59Remeeco profile Remeeco profile
FIRE FIREFIGHTING AND PREVENTION SYSTEM
Fire alarm system
Fire firefighting system
60 61Remeeco profile Remeeco profile
HOUSING PROJECTS
SCHOOL AND HOSPITAL PROJECTS
RESORT AND HOTEL PROJECTS
COMMERCIAL CENTER AND OFFICE PROJECTS
INDUSTRIAL PROJECTS
Typical projects
PROJECTSHOUSING THE GOLDVIEW
Investor : May - Diem Saigon JSC.
Address : 346 Ben Van Don, Ward 1, District 4, HCMC.
Scale :
01 27-floor tower and 03 33-floor towers, 1,896 apartments02 basements: 21,000 m2 of area 04 commercial center floors: 26,510 m2 of area
Completion time : 30 months
Project value : VND775 billion
Package : D&B
775PROJECT VALUE
30MONTHS
COMPLETION TIME
VND BILLION
65Remeeco profile64 Remeeco profile
HOUSING PROJECTS
MASTERI THAO DIENInvestor : Thao Dien Investment JSC.
Address : 159 Hanoi Highway, Thao Dien, District 2, HCMC.
Scale :5 towers, 39-45 floors, 4,000 apartmentsArea: 1800x(41+42+43+45+47) m2
02 basements, 02 Podium floor and 08 43-floor blocks
Completion time : 24 months
Project value : VND1,100 billion
Package : D&B
1,100VND BILLION
PROJECT VALUE
24MONTHS
COMPLETION TIME
66 67Remeeco profile Remeeco profile
D’CAPITALEInvestor : Tan Hoang Minh Group
Address : 1 Tran Duy Hung, Cau Giay, Ha Noi
Scale :Planning area: 50,000 m2
6 towers of 40-45 floors; Total floor area: 358,000 m2
03 interconnecting basements; total basement area 98,000m2
Completion time : 24 months
Project value : VND1,157 billion
Package : D&B
HOUSING PROJECTS
1,157 24VND BILLION MONTHS
PROJECT VALUE COMPLETION TIME
68 69Remeeco profile Remeeco profile
DIAMOND ISLAND
Investor : Kusto Home
Address : No.1- Street No.104 – BTT, Quarter 3, Binh Trung Tay Ward, District 2, HCMC.
Scale :2-floor Podium, 40,500 m2 of area and 5 towers of 23-29 floors with total floor area of 148,000 m2
Completion time : 30 months
Project value : VND780 billion
Package : D&B
HOUSING PROJECTS
780VND BILLION
PROJECT VALUE
30MONTHS
COMPLETION TIME
70 71Remeeco profile Remeeco profile
VINHOMES GOLDEN RIVERInvestor : Thanh Pho Ho Chi Minh Investment Service Trading JSC.
Address : 2 Ton Duc Thang, Ben Nghe Ward, District 1, HCMC.
Scale :Tower A1: 51 floors, 81,600 m2 – Tower A2: 51 floors, 65,000 m2
Tower A3: 41 floors, 53,000 m2 – Tower A4: 36 floors, 50,000 m2
Completion time : 18 months
Project value : VND700 billion
700VND BILLION
PROJECT VALUE
18MONTHS
COMPLETION TIME
HOUSING PROJECTS
72 73Remeeco profile Remeeco profile
HOUSING PROJECTS
VINHOMES THANG LONG
Investor : Vingroup
Address : Nam An Khanh Urban Area, An Khanh, Hoai Duc, Hanoi
Quy mô :Total floor area is 205,897m2.The project includes 798 units of townhouses, shop houses, detached villas and duplex villas.
Completion time : 14 months
Project value : VND571 billion
571VND BILLION
PROJECT VALUE
14MONTHS
COMPLETION TIME
74 75Remeeco profile Remeeco profile
FLAMINGO DAI LAI
Investor : Flamingo Dai Lai JSC.
Address : Ngoc Quang, Ngoc Thanh, Phuc Yen, Vinh Phuc
Scale : 123 hectares
Completion time : 18 months
Project value : VND160 billion
HOUSING PROJECTS
160 18VND BILLION MONTHS
PROJECT VALUE COMPLETION TIME
76 77Remeeco profile Remeeco profile
SCHOOL AND HOSPITAL PROJECTS
Investor : PIC JSC.
Address : New Urban Area C2, Gamuda Garden, Hoang Mai, Hanoi
Scale : 23,000 m2
Completion time : 07 months
Project value : VND27 billion
27PROJECT VALUE
07MONTHS
COMPLETION TIME
VND BILLION
SINGAPORE INTERNATIONAL SCHOOL (SIS)
79Remeeco profile78 Remeeco profile
SCHOOL AND HOSPITAL PROJECTS
RENAISSANCE INTERNATIONAL SCHOOL SAIGON
Investor : Khai Sang JSC.
Address : 74 Nguyen Thi Thap, Binh Thuan Ward, District 7, HCMC.
Scale : 9,400 m29,400
M2
SCALE
80 81Remeeco profile Remeeco profile
Investor : Vingroup
Address : 30/4 Street, Residence No.4 Nguyen Tri Phuong, Hoa Cuong Bac Ward, Hai Chau District, Da Nang City.
Scale : Area: 37.000 m2 – Number of block: 1Number of floor: 9 floors and 1 basement - 222 beds
Completion time : 08 months
Project value : VND90 billion
90VND BILLION
PROJECT VALUE
08MONTHS
COMPLETION TIME
VINMEC DA NANG INTERNATIONAL HOSPITAL
SCHOOL AND HOSPITAL PROJECTS
82 83Remeeco profile Remeeco profile
COMMERCIAL CENTER AND OFFICE PROJECTS
HOCHIMINH STOCK EXCHANGE - HOSE
Investor : Hochiminh Stock Exchange (Hose)
Address : 16 Vo Van Kiet Street, District 1, HCMC.
Scale : Area: 1,479 m2 – 2 basements and 12 floors
Completion time : 19 months
Project value : VND99 billion99VND BILLION
PROJECT VALUE
19MONTHS
COMPLETION TIME
85Remeeco profile84 Remeeco profile
COMMERCIAL CENTER AND OFFICE PROJECTS
SC VIVOCITY SC VIVOCITY
Investor : Vietsin Commercial Complex Development JSC.
Address :1058 Nguyen Van Linh Boulevard, Quarter 1, Tan Phong Ward, District 7, HCMC.
Scale : Area: 10,000 m2 – 5 floors and 1.5 basements
Completion time : 18 months
Project value : VND545 billion
545VND BILLION
PROJECT VALUE
18MONTHS
COMPLETION TIME
86 87Remeeco profile Remeeco profile
TAN SON NHAT INTERNATIONAL AIRPORT TERMINAL - AIR CARGO
Investor : SCSC
Address : Tan Son Nhat Airport
Scale : Area: 13,700 m2 – 01 25-meter-height warehouse and 4-floor office building
Completion time : 11 months
Project value : VND143 billion
11MONTHS
COMPLETION TIME
143PROJECT VALUE
VND BILLION
COMMERCIAL CENTER AND OFFICE PROJECTS
88 89Remeeco profile Remeeco profile
COMMERCIAL CENTER AND OFFICE PROJECTS
LIM TOWER II
Investor : Mai Thanh Service Co., Ltd. -Techcombank
Address : 9 – 10 Ton Duc Thang, District 1, HCMC.
Scale : 2 basements – 34 floors
Completion time : 14 months
Project value : VND112 billion
14MONTHS
COMPLETION TIME
112PROJECT VALUE
VND BILLION
90 91Remeeco profile Remeeco profile
RESORT AND HOTEL PROJECTS HO TRAM STRIP PHASE I
1,459PROJECT VALUE
24MONTHS
COMPLETION TIME Investor : Ho Tram Project Co., Ltd.
Address :Seaside, Phuoc Thuan, Xuyen Moc, Ba Ria – Vung Tau
Scale :Area of 164 hectares, including 541 5-star hotel rooms, international restaurants, conference hall, golf court, and Casino.
Completion time : 24 months
Project value : VND1,459 billion
VND BILLION
93Remeeco profile92 Remeeco profile
HYATT REGENCY DA NANG
Investor : Marble Mountain Beach Resort J.S.C
Address : Truong Sa Street, Hoa Hai Ward, Ngu Hanh Son District, Danang City.
Scale :Area: 96,000 m2 – 09 hotel blocks (2F-4F), 03 Condotel towers (5F-11F)Main Pool (2600m2), Regency club, Spa-Fitness, Conference, Pool bar, Camp.
Completion time : 30 months
Project value : VND393 billion
RESORT AND HOTEL PROJECTS
393 30VND BILLION MONTHS
PROJECT VALUE COMPLETION TIME
94 95Remeeco profile Remeeco profile
RESORT AND HOTEL PROJECTS
SOL BEACH HOUSE RESORT
Investor : Duc Viet Co., Ltd.
Address :Zone 1, Bai Truong Complex, Duong To Commune, Phu Quoc Island, Kien Giang Province.
Scale :Area: 13,542.5m2 - Hotel: 8 floors, 190 rooms, Low-rise: 2 3-floor buildings, 94 rooms
Completion time : 20 months
Project value : VND156 billion
156VND BILLION
PROJECT VALUE
20MONTHS
COMPLETION TIME
96 97Remeeco profile Remeeco profile
RESORT AND HOTEL PROJECTS
CASINO HOI AN
Investor : Vina Capital, Chow-Tai-Fook & The SunCity Group
Address : South Hoi An, Quang Nam
Scale : 1,000 hectares
Completion time : 19 months
Project value : VND1,990 billion
1,990VND BILLION
PROJECT VALUE
19MONTHS
COMPLETION TIME
98 99Remeeco profile Remeeco profile
Investor : C.E.O Investment JSC. – a member of CEO Group
Address : Bai Truong Complex, Duong To Commune, Phu Quoc Island, Kien Giang Province.
Scale : Total floor area of the villa is 10,000 m2. Total floor area of the hotel is 28,200 m2
Completion time : 15 months
Project value : VND220 billion
NOVOTEL
RESORT AND HOTEL PROJECTS
220 15VND BILLION MONTHS
PROJECT VALUE COMPLETION TIME
100 101Remeeco profile Remeeco profile
INDUSTRIAL PROJECTS
GENTHERM VIETNAM
Investor : Gentherm Vietnam Co., Ltd.
Address :Dong Van II Industrial Zone, Duy Tien District, Ha Nam Province
Scale : Plant of 20,000m2 of area and 1 Office Building
Completion time : 10 months
Project value : VND87 billion 87VND BILLION
PROJECT VALUE
10MONTHS
COMPLETION TIME
103Remeeco profile102 Remeeco profile
INDUSTRIAL PROJECTS
REGINA FACTORY
Investor : Regina Miracle International Vietnam Co., Ltd.
Address : VSIP Haiphong Township, Industrial & Service Park.
Scale : 7.4 hectares – in which, 03 hectares for workshops, offices, infrastructure and auxiliary items.
Completion time (phase 1, 2, 3, 4)
: 40 months
Project value : VND539 billion
539 40VND BILLION MONTHS
PROJECT VALUE COMPLETION TIME
104 105Remeeco profile Remeeco profile
PEPSICO FACTORY
Investor : Pepsico Vietnam
Address : No.88, Huu Nghi Street, VSIP - Phu Chan, Tu Son, Bac Ninh.
Scale : 12 hectares
Completion time : 07 months
Project value : VND180 billion
INDUSTRIAL PROJECTS
180 07VND BILLION MONTHS
PROJECT VALUE COMPLETION TIME
106 107Remeeco profile Remeeco profile
BROTEX 1.2.3.4.
Investor : Brotex -China Co., Ltd.
Address : Phuoc Dong - Tay Ninh Industrial Zone
Scale : 155 hectares
Completion time : 30 months
Project value : VND350 billion
350VND BILLION
PROJECT VALUE
30MONHTS
COMPLETION TIME
INDUSTRIAL PROJECTS
108 109Remeeco profile Remeeco profile
INDUSTRIAL PROJECTS
FANG BROTHERS KNITTING
Investor : ZhaoFeng Vietnam Co., Ltd.
Address : Phuoc Dong Industrial Zone, Go Dau District, Tay Ninh Province
Scale : 56,000 m2
Completion time : 12 months
Project value : VND90 billion
90VND BILLION
PROJECT VALUE
12MONTHS
COMPLETION TIME
110 111Remeeco profile Remeeco profile
Customer & Partner
CUSTOMER & PARTNER
114 115Remeeco profile Remeeco profile
CUSTOMER & PARTNER
116 117Remeeco profile Remeeco profile
CUSTOMER’S ASSESSMEMT
118 119Remeeco profile Remeeco profile
CUSTOMER’S ASSESSMEMT
120 121Remeeco profile Remeeco profile
NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT
VALUE IMAGESStarting Ending
1Vinhomes Central Park - Park 2,3,4
Tan Lien Phat Construction Investment Corp.
Vincom Construction and Consultant Co., Ltd.
2016 2017 VND425 billion
2 The Everrich Infinity Phat Dat Real Estate Development Corp.
CPE 2015 2017 VND200 billion
3Sarica Dai Quang Minh
Dai Quang Minh Corp.
Artelia 01/2016 11/2017 VND198 billion
4 Paihong Paihong VN Co., Ltd. 02/2017 11/2017 VND110 billion
5 Vifon Vifon Apave 03/2017 11/2017 VND99 billion
6 An Gia StarAn Gia Real Estate Development and Investment Corp.
05/2015 04/2017 VND68 billion
7 An Gia RiversideAn Gia Real Estate Development and Investment Corp.
05/2015 06/2017 VND57 billion
8 An Gia SkylineAn Gia Real Estate Development and Investment Corp.
05/2015 11/2017 VND112 billion
9 VHCP- Landmark 2 VinGroupMeinhardt Consultant Co., Ltd.
04/2016 05/2017 VND158 billion
LIST OF COMPLETED PROJECTS
2017NO. PROJECT INVESTOR CONSULTANT
CONSTRUCTION TIME CONTRACT VALUE IMAGES
Starting Ending
10Vinschool CC2 Primary School Vingroup Artelia 06/2016 03/2017 VND21 billion
11Fang Brothers Knitting
Fang Brothers Kitting Vietnam Co., Ltd.
ICIC 06/2017 12/2017 VND90 billion
12 M-One Tan Kieng Thao Dien Investment JSC.
Artelia 10/2015 11/2017 VND210 billion
13Park City Hanoi Phase 2
VietNam International Township JSC
Coninco-3C 10/2016 05/2017 VND115 billion
14Park Hill Times City - P1, P2, P3, P5 Vingroup Artelia 10/2015 2/2017 VND563 billion
15Vinmec Da Nang International Hospital
VingroupVietnam Institute of Architecture
10/2016 05/2017 VND76 billion
16 Masteri Villas Techcom Developer Artelia 2/2016 4/2017 VND571 billion
17Vinhomes Golden River Aqua 1,2,3,4
Thanh Pho Ho Chi Minh Investment Service Trading JSC.
Vincom Construction and Consultant Co., Ltd.
08/2015 06/2017 VND700 billion
18 Diamond Lotus ASC Sai Gon Apave 4/2016 12/2017 VND268 billion
122 123Remeeco profile Remeeco profile
NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT
VALUE IMAGESStarting Ending
1 Sol Beach House Duc Viet Co., Ltd. Apave 12/2015 10/2016 VND156 billion
2 Masteri Thao Dien Thao Dien Investment JSC.
Artelia 10/2014 10/2016 VND1100 billion
3Gamuda CT3 high rise Apartment
Gamuda Land Vietnam Co., Ltd.
- 08/2014 10/2016 VND145 billion
4Luithai Textile Factory Luithai VN Co., Ltd. - 10/2015 02/2016 VND22 billion
5YoungBo Vina Bac Ninh
Shenzhou International Group
- 04/2015 09/2016 VND40 billion
6Daeyeong Vina Factory
Daeyeong Vina Co., Ltd.
- 06/2015 01/2016 VND36 billion
7 Brotex 3 Brotex Vietnam ICIC 2015 2016 VND57.2 billion
8 Lexington Residence Nova Lexington Real Estate JSC.
Nova Land Investment Group Corp.
2015 2016 VND182 billion
2016
LIST OF COMPLETED PROJECTS (cont.)
NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT
VALUE IMAGESStarting Ending
9Dorco Vina Ha Nam Factory Phase 2 Dorco Vina Co., Ltd. B.B.Dai Minh 06/2015 02/2016 VND57 billion
10 VHCP- Central 3 VinGroupMeinhardt Consultant Co., Ltd.
8/2015 10/2016 VND144 billion
NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT
VALUE IMAGESStarting Ending
1 Icon D3 Hieu Duc JSC. Archetype 2014 2015 VND85 billion
2 Pepsi Dong Nai Pepsico InternationalCPE Chan Phuong
02/2014 01/2015 VND180 billion
3 Camoplast Solideal Campoplast Solideal Haskoning 06/2014 06/2015 VND72 billion
4 Diana Unicharm Campoplast Solideal Haskoning 06/2014 06/2015 VND72 billion
5 Caye Serano Jen Tuan Chau Co., Ltd.
WT Partnership 09/2014 06/2015 VND10 billion
2015
124 125Remeeco profile Remeeco profile
NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT
VALUE IMAGESStarting Ending
6Vo Van Kiet – Kien Giang School
Department of Education and Training - Kien Giang Province
11/2014 03/2015 VND5 billion
7Singapore International School (SIS)
PIC JSC. 11/2014 04/2015 VND26 billion
8 Gentherm Ha Nam Gentherm VN Tebodin 11/2014 10/2015 VND93 billion
2014
NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT
VALUE IMAGESStarting Ending
1Café Tran Quang II Factory
Café Tran Quang Co., Ltd.
Atelier 11/2013 03/2014 VND15 billion
2 Vivo CityVietsin Commercial Complex Development JSC.
Apave VN 07/2013 11/2014 VND545 billion
3 Mc Donald’s Go Vap Good Day Hospitality JSC.
TTAD 2014 2014 VND30 billion
2015
LIST OF COMPLETED PROJECTS (cont.)
2013
NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT
VALUE IMAGESStarting Ending
1 Marigot Factory SwarovskiHaskoning Vietnam
09/2012 05/2013 VND132 billion
2Crown New Can Da Nang
Crown Beverage Cans Danang Co., Ltd.
- 09/2012 05/2013 VND47 billion
NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT
VALUE IMAGESStarting Ending
4 Gain Lucky 1&2Shenzhou International Group Holdings Limited
IDCo 2013 2014 VND186 billion
5 Brotex 1&2 Brotex Vietnam Co., Ltd.
ICIC 2013 2014 VND201 billion
6DongSung Vina Thai Nguyen
DongSung Vina Co., Ltd.
- 03/2014 08/2014 VND14 billion
7 Formosa Ha Tinh Formosa Ha Tinh Steel Corp.
- 06/2013 06/2014 VND38 billion
8 Magic Vina Magic Vina Co., Ltd. - 06/2014 12/2014 VND49 billion
126 127Remeeco profile Remeeco profile
NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT
VALUE IMAGESStarting Ending
3Industrielle Beteiligung Building
Industrielle Beteiligung Co., Ltd.
- 06/2012 01/2013 VND24 billion
4PCC1 Trade Center and Housing Apartment
Power Construction No.1 JSC
IBST 05/2012 11/2013 VND44 billion
5 Ho Tram Strip Phase 1
Ho Tram Project Co., Ltd.Asian Coast Development, Ltd.(ACDL)
Meinhardt Singapore
2011 2013VND1,459
billion
6 Viet Luan Factory Viet Luan Co., Ltd. 2012 2013 VND49 billion
7 Texhong Ngan Long Texhong Textile JSC. ICIC 2012 2013 VND55 billion
8 Essilor Factory Essilor (France) Archetype 2013 2013 VND66 billion
9 Eximbank Ky Dong Eximbank 2013 2013 VND27 billion
10 Viglacera Tower Viglacera Corp.AIC Management
2011 2013 VND121 billion
11120 Gamuda Gardens
Gamuda Land Vietnam Co., Ltd.
G&P 12/2012 12/2013 VND50 billion
2013
LIST OF COMPLETED PROJECTS (cont.)
NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT
VALUE IMAGESStarting Ending
1 Nestle Route 66 Nestlé Vietnam Co., Ltd.
Haskoning Vietnam
09/2011 08/2012 VND220 billion
2 City Garden Phase 1City Garden Apartments Vietnam Co., Ltd.
Mace VN 08/2010 10/2012 VND280 billion
3Diamond Island Phase 1 Kusto Home
Turner & Coninco
08/2009 12/2012 VND324 billion
4Hyatt Regency Da Nang
Marble Mountain Beach Resort J.S.C
ICE(Indochine Engineering Ltd Co.)
2010 2012 VND393 billion
5 President Place Refico Mace VN 05/2011 08/2012 VND68 billion
6 LIM Tower Mai Thanh Service Co., Ltd.
Apave VNCoteba (France)
04/2011 06/2012
7 Salinda Phu Quoc An Cuong Co., Ltd. Qcons 01/2012 08/2012 VND64 billion
8Hochiminh Stock Exchange (HOSE)
Hochiminh Stock Exchange (HOSE)
- 2012 2012 VND99 billion
2012
128 129Remeeco profile Remeeco profile
2012
2011
NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT
VALUE IMAGESStarting Ending
9 Novotel Phu Quoc C.E.O Investment JSC.
2012 2012 VND220 billion
10 Ocean Villas Vinacapital Vina Project 12/2010 02/2012 VND215 billion
11 Dielac Factory Vinamilk IDCo 10/2011 10/2012 VND25 billion
NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT
VALUE IMAGESStarting Ending
1 Saigon PavillonPhu Hung Gia Investment Construction JSC.
Phu Hung Gia Investment Construction JSC.
07/2010 10/2011 VND54 billion
2 Pepsi Bac Ninh Pepsico InternationalHaskoning Vietnam
02/2011 09/2011 VND202 billion
LIST OF COMPLETED PROJECTS (cont.)
2010
2009NO. PROJECT INVESTOR CONSULTANT
CONSTRUCTION TIME CONTRACT VALUE IMAGES
Starting Ending
1 Vinamilk Bac Ninh VinamilkFCC Control and Fumigation JSC.
2009 2009 VND2.5 billion
2 ODIM Factory ODIM Factory Coteccons 07/2008 09/2009 VND80 billion
3 Sanctuary Ho Tram
Hai Vuong Tourism JSC. and Nha Le Vu Development And Business JSC.
03/2008 04/2009 VND76 billion
4 Liberty 6 Hotel Liberty Corp. UPCC 12/2008 01/2009
NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT
VALUE IMAGESStarting Ending
1Tan Son Nhat International Airport Terminal - Air Cargo
SCSC
JACDelta Investment Construction JSC.
08/2009 09/2010 VND143 billion
2 Coteccons Building Coteccons 05/2009 06/2010 VND45 billion
130 131Remeeco profile Remeeco profile
2008
2007
NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT
VALUE IMAGESStarting Ending
1 Dutch Lady Dutch Lady VN Haskoning 2007 2008 VND85 billion
2 Sabeco Cu Chi SABECO Haskoning 2007 2008 VND80 billion
3 Centre Point Tower ReficoHBP Project Management.
2008 2008 VND126 billion
NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT
VALUE IMAGESStarting Ending
1 FOSTER Foster Electric Co.,LtdICIC & BB Dai Minh
2006 2007 VND105 billion
LIST OF COMPLETED PROJECTS (cont.)
LIST OF ON-GOING PROJECTS
NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT
VALUE IMAGESStarting Ending
1 Vincom Tay Ninh VingroupVingroup Management Board
11/2016 11/2018 VND110 billion
2 Shaeffler Shaeffler VN Co., Ltd. 01/2018 11/2018 VND160 billion
3
Project of improving head office of the Government and Government Office
Vincom Construction and Consultant Co., Ltd.
Apave 2017 2018 VND111 billion
4Ho Tram Strip Phase 2
Ho Tram Project Co., Ltd.
APP 2017 2018 VND500 billion
5Vinhomes Metropolis Vietnam INCO., JSC.
Vincom Construction and Consultant Co., Ltd.
2017 2018 VND650 billion
6 Vinhomes Imperia VinGroup
Vincom Construction and Consultant Co., Ltd.
12/2017 04/2019 VND151 billion
7 City Garden Phase II City Garden Apartments Vietnam
TTAD 2016 2018 VND316.2 billion
132 133Remeeco profile Remeeco profile
NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT
VALUE IMAGESStarting Ending
8 D’capitale Tan Hoang Minh Texo 2016 2018 VND1,157 billion
9 Masteri Millennium Vinh Hoi Artelia 2016 2018 VND365 billion
10 Vincom Bac Ninh Vingroup BQL Vingroup 01/2017 09/2018 VND160 billion
11 A&B Nha Trang A&B Group Artelia 02/2017 10/2018 VND181 billion
12 Preche Thao Dien Investment JSC.
Artelia 05/2016 09/2018 VND270 billion
13 Diamond Island 2 Binh Thien An Property JSC.
Artelia 07/2016 2018 VND780 billion
14 CityLand CityLand BQL CityLand 08/2017 11/2018 VND220 billion
LIST OF ON-GOING PROJECTS (cont.)
NO. PROJECT INVESTOR CONSULTANTCONSTRUCTION TIME CONTRACT
VALUE IMAGESStarting Ending
15 Flamingo Dai Lai Flamingo Dai Lai JSC. 09/2016 05/2018 VND160 billion
16 Casino Hoi AnVina Capital, Chow-Tai-Fook & The SunCity Group
09/2017 06/2018 VND1,900 billion
17Khu Cao ốc VP - TM - DV lô 5.5 khu IIA Dai Quang Minh Apave 10/2017 04/2018 VND309 billion
18 The Goldview May - Diem Saigon JSC.
Artelia 2015 I/2018 VND775 billion
134 135Remeeco profile Remeeco profile
236/6 Dien Bien Phu Street, Ward 17, Binh Thanh District, HCMC.Tel: (84.28) 3514 2255 - 3514 2266Fax: (84.28) 3514 2277Email: [email protected]: www.coteccons.vn - www.remeeco.vn
Representative Office5th Floor, Star City Tower, 81 Le Van Luong Street, Nhan Chinh, Thanh Xuan, HanoiTel: (84.24) 3783 4851 - (84.24) 3783 4850
M&E SECTOR