leading independent third party company for survey … · • advanced survey management • relief...

4
www.pathcontrol.com Leading Independent Third Party Company for Survey Management & Relief Well Services

Upload: others

Post on 11-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Leading Independent Third Party Company for Survey … · • Advanced Survey Management • Relief Well & Intercept Wells • Blow Out Contingency Planning Added Value : • Expertise

www.pathcontrol.com

Leading Independent Third Party

Company for Survey Management

& Relief Well Services

Page 2: Leading Independent Third Party Company for Survey … · • Advanced Survey Management • Relief Well & Intercept Wells • Blow Out Contingency Planning Added Value : • Expertise

Fields of expertise :

• Wellbore Placement

• Advanced Survey Management

• Relief Well & Intercept Wells

• Blow Out Contingency Planning

Added Value :

• Expertise & Know-how

• Dedicated Methodologies

• Proprietary Algorithms & Software

• Survey Management Global Approach

Leading Independent Third Party Company for Survey Management & Relief Well Services

• Field proven methodology – First pass intercept• High profile relief well project specialists• Specific process from planning to interception• Enhanced 3D ranging interpretation• Well Control throughout Re-entry or perforation• Interception & Milling modeling

• Emergency response : Planning & Training• Communication standards & Procedures• Workflow Process and Organization Charts• Well Capping Plan & Surface intervention• Relief Well Contingency Plan• Dynamic Killing & Ranging Strategy

Blow Out Contingency Planning

Relief Well

A RELIEF WELL & INTERCEPT WELL COMPANY

Page 3: Leading Independent Third Party Company for Survey … · • Advanced Survey Management • Relief Well & Intercept Wells • Blow Out Contingency Planning Added Value : • Expertise

ACE Methodology for Survey Management Services :

ANTICIPATE :

• Advanced Survey Management & Survey Program

• Global Data Mining & Database Integrity

• Spatial IFR Services

CONTROL :

• Collision Avoidance with PCTrack (R) Ranging

• Real Time Survey Management

• Temporal 4D IFR Services

ENHANCE :

• Position Uncertainty based on enhanced models

• Reliable directional database construction

• Reservoir wellbore enhanced placement

• Directional Database Integrity• Improved Wellbore Placement• Reduced Positioning Uncertainties• Well Planning and Survey program design• Collision Avoidance Management• Advanced Training for Engineers

Wellbore Positioning

• 24/7 Remote Support Operation• Collision Avoidance with PCTrack Technology• Accurate TVD well Placement• Reduced Lateral Uncertainty• Customized Error Model• Real-Time Geosteering

Real-Time Advanced Survey Management

• Provide 3D distance and direction to offset wells• Compatible with all MWD systems• Patented 3D PCTrack Technology• Real-Time Well Detection for top-hole, sidetrack…• Collision avoidance Monitoring tool• Adapted to Plug & Abandon

Passive Magnetic Ranging

• Improve QA/QC and Accuracy of MWD measurement• Unique Temporal & Local IFR Services• Spatial In-Field Referencing Services• Geomagnetic Data Processing• Real-Time IFR 4D + MSA process• Accurate lateral wellbore positioning

In-Field Referencing (IFR)

TECHNOLOGY ORIENTED & ISCWSA MEMBERLEADING INDEPENDENT PREFERRED PARTNERA RELIEF WELL & INTERCEPT WELL COMPANY

Page 4: Leading Independent Third Party Company for Survey … · • Advanced Survey Management • Relief Well & Intercept Wells • Blow Out Contingency Planning Added Value : • Expertise

WELLBOREPOSITIONINGPARTNERFORADVANCEDSURVEYMANAGEMENTSERVICES

InterceptionandReliefwellsprojects

www.pathcontrol.comReliefWell Expert

www.pathcontrol.com

[email protected] Rue de la Rochefoucauld75009 Paris - France

2336 4389 88 05 / 2336 4389 88 09

[email protected] - France Office233 6 43 89 88 05Abu Dhabi - UAE Office297150 2415181

2008Interceptionk Milling and Re9entry of a K9BHAL stinger into a 09UHK’’ tubing

3Offshore Libya5

2009

Double interception with milling and perforation of a blow9out well

3Offshore Nigeria5

2010

Interception of a UW9FHAL casing of a blow9out well 3Offshore Nigeria5

2011

Planning of W relief wells required to kill a blow9out well surrounded by Wx

active wells and branches 3Onshore Nigeria5

2012

Drilling of K relief wells for a double intercept in the x9FHA’’ casing of ablow9out HPHT well 3Offshore UK5

ReliefWell drilling intercept in UT9WH0’’ casing of a blow9out well 3OnshoreKuwait5

2013

Intercept well to re9enter the stump of a B’’ casing 3Onshore France5

Side Track and Open9hole re9entry below BHA lost in hole 3Onshore Russia5

Design of an intercept well and its fall9back deeper intercept ofa W9UHK’’ tubing corroded KT m below surface 3Onshore Argentina5

2014

Design of two relief wells to intercept a blow9out well3Offshore Mexico5Intercept and Milling of a F9UHK’’ casing of a blow9out well 3Onshore USA5

2015

Challenging proximity drilling for a top9hole section 3Offshore Argentina5

2016

Side Trackk Interception and Re9entry of a stinger to plug and abandon ahighly corroded well and prevent communication overlaying reservoirs3Onshore France5

2017

Double9intercept well for a plug and abandon job 3Onshore USA5

2018

Successful first9pass interception and milling of a blowout well 3OnshoreNigeria5

B Interception wells 3Onshore North America5

2019

Relief Well servicesk first pass interception of a blowout well3Offshore Indonesia5

K Relief Well plans for multi well blow out cluster 3Onshore North America5

B Interception wells 3Onshore North America5