Leading Dredging & Reclamation Training Course Returns!
Course Overview:
This 5-day course has been specifically broken down into 2 sessions, firstly on dredging and secondly on reclamation, and is designed to provide you with a complete guide to planning and executing dredging & reclamation projects. The comprehensive agenda covers all the necessary knowledge of the project stages, stakeholder management, as well as physical & chemical properties of the sediments, managing environmental impacts resulting from dredging and reclamation works and how these can be minimized through project planning and environmental management during execution. In addition to presentations of the subjects, participants will be challenged in actual project case studies to apply the principles discussed.
Course Objectives:
At the end of this course, successful participants will have a solid understanding about different types of dredging equipment and boundary conditions for their use, state-of-the-art dredging and reclamation techniques including environmental measures as well as site & soil conditions and improvement. They will know how to overcome geo-technical challenges, mitigate the risks of a dredging & reclamation project, manage dredging & reclamation plans and budgets as well as minimizing the environmental impacts from the dredged materials. Project case studies during the course will give participants the opportunity to see how those principals during the course are applied in real-life projects.
Who should attend:
This Course is aimed at: • Engineers (Dredging Engineers, Civil engineers, Environmental Engineers,
Operations Engineers, Principal Engineers, Planning Directors) and practitioners representing project owners
• Professionals from port, coastal and environmental authorities • Dredging & Reclamation Contractors • Dredging & Reclamation Consultants
Special! You can choose to attend both or either of the sessions! Mix & Match!
Session 1: Dredging Module: 5-7 December 2016
Session 2: Reclamation Module: 8-9 December 2016
** NOT 1 BUT 2 EXPERT TRAINERS will guide you through case studies and practical
strategies on Dredging & Reclamation! MOST VALUE FOR MONEY COURSE GLOBALLY!**
Register by 2nd September 2016 and save SGD 1000!!!
Researched & Developed By:
Email: [email protected] | Tel: +65 6376 0908 | www.equip-global.com for more information
About your Expert Trainer Faculty:
The Experienced Master of Dredging & Reclamation
He graduated with a M.Sc. in Civil Engineering and started his professional
career as a research engineer and production estimator with Costain
Blankevoort Dredging Company in 1978. During the late seventies and the early
eighties, he worked on many dredgers as a trouble-shooter, meanwhile
developing measurement systems for the automation of the data acquisition
process.
After being employed for a few years by an automation company, specialised in
the automation of dredging processes, he joined Boskalis in 1987. He started as
a research engineer. From the early nineties until 1998 he was a member of the
soils group of the estimating department, and therefore involved with all kinds
of dredging related geological and geotechnical problems. As a senior project
engineer for Hydronamic, the Boskalis in house engineering department he has
coordinated tenders and project designs. From 2003 until 2009 he managed all
technical and environmental work during the preparation and execution of the
Channel Deepening Project in Melbourne Australia. Then, he worked as
environmental manager on the Gorgon Barrow Island Project during the
preparation phase. After his return to the Netherlands, he has been working as
a senior engineer at the Boskalis head office in the Netherlands. From his
retirement in 2014, he has been involved in education such as dredging
simulator instructor and e-learning course development for the Dutch dredging
branch organisation.
The Renowned International Dredging & Reclamation Expert
• 40 years of international experience in the dredging & reclamation industry
• Founder and Former President Director of the Dosco Group BV • Designer of customized inland dredging equipment International Dredging & Reclamation Projects: • The Philippines, Metro Manila Flood Management Project – Phase 1 • Bangladesh, Dhaka-Chittagong Corridor Performance Dredging Contract • Vietnam, Mekong Delta Soil Bank feasibility study • Bangladesh, Dhaka Urban Pilot Dredging project • Vietnam, Mekong Delta water resources management for rural
development • Vietnam, Identification mission Urban Dredging • Jakarta Emergency Dredging Initiative (JEDI-JUFMP) • Malawi, Technical solution for emptying pit latrines • Jakarta Jatiluhur Pipeline stage 2a • Pilot Dredging Project for Jakarta
Dredging & Reclamation 5 - 9 December 2016 | Singapore
Programme format This unique, cutting edge programme will be delivered in a highly interactive and practical, tutorial style format. Theory will be supported and illustrated through a combination of real-world case studies and an extended hypothetical scenario that enables participants to easily incorporate the programme insights, techniques and procedures into their own organisations.
Pre-course questionnaire To ensure that you gain maximum benefit from this event, a detailed questionnaire will be sent to you to establish exactly what your course needs are. The completed forms will be analysed by the course facilitator. As a result, we ensure the course is delivered at an appropriate level and that relevant issues will be addressed. The comprehensive course material will enable you to digest the subject matter in your own time.
Program Schedule
(Day 1 to Day 5) 08.00am 08:30am Registration
08.45am Training Session 1 10.30am Coffee Break 10.45am Training Session 2 12.30am Lunch 13.30pm Training Session 3 15.15pm Coffee Break 15.30pm Training Session 4 17.30pm End of Day
* Training Course Day 5 will consist of 1 additional session - 5 sessions, and the specific session timings breakdown will be announced closer to the training course date
Would you like to run this course in-house? (Save up to 15%) This course can be presented exclusively for your organisation on an in-house basis, tailored to meet your specific needs, at a place and time of your convenience. If you have a team of 10 or more interested in this course, let’s discuss how we can work together to meet your training needs. Please contact us and we will be pleased to assist.
Email: [email protected] | Tel: +65 6376 0908 | www.equip-global.com for more information
5 December 2016 – Dredging Session Day One:
Session 1: Overview & Key Philosophies of Dredging
Key Definitions & Statistics
The need for and benefits of dredging
The Dredging Industry
Types of Dredging
Advantages and disadvantages of each dredge type and how they can impact your project
Important Lessons Learned from past dredging projects
Updating on worldwide dredging & reclamation projects and key trends
Session 2: Dredging Project Phasing – Strategies & Lessons Learned
Planning and Design Phase Define Project Functional Requirements Prepare Conceptual Design Comply with Regulatory Framework Stakeholder Input Characterise the Baseline Environment Assess Potential Environment Impacts Prepare Final Project Design and Specifications
Construction Phase Tendering and Contract Award Contractor Defines Construction Methods and
Selects Equipment Project Execution
Post-Construction Phase Area/Facility Operations Future Maintenance Long-term Monitoring
Case Studies on Project Phasing
Session 3: Environmental Regulations, Environmental Considerations & Stakeholder management
Considering the legislation, conventions and other documents concerning clean and contaminated sediments throughout the whole management process
The parties – politicians, financiers, activists, contractors, consultants, administrators or standards institutes, owners, and polluters
Knowing from which point of view each party approaches the issues
Understanding the interrelationship of all these groups of parties
Case Studies & Hands On Activities
Characterization of the affected environment
Potential physical changes and environmental impacts from dredging & dredged material placement
Spatial and Temporal scales of effects
Environmental control measures
Dredging & Reclamation 5 - 9 December 2016 | Singapore
Spatial and Temporal scales of effects
Environmental control measures Silt screens Air bubble screen Controlled placement Reducing effects of blasting
Session 4: Dredging Process and Techniques
Cutting of sand, clay and rock
Sedimentation process in hopper dredges
Breaching process
Case study sharing and how various dredging processes techniques will fit in
Hands on Practical Exercises and Case Study Analysis
6 December 2016 – Dredging Session Day Two:
Session 1: Hydraulic Considerations of Dredging Works
The development cycle of a hydraulic fill project
How technical data are acquired and applied
Design of the hydraulic fill mass Boundary conditions for the design Effects of the design on its surroundings Strength and stiffness of the fill mass Density, sensitivity to liquefaction Design considerations for special fill material such as
silts, clays and carbonate sands Problematic subsoils and natural hazards Case Studies
Session 2: Dredging Process Equipment & Techniques
Types of Dredging Equipment
Mechanical Dredgers
Hydraulic Dredgers
Comparing different types of equipment and their suitability to your project
Session 3: Dredging Operations and Dredged Material Management Alternatives
Excavation of the material from the bottom
Removal of the loosened material to the dredge vessel
Transportation of Dredged Material
Placement or Disposal Operations Open-water disposal Confined disposal Beneficial use
Case Studies
Email: [email protected] | Tel: +65 6376 0908 | www.equip-global.com for more information
Dredging & Reclamation 5 - 9 December 2016 | Singapore
Session 4: Sediment Physical Properties – In depth analysis
Rock – sandstone, coral, granite, basalt
Gravel and Sand
Consolidated Clay
Silt/Soft Clay
Mixture (rock/sand/silt/soft clay)
7 December 2016
– Dredging Session Day Three:
Session 1: Sediment Physical Properties – In depth analysis
Rock – sandstone, coral, granite, basalt
Gravel and Sand
Consolidated Clay
Silt/Soft Clay
Mixture (rock/sand/silt/soft clay)
Session 2: Soil improvement & Managing Geo-Technical Challenges for Dredging Works & Projects
Purposes and advantages of soil improvement
Assessment of soil improvement requirements and methodologies – Soil liquefaction, vacuum consolidation, prefabricated vertical drains (PVDs) or wick drains
Recent Advances in Soft Soil Consolidation
Predictions and Observations of Soft Clay Foundations
Overcoming common geo-technical challenges in projects
Session 3: Risk Mitigation & Cost Management in Dredging Projects
Environmental Impact Assessment
Risk Analysis
Risks and uncertainties in dredging & reclamation projects
Risk management and risk communication
Cost management best practices & lessons learned in dredging projects
Session 4: Dredge Monitoring and Control
Types and purposes of Monitoring
Defining objectives & baseline conditions
Monitoring criteria
Determining methodology for measuring change
Defining threshold values
Timely review procedures
Action and communication
Case Studies
8 December 2016 – Reclamation Session Day Four:
Session 1: Why Reclamation – Key Consideration
World population and implications for reclamation
Different purposes of reclamation
Different locations and implications for reclamation
Different materials used for reclamation
Session 2: Material Sources, Methods, and Environment Considerations for Reclamation
Marine and river sources – Dredging & Reclamation
Land sources – Dry earth movement and transport
Treated soils – Plant and transport
Building with nature – source environment, work method, features design
Session 3: Planning, Design & Monitoring of Reclamation Projects
Project phasing
Location requirements
Source selection
Site investigation and soil testing
Equipment selection and Work method
Environmental restrictions and local legislation
Monitoring
Risk analysis and mitigation measures
Email: [email protected] | Tel: +65 6376 0908 | www.equip-global.com for more information
Dredging & Reclamation 5 - 9 December 2016 | Singapore
Session 4: Workshop 1 – Group Project Exercise
In this session, attendees are divided into groups to participate in a practical project exercise, focused on the following areas:
Selection of sources
Selection of equipment
Determining work method
Monitoring
9 December 2016 – Reclamation Session Day Five:
Session 1: Hydraulic Fills
Functional requirements
Technical requirements
Location vs. equipment
Subsoil considerations and treatment (ground improvement)
Reclamation materials and treatment (compaction, using problematic materials)
Design of reclamation area, water management
Quality control
Pit falls
Session 2: Hydraulic Transport
Hydraulics
Pumps
Drives
Pumps & Drives
Pipeline discharge
Session 3: Workshop 2: Group Project Exercise
In this session, attendees are divided into groups to participate in a practical project exercise, focused on the following areas:
Fill area design
Pipeline routing
Pipeline extension
Session 4: Cost and Schedule of Reclamation Projects
Setting up a schedule
Setting up a cost estimate
On-time delivery – monitoring by survey
Attention points
Session 5: Workshop 3: Group Project Exercise
In this session, attendees are divided into groups to participate in a practical project exercise, focused on the following areas:
Making a plan
Work method
Risk analysis and mitigation measures
Monitoring
Quality control
Schedule Management
Cost Management
**End of 5-Day Training Course and Certificate Presentation **