lead time reduction in manufacturing process of cnc ... · of the production process, which has...

5
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1297 Lead time reduction in manufacturing process of CNC machines by lean Principles Vinod Raj S N 1 , Dr.M .Rajesh 2 1 MTech Student , Dept. of Industrial Engineering, M S Ramaiah Institute of Technology , Karnataka, India 2 Assistant Professor, Dept. of Industrial Engineering, M S Ramaiah Institute of Technology , Karnataka, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Current economic crisis raises the constant demand to raise the more profitable solution that drive the organizations to gain competitive advantage. For the same reason the companies searching for management methodologies that allow them to improve the process of manufacturing the product and provide more reliable product and improve service characteristics. This have been attempted using through Lean manufacturing and Six sigma integrated approaches in there managerial and production processes in which, Lean focus mainly on the waste elimination, using simple and visual techniques whenever possible and Six Sigma on the control and processes variability reduction, using statistical tools. The main objective of the project was to improve the productivity of the production line, by identifying the value- added activities and eliminating the non-value-added activities through time study. To improve the value adding activity to the production process the layout redesign was proposed considering eliminating non-value adding activities. Value stream mapping is used to map the current state and map the future state after implementing the improvement. Key Words: Productivity improvement1, Time study2, Line balancing3, Value stream mapping4. 1. INTRODUCTION Lean and Six Sigma are two widely acknowledged business process improvement strategies available to organization today for achieving dramatic result in cost, quality and time by focusing on process performance. Lately, Lean Six Sigma practitioners are integrating the strategies into a more powerful and effective hybrid, addressing many of their weakness and retaining most of the strength of each strategy. Lean Six Sigma combines the variability reduction tools and techniques from Six Sigma with the waste and non-value-added elimination tools and techniques from Lean Manufacturing to generate saving to the bottom line of an organization. 1.1 Lean Production Facility layout. The production facility layout is as important as the technology it houses and has a significant impact on business performance. The layout must be modified and improved continuously. Only then can the waste associated with a poor layout be eliminated or reduced. Still, change to the existing layout is rarely taken into consideration when planning for production improvements. Instead the focus is on process, materials and the layout is most often out of scope. 1.2 Grouping of process. Process of manufacturing and the grouping of the similar kind of the activates based on the principle of rationalization. 2. Methodology DMAIC is the methodology used for carrying on the project. 3. Review of literature Overview of the literature reiview shows the Manufacturing Organizations faces an a Problem in reduction of cost and efficiency Challenges in their manufacturing Operations. To Stand up in today’s Globalization world, Manufacturers need to find ways to reduce Production time and cost to improve operating performance and Product quality. The tool commonly used for improvements are value stream mapping, process mapping etc. 4. Process visual Board Process visual board show as the process overview and current working procedure.

Upload: others

Post on 27-Mar-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Lead time reduction in manufacturing process of CNC ... · of the production process, which has been succeeded in the project. The mean lead time of the manufacturing process has

International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056

Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072

© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1297

Lead time reduction in manufacturing process of CNC machines by lean Principles

Vinod Raj S N1, Dr.M .Rajesh 2

1 MTech Student , Dept. of Industrial Engineering, M S Ramaiah Institute of Technology , Karnataka, India

2 Assistant Professor, Dept. of Industrial Engineering, M S Ramaiah Institute of Technology , Karnataka, India ---------------------------------------------------------------------***---------------------------------------------------------------------Abstract - Current economic crisis raises the constant demand to raise the more profitable solution that drive the organizations to gain competitive advantage. For the same reason the companies searching for management methodologies that allow them to improve the process of manufacturing the product and provide more reliable product and improve service characteristics. This have been attempted using through Lean manufacturing and Six sigma integrated approaches in there managerial and production processes in which, Lean focus mainly on the waste elimination, using simple and visual techniques whenever possible and Six Sigma on the control and processes variability reduction, using statistical tools. The main objective of the project was to improve the productivity of the production line, by identifying the value-added activities and eliminating the non-value-added activities through time study. To improve the value adding activity to the production process the layout redesign was proposed considering eliminating non-value adding activities. Value stream mapping is used to map the current state and map the future state after implementing the improvement.

Key Words: Productivity improvement1, Time study2, Line balancing3, Value stream mapping4.

1. INTRODUCTION Lean and Six Sigma are two widely acknowledged business

process improvement strategies available to organization

today for achieving dramatic result in cost, quality and time by focusing on process performance. Lately, Lean Six Sigma practitioners are integrating the strategies into a more powerful and effective hybrid, addressing many of their weakness and retaining most of the strength of each strategy. Lean Six Sigma combines the variability reduction tools and techniques from Six Sigma with the waste and non-value-added elimination tools and techniques from Lean Manufacturing to generate saving to the bottom line of an organization.

1.1 Lean Production Facility layout. The production facility layout is as important as the technology it houses and has a significant impact on business performance. The layout must be modified and

improved continuously. Only then can the waste associated with a poor layout be eliminated or reduced. Still, change to the existing layout is rarely taken into consideration when planning for production improvements. Instead the focus is on process, materials and the layout is most often out of scope.

1.2 Grouping of process. Process of manufacturing and the grouping of the similar kind of the activates based on the principle of rationalization.

2. Methodology DMAIC is the methodology used for carrying on the project.

3. Review of literature Overview of the literature reiview shows the Manufacturing Organizations faces an a Problem in reduction of cost and efficiency Challenges in their manufacturing Operations. To Stand up in today’s Globalization world, Manufacturers need to find ways to reduce Production time and cost to improve operating performance and Product quality. The tool commonly used for improvements are value stream mapping, process mapping etc.

4. Process visual Board Process visual board show as the process overview and current working procedure.

Page 2: Lead time reduction in manufacturing process of CNC ... · of the production process, which has been succeeded in the project. The mean lead time of the manufacturing process has

International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056

Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072

© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1298

Fig 1.1 Process overview usin visual board 4.1 Current Value stream Mapping Data is collected by systematic method using Flow process chart for accouting the value and non value adding activities of the process. Value stream mapping basically show the non value adding activites in the process.

Fig 1.2 Value Stream Mapping of current process

4.2 Current Layout Design

STORES TOOL ROOM

Cro

ss S

lid

e S

to

ra

ge

Ta

ble S

to

ra

ge

Millin

g H

ea

d S

to

ra

ge

Stru

ctu

re A

ssem

bly

-2

A 1.7 (45) (Coolant System,

Coolant Run, Air

Gun,C/S Cover,

Name Plates,

Despatch)

Movement from MFD

Movement from Stores

Movement from Electrical Sub Assy.

LM

G &

B

S S

to

ra

ge

LM

G &

B

S S

to

ra

ge

Stru

ctu

re A

ssem

bly

-1

BM

V 4

5+

/+

+/ 5

0B

MV

6

0+

/+

+/ 5

1

A 1.2 ELECTRICAL SUB ASSY.

A 1

.1

(60

)

(C

ab

t M

tn

g B

rk

t,

Ca

ble C

arrier A

ssy

.,

AT

C A

ssy

. , D

ecla

mp

Cy

lin

der, P

neu

ma

tic

Assy

., A

ccu

mu

la

to

r

A 1

.1

(60

)

(C

ab

t M

tn

g B

rk

t,

Ca

ble C

arrier A

ssy

.,

AT

C A

ssy

. , D

ecla

mp

Cy

lin

der, P

neu

ma

tic

Assy

., A

ccu

mu

la

to

r

A 1.6 (60) (Coolant System,

Coolant Run, Air

Gun,C/S Cover, Name

Plates, Despatch)

A 1.5 (60)

QA Buffer

A 1.5 (60)

QA (GT,

Laser, Load Test,

Warm up Cycle etc.,)

A 1.4 (60) (Telescopic Cover

Assy, Interfacing of

ATC, Lub, etc.,)

A 1.3 (60) (Spindle Assy, Encoder

Assy, Counter Balance,

Stroke Setting, Geometry,

Swing Reading ,

Transformer Mounting,

Axis Motor Assy.)

Stru

ctu

re A

ssem

bly

-2

A 1.5 (45) (Telescopic Cover

Assy, Interfacing of

ATC, Lub, etc.,)

A 1.6 (45)

QA (GT, Laser, Load Test,

Warm up Cycle etc.,)

A 1.6 (45)

QA Buffer

GARDEN

A 1.2 (60) (Cabinet Mounting,

Pendant Assy, MG

Assy, M/c Wiring, M/c

Energisation)

A 1

.1

(45

)

(C

ab

t M

tn

g B

rk

t,

Ca

ble C

arrier A

ssy

.,

AT

C A

ssy

. , D

ecla

mp

Cy

lin

der, P

neu

ma

tic

Assy

., A

ccu

mu

la

to

r

A 1

.1

(45

)

(C

ab

t M

tn

g B

rk

t,

Ca

ble C

arrier A

ssy

.,

AT

C A

ssy

. , D

ecla

mp

Cy

lin

der, P

neu

ma

tic

Assy

., A

ccu

mu

la

to

r

A 1.3 (45) (Cabinet Mounting,

Pendant Assy, MG

Assy, M/c Wiring, M/c

Energisation)

A 1.4 (45) (Spindle Assy, Encoder

Assy, Counter Balance,

Stroke Setting, Geometry,

Swing Reading ,

Transformer Mounting,

Axis Motor Assy.)

REST ROOMPNEUMATIC

SUB ASSY.

Co

lu

mn

S

to

ra

ge

Ba

se S

to

ra

ge

Stru

ctu

re A

ssem

bly

-1

Cro

ss S

lid

e S

to

ra

ge

Ta

ble S

to

ra

ge

Millin

g H

ea

d S

to

ra

ge

Co

lu

mn

S

to

ra

ge

Ba

se S

to

ra

ge

C- Class

Rack

Kit Kit

C-Class

Rack

Kit Kit

C-Class

Rack

C- Class

Rack

C- Class

Rack

Kit Kit Kit Kit KitKit

Kit Kit Kit Kit Kit Kit

Fig 1.4 Process capability plot of current process

Fig 1.3 Current layout Design

4.3 Process capability test for current state The process is studied for a period of 3 months and total 63 machines are produced. The lead time for each machine is collected and process capability test is performed.

Page 3: Lead time reduction in manufacturing process of CNC ... · of the production process, which has been succeeded in the project. The mean lead time of the manufacturing process has

International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056

Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072

© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1299

Which shows the current process is performing at 1 sigma level and the proces output is 60% defective considering defective percentage of milion.

4.4 Procedure of improvement Cause and effect diagram is used to list down the

potential causes of incease in lead time and cause and effect matrixs to list the potential need to improved.

Having consideing the problems the grouping of process and layout redisign is considerd for improvement of the process.

5. Visual display of regrouped and improved process using value stream mapping. The process is grouped to 7 process to 4. The lead time of the new improved process design. Value stream mapping of the improved process is collected.

Fig 1.5 Value stream mapping of improved process

5.1 Proposed New Layout New layout is proposed by based on grouping of the process and lean plant layout design procedure.

New Assembly Layout for BMV Machines

MFD KANBAN AREA

Cross Slide Storage

Table Storage

Milling Head Storage

Column Storage

Base Storage

Cross Slide Storage

Table Storage

Milling Head Storage

Column Storage

Base Storage

A 1.0

A 1.0

B 1.0

B 1.0TOOL ROOM

A 1.1 A 1.1

A 1.1 A 1.1

B 1.1 B1.1

B 1.1 B 1.1

B1.2 - B1.6

A 1.2 - A1.6

A 1.2 - A1.6

A1.2 - A1.6

A 1.2 - A1.6

GARDEN

RESTROOM

SA 2.0 PNEUMATIC SUB

ASSEMBLY

SA 1.0 ELECTRICAL SUB

ASSEMBLY

A 1.1 A 1.1

B 1.1 B 1.1

RECEPTION

CMD MARKETING OFFICE

GARDEN

RESTROOM

CMD OFFICE

CMD STORES

MEETING AREA

B1.2 - B1.6

B1.2 - B1.6

B1.2 - B1.6

A 1.2 - A1.6

A1.2 - A1.6

A1.2 - A1.6

A1.2 - A1.6

A 1.2 - A1.6

B1.2 - B1.6

A1.2 - A1.6

A1.3 - A1.6

A1.3 - A1.6

A1.3 - A1.6

A1.2 - A1.6

B1.2 - B1.6

B1.2 - B1.6

B1.2 - B1.6

B1.2 - B1.6

CMD STORES

Line 1 (MTS) 45+/++/50Line 2 (MTS) 60+/++/51Line 3 (MTO &ETO)Line 3 (MTO &ETO)

CMD STORES

B1.2 - B1.6

B1.2 - B1.6

Movement from Pneumatic & Electrical

Sub Assy.

Movement from MFD KANBAN

Movement from Stores

Movement from Structure Assy

Fig 1.6 Improved layout design

Page 4: Lead time reduction in manufacturing process of CNC ... · of the production process, which has been succeeded in the project. The mean lead time of the manufacturing process has

International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056

Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072

© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1300

6.1 Results a) Combination chart displaying the variation in the present and proposed state lead time collected.

Fig 1.7 Combination chart of comaprision of two state b) Box plot Box plot displaying the reduction of lead time of the assembly process. The lead time as been reduced from 4587 to 4002, which show the reduction of 587 min.

Fig 1.8 Comparision of two state using box plot

c) Process capability test for future(Improved) state Process capablity test for improved phase after implementing the new layout design and grouping of processs. Lead time is studied for a 10 machines and checked for process capablity.

Fig 1.9 Process capability plot of current process Process capability plot shows the significant reduction in the standard deviation of the process from mean and increase in sigma level, and increase in productivity for 60% defective to 19% defective per million.

3. CONCLUSIONS CTQ of the project as defined was to reduce the lead time of the production process, which has been succeeded in the project. The mean lead time of the manufacturing process has been reduced from 4587 to 4000 which is shows the reduction of 587 min. The number of days required for manufacturing of one

machine has been reduced from 8 to 9 days to 7 to 6 days.

The quality control plan is deployed for continuous

improvement of the process and layout. Increase in process capability of the process from 60%

defects to 19 % defects by increasing the sigma level.

Page 5: Lead time reduction in manufacturing process of CNC ... · of the production process, which has been succeeded in the project. The mean lead time of the manufacturing process has

International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056

Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072

© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 1301

REFERENCES [1] “Lean Manufacturing Implementation Using Value

Stream Mapping: A Case study of Pumps Manufacturing Company”, authors Santosh B. Dighe1 and Abhay Kakirde.

[2] Chakravorty, S.S., 2010, An Implementation model for lean programmes, European Journal of Industrial Engineering, Vol. 4, No. 2 pp 228-248.

[3] Duggan, Kevin., 2002, Creating Mixed Model Value Streams, New York, Productivity Inc.

[4] Upadhye Nitin, Deshmukh S.G and Garg Suresh., 2010, Lean Manufacturing in biscuit manufacturing plant : A case, International Journal of Advanced Operations Management – Vol.2, No. ½ pp 108 – 139.