April 14th, 2006 – Nodal Program Charter v0.9 1 Lead From The Front
Texas Nodal
Program Charter Texas NodalProject Number NP-60C00_01 Charter Date April 14th, 2006
Program Sponsor Ron Hinsley Program Director Kathy Hager
Program Scope Design and implement the nodal market system and transition from the current zonal market to the nodal market by <date not certain> as defined in the Protocols approved by the PUCT on March 30, 2006.
Specific exclusions are those items not yet embodied in the Protocols (e.g. Real Time Co-optimization) that have a material impact on the scope, time and cost of the program.
Objectives ERCOT is charged with delivering the capability to:
Directly assign congestion costs
Increase transparency of energy prices
Increase reliability and market efficiency
By
Computing LMPs for 100% of settlement points, 100% of the time
Moving from portfolio based dispatch to resource-specific dispatch
Running and settling the Nodal markets to comply with 100% of the Nodal protocol requirements as measured by the accuracy of calculations and compliance with prescribed operational timelines
While achieving agreed Program Targets of:
Zonal Market continuity – as measured by adherence to existing target levels of availability
Timeliness – as measured by achievement of key Program milestones
Budget – as measured by achievement of budget goals
Current Zonal market characteristics Nodal Market Characteristics
Transmission Congestion Rights (flowgates) Congestion Revenue Rights (PTP Options, Obligations, Flowgates)
No Day-Ahead Energy Market Ancillary Services Market Day-Ahead
Day-Ahead Energy and Ancillary Services Co-optimized Market
Replacement Reserve Service (RPRS) Daily Reliability Unit Commitment (DRUC)
Hour Ahead Studies Hourly Reliability Unit Commitment (HRUC)
Balancing Energy Service every 15 minutes Zonal by portfolio for CSCs Unit Specific for Local
Security Constrained Economic Dispatch every 5 minutes (still 15 minute settlement) All Unit Specific
Zonal Average Shift Factors for Resources Actual Shift Factors for Resources
Zonal Market Clearing Price for Balancing Energy for Generation and Loads Nodal Locational Marginal Prices (LMP) for Generation Zonal weighted LMPs for Loads
April 14th, 2006 – Nodal Program Charter v0.9 2 Lead From The Front
Texas Nodal
Program Charter Texas NodalDeliverables The going-in position on high-level components is as follows.
Processes: Integration testing – substantial replacement (100% new) Training – education and training for ERCOT, Market Participants and Operators (100% new) Market Participant readiness – communication, impact assessment, Readiness Criteria, development and testing (100% new) ERCOT, Inc readiness – communication, impact assessment, business process change (all Markets), organizational preparation and testing (100% new) Market Trials – preparation, execution and Readiness Declaration (100% new) Transition to live operations – cut-over & business continuity (100%)
Systems: Registration System – minor enhancements (<10% functionality) Network Model Management System (NMMS) – replacement of Genesys (100% replacement plus significant additional functionality) Energy Management System (EMS) – substantial upgrades and enhancements (>50% of functionality) Market Management System (MMS) – replacement (100% replacement) Congestion Revenue Rights (CRR) – new (100% new) Commercial Systems (Settlements and Billing) – substantial upgrades and enhancements (>50% of functionality) Monitoring applications for Credit, Market & Compliance – substantial upgrades and enhancements (>50% of functionality) Reporting/Analysis (Enterprise Data warehouse/Enterprise Information Services) – substantial upgrades and enhancements (>50% of functionality) Interfaces within ERCOT, and external Interfaces between ERCOT and participants – substantial enhancements (>50%) Infrastructure – substantial enhancements (>50%)
Key Risks Risk Mitigation Strategy
Ineffective engagement, mobilization of the organization
Visible leadership from the Executives down. Demonstration of the “right” behaviors through rapid decision-making, communication, signals to the organization.
Delays & rework due to complexity Focus on architecture, early design, development of critical components, quality assurance, phased integration releases and testing, proactive communication and interaction with the selected vendors.
Poor integration Focus on architecture, early interface definition, integrated project planning. Significant testing will happen frequently and as early in the process as practical. Additionally, testing will be considered throughout the program design.
Ineffective engagement of, response from, market participants
Program Director and TPTF Chairman will take active steps to set mutual expectations and commitments, provide timely and appropriate information, in person meetings will be followed with detailed documentation; the program will actively follow up with the TPTF for responses, ensure mutual progress is highly visible, and escalate as needed.
Zonal v. Nodal Zonal projects will compete with the Nodal program for resources and focus, ERCOT Executives will be expected to make a commitment to the Nodal program. Additionally, the PUCT & TAC will be requested to freeze and rationalize Zonal PRRs.
Scope creep If an activity is not necessary for the transition to, and operation of, nodal, it will be considered out of the program scope and must be negotiated with the Program Director and, if required, the Steering Board.
Staff morale, turn-over and motivation
Job satisfaction and morale are based more on a sense of accomplishment, fairness and belonging. The program will challenge team members as much as possible and define work in achievable chunks. The program will also recognize accomplishments and superior achievement.
Core team capability Begin selecting the team that can move the program forward from its early stages. Selection of ‘super’ PMs – with project delivery accountability & authority – will be the highest staffing priority. Then we can re-introduce the rest of the organization under a more positive model and staffing plan.
Key resource bottlenecks The bottlenecks with key resources will be identified and their focus will be managed to minimize impact at critical times.
Software immaturity Implementation of “green” software – applications, infrastructure and tools – inevitably leads to substantial defects. The program will limit development and deployment of unproven software as a matter of policy.
April 14th, 2006 – Nodal Program Charter v0.9 3 Lead From The Front
Texas Nodal
Program Charter Texas Nodal
Key Milestones The master schedule and critical path are being defined, early critical milestones are shaping up: Program Charter complete - April 14, 2006 Program Charter signed off – April 25, 2006 Critical path RFPs issued – April 14, 2006 Zonal PRR freeze – May 1, 2006 Overall business and IT architecture (top level) approved – May 15, 2006 Vendors selected – June 7, 2006 Vendors on board and begin work – June 30, 2006 Project-based RUP phase gates – July 1, 2006
Approach Key elements of the required approach are clear: This Charter establishes the Program scope, schedule and budget baseline – any changes will be subject to formal change control. The management of the program will follow the Rational Unified Process (RUP) Methodology of iterative development. All critical documentation will go through a quality assurance process comprising Project- and independent Program-level assurance. The resource model envisages a lean core team (including “super” Project Managers and assurance functions) – ‘contracting’ with internal and external
providers for deliverables (rather than resources). RFPs will be expedited – detailed requirements will be developed together with vendors for critical applications. Project approval will be by phase – passage through each phase gate will require a detailed estimate for the subsequent phase, together with an estimate
to complete the entire project (Estimate At Completion – EAC). Project work breakdown for the impending phase will require definition and assignment of 40 hour deliverables for each resource Engagement with Market Participants will comply with the requirements of the ERCOT Nodal Transition Plan (dated November 3, 2005) Projects will be subject to periodic critical examination and health-checks
Organization model Accountability is king
CommercialSystems Project
Raj Chudgar
Program Control
Rob Connell
EMS Project
Carlos Gonzales-
Perez
MMS Project
Al Hirsch
CRR Project
Beth Garza
Market Participant
Engagement & Readiness
Project
Trip Doggett
Integration Testing Project
Glen Wingerd
Integrated ERCOT
Readiness & Transition
Project
Steve Grendel
NMMS Project
Raj Chudgar
Integration & Design
Authority
Jeyant Tamby
Implications• Those with delivery accountability are core
Program Team members.• Each needs to produce a Charter, including
team & resource requirements.
Nodal Program Sponsor
Ron Hinsley
Nodal ProgramDirector
Kathy Hager
EDW Project
TBC
Nodal Program
Board
Note• Additional groups and individuals will provide
advice and support across the program. • These include the Business Analysis team,
Procurement, Legal and Finance.
April 14th, 2006 – Nodal Program Charter v0.9 4 Lead From The Front
Texas Nodal
Program Charter Texas NodalBudget The budget process envisions at least 3 cycles leading to the PUCT cost recovery plan
Initial submission – Mid March Detailed Work-Product Plan – +2 months Post-Procurement Strategy – +3 months
Resourcing and facilities
Next Steps This Program Charter will be expanded into a broader Program Management Plan (the “how” at a program level). Additionally, the Program Charter is intended to be a requirements document for the more detailed Project Charters and detailed plans to follow.
Sponsoring Operation AreaLabor (Blended
Rate $100/hr) Vendor Labor ($)Hardware and Software
Cost ($) TOTAL COST ($)EMS $3,400,800 $1,962,000 $1,962,000 $7,324,800MMS $14,304,000 $4,520,000 $4,520,000 $23,344,001Comm Ops $12,791,040 $0 $0 $12,791,040EIS $3,520,280 $0 $0 $3,520,280Market Services Training $7,590,000 $0 $0 $7,590,000Market Services Apps $612,480 $0 $0 $612,480Market Services Simulation/Pilot $6,752,000 $0 $0 $6,752,000SOA and Portal $1,121,120 $0 $312,000 $1,433,120Hardware $2,416,000 $0 $30,487,455 $32,903,455Sub-TOTAL $52,507,720 $6,482,000 $37,281,455 $96,271,175Contingency (20%) $24,067,794Finance Charges $5,313,468TOTAL $125,652,437
Nodal Staff Analysis
0
50
100
150
200
250Ja
nu
ary
-06
Ma
rch
-06
Ma
y-0
6
July
-06
Se
pte
mb
er-
06
No
vem
be
r-0
6
Jan
ua
ry-0
7
Ma
rch
-07
Ma
y-0
7
July
-07
Se
pte
mb
er-
07
No
vem
be
r-0
7
Jan
ua
ry-0
8
Ma
rch
-08
Ma
y-0
8
July
-08
Se
pte
mb
er-
08
No
vem
be
r-0
8
Jan
ua
ry-0
9
Ma
rch
-09
Ma
y-0
9
July
-09
Se
pte
mb
er-
09
No
vem
be
r-0
9
Date
Nu
mb
ers
Employee
Contractor
Space Available
Major issues with space until this point
April 14th, 2006 – Nodal Program Charter v0.9 5 Lead From The Front
Texas Nodal
Program Charter Texas Nodal
The release strategy and critical path are built around the Early Delivery System sequence agreed with TPTF
We will demonstrate the current SE model meets Nodal criteria using the existing production system
EDS 1
We will demonstrate the current SE model meets Nodal criteria using the existing production system
EDS 1
168 Hour test complete
MP financial & operational qualification complete
Market Readiness Declarations met All interfaces validated CM, FT complete
Training complete
EDS 5 outcomes
168 Hour test complete
MP financial & operational qualification complete
Market Readiness Declarations met All interfaces validated CM, FT complete
Training complete
EDS 5 outcomes
Must haves: EMS upgrade Network security analysis Topology consistency analyzer Forced outage detection SCED 15 min point price calculations
Outage scheduler LFC Load/RPP Forecasting NMMS CIM
Model functionality Transmission constraints manager
8*5 support
EDS 3 enablers
Must haves: EMS upgrade Network security analysis Topology consistency analyzer Forced outage detection SCED 15 min point price calculations
Outage scheduler LFC Load/RPP Forecasting NMMS CIM
Model functionality Transmission constraints manager
8*5 support
EDS 3 enablers
6 month SCED test completed
SCADA/ICCP enhancement requirements EMS enhancements complete
MP offers Publish LMPs LFC, OS, RPP complete
EDS 3 outcomes
6 month SCED test completed
SCADA/ICCP enhancement requirements EMS enhancements complete
MP offers Publish LMPs LFC, OS, RPP complete
EDS 3 outcomes
Must haves:
DAM RUC CRR auction SASM EMS/MMS interface OTS Settlement & billing 8*5 support (24*7 for MP SAT)
ERCOT & Market Readiness Criteria approved
EDW & MIS components
EDS 4 enablers
Must haves:
DAM RUC CRR auction SASM EMS/MMS interface OTS Settlement & billing 8*5 support (24*7 for MP SAT)
ERCOT & Market Readiness Criteria approved
EDW & MIS components
EDS 4 enablers
All MP Registration complete for Go Live
OTS complete All market facing interfaces
complete Testing of all markets complete
EDS 4 outcomes
All MP Registration complete for Go Live
OTS complete All market facing interfaces
complete Testing of all markets complete
EDS 4 outcomes
Q2 2009Q1 2009 Q3 2009Q2 2008Q1 2008Q4 2007Q3 2007 Q4 2008Q3 2008
Must haves: NMMS UI in production Training complete
EDW & MIS components 24*7 support Final configurationNice to haves: Credit Monitoring Financial Transfer (CRR)
EDS 5 enablers
Must haves: NMMS UI in production Training complete
EDW & MIS components 24*7 support Final configurationNice to haves: Credit Monitoring Financial Transfer (CRR)
EDS 5 enablers
Must haves: Final EDW & MIS components Credit Monitoring Financial Transfer Production Environment
NMMS in production 90 days in advance
Outage Scheduler in production 45 days in advance
EDS 6 (TXMACS 1.0) enablers
Must haves: Final EDW & MIS components Credit Monitoring Financial Transfer Production Environment
NMMS in production 90 days in advance
Outage Scheduler in production 45 days in advance
EDS 6 (TXMACS 1.0) enablers
EDS 3 (TXMACS 0.3)
SCED; MP OffersEDS 4 TXMACS 0.4)with selected MPs EDS 5 (TXMACS 0.5)EDS 4
MP SATTXMACS 1.0
Live operations
April 14th, 2006 – Nodal Program Charter v0.9 6 Lead From The Front
Texas Nodal
Program Charter Texas Nodal
Going-in critical path analysis – 1/1/09 is not feasible. This revised timeline is unconstrained and needs validating through resourced project schedules.
EMS
Early Delivery Systems
MMS
CRR
MIS
NMMS
Commercial Systems
ERCOT & MP Readiness
Q2 2008 Q3 2009Q4 2008Q3 2008Q2 2007Q1 2007Q4 2006 Q4 2007Q3 2007 Q1 2008Q3 2006 Q1 2009
Outage Scheduler
EDW
“UI in production”
Q2 2009
Qualification Blackout
EDS 3 (TXMACS 0.3)
SCED; MP SCED Offers
EDS 4 TXMACS 0.4)
with selected MPsEDS 5 (TXMACS 0.5)
MMS FAT MMS SAT
CRR Design, Build, Pre-FAT CRR FAT CRR SAT
Final MP Interface
Specs 3/31
MP Registration complete
MIS FAT MIS SAT
168 hour market trial
FAT SATNaming Convention; Requirements, Concept Design CIM-compliant Model (flat file)
FAT SATNMMS User Interface & business processes
Zonal Genesys Operational
Common model update process
NODAL GO LIVE
MIS (EMS/MMS/CRR) Design, Build, Pre-FAT
EDW FAT EDW SAT
StatementsLayout
Script test Credit Monitoring
End of Trials
MP Nodal Registration MP Financial & Operational Qualification
EMS SATEMS EMS FATEMS Requirements, Conceptual Design
MIS SATMIS (SCED) Design, Build, Pre-FAT MIS FAT
MMS Design, Build, Pre-FATMMS Requirements, Conceptual Design
OS SATOS Build OS FATOS Requirements, Conceptual Design
CRR Requirements, Conceptual Design
Commercial Systems Design, Build, Pre-FAT CS FAT CS SAT
EDW Requirements, Conceptual Design
SCED SATSCED Build SCED FATSCED Requirements, Conceptual Design
Registration ready
MPSCED OffersBusiness Requirements
complete 10/30
Preliminary MP Interface Specs 12/31
CS FAT CS SAT
EDW FAT EDW SAT EDW FAT EDW SAT
CS Requirements, Conceptual Design
EDW Design, Build, Pre-FAT
MIS FAT MIS SAT
Begin MP trial participation
“Non-binding settlements”
Financial Transfer
CS FAT CS SAT
EDS 4 MP SAT
TXMACS 1.0Live
operations
MIS FAT MIS SAT
“CRR Auction for Go Live”
Vendors will share detailed design documents with other vendors for interface definitions
Vendors selection will be done by Mid-June
TPTF will hold review meetings as required for approval of requirements and conceptual design documents
All systems have to conform with the integrated Data Dictionary
Areva’s EMS will handle CIM models
ERCOT would need 6 months of integration testing on applications such as MMS, CRR and NMMS
To satisfy section 17.3 of the Nodal protocols, ERCOT will deploy COGNOS and SAS to provide PUCT with the ability to generate reports
To allow for interface definitions, detailed design documents of individual projects can be completed 80 hours after one another. The order of completion will be NMMS – MMS/EMS/SE – CRR/Outage Schedule –Commercial Systems – MIS/EDW
The current State Estimator will meet the necessary criteria
TDSPs will be trained on new NMMS and there will dual entry of models – into the new NMMS and into GENESYS. ERCOT will have enough staff to handle this work
Assumptions affecting the critical path
Vendors will share detailed design documents with other vendors for interface definitions
Vendors selection will be done by Mid-June
TPTF will hold review meetings as required for approval of requirements and conceptual design documents
All systems have to conform with the integrated Data Dictionary
Areva’s EMS will handle CIM models
ERCOT would need 6 months of integration testing on applications such as MMS, CRR and NMMS
To satisfy section 17.3 of the Nodal protocols, ERCOT will deploy COGNOS and SAS to provide PUCT with the ability to generate reports
To allow for interface definitions, detailed design documents of individual projects can be completed 80 hours after one another. The order of completion will be NMMS – MMS/EMS/SE – CRR/Outage Schedule –Commercial Systems – MIS/EDW
The current State Estimator will meet the necessary criteria
TDSPs will be trained on new NMMS and there will dual entry of models – into the new NMMS and into GENESYS. ERCOT will have enough staff to handle this work
Assumptions affecting the critical path