lda18-0675 stantec tower feature lighting designs › infraplan › plans_in...architecture, vibrant...

26
ICE District STANTEC TOWER FEATURE LIGHTING/ MAJOR DIGITAL SIGN June 1, 2018

Upload: others

Post on 05-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

ICE Distr ictSTANTEC TOWER FEATURE LIGHTING/ MAJOR DIGITAL SIGN June 1, 2018

Page 2: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

Project Team:

CLIENT

ARCHITECT

ICEJV

Stantec Architecture Ltd

Digital Sign and Feature Lighting Report

INTRODUCTION CONTENTS

Executive Summary

DP Approved Concept and Diagrams

Tower Signage Elevations

Technical Information

Lighting Themes

Residential Lighting Impact

Application Letters of Support

1.0

2.0

3.0

4.0

5.0

6.0

Page 3: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

EXECUTIVE SUMMARYThe proposed Major Digital Sign meets the intent of both the Capital City Downtown Plan and the AED Zone. The Capital City Downtown Plan speaks to creating a vibrant downtown that will be a regional, national and international centre for arts, culture, festivals and entertainment. Lighting and signage play a very important role in place-making, defining an area as special or unique. Similar strategies have been incorporated in New York’s Times Square, Toronto’s Yonge-Dundas Square, London’s Picadilly Circus or many streets in Asia.

The signage and lighting strategies in the aforementioned places have made these areas famous and unique within their respective cities and recognizable on the world stage. One of the common denominators for these internationally-renowned locations is that these are the areas within their respective cities that are the most tourist and entertainment oriented. The quantity and quality of the digital signs is intended to create energy and drama, and add to local and regional place-making. Our proposed signage seeks to enhance and confirm the unique characteristics of ICE District, both locally and on the world stage.

The overall plan for ICE District provides a pedestrian-friendly street environment, innovative signage, iconic architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of place. The proposed Major Digital Sign is a component of this larger project and needs to be reviewed in the larger context. The Major Digital sign helps to create a sense of excitement and arrival to ICE District with wayfinding properties which extend beyond the site. ICE District is a unique entity within the City, region and even the Province and the sign contributes to the identity of this unique area.

The proposed application conforms with the general intent of the urban design guidelines of the AED zone in terms of the architectural style and urban character of the area. The sign blends seamlessly into the design of the building itself; contains sustainable features in terms of LED lights; adds to the signature of the tower top (including variations in colour); and has the ability to work with signage and lighting in the rest of the district to mark special seasons, weather, events, themes, etc. The Major Digital Sign also contributes to the signature of the building and the City’s skyline with its ability to provide visual interest at the tower top and variation in colours.

The Comprehensive Sign Design Plan will be updated to incorporate the proposed Major Digital Sign.

The AED Zone provides opportunities for Theatrically Programmed Environment signage to be incorporated in different areas throughout the site. Including and not limited to publicly accessible open space and the facades and/or roof structures of buildings. The proposed Major Digital Sign is located on the façade of a building, in line with this regulation.

The area is a hybrid between an entertainment district and an urban village with its mix of allowable uses. The technology of the Major Digital Sign can be adjusted accordingly in terms of intensity of lighting, messaging, or turned off at certain hours such that illumination is minimized beyond the boundaries of the site, limiting and/or preventing potential light pollution and intrusion. The sign is also located on the north face of Edmonton Tower which is not directly oriented towards the hotel or residential development.

Page 4: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of
Page 5: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of
Page 6: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of
Page 7: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of
Page 8: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

DP APPROVED CONCEPT & DIAGRAMS 1.0

Page 9: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

EDMONTON ICE DISTRICT | TOWER E Major Digital Sign and Feature Lighting Report June 1, 2018 9

LEVEL 67903305

LEVEL 68908805

LEVEL 69912525

16e

7' - 9

1/2"

2380

Glass Exterior . The use of transpareny to reflect the sky from some angles and show structure from others

Secondary Structure . Support the pixeldome lighting and horozontal elements

Primary Structure . Structural supports

Specific to our AED zoning: section 910.12 (4)(g);Major/Minor Digital Signage is a ‘discretionary’ use class in the zoning regulations meaning it must be approved directly at the discretion of the Development Permit Officer.

Theatrically Programmed Environment (TPE System) signage can be incorporated into publicly-accessible open space, the facades and/or roof structures of buildings within the AED Zone as a Sign Use Class, most notably Major and Minor Digital Signs The TPE System may include, but is not limited to, features such as: - Full running video; - Projection systems on architectural surfaces; - LED lighting embedded into structures/buildings (i.e. nightscaping); - Interactive multi-media technologies; and - Environmental effects (i.e. special effects with the use of water and light).

Schedule 59H regulations are applied to Discretionary Signs in the AED Zone

Diagram

Tower E Stantec Tower: L ight ing Concept

DP APPROVED PLAN

2.38

m3.

72m

Page 10: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

REINFORCEMENTAS REQUIRED

SNAP ON ALUMINUMCOVER

THERMAL BREAK

PRESSURE PLATE75

6/12/6mm INSULATINGGLASS UNIT

SNAP-ON VERTICAL CAPWITH TOP AND BOTTOMCLOSURE

AIR SEALGASKET

SSG

ACOUSTIC / SMOKEGASKET

EXTERIOR

INTERIORCL

300

2417

8

75

60

5

75

LIGHTING FIXTURE ASSCHEDULED

AutumnSummerSpr ingWinter

The feature lighting presented at our formal review continues to be studied. The concepts of lit end cap mullions flowing up into the wash of the tower crown remains any important and defining element in the project. Full spectrum LED’s have been explored as a method of executing the concept. Both fixtures currently being explored will facilitate a similar aesthetic of full spectrum controllable light. This canvas would be controlled by the ownership group and could potentially signal civil/district events, changing of the season’s and/or tenant signage.

Pixel Dome Fixture/ GVA

Assembly System/ Steel Mesh by Carl Stahl (or similar to attach to building structure)

Dimensions / Pixel Dome Fixture

Tower Crown - East/West LED Fixtures

Tower Crown

Typical Fin Light Detail

Tower Fins

Crown/ Feature Lighting

Tower E Stantec Tower: L ight ing Concept

DP APPROVED PLAN

Page 11: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

TOWER DIGITAL SIGNAGE DRAWINGS 2.0

Page 12: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

DN

UP

UP

UP

UP

M

N

P

Q

R

S

T

U

9 10 11 12 13 13.1 14 14.1 15 17e 18e 19e 20

VVe

Ue

Te

Se

Re

Qe

Pe

Ne

Me

102

ST.

103 AVE.

103

ST.

PARKADE / LOADING DOCKACCESS RAMP

667100

667650

667100

PLAZA

OUTLINE OF TOWER ABOVE

TOWER OUTLINE ABOVE

PROPERTY LINE

EXTENT OF BLOCK E/F DEVELOPMENTPERMIT SITE SCOPE

(SITE LANDSCAPE/ SURFACETREATMENT/ ELEMENTS IN FUTURE

'PUBLIC REALM' SCOPE)

PROPOSED CURBALIGNMENT

PROPOSED CURBALIGNMENT

9.1

PROPERTY LINE

667300

OUTLINE OF CANOPY ABOVE

OUTLINE OFCANOPY ABOVE

OUTLINE OFCANOPY ABOVE

PEDWAY ABOVE

OVERHEAD DOOR

SIAMESE CONNECTION

16e

16 17 18 19

TOWER A

PEDWAY ABOVE

PROPERTY LINE

PLAN 1321953BLOCK2 LOT1

GENERALRETAILSTORE

GENERALRETAILSTORE

GENERALRETAILSTORE

GENERALRETAILSTORE

GENERALRETAILSTORE

GENERALRETAILSTORE

GENERALRETAILSTORE

GENERALRETAILSTORE

PLAN 1321953BLOCK2 LOT2

1645

715

3199

1338

1050

667700667750

667100

667700

667700

667725

667450

EDMONTON ICE DISTRICT | TOWER E Major Digital Sign and Feature Lighting Report June 1, 2018 12

E/F

D

JW MARRIOTT

HOTEL

G

Extent of Sign(See Elevation)

Extent of Sign(See Elevation)

Extent of Sign(See Elevation)

Extent of Sign (See Elevation)

Site Plan

Tower E Stantec Tower: Digital S ign Extents

Site Plan

Key Plan

Page 13: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

EDMONTON ICE DISTRICT | TOWER E Major Digital Sign and Feature Lighting Report June 1, 2018 13

Area of Lighting Fins

Area of Lighting Crown

North ElevationSouth Elevation West Elevation East Elevation

Total Area: 4023m2

Fin Length247m

Total Area: 572m2

Total Area: 468m2

Total Area: 4641m2

Fin Length223m

52m 21m21m

5.5m

52m

11m

221m

123m

11m

Elevations

Tower E Stantec Tower: Digital S ign Extents

19m

9m

243m

EXTENTS IDENTICAL TO CURRENT DP APPROVED PLANS

Page 14: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

TECHNICAL INFORMATION 3.0Specific sign manufacturer has not yet been selected. Manufacturer information will be supplied at time of selection, however Owner confirms sign brightness levels will be in conformance with the following:

1. Ambient light monitors shall automatically adjust the brightness level of the Copy Area based on ambient light conditions. Brightness levels shall not exceed 0.3 footcandles above ambient light conditions when measured from the Sign face at its maximum brightness, between sunset and sunrise, at those times determined by the Sunrise/ Sunset calculator from the National Research Council of Canada (Reference: Section 59.2(5)(a) of the Edmonton Zoning Bylaw 12800).

2. Brightness level of the Sign shall not exceed 400 nits when measured from the sign face at its maximum brightness, between sunset and sunrise, at those times determined by the Sunrise/ Sunset calculator from the National Research Council of Canada (Reference: Section 59.2(5)(b) of the Edmonton Zoning Bylaw 12800).

Page 15: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

EDMONTON ICE DISTRICT | TOWER E Major Digital Sign and Feature Lighting Report June 1, 2018 15

01 Pixel Dome Fixture / GVA

02 Assembly System/ Steel Mesh by Carl Stahl or similar to attach to building structure

Precedent / National Library of Belrus / Minsk, Belarus

03 Dimensions / Pixel Dome Fixture

www.gvalighting.com

PixelDOME™ is an RGB Color Changing or Monochromatic pixel luminaire. It is designed to be used in an array for low resolution image creation or color changing effect lighting. Typical applications include‘Architainment’, media façades, low resolution video displays and special effect lighting.

Each PixelDOME™ is a compact aluminum body and an opal acrylic dome. The dome lens provides viewers with a highly saturated body of light with an overall viewing angle of more than 180° PixelDOME™ is IP66 rated for indoor and outdoor locations. Its design is optimized for thermal management and can operate at temperatures from -30°C to +50°C. Bracket Mount, Flange Mount and Junction Box Mounting options are available.

PixelDOME RGB models are controlled via DMX. Monochromatic versions can be supplied with DMX dimming input or with no control (no dimming, on/off).

Pixel Dome LED Fixture

Tower Top Panel SystemDP APPROVED

Page 16: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

EDMONTON ICE DISTRICT | TOWER E Major Digital Sign and Feature Lighting Report June 1, 2018 16

I. LIGHT PARTS II. ASSEMBLED III. POWER AND CONTROLLER

WIDE RANGE OF COLOURS

2-FOOT MODULE - DIMENSION (WXH) 1 1/2” X 1 5/8”

Images

Tower FinsDP APPROVED

Page 17: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

LIGHTING THEMES 4.0Proposed Signage Content Themes: #1 - Approved lighting (colour/ Aurora Borealis) #2 - Community themes / public art #3 - Corporate Advertising (Major Digital Sign)

Our proposal includes for ‘corporate advertising’ to be a permitting ‘signage theme’ in order to offer the ability to display themes #1 and #2. Expanded details including hours of operation, duration/speed of transitions, and full technical operating requirements will be made available once the concept in principle can be reviewed and approved.

Page 18: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

EDMONTON ICE DISTRICT | TOWER E Major Digital Sign and Feature Lighting Report June 1, 2018 18

Tower E Stantec Tower: L ight ing Themes

Feature L ight ing Theme: “Canada Day” Example

Feature L ight ing Theme: “Oi lers” Example

Feature L ight ing Theme: “Pr ide” Example

Page 19: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

EDMONTON ICE DISTRICT | TOWER E Major Digital Sign and Feature Lighting Report June 1, 2018 19

Tower E Stantec Tower: L ight ing Themes

Feature L ight ing Theme: “Oi lers” Example

Page 20: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

EDMONTON ICE DISTRICT | TOWER E Major Digital Sign and Feature Lighting Report June 1, 2018 20

Feature L ight ing Branding: “Rogers” Example

Feature L ight ing Branding: “Ford” Example

Feature L ight ing Branding: “TD Bank” Example

Tower E Stantec Tower: L ight ing Branding Themes/ Major Digital S ign

Page 21: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

EDMONTON ICE DISTRICT | TOWER E Major Digital Sign and Feature Lighting Report June 1, 2018 21

Feature L ight ing Branding: “Rogers” Example

Tower E Stantec Tower: L ight ing Branding Themes/ Major Digital S ign

Page 22: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

RESIDENTIAL L IGHTING IMPACT 5.0

Page 23: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

EDMONTON ICE DISTRICT | TOWER E Major Digital Sign and Feature Lighting Report June 1, 2018 23

Tower E Stantec Tower: Residential L ight ing Impact

LED Mull ions (@ 10’ intervals) L5 to Tower Top

LED Mull ions (@ 10’ intervals) L2 to Tower Top

LED

Pix

el

Do

me

s st

art

ing

@ L

67 -

(77

0’ a

bo

ve g

rad

e)

LED

Pix

el

Do

me

s st

art

ing

@ L

67 -

(77

0’ a

bo

ve g

rad

e)

North Section

Residential

Hotels

Area of Imact of Lighting

Towers

Radial Distances from Center

Tower Heights#

50m

150m

200m

OILERS WAY

103 AVE

OILERS WAY

103 AVE

02 30

69

5527

31

25

33

33

4

4

4 42

32

14

10

5

1927

24

36

27

25

2320

30

28

35

24

20

10

Page 24: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

EDMONTON ICE DISTRICT | TOWER E Major Digital Sign and Feature Lighting Report June 1, 2018 24

West Section

Tower E Stantec Tower: Residential L ight ing Impact

LED Mull ions (@ 10’ intervals) L5 to Tower Top

LED Mull ions (@ 10’ intervals) L2 to Tower Top

LED

Pix

el

Do

me

s st

art

ing

@ L

67 -

(77

0’ a

bo

ve g

rad

e)

LED

Pix

el

Do

me

s st

art

ing

@ L

67 -

(77

0’ a

bo

ve g

rad

e)

Residential

Hotels

Area of Imact of Lighting

Towers

Radial Distances from Center

Tower Heights#

50m

150m

200m

OILERS WAY

103 AVE

OILERS WAY

103 AVE

02 30

69

5527

31

25

33

33

4

4

4 42

32

14

10

5

1927

24

36

27

25

2320

30

28

35

24

20

10

Page 25: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

APPLICATION LETTERS OF SUPPORT 6.0

1. Downtown Business Association2. NAV Canada

The following groups were sent copies of the proposal as summarized in this package and have provided letters of support and/or acknowledgement of review;

Page 26: LDA18-0675 Stantec Tower Feature Lighting Designs › infraplan › plans_in...architecture, vibrant architectural lighting and exceptional urban design to create a strong sense of

EDMONTON ICE DISTRICT | TOWER E Major Digital Sign and Feature Lighting Report June 1, 2018 26

From: Ian O’Donnell [mailto:[email protected]] Sent: Monday, December 04, 2017 9:01 AMTo: Lew, Yolanda <[email protected]>Subject: Ice District

Good morning Ms. Lew,

Thank you for providing the Ice District Feature Lighting package for our review. We have reviewed it in its entirety and have no issues with what is being presented. It aligns with our Winter City Strategy to bring additional appropriate lighting to our buildings and entertainment/civic areas, to help illuminate darker months.

The AED zone is a unique area within our Downtown/City; this will help enhance its signature architecture and bring a new sense of vibrancy to the area.

Sincerely,

Ian O’DonnellExecutive Director10121 Jasper AvenueEdmonton, AlbertaT5J 4X6(780) 426-8575 To Support, Connect, & Enrich Edmonton’s Downtown Community

1601 Tom Roberts Avenue, Ottawa, ON, K1V 1E5 1601 avenue Tom Roberts, Ottawa, Ontario, K1V 1E5 Telephone: +1 (866) 577-0247, Fax: +1 (613) 248-4094 Téléphone: +1 (866) 577-0247, Télécopieur: +1 (613) 248-4094 Z-LDU-101 Version 17.5 7 July 2017

November 12, 2017

Your file LDA17-0481 (10111-104 Avenue NW)

Our file 17-3769

Mr. Sean Lee City of Edmonton 6th Floor Edmonton Tower, 10111-104 Avenue NW Edmonton AB T5J 0J4 RE: Development Proposal/Plans: Re-Zoning - Edmonton, AB (N53° 32’ 44.8” W113° 29’ 41.3” / 436.6798’ AGL / 2625.6562’ AMSL) Mr. Lee, NAV CANADA has evaluated the captioned proposal and has no objection to the project as submitted. NAV CANADA does not require notification of construction; however, if you should decide not to proceed with this project, please advise us accordingly so that we may formally close the file. If you have any questions, contact the Land Use Department by telephone at 1-866-577-0247 or e-mail at [email protected]. NAV CANADA's land use evaluation is valid for a period of 12 months. Our assessment is limited to the impact of the proposed physical structure on the air navigation system and installations; it neither constitutes nor replaces any approvals or permits required by Transport Canada, Industry Canada, other Federal Government departments, Provincial or Municipal land use authorities or any other agency from which approval is required. Industry Canada addresses any spectrum management issues that may arise from your proposal and consults with NAV CANADA Engineering as deemed necessary. Yours truly,

Gheorghe Adamache | NAV CANADAManager - AIM IFP Service Delivery cc NOPR - Northern and Prairie Region, Transport Canada CFH7 - (ROYAL ALEXANDRA HOSPITAL)(HELI) CEW7 - UNIV OF ALBERTA (STOLLERY CHILDREN’S HOSP MAHI)(HELI) CMC2 - MISERICORDIA (COMMUNITY HOSPITAL)(HELI)

Tower E Stantec Tower: Letters of Support