  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012

    LCLS-I/LCLS-II Timing System

    Low Level Kukhee Kim for LCLS Timing Team

    ICD Software, SLAC National Accelerator Laboratory

    October 22, 2012

    http://www.aps.anl.gov/epics/index.phphttp://www.aps.anl.gov/epics/index.php

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012 2

    Event System is a most complicated system!

    http://www.aps.anl.gov/epics/index.php

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012 3

    Accelerator complex for current and future

    (LCLS-I, LCLS-II and …)

    LCLS

    LCLS-II

    End of

    linac

    LCLSLCLS-II

    Bypass line

    |

    Sector 0

    |

    Sector 10

    |

    Sector 20|

    Sector 30

    FEL Injector Test Facility

    3 km SLAC LINAC

    LTU

    Undulators

    Interleaved Accelerator Operation

    LCLS-III ? LCLS-I

    One gun, one destination

    120 Hz

    LCLS-II

    One gun, two destinations,

    plus shared tunnel,

    plus multibunch?

    120 Hz

    Separate but synchronous timing systems

    360 Hz = 6 x 60 Hz power line timeslots

    Independent rate control to each destination

    MPS-aware timing

    TS4, and TS1

    TS5 and TS2

    TS6, and TS3

    http://www.aps.anl.gov/epics/index.php

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012 4

    360Hz – constraint: What is the timeslots?

    LCLS-I LCLS-I LCLS-II LCLS-II

    FACET FACET

    http://www.aps.anl.gov/epics/index.php

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012 5

    Legacy Timing System

    • SLC timing system

    - The Linac is a Pulsed Machine (get a packet of beam per pulse) runs

    at a max of 360Hz (120Hz)

    - Three Main Timing Signals:

    • Hardware

    - 476MHz Master Accelerator Clock (runs down 2mile Heliax Main Drive Line cable)

    - 360Hz Fiducial Trigger / encoded onto the 476MHz master clock

    • Software – MPG (Master Pattern Generator)

    - 128-Bit PNET (Pattern Network) Digital Broadcast (contains time slot, trigger setup,

    beam type & rate information, beam destination)

    - Provide the timing pattern 3 fiducial prior

    • Advantage of the Legacy system

    - Physicists & Operator are used to the old system

    - Provide event patterns 3 fiducial prior

    • give a time margin to slow device, or pre-trigger up to 2 fiducial ahead

    http://www.aps.anl.gov/epics/index.php

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012 6

    Old architecture for the LCLS-I Timing System

    D

    E

    V

    ~ Linac main drive line

    Sync/Div

    SLC

    MPG

    P

    N

    E

    T

    119 MHz 360 Hz

    SLC

    events

    LCLS

    events

    P

    N

    E

    T

    m

    P

    P

    D

    U

    E

    V

    R

    I

    O

    C

    TTL-NIM

    convert.

    Digitizer

    LLRF

    BPMs

    Toroids

    Cameras

    Wire Scanner

    SLC klystrons

    TTL

    SLC Trigs

    F

    A

    N

    I

    O

    C

    Low Level RF

    EPICS Network

    Precision

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012 7

    LCLS-I Timing System

    • LCLS Timing System

    • Use MRF EVG and EVRs

    • Generate event code at 360 Hz based on:

    - PNET pattern input (beam code + 128 bits pattern that define beam

    path and other conditions, scheduled information)

    - Receive MPS*) information (real-time information), and queue it up

    into the pattern pipeline (pipeline bypass for quasi real-time)

    - Add LCLS information (MPS, BPM calibration, diagnostics and ….)

    • Extend the pattern to 192 bits

    - Hardwired BCS fault

    • Send out timing pattern, including EPICS timestamp with encoded

    pulse ID on the timing fiber

    • Manage user-defined Beam Synchronous Acquisition (BSA)

    MPS*) Please, see the talk for LCLS Machine Protection System (M. Boyes) in hardware solution session (16:30 – 16:50 Oct 22, 2012)

    http://www.aps.anl.gov/epics/index.php

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012 8

    How to work the EVG

    • PNET message broadcast from the old timing system (following a

    fiducial, 360 Hz rate)

    • PNET receiver in EVG IOC generates IRQ

    • EVG software takes the PNET data and uses it to assign the proper

    event codes (the PNET data pipelined 3 fiducial ahead)

    • Event code setup in EVG one cycle head

    • Next fiducial is sent: 360 Hz fiducial signal received by EVG

    • The EVG begins to send out the event codes in its Sequence RAM

    • The event codes get sent across the timing fiber links to the EVRs

    • Inside the EVR, its mapping RAM is set to map a specific HW trigger to

    an event code

    • when the Event Code matches the same value in the mapping RAM, a

    hit is generated and after a programmed delay, a HW trigger is output

    form the EVR to the device

    http://www.aps.anl.gov/epics/index.php

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012 9

    How to work the EVR

    • Set trigger delays, pulse width, and enable/disable via

    user requests

    • Set event code per trigger

    • Receive timing pattern ~8.3 msec (3 fiducials prior) before

    corresponding pulse. Provides EPICS timestamp to record

    processing

    • Perform BSA based on tags which are set by EVG in the

    timing pattern

    • Process pre-defined records when specific event codes

    are received

    http://www.aps.anl.gov/epics/index.php

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012 10

    Timeline for the EVR

    F0

    0

    Fiducial

    Time (usec)

    B0

    Acq

    Trigger

    1023

    Beam Kly Standby

    Record processing (event, interrupt)

    Fiducial Event

    Received

    Event Timestamp,

    pattern records,

    and BSA ready

    Receive pattern for

    3 pulses ahead

    Hardware Triggers

    ~500 0.3

    ~40 100

    Triggering

    Event Codes

    Kly Accel

    F1

    Fiducial

    … 2778

    110

    Start End

    http://www.aps.anl.gov/epics/index.php

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012 11

    Upgrade Timing system for both LCLS-I and LCLS-II

    • Main Goals

    • Remove the dependency with the SLC timing system

    • Independent EVG for each beam program - LCLS-I, LCLS-II, FACET, XTA and future beam programs

    - Promise for independent operation

    - Relieves the pain from limited event number (255 limitation)

    • Keep compatibility with old system, keep SLAC specific features

    (advantage of the legacy system) - Beam code and timing pattern pipeline:

    • For pattern aware operation

    - BSA

    - Event Code Sequence for photon group

    • Covers various platforms for EVR: RTEMS, linux, and linuxRT - LCLS-I, and LCLS-II both are going to use various hardware platforms

    • VME, PMC, Standard PC, uTCA, and COM-X

    • Need to support linux/linuxRT for new hardware platform

    http://www.aps.anl.gov/epics/index.php

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012 12

    Timing System Upgrade Cont’d

    • Upgrade

    • Develop a new hardware called VMTG: VME based Master

    Trigger Generator which provides 360 Hz IRQ to drive EVG

    software instead of the PNET receiver (VMTG in EVG side)

    • Develop new software module PABIG: Pattern Bits Generator

    which mimics the PNET

    • Develop a new software tool to design the event/timing

    pattern visually: evGUI1)

    • Work on the EVR software to support linux/linuxRT2) for the

    new hardware platform: uTCA, and COM-X

    evGUI1) Please, see the talk for LCLS timing system for pattern design , evGUI and high level (M. Zelazny)

    in the timing system session (15:00 – 15:20 Oct 22, 2012)

    Support for linux/linuxRT 2) Please, see the talk for Real-Time Performance Issues on linux/linuxRT (K. Kim)

    in the low level application session (14:10 – 14:30 Oct 23, 2012)

    http://www.aps.anl.gov/epics/index.php

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012 13

    New architecture for the timing system

    Device

    Analog

    Front End

    Device

    Analog

    Front End

    EVR

    DAQ

    IOC

    EVR

    DAQ

    IOC

    Linac LLRF Phase Distribution~

    LCLS

    Local

    Oscillator

    Synchronizer

    Divider

    Fiducial

    Detector

    EV

    G

    Fa

    no

    ut

    IOC

    Timing

    Reference

    Distribution

    360 Hz

    119 MHz 360 Hz

    119 MHz 119 MHz Fiber Distribution

    Timing Event System Fiber Distribution

    EPICS CA Network

    476 MHz

    Device

    Analog

    Front End

    Hardware trigger

    signal

    Beam

    Synchronous

    Acquisition

    BSA

    Data Buffers

    To clocked devices

    To LCLS-I

    EVG

    EVR

    DAQ

    IOC

    Master

    Oscillator

    MPS Link Node MPS Network

    LCLS-II CD-2 DOE Review / Aug 21 - 23, 2012

    http://www.aps.anl.gov/epics/index.php

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012 14

    VMTG

    Sector 0 (LI00) VMTG – Master Trigger Generator

    • Provides the synchronized 360Hz trigger to the fiducial generator

    • Input: 360Hz AC trigger train + 476 MHz MDL RF

    • Ouput: 360Hz synchronized trigger

    • Then, the fiducial generator makes synchronization with the Master

    Oscillator

    Sector 20 (IN20) VMTG with the EVG – Master Trigger

    Generator

    • Provide 360 Hz interrupts with the Timeslot counter

    • Provide Timeslot Synchronization

    • Input: 60 Hz AC trigger (AC phase C) + Synchronized 360 Hz trigger

    • Output: 360 Hz interrupts + timeslot counters

    http://www.aps.anl.gov/epics/index.php

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012 15

    Disabling PNET allows VMTG control

    • PNET task needs to be delayed ~ 150 usec after the PNET IRQ to wait the MPS

    message.

    • PNET IRQ is using HW_TIMER to make the delay

    • The PNET ISR implement 150 usec delay on the HW_TIMER

    • The callback for the HW_TIMER releases signal to execute the PNET Task.

    • VMTG has configurable IRQ delay

    • Configure the VMTG IRQ delay as ~570 usec

    • The VMTG IRQ occurs 150 usec after the PNET IRQ

    Fiducial

    PNET

    VMTG

    Unknown delay

    PNET IRQ

    ISR implements the timer

    Timer callback releases the signal

    to the PNET task

    PNET task

    VMTG IRQ

    The ISR releases the signal to the PNET task

    ~150 usec

    ~ 570 usec

    MPS message arrives somewhere before the signal.

    http://www.aps.anl.gov/epics/index.php

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012 16

    Software Stacks for the new EVG application and the

    PABIG

    PNET VMTG Acromag DIO EVG

    BCS SBI Permit BCS Beam Permit 119MHz Clock 360Hz Fiducial Trigger PNET broadcasting

    Asyn module VMTG

    module

    EVG

    Drv/Dev

    PABIG GenVar Master Beam

    Control

    Bits 0 to 8

    via CA

    HW input bits in PABIG EVG Application

    EPICS

    DB

    EDEF reservation for the BSA

    PNBN PVs from SoftIOC

    SNL program

    476MHz Clock

    360Hz Trigger

    360Hz Fiducial Trigger

    2nd NIC

    udpComm

    mpsComm PNET Task

    MPS message

    (beam destination &

    Permit)

    http://www.aps.anl.gov/epics/index.php

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012 17

    EVR Software Stacks/ Form factor & OS dependency

    VME EVR Hardware PMC EVR Hardware

    mrfCommon/mrfVme64

    drvErMrf

    devErMrf

    erRecord BSA

    EVR Processing Logic

    Event Module for RTEMS/vxWorks

    erapi

    drvLinuxEvr

    devErMrf

    erRecord BSA

    EVR Processing Logic

    Event Module for linux/linuxRT

    PMC EVR Hardware

    Works with old register map Works with modular register map (new)

    http://www.aps.anl.gov/epics/index.php

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012 18

    Summary

    •Successfully upgraded timing system

    • Standalone from the SLC system

    • Same code base for LCLS-I, LCLS-II and future projects

    • Backward compatibility, keep the advantages from the legacy

    system

    •Our Team has done the following work:

    • Develop new VMTG hardware: John Dusatko

    • Develop PABIG software: Till Straumann

    • Develop evGUI: Mike Zelazny and Partha Natampalli

    • EVG software integration,

    EVR software support for linux/linuxRT and real-time performance

    issues: Kukhee Kim, Till Straumann, Stephanie Allison

    http://www.aps.anl.gov/epics/index.php

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012 19

    Related Talks

    • LCLS Machine Protection System (M. Boyes)

    in hardware solution session (16:30 – 16:50 Oct 22, 2012)

    • LCLS timing system for pattern design , evGUI and high level (M. Zelazny)

    in the timing system session (15:00 – 15:20 Oct 22, 2012)

    • Real-Time Performance Issues on linux/linuxRT (K. Kim)

    in the low level application session (14:10 – 14:30 Oct 23, 2012)

    http://www.aps.anl.gov/epics/index.php

  • EPICS Collaboration Meeting Fall 2012 @ PAL

    October 22 ~ 26, 2012

    Thank You!