Page 1: LBT Q2 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications

LBT Q2 2007 Engineering LBT Q2 2007 Engineering ReviewReview

PSPI: PEPSI installation PSPI: PEPSI installation preparation, includes all of preparation, includes all of

the pier modificationsthe pier modifications

Page 2: LBT Q2 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications

22

Highlights (Q2/2007)Highlights (Q2/2007)

Install 47 deg coolant to PEPSI bridge locationInstall 47 deg coolant to PEPSI bridge location Install clean dry air to PEPSI bridge locationInstall clean dry air to PEPSI bridge location Schedule PEPSI team, Frank and Emil visit first of July 2007Schedule PEPSI team, Frank and Emil visit first of July 2007

Page 3: LBT Q2 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications

33

Open IssuesOpen Issues

TechnicalTechnical Definition of power at connection pointDefinition of power at connection point

ScheduleSchedule Part scheduledPart scheduled

FinancialFinancial Cost of paint and materialsCost of paint and materials

ResourceResource Identify paint and paint contractorIdentify paint and paint contractor

Page 4: LBT Q2 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications

44

Progress (Q2/2007)Progress (Q2/2007)

Install 47 deg coolant to PEPSI bridge locationInstall 47 deg coolant to PEPSI bridge location Install clean dry air to PEPSI bridge locationInstall clean dry air to PEPSI bridge location

Page 5: LBT Q2 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications

55

Planning (Q3/2007)Planning (Q3/2007)

Terminate fibersTerminate fibers Define and install the connection point boxDefine and install the connection point box Install more servicesInstall more services Move J box in pier up to 4 M, Q3 2007Move J box in pier up to 4 M, Q3 2007 Move florescence lights in pier up to 4 M, Q3 2007Move florescence lights in pier up to 4 M, Q3 2007 Installing energy chain/ cable chainInstalling energy chain/ cable chain Installing AZ hole support structureInstalling AZ hole support structure Installing gallery bracketsInstalling gallery brackets

Page 6: LBT Q2 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications

66

Planning (before 2008)Planning (before 2008)

Install servicesInstall services install E-net, install E-net, install E-stopinstall E-stop install telephoneinstall telephone install power and conduitinstall power and conduit

Insulate all pipe carrying liquidsInsulate all pipe carrying liquids Epoxy paint entire floorEpoxy paint entire floor Paint walls with epoxy paintPaint walls with epoxy paint