launching seminar paris, 14-15 sept...

33
Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION M. Marcello Corongiu Sequoia Automation S.r.l. ITALY

Upload: others

Post on 24-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

Launching SeminarParis, 14-15 Sept 2012

K-VEC PROJECT PRESENTATION

M. Marcello Corongiu

Sequoia Automation S.r.l.

ITALY

Page 2: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

K-VEC PROJECT:K-VEHICLE: ULTRAFAST AND DISTRIBUTED POWER CHARGE SYSTEM FOR HIGH PERFORMANCE ON-BOARD ENERGY STORAGE DEVICES

K-VEC

Sequoia Automation S.r.l.

Via XXV Aprile, 8 Chieri – (TO) ITALY

All rights reserved

TOTAL COST: 680 K €CONTRIBUTION: 340 K €STARTED: JUNE 2012

Page 3: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

Electrochemical storage systems

• Life Cycle / costs (200-2500 cycles,

Electro-mobility: main problem

K-VEC

3

• Life Cycle / costs (200-2500 cycles,

waste disposal)

• Energy density (weight, volume,

autonomy)

• (re)charging time

• regenerative brake

• Raw materials availability, strategic

issues

Page 4: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

K-VEC in synthesis

Quick recharge of a pack of ultracapacitors on board the vehicle, at every charging station;Automatic 5”/20” connection between the vehicle and an

energy “feeding carpet” set on the road surface, will allow a 1-10 km trip.

K-VEC

This is possible applying the conceptsprotected by SEQ patent invention:

Sequoia Automation S.r.l. All rights reserved

4

• Ultra-capacitors installed on bus and at the bus stop• Quick transfer of energy from the station to the vehicle

Page 5: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

Scenario100% 0%

Battery buses Battery buses with biberonage

Electric on-board energy storage

K-VEC

K-VEC

Sequoia Automation S.r.l. - All rights reserved 5

battery replacement systems

Battery/supercap trolley buses

Hybrid buses

Trolley/GPS (APS)powered trains

with biberonageK-VEC

Page 6: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

Retrofit braking energy regenerator for endothermic powered vehicles (patented)

Ultracapacitors: implementations made by SequoiaPHR - Power Hybrid Regenerator

K-VEC

Sequoia Automation S.r.l. All rights reserved 6

vehicles (patented)

Based on the ultracapacitors technology and on the SETAC accelerometer, PHR is driven by a PLC developed by Sequoia

Page 7: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

K-VEC project expected outcomes

1.Autonomy moved from the vehicle to the roadinfrastructure

2.Charging times up to few seconds

3.1 million charging cycles without significant loss

K-VEC

3.1 million charging cycles without significant lossof efficiency of storage system

4. Reduction of operational costs

Sequoia Automation S.r.l. - All rights reserved 7

Page 8: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

Electrochemicalsystems

ECDLsystems

Energy density (Wh/kg) Up to 250 Up to 30

Charging time Ca. 15/30 min* Ca 5-20 sec.**

Lifecycle (n. charging cycles) 200 (Pb) - 2500 (LiOn) > 1.000.000

Electrochemicals storage & Ultracap

K-VEC

Sequoia Automation S.r.l. - All rights reserved 8

Lifecycle (n. charging cycles) 200 (Pb) - 2500 (LiOn) > 1.000.000

Disposal complex n.a.

Operational costs High Very low

Initial costs (€/Wh) 0,14 (pb) – 1,2 (LiOn) 8

* According to technology, power, life cycle,...** According to technology, power, power line and connections, ...

Page 9: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

300 kg of ultra-capacitors

� store up to 4-10 MJ of energy � enable a 20 tons vehicle to ride for > 3 km

K-VEC

� enable a 20 tons vehicle to ride for > 3 km� could be recharged in few seconds

Sequoia Automation S.r.l. - All rights reserved 9

Page 10: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

Quick recharge

A plate (9a), set underneath the bus, made of“spring” prods (9b, 9c), lowers at every station and pressing the “contact

biberonaggio 008.jpg

and pressing the “contact carpet” “sucks” the energy from it.

Actuators (9d) are

required to allow the plate to move up and down

Sequoia Automation S.r.l. - All rights reserved 10

biberonaggio 008.jpgbiberonaggio 008.jpgbiberonaggio 008.jpgbiberonaggio 008.jpgbiberonaggio 008.jpgbiberonaggio 008.jpgbiberonaggio 008.jpgbiberonaggio 008.jpg

Page 11: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

Solar energy PV shelter

The station may be partially/completely

self feeding, thanks to a PV roof which permanently

recharges the ultra-capacitors of the station

K-VEC

Sequoia Automation S.r.l. - All rights reserved 11

Page 12: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

Working cycle

K-VEC

Sequoia Automation S.r.l. - All rights reserved 12

Page 13: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

Braking energy regeneration sample duty cycle

Up to 95% braking regeneration K-VEC

Sequoia Automation S.r.l. - All rights reserved 13

Page 14: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

System scheme on vehicle K-VEC

Sequoia Automation S.r.l. - All rights reserved 14

Page 15: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

System’s scheme at bus stop K-VEC

Sequoia Automation S.r.l. - All rights reserved 15

Page 16: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

A movable plate on boardthe vehicle

How it works

K-VEC

A conductive carpet at ground

the vehicle

Page 17: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

The vehicle stops and stands over the carpet

How it works

K-VEC

Page 18: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

The plug moves down and touches the carpet

How it works

K-VEC

Socket bronze prototipes for K-VEC

Page 19: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

Probes come out from an insulating material layer

How it works

K-VEC

Page 20: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

External probes (at ground)

Insulated area

How it works

K-VEC

Insulated area

Internal probes for power transfer (n. 145)

Page 21: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

Topological pseudo-image detected by the conductivity sensors

K-VEC

Sequoia Automation S.r.l. - All rights reserved 21

Page 22: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

High positional variability on the two axis.

High power transfer efficiency

Safety

Plug advantagesK-VEC

Page 23: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

External ring always at ground

Insulated area at

Safety issues

K-VEC

Insulated area at perimeter

Page 24: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

The whole conductive carpet is on a ground position

A redundant computerized control system applies power only to a part of the carpet under the vehicle’s plug, when it has been “recognized” and it’s position identified.

Safety issues

K-VEC

identified.

Page 25: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

K-VEC

Dimensions

Page 26: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

The dimensions of

hexagons and their

relative distances

are defined in order

to grant a correct

K-VEC

to grant a correct

power transfer,

independently from

the position of the

plug.

Page 27: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

300

mm

100

mm

500 mm

K-VEC

1300 mm

Dimensions

Page 28: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

External diameter 8,5 mm

K-VEC

Internal diameter 6 mm

Probe diameter 4 mm

Dimensions

Page 29: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

Related Patents owned by Sequoia Automation

DATE DESCRIPTION PATENT NUMBER

02/09/05 Dispositivo di rigenerazione per il recupero di energia cinetica di autoveicoli

TO2005A000642

07/09/06 Energy regenerating device for recovering kinetic energy in motor

BEP827

K-VEC

recovering kinetic energy in motor vehicles

17/08/06 Sistema di biberonaggio energetico a ricarica rapida di un mezzo di trasporto a trazione elettrica . . . . .

TO2006A000610

01/08/07 Quick recharging energy feedingsystem for means of transport withelectric traction

PCT/IT2007/000554

Sequoia Automation S.r.l. - All rights reserved 29

Page 30: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

The feeding system is not limited to buses, but can be easily applied to every vehicle transporting

Future applications K-VEC

transporting people or goods.

Sequoia Automation S.r.l. - All rights reserved 30

Page 31: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

Sequoia Automation (ITALY)Smart sensors, electronic vibration and sound wave analysis, energy management, parallel robotics, hardware and software interfaces

K-VEC project PartnersK-VEC

FEBO Engineering (ITALY)Design and realization of automation systems

Bergishe Wuppertal UniversitySafety and Quality Engineering (ProQ), systematic approaches to demand compliant development of mechatronic systems

31

Page 32: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

K-VEC

32

Page 33: Launching Seminar Paris, 14-15 Sept 2012electromobility-plus.eu/.../32_K-VEC_2012_09_14_K-VEC_Presentatio… · Launching Seminar Paris, 14-15 Sept 2012 K-VEC PROJECT PRESENTATION

THANK YOU FOR YOUR ATTENTION!

Launching SeminarParis, 14-15 Sept 2012