• Lauren Colón• Lisandra Cordero• Pedro J. Dávila• Luis García• Rafael Gavilanes• Gladys Muñoz• Laura Obén• Marilena Ortíz• Oscar Resto• Ozzie Resto• Esteban Romero• Noel Sánchez• Verónica Zayas
Team Members:
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
Type of Restriction Restriction Status
Mass allotment: 19.6 lbs
Volume allotment: Full Canister
The payload’s center of gravity (CG): Yes
Activation met under requirement: (either 1.SYS.1 or 1.SYS.2)
Yes
1.SYS.1
Structure mounts: Top and bottom bulkheads
Sharing: NO
Sharing Atmospheric exhaust line with theMinnSpec University of Minnesota experiment.
• Our canister is already fully integrated.
• We are still working on our software. We expect to have everything done before next Wednesday.
• Final Cleaning and assembly will be perform on Friday June 11.
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
Test:
We completed the Pressure Tight Seal. We found some leakages, but they were corrected.
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
• We are ready!
• We are still working on some minor details of the software, but we expect to solve them this weekend.
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
• Software
– We will be ready!
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
• Are you ready for Wallops?
– What tools do you plan to bring?
Digital Volt Meter, Oscilloscope, Hand Drill, Drills, Whrenches,
Gloves, Kin wipes, Antistatic Pads, Utility Knife, Clippers,
Soldering Iron and Tin, etc, etc, etc…….
– What tools are you assuming you have at your disposal?
Anything that will not affect our experiment.
– Are you brining extra hardware?
Extra Semiconductor Sensors and Boards, Lexan Plates,
Nanometric Filters, Teflon tubing and Fittings, TTL chips and transistors, Cables, etc, etc., etc …….
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
• Yes we went through the procedure.
• No question
• Yes, we will be prepare.
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A