launch investa - britta van boven
DESCRIPTION
Presentation given Biomass Gasification Europe 2014 at the Conference of the European Biogas Association 2014.TRANSCRIPT
Launch InVesta Green Gas 2.0/Milena
Biomass Gasification Europe
Alkmaar, 2 October 2014
Britta van Boven
BioSNG will be an important cornerstone of a renewable energy mix
Source: Routekaart Hernieuwbaar Gas, June 2014
Renewable gas - Heating and electricity
production - Backup for renewable
electricity - Feedstock for industry - As a transport fuel: CNG and
LBG
- Expected demand for renewable gas supersedes local biomass potential for anaerobic digestion
- Future import of sustainable biomass
- BioSNG and gasification as the most energy and cost efficient solution
Green Gas 2.0 (Milena) project
Present
R&D Refinements
Operation (Alkmaar)
Build demo 4MW plant
Final plan and FID decision
Consortium building and commercial negotiations
Successful R&D and lab scale test, small
demo*
Near Future Future steps Past
Selling licences
Launching customer
50- 100MW plant
Analyses & review, build-up of consortium
GG 2.0
2015 2017 2014 20xx 20xx 20xx 2011 2012 2014 2014
Assignment of TKI and SDE+
subsidies
*Gasification and cleaning on small demo scale, gas upgrading on lab scale
Installation Alkmaar, Green Gas 2.0
- 4 MW Milena gasifier - Capex: ca. EUR 23 mln - Location: Alkmaar, NL - Input material: sustainable woodchips - Output: ca. 2,8 MW biomethane for injection in local grid - Partners: Gasunie, Dahlman, Taqa, ECN, (PDENH), (HVC)
Enabling competitive large-scale biomethane production
4MW MILENA gasifier for Alkmaar
Gasification Methanation and gas
upgrading
Cleaning (tar removal)
MILENA OLGA SNG
CH4
§ 4 MW installation to be build in NL for GG 2.0
§ Possibly to be tested with OLGA in Portugal for project in Alkmaar
§ 4MW installation is in place in Portugal
§ Existing installation available for test
§ New OLGA installation to be build in Alkmaar for GG 2.0 project
§ 4 MW added in Alkmaar as part of GG 2.0 project
Lab scale installation in Petten
0,8 MW installation in Petten
4 MW installation in Portugal