lateral pile capacity - broms

Upload: calky117

Post on 02-Jun-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/10/2019 Lateral Pile Capacity - Broms

    1/2

    Cohesionless - Long - Free Head

    My [kNm] 175

    eccentricity [m] 4.13

    phi_soil [deg] 32

    Kp 3.254588

    gamma_sub [kN/m^3] 6

    Pile diameter [m] 0.4

    phi_capacity reduction steel 0.8

    Hu [kN] 33.35903

    Hu (iteration) [kN] 33.35903

    phiHu [kN] 26.68723

    Cohesionless - Short - Free Head

    L [m] 6

    phi_capacity reduction soil 0.55

    Hu [kN] 83.27634

    phiHu [kN] 45.80199

    Cohesionless - Long - Fixed Head

    Hu [kN] 61.93992

    Hu [kN] 61.93992phiHu [kN] 49.55194

    Cohesionless - Intermediate - Fixed Head

    Hu [kN] 100.5518

    phiHu [kN] 55.30347

    Cohesionless - Short - Fixed Head

    Hu [kN] 421.7946

    phiHu [kN] 231.9871

  • 8/10/2019 Lateral Pile Capacity - Broms

    2/2

    Cohesive - Long - Free Head

    My [kNm] 275

    eccentricity [m] 7.13

    Cu soil [kPa] 20

    Pile diameter [m] 0.4

    phi_capacity reduction steel 0.8

    Hu [kN] 34.50601Hu (iteration) [kN] 34.50601

    phiHu [kN] 27.60481

    Cohesive - Short - Free Head

    L [m] 6

    phi_capacity reduction soil 0.55

    Hu [kN] 79.95126

    phiHu [kN] 43.97319

    Cohesive - Long - Fixed Head

    Hu [kN] 67.1058

    Hu [kN] 67.1058phiHu [kN] 53.68464

    Cohesive - Intermediate - Fixed Head

    Hu [kN] 100.8957

    phiHu [kN] 55.49261

    Cohesive - Short - Fixed Head

    Hu [kN] 388.8

    phiHu [kN] 213.84