large bottom sump installation...

2
1. GENERAL 1.1. Before beginning the large bottom sump installation, read through the entire Large Bottom Sump Installation Instructions (subsequently referred to as “LBS Instructions”) and the Xerxes Installation Manual and Operating Guidelines (subsequently referred to as “Installation Manual”). 1.2. It is the responsibility of the owner, installer and operator to follow all requirements contained in the LBS Instructions and the Installation Manual, and comply with all federal, state and local regulations that may apply to LBS installation, operations and maintenance. 1.3. No instructions or procedures presented in the LBS Instructions and the Installation Manual should be interpreted so as to put at risk any person’s health or safety, or to harm any property or the environment. 1.4. A Xerxes large bottom sump is designed to allow for the maximum volume of water or wastewater to be pumped out of a Xerxes tank. (See FIGURE 1-1.) It is available in a 30-inch-diameter and a 48-inch-diameter size. FIGURE 1-1 1.5. Assembly and installation of the bottom sump is the responsibility of the tank owner. 1.6. Before beginning to assemble and install the bottom sump, check the tank (according to instructions in the Installation Manual) to ensure that the tank was not damaged during delivery, unloading and handling on the job site. 1.7. Always use lifting lug(s) when lifting the tank. 1.8. When handling a tank with a bottom sump, always take extra care so that the bottom sump is not damaged by contact with any other object, such as the truck bed or the ground. 2. ATTACHING BOTTOM SUMP TO TANK 2.1. The tank comes with bolting flanges at the bottom of the tank and on the bottom sump. These come in separate pieces to allow for shipping. The bottom sump must be attached to the bolting flange before installation. This assembly must be done aboveground. 2.2. Using the lifting lugs situated on the side of the tank, set the tank on the ground so it is in a rotated position. (See FIGURE 2-1.) FIGURE 2-1 2.3. Position the bottom sump so that it is in line with the flange on the bottom of the tank. 2.4. Place the gaskets on the flange and the sump, and bolt the sump to the bottom of the tank using the bolting pattern as shown in FIGURE 2-2. (A double-gasket system has been supplied for this application.) FIGURE 2-2 2.5. Tighten the bolts to 25 foot-pounds. 3. PREINSTALLATION TESTING 3.1. If possible, test the tank and flange joint using the standard 5 psig air test as instructed in the Installation Manual. 4. PREPARING THE EXCAVATION 4.1. Dig a hole in the bottom of the excavation that is large enough to accommodate the sump. 4.2. Proceed with the installation by adding the required 12 inches of approved backfill material to the bottom of the excavation (including the bottom sump hole in the excavation) as specified in the Installation Manual. 1 2 3 4 5 6 10 10 14 14 18 18 22 22 26 26 30 30 34 34 38 38 40 40 36 36 32 32 29 29 25 25 21 21 17 17 13 13 9 39 39 35 35 31 31 27 27 23 23 19 19 15 15 11 11 7 12 12 16 16 20 20 24 24 28 28 28 28 24 24 20 20 12 12 8 16 16 1 2 3 4 5 6 23 23 19 19 15 15 11 11 7 10 10 14 14 18 18 22 22 26 26 30 30 27 27 29 29 25 25 21 21 17 17 13 13 9 34 1/2" Bolt Circle 30"-diameter Flange 48"-diameter Flange 34 1/2" Bolt Circle 33 33 37 37 8

Upload: others

Post on 27-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Large Bottom Sump Installation Instructionscorerosion.thomasnet-navigator.com/Asset/large-bottom...1. GENERAL 1.1. Before beginning the large bottom sump installation, read through

1. GENERAL1.1. Before beginning the large bottom sump installation, readthrough the entire Large Bottom Sump Installation Instructions(subsequently referred to as “LBS Instructions”) and the XerxesInstallation Manual and Operating Guidelines (subsequently referredto as “Installation Manual”).

1.2. It is the responsibility of the owner, installer and operator tofollow all requirements contained in the LBS Instructions and theInstallation Manual, and comply with all federal, state and localregulations that may apply to LBS installation, operations andmaintenance.

1.3. No instructions or procedures presented in the LBS Instructionsand the Installation Manual should be interpreted so as to put at riskany person’s health or safety, or to harm any property or theenvironment.

1.4. A Xerxes large bottom sump is designed to allow for themaximum volume of water or wastewater to be pumped out of aXerxes tank. (See FIGURE 1-1.) It is available in a 30-inch-diameterand a 48-inch-diameter size.

FIGURE 1-1

1.5. Assembly and installation of the bottom sump is theresponsibility of the tank owner.

1.6. Before beginning to assemble and install the bottom sump,check the tank (according to instructions in the Installation Manual) toensure that the tank was not damaged during delivery, unloading andhandling on the job site.

1.7. Always use lifting lug(s) when lifting the tank.

1.8. When handling a tank with a bottom sump, always take extracare so that the bottom sump is not damaged by contact with anyother object, such as the truck bed or the ground.

2. ATTACHING BOTTOM SUMP TO TANK 2.1. The tank comes with bolting flanges at the bottom of the tankand on the bottom sump. These come in separate pieces to allow forshipping. The bottom sump must be attached to the bolting flangebefore installation. This assembly must be done aboveground.

2.2. Using the lifting lugs situated on the side of the tank, set the tankon the ground so it is in a rotated position. (See FIGURE 2-1.)

FIGURE 2-1

2.3. Position the bottom sump so that it is in line with the flange onthe bottom of the tank.

2.4. Place the gaskets on the flange and the sump, and bolt thesump to the bottom of the tank using the bolting pattern as shown inFIGURE 2-2. (A double-gasket system has been supplied for thisapplication.)

FIGURE 2-2

2.5. Tighten the bolts to 25 foot-pounds.

3. PREINSTALLATION TESTING3.1. If possible, test the tank and flange joint using the standard 5psig air test as instructed in the Installation Manual.

4. PREPARING THE EXCAVATION4.1. Dig a hole in the bottom of the excavation that is large enough toaccommodate the sump.

4.2. Proceed with the installation by adding the required 12 inches ofapproved backfill material to the bottom of the excavation (includingthe bottom sump hole in the excavation) as specified in theInstallation Manual.

11

22

33

44

55

6610101414

18182222

2626

3030

3434

3838

4040 3636 3232

2929

2525

21211717

131399

3939353531312727

23231919

1515

1111

77

1212

1616

20202424

2828

2828 24242020

1212

88

1616

11

22

33 44

55

66

23231919

1515

1111

77

10101414

1818

2222

2626

3030

2727 2929

25252121

1717

131399

34 1/2" Bolt Circle

30"-diameter Flange

48"-diameter Flange

34 1/2" Bolt Circle3333

3737

88

B (DR 622-456)

A (DR 622-456)

Large Bottom Sump Installation Instructions

xls11/04ih

7901 Xerxes Avenue South, Minneapolis, MN 55431-1288 n

(952) 887-1890 n

Fax (952) 887-1882 n

www.xerxescorp.com

© 2004 Xerxes Corporation

Page 2: Large Bottom Sump Installation Instructionscorerosion.thomasnet-navigator.com/Asset/large-bottom...1. GENERAL 1.1. Before beginning the large bottom sump installation, read through

5. ROTATING AND SETTING THE TANK AFTER ASSEMBLY5.1. General

5.1.1. Rotate the tank into its upright position. This can be doneeither inside or outside the excavation hole as conditions permit.

5.2. ROTATING THE TANK OUTSIDE THE EXCAVATION5.2.1. When rotating the tank aboveground (outside the excavationhole), dig a separate bottom sump hole alongside the tank. It needsto be large enough to accommodate the sump when rotating thetank. (See FIGURE 5-1.)

FIGURE 5-1

5.2.2. Slope the sides of the aboveground bottom sump hole asshown in FIGURE 5-1. This will allow rotating the tank into position.

5.2.3. Align the tank lengthwise alongside the aboveground bottomsump hole so that the bottom sump is lined up with the hole asshown in FIGURE 5-1 and FIGURE 5-2.

FIGURE 5-2

5.2.4. Use the lifting lugs that are situated at the top centerline of thetank and move the upright tank into place in the excavation as shownin FIGURE 5-3

FIGURE 5-3

5.3. ROTATING THE TANK INSIDE THE EXCAVATION5.3.1. When rotating the tank inside the excavation, slope the sidesof the bottom sump hole in the excavation as shown in FIGURE 5-2.This will allow rotating the tank into position.

5.3.2. Align the tank lengthwise alongside the bottom sump hole inthe excavation so that the bottom sump is lined up with the hole asshown in FIGURE 5-1.

5.3.3. Use the lifting lugs that are situated at the top centerline of thetank and rotate the tank to its upright position as shown in FIGURE 5-3.

6. BACKFILLING AND PIPING

6.1. Using approved backfill material as specified in the InstallationManual, thoroughly backfill the area around the bottom sump. (SeeFIGURE 5-3.)

Note: There should be no voids or air pockets.

6.2. Add piping as necessary.

6.3. Finish backfilling to the top of the tank as specified in theInstallation Manual. (See FIGURE 6-1.)

FIGURE 6-1

7. POSTINSTALLATION TESTING7.1. Test the tank according to instructions and requirements of theInstallation Manual.

8. PIPING AND VENTING8.1. Follow instructions in the Piping and Venting Section ofInstallation Manual.

9. BACKFILLING TO GRADE9.1. Follow instructions in the Backfilling to Grade Section ofInstallation Manual.

G (DR 622-456)

C (DR 622-456)

F (DR 622-456)