landscape architecture portfolio
DESCRIPTION
Work from BSU BLA program and City of ClearwaterTRANSCRIPT
B_LEZON
B_LEZON
Table of Contents
Proj
ects
Skills
+Ab
ilitie
s
Exp
erie
nce
Tra
vel
Lea
der
ship
Com
pre
hens
ive
Proj
ect
1.0
2.0
3.0
4.0
5.0
6.0
B_LEZON
Brett Lezon, Associate ASLA, LEED Green Associate
Address: 116 Chestnut Drive Frankfort, IL 60423
Cell: 815.545.2197
Email: [email protected]
Attending Ball State University the past five years and through professional experience landscape architecture, design, and sustainability have become important aspects of my life. I am persistently striving to become a better designer through study and guidance, while developing the ability to effectively communicate project ideas.
Thank you for your time and consideration.
Sincerely,
B_LEZON
S t u d i o P r o j e c t s 1 . 0Main Street Muncie
1.2 Moon Garden Moonville
Community Garden Albion1.3
Pogue’s Run Park Indy1.4
1.1
Main Street Section
Master Plan
Main Street Perspective
Mai
n St
reet
Mun
cie
A downtown ‘green finger system’ will connect to the surrounding neighborhoods and enliven the businesses.
To accomplish this method, a portion of land behind the buildings situated on Main Street was allocated for open space.
1.1
Framework Plan
A key element to the street design is the use of colors to distinguish each block.
Master PlanMoon Garden Section
Moon Garden Model
Moon gardens were used in ancient times as places of gathering for worship. This garden utilizes the quarters of the moon to shape the rooms.
Plants were chosen based on their night blooming abilities, fragrance, silvery appearance, and ornamental qualities.
Experiences range from smelling the pungent scent of fragrant columbine to viewing the illuminated moon forms at the gardens highest point, the full moon phase.
Moo
n G
arde
n M
oonv
ille
1.2
Master Plan Albion Community Garden Sketch
Albion Community Garden Section
Located adjacent to the Noble County Courthouse in Albion, Indiana this 1.06 acre site will become Albion’s own community garden.
Goals include improving downtown Albion’s recreation, economy, tourism, and zoning. Establishing additional green space was key in the progress.
Designed for both adults and children this community garden offers a variety of activities including an educational garden, children’s garden, and market stand.
1.2
Com
mun
ity G
arde
n A
lbio
n1.
3
Master Plan
Section
Sketch
Primary medium of the site involves vegetation. The transitions between planting zones were worked out deliberately to create a visually engaging mix.
Program elements include a three weir system acting as hydrology control, islands serve as resting areas, and water basins radiate from islands.
Generating visual interest from 1-70 was mandatory. To achieve this goal a line of Norway spruce and redbuds were planted along 1-70. Grand entrance lined with sycamores.
Team project completed by Andy Burrus, TJ
Dwyer, and Brett Lezon. I was responsible for
assisting in the creation of the sections and
rendering the plan and sections.
Pogu
e’s
Run
Indi
anap
olis
1.4
Sketch
1.4
B_LEZON Clearwater Parks & Recreation2.
1
Professional Experience 2.0
Interchurch Center Project2.2
Moccasin Lake Boardwalk
Wood Railing Section
Moccasin Lake is a 51-acre nature park owned and operated by the City of Clearwater. My task was to design retrofit boardwalks to replace the existing structures.
I was responsible for the design, calculation of materials, purchasing, meeting with contractor, and project management with the assistance of the Project Manager for the City of Clearwater.
Deck Section
Improvement Plan
Moc
casi
n La
ke P
ark
Cle
arw
ater
2.1
This project was completed in the Winter of 2012. The next phase includes a overall master plan, vision, and minor improvements to the facilities.
2.1
Gulf to Bay Boulevard is one of the primary access roads to and from Clearwater. It is significant because many of the tourists, seasonal residents, and residents travel this road.
I was responsible for site inventory/analysis, drafting the existing conditions/demolition plans, irrigation plans, and planting plans for 16 medians. In addition, I developed a cost estimate.
Existing Conditions/Demolition Plan for Median 1-2
Gul
f to
Bay
Blvd
Cle
arw
ater
2.1
This project is state funded through the Florida Department of Transportation. Construction began in February 2012 and is slated to be completed in summer 2012.
Fire Station 48 Memorial Garden was designed as a ceremonial space for the firefighters of Clearwater. I was responsible for the irrigation plan, layout plan, cost estimate, and project management.
The irrigation system has 4 zones and features a spray system for the planting beds and rotors for the turf grass.
Fire Station Irrigation Plan
Fire Station 48 Memorial Garden
Fire
Sta
tion
48 C
lear
wat
er2.
1
This project was completed in September 2011.
3/8"
18"
3'-0"3'-0"
1'-0"
6"
1/4" 1/4"
6"
1'-0"
EQUAL EQUAL
EQUAL EQUAL
3/4"3/4"
1'-0"
EQUAL EQUAL
EQUAL EQUAL
3/4"3/4"
1'-0"
EQUAL EQUAL
EQUAL EQUAL
3/4"3/4"
1'-4
"TO
FIN
. GR
.1'
-2" M
AX.
2'-6
"M
AX.
TO
FIN
. GR
.1'
-0"
MIN
.10
"
2'-4"
8"8"1'-0"
1'-0
"O
.C. T
OR
EVE
AL
CONCRETE
POLY EXPANSION JOINT 1/4" x 6"
TRENCH DRAIN STAR PATTERN STAR PATTERN
EXISTING EXPANSIONJOINT 1/2" x 6"
SAND/SEAT WALL
PREPARED SUBGRADE
EXISTING EXPANSIONJOINT 1/2" x 6"
Section B-B DimensionsScale: 2 1/2" = 1'-0"
1 Section B-BScale: 2 1/2" = 1'-0"
2
3/8" Thick Brushed Aluminum Grate, Typ.
Stainless Steel 1/4-20 x 1 Flat Head Torx Security Screw, Typ.
Stainless Steel 1/4-20 Drop In Anchor SS 18-8, Typ.
Vulcum Caulk to Match Concrete, Typ.1/4" Backer Rod, Typ.
1/4" x 6" Poly Expansion Joint, Typ.
6" Existing Concrete Slab, Typ.
Existing Beach Sand Subgrade, Typ.
Screw DetailScale: 6" = 1'-0"
5
CL
North Beach Shower Screw LayoutScale: 2 1/4" = 1'-0"
6
Middle Beach Shower Screw LayoutScale: 2 1/4" = 1'-0"
7 South Beach Shower Screw LayoutScale: 2 1/4" = 1'-0"
8
5
Section C-CScale: 3/4" = 1'-0"
9
OF
EHTOF
Y
,
DIA
ROLFRETAWR
AE
LC
TI
CYTIC
LAES
7 7 7 7
7 7 7
7
3/8" Stainless Steel Aluminum Grate, Typ.
1/4 x 1" Stainless Steel Drop In Anchor(Pre Drill & Slip in Anchor)
o
Beach Walk- Shower RemediationProposed Details
Section D-DScale: 3/32" = 1'-0"
37
47
Aluminum Angle Iron Detail
Scale: 6" = 1'-0"47
Aluminum Angle Iron, Typ.
3/8" Thick Brushed Aluminum Grate, Typ.
Existing Seat Wall,Typ.
3,000 PSI Concrete in 28 days, with Commercial Fiber Mesh Typ.
3,000 PSI Concrete in 28 Days with Commercial Fiber Mesh, Typ.
CL
3/4"
3/4"
2'-0"
2'-0" 2'-0"
LakeChautauqua
B.S.A. Camp Soule
Lake Chautauqua Park
Chautauqua Park South
Pro
ject
Bou
ndar
y
Future Connectionto Local Trails
Shared UseEquestrian andNature Trail
Pond
Proposed Parking withBike Rack
Futu
re E
ast W
est T
rail
PicnicPavillion Picnic
Pavillion
TrashTrash
Project BoundaryFuture Facilities (Not grant related)
Existing FacilitiesExisting PondProposed Grant Facilities Interpretive Signage Locations
Trash ReceptaclePicnic Pavillion
KEY
2
1
Future Connectionto Local Trails
New Bridge
Existingprimitive trailto bereplacedwith new trail
New bridge
Primitive Bridges To BeRemoved & Replaced
Land
mar
k D
r.
Landmark Dr.
Entrance to parking
Exit toLandmark Dr.
Primitivebridge tobe removed& replaced
Primitivebridge tobe removed& replaced
Beachwalk Shower Trench Drain Details Lake Chautauqua Equestrian Trail System
Completed Beachwalk Shower Trench DrainLake Chautauqua Equestrian Parking Design
One of my initial projects, Lake Chautauqua, was to propose enhancements to the master plan for a grant, design a 12 stall equestrian parking lot, and perform cost estimation.
Three of the Beachwalk showers had drainage issues. As a result, my task was to resolve the issues. I chose to design and install trench drains. Details and completed design shown above.
Beac
hwal
k C
lear
wat
er2.
1
The photo above showcases the completed trench drain. Three trench drains were installed to remedy the drainage issue.
2.1
Conceptual Plan for Phase 1-2 (tree planting + prairie)
Contemplative Garden Looking East
Conceptual Plan for Phase 1 (tree planting)
As a class we led several design charrettes, which ultimately produced a master plan, maintenance plan, and the creation of an Indiana Certified Wildlife Friendly Habitat.
Getting Directions
Inte
rchu
rch
Cen
ter I
ndia
napo
lis2.
2
At the end of this class we coordinated a planting day which installed trees, shrubs, perennials, and grasses.
The final result provides a gathering space for those using the facility, in addition to a stormwater feature, two bioswales.
B_LEZON Hand Graphics3.
1
AutoCAD Drafting3.2
Google SketchUp3.3
Adobe Creative Suite3.4
S k i l l s +Ab i l i t i e s 3 . 02.2
Night Rendering of Alley Historic Facade Elevation St. Clair Housing Design Sketch
Street Cross-Section St. Clair Housing Design Sketch
I enjoy sketching and employing hand graphics. Sketch books accompany me when I travel.
Experimentation with a variety of hand graphics is showcased above.
The sketches above were created using a variety of media including: markers, colored pencils, sign pens, and many sizes of microns.
Han
d G
raph
ics
mix
ed m
edia
3.1
Magnificent Amberson’s Planting Plan
Comprehensive Project Planting Plan of Active Recreation Area Beachwalk Shower Drainage
Aut
oCA
D d
rafti
ng3.
2
3.1
Looking North Looking North
Looking South Close-Up Looking North
SketchUp allows for quick and simple 3D digital modeling.
The images above showcase design work from the Indiana Interchurch Center immersive learning project.
Our goal was to use native plants, best management practices, and planning to obtain the Indiana Wildlife Friendly Habitat certification.
Goo
gle
Sket
chUp
Inte
rchu
rch
Cen
ter3.
3
Main St. Muncie Enlarged Plan using Photoshop
Craddock Wetland Section using Photoshop
Board Layout using Illustrator
Plan Rendering using Photoshop
Team project completed by Andrea Borkowski, Pat Stout, and Brett Lezon. As a group, we developed the layout.
Ado
be C
reat
ive
Suite
layo
ut +
med
ia3.
4
3.3
Trav
el S
EA P
DX
AUS
NYC
SA
N 4
.0
1 2 3 4
1 - 9/11 Memorial New York2 - Teardrop Park New York3 - Scripps Park La Jolla, CA4 - Waterfront Park Portland, OR
This diagram illustrates a few of the cities I have visited. I am an avid traveler and enjoy learning new cultures, indulging in all varieties of food, and experiencing the great spaces that form our cities.
B_LEZON
While serving as the Ball State Student Chapter ASLA President for two years I coordinated, with the help of the officers:
-Biweekly meetings-Events which include:
Applefest- flag football tournament and cookout, a BSU landscape architecture tradition
LABASH- conference for landscape architecture students held yearly at a university.
Student Advisory Board-meeting with the Chair of Landscape Architecture at Ball State to discuss current events and topics of concern.
Applefest
LABASH 2010
Lead
ersh
ip A
SLA
EPC
CPE
C L
EED
5.0
Currently, I serve on The American Society of Landscape Architects Emerging Professionals Committee, Coachman Park Enhancement Coalition, and a active LEED emerging professional.
4.0
B_LEZON Problem + Inventory + Analysis6.
1
Concepts + Diagrams6.2
Schematic Design6.3
Master Plan + Renderings6.4
Sections6.5
Comprehensive Project 6.0
Harborview Center
The 5th year of the program at Ball State requires a research phase and comprehensive design project.
I chose my project site in Clearwater, FL. The site is comprised of Coachman Park, Harborview Center, and Bayfront Tennis Complex.
The site is adjacent to Clearwater Harbor, creating an opportunity for the site. Currently, an abundance of parking poses a strong disconnect to the neighboring context.
Strong disconnect due to parking lot, complete linear pattern
Lack of connectivity to Cleveland Street, borrow elements to unify
Strong disconnect due to parking lot, complete linear pattern
Terminate Cleveland St. at Osceola to increase water views and establish pedestrian entry
Terminate Drew St. to fishing pier, allow for a drop off area and turn around zone
Extend Pierce Blvd. to connect with Drew St., locating parking on the perimeter
Establish parking on north and south perimeter of park, allowing for views of Clearwater Harbor in center
Coachman Park
Site Analysis
Vicinity Map
Prob
lem
+ in
vent
ory
+ A
naly
sis
Coa
chm
an P
ark
6.1
Com
poun
d Co
ncep
t
Figure GroundBlack- RemainRed- Demolish
RoadsRed- Addition
Pinellas TrailGreen- ExistingPink- Proposed
CirculationBrown- BoardwalkTan- Primary SpineGrey- Secondary Path
Programmed AreasDark Green- Great LawnGreen- Recreational/EducationalLight Blue- WetlandBlue- PondPurple- TennisGrey- ParkingPink- Primary Entrances
ViewsInward- PurpleOutward- Yellow
The Solar Canopy Equation
By borrowing elements from the Singapore helix bridge and the Treepods in Boston, I’ve developed a solar canopy concept.
Due to the average 240 sunny days per year in Clearwater, implementing a solar generating system while linking key nodes begins to set the framework.
The solar canopy has several benefits: provides cover, serves as an artistic element, establishes a educational opportunity, removes carbon dioxide and releases oxygen, and creates an attractive environment.
Solar Canopy Concept
Great Lawn Solar Canopy
Solar Canopy Promenade
Con
cept
s +
Dia
gram
s C
oach
man
Par
k6.
2
GalleriaLooking South Toward Great Lawn
Looking Southwest
Solar Canopy Promenade
Above are a series of renderings produced in Google Sketchup Pro 8 at the schematic design stage. I enhanced the images using Photoshop.
The galleria was envisioned to attract tourists and locals which will help to keep the site lively on a consistent basis.
The great lawn, as shown on the bottom left, will be host to a variety of events including the Jazz Holiday and Sea Blues, to name a few.
6.2
Sche
mat
ic D
esig
n C
oach
man
Par
k6.
3
Legend:
1_Parking/Staging Area2_Boat Slips North3_Boat Slips South4_Clearwater Harbor5_Great Lawn/Bandshell6_Rec. Space/Vendor/Staging7_Water Feature8_Gathering Space9_Bosque10_Solar Canopy Promenade11_Central Active Quad12_Bayfront Tennis Complex13_Parking14_City Hall15_Boardwalk/Pinellas Trail Ext.16_Galleria17_Urban Oasis18_Clearwater Public Library19_Restrooms20_Residential Tower21_Mixed-Use22_Housing23_Mixed-Use24_Underground Parking25_Pond26_Memorial Causeway
1
2
3
44 5
6
7
89
10
11
12
1314
1516
17
18
19
20 21
22
23
24
25
26
Bandshell/Great Lawn at Night View Looking East Urban Oasis at Night
Mas
ter P
lan
+ Re
nder
ings
Coa
chm
an P
ark
6.4
Key
Section B: Boat Slips to Clearwater Public Library Looking North
Section A: Parking to Galleria and Solar Canopy System
Section C: Boardwalk Looking West toward Clearwater Harbor
Key Words:-Dynamic-Transitional-Anchor
Key Words:-Entertainment-Accessible-Connective
Key Words:-Linear-Diverse-Active
Water Active Learning ParkingGathering
Sect
ions
Coa
chm
an P
ark
6.5
6.4
B_LEZON