Lancaster Solar
![Page 2: Lancaster Solar - CMRPC...Lancaster Solar. Presentation Overview • Background Information • Why Solar? • Site Selection • Site Details • Ownership model • Management •](https://reader033.vdocuments.us/reader033/viewer/2022051810/6018a7a202070174e310c0b4/html5/thumbnails/2.jpg)
Presentation Overview
• Background Information• Why Solar?• Site Selection • Site Details• Ownership model• Management• Next Steps
![Page 3: Lancaster Solar - CMRPC...Lancaster Solar. Presentation Overview • Background Information • Why Solar? • Site Selection • Site Details • Ownership model • Management •](https://reader033.vdocuments.us/reader033/viewer/2022051810/6018a7a202070174e310c0b4/html5/thumbnails/3.jpg)
Background Information
• Lancaster – Worcester County; population 7,026
• Lancaster becomes a Green Community in 2010- Reduce energy consumption by 20%
• Additional Goal: offset 100% non-enterprise consumption
- 680,000 kWh/year
• Many innovative measures already taken to improve efficiency
![Page 4: Lancaster Solar - CMRPC...Lancaster Solar. Presentation Overview • Background Information • Why Solar? • Site Selection • Site Details • Ownership model • Management •](https://reader033.vdocuments.us/reader033/viewer/2022051810/6018a7a202070174e310c0b4/html5/thumbnails/4.jpg)
Why Solar?
• No wind!
• Incentives Available for Solar-Congressional Earmark
- Net Metering- SRECs
• LandAvailable
Easy Permitting
![Page 5: Lancaster Solar - CMRPC...Lancaster Solar. Presentation Overview • Background Information • Why Solar? • Site Selection • Site Details • Ownership model • Management •](https://reader033.vdocuments.us/reader033/viewer/2022051810/6018a7a202070174e310c0b4/html5/thumbnails/5.jpg)
Site Selection
• Feasibility Study- All rooftops- All Municipal land
• Rooftops- Not enough load capacity(have structural engineer available)
• Landfill was best Municipal Land- 72 acre parcel- Abutters are far- Zoned Appropriately
![Page 6: Lancaster Solar - CMRPC...Lancaster Solar. Presentation Overview • Background Information • Why Solar? • Site Selection • Site Details • Ownership model • Management •](https://reader033.vdocuments.us/reader033/viewer/2022051810/6018a7a202070174e310c0b4/html5/thumbnails/6.jpg)
Site Details• 72 acre parcel• 10 acre cap• Capacity: 0.5 MW
- 610,000 kWh/yr (Goal was 680,000 kWh/yr)
![Page 7: Lancaster Solar - CMRPC...Lancaster Solar. Presentation Overview • Background Information • Why Solar? • Site Selection • Site Details • Ownership model • Management •](https://reader033.vdocuments.us/reader033/viewer/2022051810/6018a7a202070174e310c0b4/html5/thumbnails/7.jpg)
Ownership Model
REVENUE: $173,000 /yr (SREC sales at $285)
- SRECs paying the bond• Net metering avoided cost is profit (est. $85,400 /yr)• Taking advantage of low hanging fruit
COST: $2.5 Million• Received Congressional earmark of $0.5 Million• Town voted to borrow $2 Million
- Bond Cost: $171,000 /yr(Principal and Interest)
![Page 8: Lancaster Solar - CMRPC...Lancaster Solar. Presentation Overview • Background Information • Why Solar? • Site Selection • Site Details • Ownership model • Management •](https://reader033.vdocuments.us/reader033/viewer/2022051810/6018a7a202070174e310c0b4/html5/thumbnails/8.jpg)
• Renewable Energy Enterprise (MGL c.44, SS 53F1/2)
• Separate budget & accounting:• SRECs• Net Metering
• Isolate debt service from general fund• Isolate revenue from Town operating budget
Management
Results: project accountability & simplified success and failure tracking• Town is authoring guidance on allowable enterprise expenses and revenues
![Page 9: Lancaster Solar - CMRPC...Lancaster Solar. Presentation Overview • Background Information • Why Solar? • Site Selection • Site Details • Ownership model • Management •](https://reader033.vdocuments.us/reader033/viewer/2022051810/6018a7a202070174e310c0b4/html5/thumbnails/9.jpg)
PROCURE (Current)• Equipment• Installation Services• Permits
Next Steps
BUILD (March 2012)• Site Preparation• Panel Install• Interconnection
![Page 10: Lancaster Solar - CMRPC...Lancaster Solar. Presentation Overview • Background Information • Why Solar? • Site Selection • Site Details • Ownership model • Management •](https://reader033.vdocuments.us/reader033/viewer/2022051810/6018a7a202070174e310c0b4/html5/thumbnails/10.jpg)
Questions & Discussion