lakewood high school renovations
DESCRIPTION
NEW CONSTRUCTION & RENOVATION – A & B ACADEMIC WING Lakewood, OhioTRANSCRIPT
Robert P. Madison, International
Community Meeting #2 October 7, 2014
Lakewood High School Renovation and Additions
Robert P. Madison, International
Program of Requirements
Academics* Classrooms (22 new) Science Room (1 new )
Special Education* Self-Contained Classrooms (7 new)
Music Band / Orchestra Room Vocal Room Piano Lab
Drama/TV Production Black Box Theater – can be shared with Music
New Media Center Includes Alumni Offices Large Reading Room Media Production Areas Computer Storage Areas *(Currently 30 classrooms in Modulars on Franklin)
Robert P. Madison, International
Program of Requirements
Dining Hall Student Dining – including “L” Room
Physical Education 3 Cross Courts or 1 Competition Gym Fitness /Weight Room Wrestling Room Team and PE Locker Rooms Athletic Offices and Training Room Concessions Area Ranger Shop Optional Elevated Track for Recreational Use
Administration Relocated Main Office Relocated House Principals’ Offices Relocated Guidance Center
Student Activity Rooms Collaboration Spaces H2O
Student Health Center
Robert P. Madison, International
Project Budget
Existing Building Demolish 264,790
Remain 268,850
New 149,000 Total 417,850
Project Budget
Construction Cost: $45,949,887
Robert P. Madison, International
Project Schedule 2014-2017
Construction Packages Construction Start Completion 1.) Swing Space Transition Package September 2014 January 2015 2.) Existing Building Demo & Abatement Package December 2014 Spring 2015 3.) Early Site & Foundation Package Spring 2015 October 2015 4.) Academic & East Wing Building Package Spring 2015 June 2017 5.) Civic Auditorium & Natatorium MEP Summers of 2015, June 2017 2016 & 2017
Robert P. Madison, International
TRANSITION PACKAGE: TEMPORARY CAFETERIA &
WARMING KITCHEN STORAGE & EGRESS
Robert P. Madison, International
Transition Package ‘A’ Building
Robert P. Madison, International
NEW CONSTRUCTION & RENOVATION – A & B ACADEMIC
WING
Robert P. Madison, International
Existing School Renovations
First Level Floor Plan
Robert P. Madison, International
Existing School Renovations
Second Level Floor Plan
Robert P. Madison, International
Existing School Renovations
Third Level Floor Plan
Robert P. Madison, International
LIFE SAFETY & MEP RENOVATIONS – CIVIC AUDITORIUM
Robert P. Madison, International
Access to Workroom and Changing Rooms Civic Basement
NEW CORRIDOR ACCESS NEW CORRIDOR ACCESS
NEW RAMP UP
NEW RAMP UP
NEW ELEVATOR
Robert P. Madison, International
NEW CONSTRUCTION & RENOVATION
Robert P. Madison, International
South - Site Plan
Robert P. Madison, International
North - Site Plan
Robert P. Madison, International
New Construction & Renovation South Addition Academic Wing
Robert P. Madison, International
Academic South Wing Addition / House Principal / Special Education
First Level Floor Plan
POTENTIAL TWO
CLASSROOM ADDITION
MOVEABLE WALL
Robert P. Madison, International
Academic South Wing Addition Second Level Floor Plan
POTENTIAL TWO
CLASSROOM ADDITION
MOVEABLE WALL
Robert P. Madison, International
Academic South Wing Addition – Academic Core / Science
Third Level Floor Plan
POTENTIAL TWO
CLASSROOM ADDITION
MOVEABLE WALL
SCIENCE CLASSROOM & LAB
Robert P. Madison, International
Site Section Looking West Academic South Wing Addition
EX
IS
TIN
G R
ES
ID
EN
TIA
L
ALO
NG
R
OB
IN
WO
OD
A
VE
LEVEL 3
LEVEL 2
LEVEL 1
EX
IS
TIN
G H
S
PR
OP
OS
ED
AC
CE
SS
D
RIV
E
42’ 14’
CLA
SS
RO
OM
EX
PA
NS
IO
N A
RE
A
208
’
PR
OP
ER
TY
LIN
E
Robert P. Madison, International
South Addition View from east side of Robinwood Avenue
Robert P. Madison, International
South Site Plan
Robert P. Madison, International
New Construction East Addition – ‘L’ Room / Dining / Music /
Theater / Physical Education
Robert P. Madison, International
East Addition – ‘L’ Room / Dining / Music / Theater / Physical Education
First Level Floor Plan
Robert P. Madison, International
East Addition – Media / Alumni Foundation / Alternate Track / House Principal
Second Level Floor Plan
BID ALTERNATE: UPPER LEVEL WALKING TRACK
Robert P. Madison, International
‘L’ Room – Dining & Media Spaces East Addition
Robert P. Madison, International
‘L’ Room – Dining & Media Spaces East Addition
Robert P. Madison, International
View from Bunts & Franklin East Addition
Robert P. Madison, International
View of Student Dining and Gymnasium East Addition
Robert P. Madison, International
MAIN OFFICE & HEALTH CENTER ENTRY CAREER TECH ENTRY CIVIC AUDITORIUM ENTRY RANGER SHOP & DINING ROOM / PRE-FUNCTION SPACE ENTRY
“Front Doors High School Entry
Robert P. Madison, International
CONSTRUCTION PHASING
Robert P. Madison, International
During Construction Site Plan
Robert P. Madison, International
Construction Staging Plan Turner / Regency / AKA (Construction Manager)
Pot ent ial