Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 201490 ADDENDUM NO. 1 TO ALL PLANHOLDERS: The following items shall be incorporated into the Bidding/Contract Documents for the above described project and will supersede any provisions with which they may conflict. All other provisions not modified by this addendum shall remain in full force and effect. Issued: June 4, 2020 CHANGES TO SPECIFICATIONS Table of Contents: 1. The attached Table of Contents (Rev. 1) shall replace the Table of Contents in its entirety. Section 01 30 50: 2. Insert the attached Specification Section 01 30 50 in its entirety. Sections 01 75 00.01 through 01 75 00.03: 1. Insert the attached Specification (forms) Section 01 75 00.01, Section 01 75 00.02, and Section 01 75 00.03 in their entirety. These are startup reference forms required by Section 01 75 00. Section 46 23 23: 1. Clarification for Section 46 23 231.4.D.1.i anchorage calculations, per Section 03 15 19, are required to be stamped and sealed by a Professional Engineer registered in the State of Washington. 2. Clarification for Section 46 23 233.2.C.2.b – the vendor should plan to conduct a minimum of two (2) separate tests on two (2) separate days. One (1) test will be during a high flow period (at a time when the plant flow is projected to fall into the range indicated) and the other test will be during a low flow period (at a time when the plant flow is projected to fall into the range indicated). The test days may not be consecutive,

Upload: others

Post on 22-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

Page 1 of 3 02/18/2020 

LAKEHAVEN WATER AND SEWER DISTRICT  

2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II  

Bid Number: 20‐1490  

ADDENDUM NO. 1  TO ALL PLANHOLDERS:  The  following  items  shall  be  incorporated  into  the  Bidding/Contract Documents  for  the  above described  project  and will  supersede  any  provisions with which  they may  conflict.    All  other provisions not modified by this addendum shall remain in full force and effect.    

Issued:  June 4, 2020   CHANGES TO SPECIFICATIONS 

Table of Contents:   

1. The  attached  Table  of  Contents  (Rev.  1)  shall  replace  the  Table  of  Contents  in  its entirety.   

Section 01 30 50: 

2. Insert the attached Specification Section 01 30 50 in its entirety.   

Sections 01 75 00.01 through 01 75 00.03: 

1. Insert the attached Specification (forms) Section 01 75 00.01, Section 01 75 00.02, and Section 01 75 00.03  in  their entirety.   These are  startup  reference  forms  required by Section 01 75 00.   

Section 46 23 23: 

1. Clarification  for  Section 46  23  23‐1.4.D.1.i  –  anchorage  calculations,  per Section 03 15 19,  are  required  to  be  stamped  and  sealed  by  a  Professional  Engineer registered in the State of Washington. 

2. Clarification  for  Section 46  23  23‐3.2.C.2.b  –  the  vendor  should  plan  to  conduct  a 

minimum of two (2) separate tests on two (2) separate days.  One (1) test will be during 

a high  flow period  (at  a  time when  the plant  flow  is projected  to  fall  into  the  range 

indicated) and the other test will be during a low flow period (at a time when the plant 

flow is projected to fall into the range indicated).  The test days may not be consecutive, 

Page 2: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

Page 2 of 3 02/18/2020 

as  the  plant  flow  and  weather  conditions  will  determine  the  testing  time,  and  the 

vendor  should  plan  for  two (2)  separate  trips.    The  vendor  will  not  be  required  to 

otherwise manipulate influent to the system during testing and the flows during the test 

will be subject to the flow  into the plant at that time.   Exact testing conditions can be 

flexible.  The number of samples taken during each test must be statistically defensible 

(single grab samples will not be sufficient).  Capture efficiencies can have an error of up 

to five percent (5%).   

CHANGES TO DRAWINGS 

Drawing M2‐24: 

1. Clarification for Drawing M2‐24, Grid 3B – the 4” GT and 1.5” C3 pipes entering the grit tank and  routed  to GU‐202 are  shown nominally.   The precise point of entry  into  the tank (for the C3  line) and  interior routing (for both the GT and C3  lines) to the GU‐202 equipment shall be determined by the manufacturer (Section 46 23 23) and coordinated by the Contractor for Shop Drawing review and approval by the Engineer. 

CLARIFICATIONS TO BID DOCUMENTS 

GENERAL CONDITIONS: 

1. Sections  54.6.1  through  54.6.3,  inclusive,  shall  be  superseded  and  replaced  by  the following:   

54.6.1. When  five  percent (5%)  of  the  total  original  Contract  amount  is  earned,  less Mobilization,  Cleanup  ,and  Demobilization  and  excluding  amounts  paid  for Materials  on  Hand,   fifty  (50)  percent  of  the  lump  sum  amount  bid  for Mobilization,  Cleanup,  and  Demobilization,  or  five  percent (5% ) of  the  total original Contract amount, whichever is the least, shall be paid.   

54.6.2. When  ten percent (10%) of  the  total original Contract amount  is earned,  less Mobilization,  Cleanup  ,and  Demobilization  and  excluding  amounts  paid  for Materials on Hand, seventy‐five percent (75%) of the lump sum amount bid for Mobilization, Cleanup,  and Demobilization, or  ten percent (10%) of  the  total original Contract amount, whichever is the least, shall be paid.   

54.6.3. Upon  completion  of  all  work  on  this  Project,  payment  for  the  remaining amount  bid  for Mobilization,  Cleanup,  and  Demobilization  in  excess  of  ten percent (10%) of the total original Contract amount, shall be paid.   

54.6.4. See  Specification  Section  01 71 14  for  additional  payment  terms  and requirements.     

Page 3: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM
Page 4: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

[This Page Left Blank Intentionally]

Page 5: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

SPECIFICATIONS    TABLE OF CONTENTS  

 HDR Project No. 10106807  Lakehaven Water and Sewer District  March 2020   2020 LAKOTA LIQUID STREAM IMPROVEMENTS – PHASE II  Bid Documents  

  SPEC ‐ i   

TABLE OF CONTENTS (REV. 1) 

DIVISION 01 — GENERAL REQUIREMENTS 01 11 00 ‐ SUMMARY OF WORK  01 11 10 ‐ OWNER FURNISHED EQUIPMENT  01 11 20 ‐ JOB CONDITIONS  01 14 19 ‐ USE OF SITE  01 25 13 ‐ PRODUCT SUBSTITUTIONS  01 26 13 ‐ REQUESTS FOR INFORMATION (RFI)  01 29 73 ‐ SCHEDULE OF VALUES (LUMP SUM PROJECTS)  01 30 00 ‐ SPECIAL CONDITIONS  01 30 50 ‐ WEB BASED CONSTRUCTION MANAGEMENT 01 31 19 ‐ PROJECT MEETINGS  01 32 17 ‐ CONSTRUCTION PROGRESS SCHEDULE  01 33 00 ‐ SUBMITTALS  01 33 04 ‐ OPERATION AND MAINTENANCE MANUALS  01 35 05 ‐ ENVIRONMENTAL PROTECTION AND SPECIAL CONTROLS  01 42 13 ‐ STANDARD ABBREVIATIONS AND SYMBOLS  01 45 33 ‐ SPECIAL INSPECTIONS AND TESTING PROGRAM  01 61 03 ‐ EQUIPMENT ‐ BASIC REQUIREMENTS  01 61 04 ‐ EQUIPMENT LIST  01 65 50 ‐ PRODUCT DELIVERY, STORAGE, AND HANDLING  01 71 14 ‐ MOBILIZATION AND DEMOBILIZATION  01 73 20 ‐ OPENINGS AND PENETRATIONS IN CONSTRUCTION  01 73 29 ‐ DEMOLITION, CUTTING AND PATCHING  01 74 13 ‐ CLEANING  01 75 00 ‐ SYSTEM STARTUP  01 75 00.01 ‐ MANUFACTURERS INSTALLATION CERTIFICATION  01 75 00.02 ‐ EQUIPMENT TEST REPORT FORM  01 75 00.03 ‐ TRAINING ATTENDANCE FORM  

DIVISION 03 — CONCRETE 03 05 05 ‐ CONCRETE TESTING AND INSPECTION  03 09 00 ‐ CONCRETE  03 15 19 ‐ ANCHORAGE TO CONCRETE  03 35 00 ‐ CONCRETE FINISHING AND REPAIR OF SURFACE DEFECTS  

DIVISION 04 — MASONRY 04 01 20 ‐ MASONRY CLEANING  04 05 13 ‐ MASONRY MORTAR AND GROUT  04 05 23 ‐ MASONRY ACCESSORIES  04 05 50 ‐ COLD AND HOT WEATHER MASONRY CONSTRUCTION  04 22 00 ‐ CONCRETE MASONRY  

Page 6: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

SPECIFICATIONS    TABLE OF CONTENTS  

 HDR Project No. 10106807  Lakehaven Water and Sewer District  March 2020   2020 LAKOTA LIQUID STREAM IMPROVEMENTS – PHASE II  Bid Documents  

  SPEC ‐ ii   

DIVISION 05 — METALS 05 12 00 ‐ STRUCTURAL STEEL  05 14 00 ‐ STRUCTURAL ALUMINUM  

DIVISION 05 — METALS (CONTINUED) 05 50 00 ‐ METAL FABRICATIONS  05 52 02 ‐ ALUMINUM RAILINGS  

DIVISION 06 — WOOD, PLASTICS, AND COMPOSITES 06 82 00 ‐ FIBERGLASS REINFORCED PLASTIC FABRICATIONS  06 85 14 ‐ FLOCCULATION BAFFLES  

DIVISION 07 — THERMAL AND MOISTURE PROTECTION 07 61 13 ‐ METAL ROOFING  07 92 00 ‐ JOINT SEALANTS  

DIVISION 08 — OPENINGS 08 33 22 ‐ ALUMINUM ROLLING OVERHEAD DOORS  

DIVISION 09 — FINISHES 09 96 00 ‐ HIGH PERFORMANCE INDUSTRIAL COATINGS  

DIVISION 10 — SPECIALTIES 10 14 00 ‐ IDENTIFICATION DEVICES  

DIVISION 13 — SPECIAL CONSTRUCTION 13 34 23 ‐ FRP SHELTERS 

DIVISION 22 — PLUMBING 22 20 00 ‐ PLUMBING FIXTURES AND EQUIPMENT  

DIVISION 23 — HEATING VENTILATING AND AIR CONDITIONING 23 05 93 ‐ HVAC SYSTEMS ‐ BALANCING AND TESTING  23 31 00 ‐ HVAC ‐ DUCTWORK  23 80 00 ‐ HVAC ‐ EQUIPMENT  

DIVISION 26 — ELECTRICAL 26 05 00 ‐ ELECTRICAL ‐ BASIC REQUIREMENTS  26 05 19 ‐ WIRE AND CABLE ‐ 600 VOLT AND BELOW  26 05 26 ‐ GROUNDING AND BONDING  26 05 33 ‐ RACEWAYS AND BOXES  26 05 74 ‐ SHORT CIRCUIT AND COORDINATION STUDY, AND ARC FLASH REPORT  26 08 13 ‐ ACCEPTANCE TESTING  26 09 16 ‐ CONTROL EQUIPMENT ACCESSORIES  26 24 19 ‐ MOTOR CONTROL EQUIPMENT  26 27 26 ‐ WIRING DEVICES  

Page 7: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

SPECIFICATIONS    TABLE OF CONTENTS  

 HDR Project No. 10106807  Lakehaven Water and Sewer District  March 2020   2020 LAKOTA LIQUID STREAM IMPROVEMENTS – PHASE II  Bid Documents  

  SPEC ‐ iii   

DIVISION 26 — ELECTRICAL (CONTINUED) 26 28 00 ‐ OVERCURRENT AND SHORT CIRCUIT PROTECTIVE DEVICES  26 28 16 ‐ SAFETY SWITCHES  26 29 23 ‐ VARIABLE FREQUENCY DRIVES ‐ LOW VOLTAGE  26 36 00 ‐ TRANSFER SWITCHES  26 50 00 ‐ INTERIOR AND EXTERIOR LIGHTING  

DIVISION 31 — EARTHWORK 31 10 00 ‐ SITE CLEARING  31 23 00 ‐ EARTHWORK  31 25 00 ‐ SOIL EROSION AND SEDIMENT CONTROL  

DIVISION 32 — EXTERIOR IMPROVEMENTS 32 12 16 ‐ ASPHALTIC CONCRETE VEHICULAR PAVING  

DIVISION 40 — PROCESS INTERCONNECTIONS 40 05 00 ‐ PIPE AND PIPE FITTINGS ‐ BASIC REQUIREMENTS  40 05 07 ‐ PIPE SUPPORT SYSTEMS  40 05 17 ‐ PIPE ‐ COPPER  40 05 19 ‐ PIPE ‐ DUCTILE  40 05 23 ‐ PIPE ‐ STAINLESS STEEL  40 05 24 ‐ PIPE ‐ STEEL  40 05 26 ‐ PIPE ‐ CAST‐IRON SOIL  40 05 31 ‐ PIPE ‐ PLASTIC  40 05 33 ‐ PIPE ‐ POLYETHYLENE (HDPE)  40 05 51 ‐ VALVES ‐ BASIC REQUIREMENTS  40 05 52 ‐ MISCELLANEOUS VALVES  40 05 53 ‐ HAND VALVE SCHEDULE 40 05 54 ‐ CONTROL AND SAFETY VALVE SCHEDULE 40 05 58 ‐ WATER CONTROL GATE SCHEDULE 40 05 59 ‐ FABRICATED STAINLESS STEEL SLIDE GATES  40 05 61 ‐ GATE VALVES  40 05 62 ‐ PLUG VALVES  40 05 63 ‐ BALL VALVES  40 05 65 ‐ GLOBE VALVES  40 05 66 ‐ CHECK VALVES  40 10 15 ‐ FIBERGLASS REINFORCED PLASTIC DUCT  40 42 00 ‐ PIPE, DUCT AND EQUIPMENT INSULATION  40 61 13 ‐ PROCESS CONTROL SYSTEMS GENERAL REQUIREMENTS  40 62 16 ‐ COMPUTER NETWORK AND HUMAN MACHINE INTERFACE (HMI) HARDWARE  40 63 43 ‐ PROGRAMMABLE LOGIC CONTROLLER (PLC) CONTROL SYSTEM  40 63 44 ‐ PLC IO SCHEDULE 40 67 00 ‐ CONTROL SYSTEM EQUIPMENT PANELS AND RACKS  40 71 00 ‐ FLOW INSTRUMENTATION  

Page 8: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

SPECIFICATIONS    TABLE OF CONTENTS  

 HDR Project No. 10106807  Lakehaven Water and Sewer District  March 2020   2020 LAKOTA LIQUID STREAM IMPROVEMENTS – PHASE II  Bid Documents  

  SPEC ‐ iv   

DIVISION 40 — PROCESS INTERCONNECTIONS (CONTINUED) 40 72 00 ‐ LEVEL INSTRUMENTATION  40 73 00 ‐ PRESSURE INSTRUMENTATION  40 74 00 ‐ INSTRUMENT SCHEDULE 40 90 05 ‐ CONTROL LOOP DESCRIPTIONS  40 91 10 ‐ PRIMARY METERS AND TRANSMITTERS  40 96 52 ‐ CONFIGURATION REQUIREMENTS ‐ HUMAN MACHINE INTERFACE (HMI) AND 

REPORTS  40 97 00 ‐ CONTROL AUXILIARIES  

DIVISION 43 — PROCESS  GAS  AND  LIQUID  HANDLING,  PURIFICATION,  AND  STORAGE EQUIPMENT 

43 21 00 ‐ PUMPING EQUIPMENT ‐ BASIC REQUIREMENTS  43 23 15 ‐ PUMPING EQUIPMENT ‐ SELF‐PRIMING CENTRIFUGAL PUMPS  43 23 17 ‐ PUMPING EQUIPMENT ‐ VORTEX (TORQUE‐FLOW)  43 23 54 ‐ PUMPING EQUIPMENT ‐ PERISTALTIC  43 41 43 ‐ POLYETHYLENE CHEMICAL TANKS  

DIVISION 46 — WATER AND WASTEWATER EQUIPMENT 46 20 00 ‐ GRIT REMOVAL EQUIPMENT 46 23 23 ‐ GRIT REMOVAL SYSTEM 46 23 63 ‐ GRIT CLASSIFIER‐WASHER 46 43 22 ‐ FINAL CLARIFIER SOLIDS COLLECTION EQUIPMENT ‐ CIRCULAR TANK SUCTION 

HEADER TYPE  

APPENDICES APPENDIX A ‐ EXISTING GRIT WASHER REFURBISHMENT EQUIPMENT LIST APPENDIX B ‐ CONSERVATEK CLARIFIER COVER DRAWINGS APPENDIX C ‐ EVOQUA CLARIFIER DRIVE DRAWINGS & INSTALLATION INSTRUCTIONS APPENDIX D ‐ CONTROL PANEL CP‐244 RECORD DRAWINGS APPENDIX E ‐ DAFT CONTROL SYSTEM RECORD DRAWINGS 

Page 9: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

SPECIFICATIONS    DIVISION 01 — GENERAL REQUIREMENTS     SECTION 01 30 50     WEB BASED CONSTRUCTION MANAGEMENT  

 HDR Project No. 10106807   Lakehaven Water and Sewer District  March 2020   2020 LAKOTA LIQUID STREAM IMPROVEMENTS – PHASE II  Bid Documents      

  01 30 50 ‐ 1   

SECTION 01 30 50 WEB BASED CONSTRUCTION MANAGEMENT 

PART 1  GENERAL 

1.1 SUMMARY 

A. The Owner and Contractor shall utilize Bluebeam REVU for electronic submittal of all data  throughout  the duration of  the Contract.   Bluebeam REVU  is a program  for  file sharing as well as coordinating Portable Document Format (PDF) documents, allowing for web‐based electronic access by multiple parties.  Access to the construction session for  this  project  will  be  made  available  by  the  Owner  to  all  Contractors’  project personnel,  subcontractor  personnel,  suppliers,  consultants,  and  the  Engineer.    The joint use of this system is to facilitate electronic exchange of information, automation of key Contract processes, and overall management of the contract.   Bluebeam REVU shall  be  the  primary  means  of  all  project‐related  information,  submission,  and execution  of  project‐related  items  and management  of  the  project  communication.  When required by Contract and/or agreed by joint parties, the Project Representative and/or  Contractor will  also  provide  paper  documents.    In  the  event  of  discrepancy between  the  electronic  version  and  paper  documents,  the  paper  documents  will govern.  Bluebeam REVU is a registered trademark of Bluebeam, Inc.   

B. Contractor  is  required  to  obtain  their  own  copy  of  Bluebeam  REVU  for  access  to upload and download files to the session created by the Owner.  Contractor shall pay for  costs  for  communications,  labor,  computer  hardware,  or  other  Contractor/ subcontractor/supplier costs to operate their own copy of the program.   

C. The Owner will provide basic Bluebeam REVU access instructions to the Contractor at no cost to the Contractor.  The instruction will not include detailed training, but will be basic  instructions regarding access and  logistics (workflow process) within the project session.  This instruction will be provided after the notice to proceed at a time agreed to by the Owner and Contractor.   

1.2 USER ACCESS LIMITATIONS 

A. The Project Representative will control the Contractor's access to Bluebeam REVU by allowing access and assigning user profiles to accepted Contractor personnel.  

1. Subcontractors  and  suppliers  will  be  given  access  to  Bluebeam  REVU  by  the Contractor’s  designated  representative.    Entry  and  accuracy  of  information exchanged  and  transferred  between  the  Contractor  and  its  subcontractors  and suppliers on Bluebeam REVU shall be the responsibility of the Contractor.   

Page 10: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

SPECIFICATIONS    DIVISION 01 — GENERAL REQUIREMENTS     SECTION 01 30 50     WEB BASED CONSTRUCTION MANAGEMENT  

 HDR Project No. 10106807   Lakehaven Water and Sewer District  March 2020   2020 LAKOTA LIQUID STREAM IMPROVEMENTS – PHASE II  Bid Documents      

  01 30 50 ‐ 2   

B. Joint Ownership  of Data  ‐ Data  entered  in  a  collaborative mode  (entered with  the intent  to  share  as  determined  by  permissions  and workflows within  the  Bluebeam REVU system) by the Project Representative and the Contractor will be jointly owned.   

C. Contractor  is  responsible  to  download  and maintain  their  own  archive  copy  of  any items from Bluebeam REVU upon completion of the project.   

1.3 AUTOMATED SYSTEM NOTIFICATION AND AUDIT LOG TRACKING 

A. Review  comments  made  (or  lack  thereof)  by  the  Owner  on  Contractor‐submitted documentation shall not relieve the Contractor from compliance with requirements of the Contract Documents.   The Contractor  is  responsible  for managing,  tracking, and documenting the Work to comply with the requirements of the Contract Documents.  Owner’s acceptance via automated system notifications or audit  logs extends only to the face value of the submitted documentation and does not constitute validation of the Contractor's submitted information.   

1.4 SUBMITTALS 

A. See Section 01 33 00.   

1. All submittal procedures shall be executed and managed via  the Bluebeam REVU program.   

B. Pre‐construction Submittals:  Submit list of Contractor's key Bluebeam REVU personnel for  review  and  approval  of  Project  Representative.  Include  descriptions  of  key personnel's roles and responsibilities for this project.   Contractor should also  identify their organization's administrator on the list.   

1.5 COMPUTER REQUIREMENTS 

A. The  Contractor  shall  use  computer  hardware  that meets  the  requirements  of  the Bluebeam REVU software.   

1. Upgrading of the Contractor's computer systems will not be justification for a cost or time modification to the Contract.   

2. The  Contractor  will  ensure  that  connectivity  to  the  Bluebeam  REVU  session (whether at the home office or jobsite) is accomplished through DSL, cable, T‐1, or wireless communications systems.  It is recommended a faster connection be used when uploading pictures and files into the system.   

Page 11: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

SPECIFICATIONS    DIVISION 01 — GENERAL REQUIREMENTS     SECTION 01 30 50     WEB BASED CONSTRUCTION MANAGEMENT  

 HDR Project No. 10106807   Lakehaven Water and Sewer District  March 2020   2020 LAKOTA LIQUID STREAM IMPROVEMENTS – PHASE II  Bid Documents      

  01 30 50 ‐ 3   

1.6 CONTRACTOR RESPONSIBILITY 

A. The Contractor shall be responsible for the timeliness and validity of their information placed in Bluebeam REVU and for the abilities of their personnel.   

1. Accepted users shall be knowledgeable in the use of computers, including Internet Browsers,  email  programs,  CADD  drawing  applications,  and  PDF  document distribution program.   

2. The Contractor  shall utilize  the  forms provided  in  the Contract Documents as an attachment to a submittal, RFI, or other uploaded information.   

a. If a form does not exist in the Contract Documents, the Contractor may submit a suggested form for review and approval by the Owner.   

b. File exchange shall be primarily through PDF documents.   

c. PDF  documents  will  be  created  through  electronic  conversion  rather  than optically scanned whenever possible.   

3. The  Contractor  is  responsible  for  the  training  of  their  personnel  and  their subcontractors/suppliers  in  the  use  of  Bluebeam  REVU  and  the  other  programs indicated above as needed.   

4. User  Access  Administration  ‐  Provide  a  list  of  Contractor's  key  Bluebeam  REVU personnel for acceptance by the Project Representative.   

a. Contractor  is responsible for adding and removing Contractor‐controlled users from the system.   

b. The Project Representative reserves the right to perform a security check on all potential users.   

c. The Contractor will be allowed to add additional personnel and subcontractors to Bluebeam REVU upon acceptance of the additional personnel by the Project Representative.   

d. The  Contractor  is  responsible  to  maintain  access  and  permissions  for  the Contractor‐controlled users and organizations.   

1.7 CONNECTIVITY PROBLEMS 

A. Access to the Bluebeam REVU session is subject to the inherent speed and connectivity problems of the Internet.  The Contractor is responsible for its own connectivity to the Internet.   

Page 12: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

SPECIFICATIONS    DIVISION 01 — GENERAL REQUIREMENTS     SECTION 01 30 50     WEB BASED CONSTRUCTION MANAGEMENT  

 HDR Project No. 10106807   Lakehaven Water and Sewer District  March 2020   2020 LAKOTA LIQUID STREAM IMPROVEMENTS – PHASE II  Bid Documents      

  01 30 50 ‐ 4   

1. Bluebeam  REVU  response  time  is  dependent  on  the  Contractor's  equipment, including processor  speed,  Internet access  speed,  current  traffic on  the  Internet, etc.   

2. The Owner will not be liable for any delays associated from the usage of Bluebeam REVU  including,  but  not  limited  to:    slow  response  time,  down  time  periods, connectivity problems, or loss of information.   

3. Under no circumstances shall  the usage of  the Bluebeam REVU be grounds  for a time extension or cost adjustment to the contract.   

PART 2  PRODUCTS  

2.1 DESCRIPTION 

A. Bluebeam REVU software (no equal).   

1. Provided by Bluebeam, Inc., https://www.bluebeam.com/.   

PART 3  EXECUTION  

3.1 BLUEBEAM REVU UTILIZATION 

A. Design  Document  Submittals  –  All  design  drawings  and  specifications  shall  be submitted as PDF attachments to the Bluebeam REVU submittal work flow process and form.   

1. Design Documents shall represent the original bid documents.   

2. Contractor is responsible for conforming sets of documents for use in field.   

B. Shop Drawings ‐ Shop drawing and design data documents shall be submitted as PDF attachments to the Bluebeam REVU submittal work flow process and form.   

1. See Section 01 33 00 for submittal requirements.   

C. Electronic O&M Manuals shall be submitted per Section 01 33 04.   

D. Schedules shall be submitted per the requirements of Section 01 32 17.   

E. Photographs – Pictures shall be uploaded as required by Contract as “.jpg” files to the Bluebeam REVU file location as determined by the Project Representative.   

Page 13: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

SPECIFICATIONS    DIVISION 01 — GENERAL REQUIREMENTS     SECTION 01 30 50     WEB BASED CONSTRUCTION MANAGEMENT  

 HDR Project No. 10106807   Lakehaven Water and Sewer District  March 2020   2020 LAKOTA LIQUID STREAM IMPROVEMENTS – PHASE II  Bid Documents      

  01 30 50 ‐ 5   

F. Product Data (Product Review and Product Information Submittals) – Product catalog data  and manufacturer’s  instructions  shall be  submitted  as PDF  attachments  to  the Bluebeam REVU submittal work flow process and form.   

1. See Section 01 33 00.   

G. Samples – Contractor shall enter submittal data information into Bluebeam REVU with a copy of the submittal form(s) attached to the sample submitted as PDF attachments.   

1. Submit number of samples as required per Section 01 33 00.   

H. RFIs  –  Requests  for  Information  shall  be  submitted  utilizing  the  Bluebeam  REVU workflow process per Section 01 26 13.   

1. Attachments to RFIs shall be uploaded as PDF attachments.   

I. Administrative  Information  –  All  correspondence  and  preconstruction  information shall be  submitted and managed  in Bluebeam REVU  submitted as PDF attachments.  Examples of administrative information include, but are not limited to:   

1. Digging permits and notices for excavation.   

2. List of product substitutions.   

3. List of contact personnel.   

4. Notices for work outside regular hours and utility cut overs.   

5. Bonds and insurance information.   

6. Project permits, including hot work, and updates.   

7. All project serial letters and official correspondence.   

8. All Owner Field Directives will be issued via Bluebeam REVU.   

9. All Owner Requests  for Pricing will be  issued via Bluebeam REVU and  should be managed and processed utilizing the Bluebeam REVU workflow process.   

10. Plans  for  safety,  demolition,  environmental  protection,  and  similar  activities  as required by the Contract.   

11. Quality Control Plan(s), Testing Plan and Log, Quality Control Reports, Production Reports, Non‐Conformance Reports, Punch Lists, Quality Control Specialist Reports, Start‐up and Testing Reports, Field Test Reports, Summary Reports, Rework Items List, Daily Work Logs, Cost Tracking Logs, Schedules, Monthly Reports, etc.   

12. Meeting minutes  for quality control meetings, progress meetings, pre‐installation meetings, and other Contract‐required meetings, etc.   

Page 14: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

SPECIFICATIONS    DIVISION 01 — GENERAL REQUIREMENTS     SECTION 01 30 50     WEB BASED CONSTRUCTION MANAGEMENT  

 HDR Project No. 10106807   Lakehaven Water and Sewer District  March 2020   2020 LAKOTA LIQUID STREAM IMPROVEMENTS – PHASE II  Bid Documents      

  01 30 50 ‐ 6   

13. All general correspondence for the project should be through the Bluebeam REVU system as determined by the Project Representative (versus use of email).   

J. Compliance  Submittals  –  Test  reports,  certificates,  and manufacturer’s  field  report submittals  shall be  submitted on Bluebeam REVU as PDF attachments.   Examples of compliance submittals include, but are not limited to:   

1. Field test reports.   

2. Quality control certifications.   

3. Manufacturer’s  documentation  and  certifications  for  quality  of  products  and materials provided.   

K. Record and Closeout Submittals – Record and closeout submittals shall be submitted on Bluebeam REVU in locations specified by Project Representative as PDF documents during the approval and review stage as specified, with the actual set hard copy and electronic  copy  of  documents  submitted  for  final.    Examples  of  record  submittals include, but are not limited to:   

1. Record Drawings:  Final documents shall be submitted as specified.   

2. Extra Materials,  Spare  Stock,  etc.:    Submittal  forms  shall  indicate  when  actual materials are submitted.   

3. Testing, training, and commissioning documents.   

4. Guarantees/Warranties:  Final documents shall be submitted as specified.   

L. Financial Submittals – Schedule of Value, Pay Estimates, and Change Request Proposals shall  be  submitted  and  processed  in  the  Bluebeam  REVU workflow  process  and  as required by the Contract Documents.   

1. Supporting  material  for  Pay  Estimates,  Change  Requests,  and  other  financial information shall be submitted on Bluebeam REVU as PDF attachments.   

2. Examples of financial  information to be submitted and processed  include, but are not limited to:   

a. Contractor’s Schedule of Values.   

b. Contractor’s Monthly Progress Payment Requests.   

c. Contract Change proposals requested by the Owner.   

d. Contract Requests for Pricing requested by the Contractor.   

e. Change Orders.   

Page 15: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

SPECIFICATIONS    DIVISION 01 — GENERAL REQUIREMENTS     SECTION 01 30 50     WEB BASED CONSTRUCTION MANAGEMENT  

 HDR Project No. 10106807   Lakehaven Water and Sewer District  March 2020   2020 LAKOTA LIQUID STREAM IMPROVEMENTS – PHASE II  Bid Documents      

  01 30 50 ‐ 7   

f. Intent to Pay Certified Payroll.   

1) Contractor shall submit Certified Payroll online per L&I standards.   

g. Affidavits of Wages Paid.   

h. Lien Releases.   

i. All other financial supporting documents as required by the Contract.   

END OF SECTION 

Page 16: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

[This Page Left Blank Intentionally]

Page 17: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

SPECIFICATIONS    DIVISION 01 — GENERAL REQUIREMENTS     SECTION 01 75 00.01     MANUFACTURER’S INSTALLATION CERTIFICATION  

 HDR Project No. 10106807   Lakehaven Water and Sewer District  March 2020   2020 LAKOTA LIQUID STREAM IMPROVEMENTS – PHASE II  Bid Documents      

  01 75 00.01 ‐ 1   

SECTION 01 75 00.01 MANUFACTURER’S INSTALLATION CERTIFICATION 

Contract: Specification Section:

Owner:

Contractor:                           

Equipment Name: Equipment No.:

Manufacturer:                        

The undersigned manufacturer of the equipment item described above hereby certifies that he has  checked  the  installation  of  the  equipment  and  that  the  equipment,  as  specified  in the contract, has been provided in accordance with the manufacturer’s recommendations and that the  trial  operation  of  the  equipment  item  has  been  satisfactory  and  meets  the  contract requirements. 

Comments           

Date Manufacturer

Date Signature of Authorized Representative

Date Contractor

Date Signature of Authorized Representative

Page 18: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

 

 

                   

[This Page Left Blank Intentionally] 

Page 19: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

SPECIFICATIONS    DIVISION 01 — GENERAL REQUIREMENTS     SECTION 01 75 00.02     EQUIPMENT TEST REPORT FORM  

 HDR Project No. 10106807   Lakehaven Water and Sewer District  March 2020   2020 LAKOTA LIQUID STREAM IMPROVEMENTS – PHASE II  Bid Documents      

  01 75 00.02 ‐ 1   

01 75 00.02 EQUIPMENT TEST REPORT FORM 

Note:  This example equipment test report is provided for the benefit of the Contractor and is not specific to any piece of equipment to be installed. The example is furnished as a means of  illustrating the  level of detail required  for the preparation of equipment test report forms and shall be adjusted to meet the specific requirements of the Contract Documents. 

Equipment Name:     

Equipment Number:     

Specification Reference:     

Location:     

PREOPERATIONAL CHECKLIST 

MECHANICAL

  Contractor Vendor Project Rep

  Verified Date Verified Date Verified Date

Lubrication  Alignment  Anchor Bolts  Seal Water System Operational  Equipment Rotates Freely  Safety Guards  Valves Operational  O&M Manual Information Complete  Manufacturer’s Installation Certificate Complete

           

         

Page 20: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

SPECIFICATIONS    DIVISION 01 — GENERAL REQUIREMENTS     SECTION 01 75 00.02     EQUIPMENT TEST REPORT FORM  

 HDR Project No. 10106807   Lakehaven Water and Sewer District  March 2020   2020 LAKOTA LIQUID STREAM IMPROVEMENTS – PHASE II  Bid Documents      

  01 75 00.02 ‐ 2   

ELECTRICAL (Circuit Ring-Out and High-Pot Tehsts)

  Contractor Vendor Project Rep

  Verified Date Verified Date Verified Date

Circuits:  Power to MCC  Control to HOA  Indicators at MCC:  Red (Running)  Green (Power)  Amber (Auto)  Indicators at Local Control Panel  Wiring Labels Complete  Nameplates:  MCC  Control Station  Control Panel  Equipment Bumped for Rotation           

PIPING SYSTEMS

  Contractor Vendor Project Rep

  Verified Date Verified Date Verified Date

Cleaned and Flushed:  Suction  Discharge  Pressure Tests  Temporary Piping Systems in Place        

   

Page 21: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

SPECIFICATIONS    DIVISION 01 — GENERAL REQUIREMENTS     SECTION 01 75 00.02     EQUIPMENT TEST REPORT FORM  

 HDR Project No. 10106807   Lakehaven Water and Sewer District  March 2020   2020 LAKOTA LIQUID STREAM IMPROVEMENTS – PHASE II  Bid Documents      

  01 75 00.02 ‐ 3   

INSTRUMENTATION AND CONTROLS

  Contractor Vendor Project Rep

  Verified Date Verified Date Verified Date

Flow Meter Calibration:  Calibration Report No.  Flow Recorder Calibrated:  Against Transmitter  VFD Speed Indicator Calibrated Against:

           

Independent Reference  Discharge Over-Pressure Shutdown:  Switch Calibration  Simulate Discharge Over-pressure:  Shutdown           

INITIAL OPERATION 

MECHANICAL

  Contractor Vendor Project Rep

  Verified Date Verified Date Verified Date

Motor Operation Temperature Satisfactory

           

Pump Operating Temperature Satisfactory

           

Unusual Noise, Etc.            

Pump Operation:  Measurement:  Flow  Pressure  Test Gauge Number  Alignment Hot  Doweled In           

Page 22: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

SPECIFICATIONS    DIVISION 01 — GENERAL REQUIREMENTS     SECTION 01 75 00.02     EQUIPMENT TEST REPORT FORM  

 HDR Project No. 10106807   Lakehaven Water and Sewer District  March 2020   2020 LAKOTA LIQUID STREAM IMPROVEMENTS – PHASE II  Bid Documents      

  01 75 00.02 ‐ 4   

REMARKS:   

                         

                           

ELECTRICAL

  Contractor Vendor Project Rep

  Verified Date Verified Date Verified Date

Local Switch Function:  Runs in HAND            No Control Power in OFF

Timer Control in AUTO

Overpressure Protection Switch:            

Functional in both HAND and AUTO            

Overpressure Protection Switch Set at XX psig

           

PLC Set at 24 Hour Cycle, XX Minutes ON

           

OPERATIONS TEST 

Continuous  test.  Pump  cycles  as  specified,  indicators  functional,  controls  functional,  pump maintains capacity, over pressure protection remains functional, hour meter functional. 

RECOMMENDED 

Contractor Representative     Date 

ACCEPTED 

Project Representative     Date 

Page 23: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

SPECIFICATIONS    DIVISION 01 — GENERAL REQUIREMENTS     SECTION 01 75 00.03     TRAINING ATTENDANCE FORM  

 HDR Project No. 10106807   Lakehaven Water and Sewer District  March 2020   2020 LAKOTA LIQUID STREAM IMPROVEMENTS – PHASE II  Bid Documents      

  01 75 00.03 ‐ 1   

01 75 00.03 TRAINING ATTENDANCE FORM 

Contract Name:     

Contract No:   Training Date:   

Training Name:    

Trainer: Company:

Phone No.: email address

Attendees:

Name  Company  Phone No.   Email Address 

Page 24: LAKEHAVEN WATER AND SEWER DISTRICT LIQUID ......Page 1 of 3 02/18/2020 LAKEHAVEN WATER AND SEWER DISTRICT 2020 LAKOTA LIQUID STREAM IMPROVEMENTS PHASE II Bid Number: 20‐1490 ADDENDUM

 

 

                    

[This Page Left Blank Intentionally]