Prepared by: Manitoba Hydro Winnipeg, Manitoba November 2018
Lake Winnipeg East System Improvement Transmission Project
Environmental Effects Monitoring Report
Lake Winnipeg East System Improvement Transmission Project 2017/18 Environmental Effects Monitoring Report
Page i
Document Owner Licensing and Environmental Assessment Department Transmission Planning and Design Division Transmission Business Unit Manitoba Hydro Version – Final 2.0
List of Revisions Number Nature of revision Section(s) Revised by Date
1 Corrected camera trap survey results for moose 10.1 MH 10/01/2019
2 Corrected camera trap survey results for white-tailed deer
10.2 MH 10/01/2019
3 Corrected camera trap survey results for wolves 10.3 MH 10/01/2019
Lake Winnipeg East System Transmission Improvement Project 2017/18 Environmental Effects Monitoring Report
Page ii
TABLE OF CONTENTS
1 INTRODUCTION ............................................................................................................................................................... 1
2 PROJECT OVERVIEW ..................................................................................................................................................... 1
3 PROJECT STATUS .......................................................................................................................................................... 1
3.1 Pine Falls Generating Station Switchyard Modifications ..................................................................................... 13.2 115-66kv Transmission Station ........................................................................................................................... 13.3 115 kV Transmission Line ................................................................................................................................... 1
4 ENVIRONMENTAL EFFECTS MONITORING PLAN OVERVIEW ................................................................................. 3
5 IMPLEMENTATION OF MONITORING AND FOLLOW-UP ACTIVITIES....................................................................... 4
6 ENVIRONMENTAL COMPONENT MONITORING .......................................................................................................... 5
7 AQUATICS ........................................................................................................................................................................ 5
8 VEGETATION ................................................................................................................................................................... 5
8.1 Species of Conservation Concern ....................................................................................................................... 58.2 Plants and Plant communities important to Indigenous Peoples ........................................................................ 68.3 Invasive and Non Native Plants ........................................................................................................................... 7
9 BIRDS ............................................................................................................................................................................... 7
9.1 Bird-Wire Collision Monitoring ............................................................................................................................. 79.2 Stick Nests ........................................................................................................................................................... 89.3 Bird Species of Conservation Concern ............................................................................................................... 8
10 MAMMALS ...................................................................................................................................................................... 10
10.1 Moose ................................................................................................................................................................ 1010.2 White-tailed Deer ............................................................................................................................................... 1110.3 Wolves ............................................................................................................................................................... 12
11 ACCESS ......................................................................................................................................................................... 13
12 COMPLIANCE MONITORING ........................................................................................................................................ 13
13 FUTURE MONITORING ................................................................................................................................................. 13
MAPS
Map 1: Lake Winnipeg East System Improvement Transmission Project Area .............................................................. 2Map 2: Lake Winnipeg East System Improvement Transmission Project Monitoring Site Locations ............................. 9
PHOTOS
Photo 1: Construction crews used helicopters to install conductors in 2017/18 ................................................................ 1Photo 2: Final tower construction was completed in 2017/18 ............................................................................................ 1Photo 3: Environmental protection signage installed to assist construction crews ............................................................ 4
Lake Winnipeg East System Improvement Transmission Project 2017/18 Environmental Effects Monitoring Report
Page iii
Photo 4: Access trail monitoring is continuing after decommissioning .............................................................................. 4Photo 5: A small creek south of the Sandy River showing the preservation of the riparian zone and regrowth of
vegetation along the ROW .................................................................................................................................. 5Photo 6: Herbaceous vegetation regrowth on the ROW .................................................................................................... 6Photo 7: Monitoring plot with healthy, fruit-bearing plants within the ROW ....................................................................... 7Photo 8: Highway crossing with encroaching white sweet clover ...................................................................................... 7Photo 9: Biologist conducting a bird-wire collision survey along the right of way .............................................................. 8Photo 10: Canada geese migrating over the transmission line. Bird diverter devices were installed in areas of
high bird activity. .................................................................................................................................................. 8Photo 11: Moose detected in a camera trap ...................................................................................................................... 11Photo 12: White-tailed deer detected in a camera trap on the right of way near Pine Falls generating station ................ 11Photo 13: Graduate students from Memorial University are conducting analysis of wolf home range and
movements in the Project area .......................................................................................................................... 12Photo 14: Student conducting analysis of wolf den in the Project area ............................................................................. 12
TABLES
Table 1: 2017/18 Monitoring Activities by Environmental Component .............................................................................. 5
Lake Winnipeg East System Transmission Improvement Project 2017/18 Environmental Effects Monitoring Report
Page iv
Abbreviations ac Alternating Current
EA Environmental Assessment
EEMP Environmental Effects Monitoring Plan
EPIMS Environmental Protection Information Management System
EPP Environmental Protection Program
GPS Geographic Positioning System
km kilometre
LWESI Lake Winnipeg East System Improvement
kV kilovolt
m metres
PR Provincial Road
ROW Right-of-Way
SD Sustainable Development
Lake Winnipeg East System Improvement Transmission Project 2017/18 Environmental Effects Monitoring Report
Page 1
1 INTRODUCTION
ThisreportpresentstheresultsoftheenvironmentaleffectsmonitoringplanfortheLakeWinnipegEastSystemImprovement(LWESI)Transmission Project,herebyknownas“theProject”.Thisreportisproducedincompliancewithclause43ofTheEnvironmentActlicenceNo.3210.ManitobaHydropresentsthisinformationtoinformstakeholdersandthegeneralpubliconprogressmadeonconstructionandimplementationofmitigationmeasuresthatminimizeenvironmentaleffects.
ThisistheProject’sthirdannualmonitoringreportanddescribesconstructionprogressfromApril1,2017throughMarch31,2018,butalsoincludessomemorerecentmonitoringresults.Map1outlinestheLakeWinnipegEastSystemImprovementTransmissionProjectarea.AnyoneinterestedinfurtherinformationaboutthisreportortheProjectisinvitedtocontactManitobaHydroat:
LicensingandEnvironmentalAssessment360PortageAvenue(5),WinnipegMBR3C0G81‐877‐343‐1631or204‐360‐7888
2 PROJECT OVERVIEW TheLakeWinnipegEastSystemImprovementTransmissionProjectinvolvestheconstructionandoperationofanew75km115kVtransmissionlinefromtheTownofPowerview‐PineFallstoManigotaganCornerStation,anew115‐66kVtransmissionstationwestoftheintersectionofProvincialRoad(PR)304andRiceRiverRoad,andmodificationstotheexistingPineFallsGeneratingStationSwitchyard. 3 PROJECT STATUS
ConstructionoftheProjectbeganinAugust2015.TheprojectofficiallycameintoserviceonJune30th,2018.
3.1 Pine Falls Generating Station Switchyard Modifications
ImprovementstothePineFallsGeneratingStationswitchyardwererequiredtoaccommodatetheProject.Stagingandoutagecoordinationactivitiesarecompletedincludingrelaybuildingmodifications,cabletrenchextensions,breakerreplacementszoneboxinstallationandtheinstallationofanewbusconductor.
3.2 115-66kv Transmission Station Thenew115‐66kvswitchingstationnearManigotaganacceptspowerfromthegeneratingstationviaanew75kmtransmissionline.StationconstructionwascompletedinApril2018.
3.3 115 kV Transmission Line Clearingofthe60meterROW(rightofway)wasconductedinthewinter2015/16injointventureswithSagkeengFirstNation,BlackRiverFirstNation,HollowWaterFirstNationandelectricalutilitycontractors.Towerassemblywasconductedin2016/17injointventureswiththesamecommunities.Foundationconstructionandtowererectionwerecompletedinspring2017.TransmissionlinestringingwascompletedinFebruary2018.
Photo1: Constructioncrewsusedhelicopterstoinstallconductorsin2017/18
Photo2: Finaltowerconstructionwascompletedin2017/18
Lake Winnipeg East System Improvement Transmission Project 2017/18 Environmental Effects Monitoring Report
Page 2
Map1: LakeWinnipegEastSystemImprovementTransmissionProjectArea
Lake Winnipeg East System Improvement Transmission Project 2017/18 Environmental Effects Monitoring Report
Page 3
4 ENVIRONMENTAL EFFECTS MONITORING PLAN OVERVIEW
ManitobaHydro’scommitmenttoenvironmentalprotectionincludesthedevelopmentofacomprehensiveEnvironmentalProtectionProgram(EPP)fortheProject.Thisincludesmonitoringandfollow‐upofbiophysicalenvironmentalcomponentsidentifiedintheenvironmentalassessment.TheEnvironmentalEffectsMonitoringPlan(EEMP)wasapprovedbytheDepartmentofSustainableDevelopment(SD)onAugust9th,2016,andoutlinesthevariousmonitoringactivitiesthatwilloccurduringthedifferentphasesoftheProject.
Thescopeofthisplanincludesphysicalandbiologicalcomponentsoftheenvironment.ThepurposeoftheEEMPistoidentifythekeyactivitiesthatwillbeconductedaspartofthemonitoringandfollow‐upcomponentoftheEnvironmentalProtectionProgramthatwillverifypotentialeffectsandeffectivenessofmitigation.
TheobjectivesoftheEEMPareto:
Confirmthenatureandmagnitudeofpredictedenvironmentaleffectsasstatedintheenvironmentalassessment(EA);
Assesstheeffectivenessofmitigationmeasuresimplemented;
IdentifyunexpectedenvironmentaleffectsoftheProject,iftheyoccur;
Identifymitigationmeasurestoaddressunanticipatedenvironmentaleffects,ifrequired;
Confirmcompliancewithregulatoryrequirements;and
Providebaselineinformationtoevaluatelong‐termchangesortrends.
Environmentalcomponentsrequiringfollow‐upmonitoringarediscussedfurtherinthisannualEnvironmentalEffectsMonitoringReportinclude:
Aquatics;
Vegetation;
Birds;
Mammals;and
Access
2017/18EnvironmentalEffectsMonitoringHighlights
Keymonitoringhighlightsduringthisreportingperioddescribedinfurtherdetailinthisdocumentinclude: Surveysidentifiedthatmostvegetationspeciesofconservationconcernwereingoodconditionwithsome
potentiallybenefittingfromtheright‐of‐wayclearingactivitiesasaresultofadditionalsunlightandreducedcompetitionaffordedtoherbaceousplants.
PlantsandplantcommunitiesimportanttoIndigenouspeoplesappearedtobethrivinginmostareas. PlantspeciesimportanttoIndigenouspeoplesforfoodormedicineappearedtobehavinganexcellent
yearforfruitingwithblueberryandcranberryspeciesfruitingprofuselywithinthetransmissionlineROW. Aquaticplantspeciesincludingsweetflag(Weekay),wildriceandsessile‐fruitedarrowheadwereall
observedtobeingoodconditionwithabundantfloweringorfruiting. WillowcuttingswereplantedatlocationswherethetransmissionlinecrossesPTH304toenhancethe
visualbarrieraffordedbywoodyvegetation.Resultsfromfollow‐upsurveysindicatethatplantingsurvivalwasverylow.Timingofplanting,andhotdryweatherlikelypreventedbettersurvival.Followupmonitoringisplannedforspringof2019.
Bird‐wirecollisionmonitoringwasconductedatallmajorrivercrossings.Sixbirdcollisionswereidentifiedacrosseightdaysofintensivesurveys.Theseresultsindicateaverylowrateofbird‐wirecollisionsandsignifytheeffectivenessofbirddivertermitigation.
Anaerialsurveywasconductedintheprojectareaformoose,white‐taileddeer,andwolves.94moose,ninewhite‐taileddeerandtwowolvesweredetectedduringthethreedaysurvey.
WiththesupportofManitobaHydro,aGPSwolfstudyhasbeenongoingwithinandneighbouringtheProjectstudyareabyaPhDcandidatefromMemorialUniversity.PreliminaryinformationfromaPhDstudyonwolfmovementsintheregionindicatesthatwolveshaveavoidedtheProjectarea,todate,thereforelimitingthelikelihoodofincreasedmoosepredationasaresultoftheProject.
Lake Winnipeg East System Improvement Transmission Project 2017/18 Environmental Effects Monitoring Report
Page 4
Adaptive Management
ManitobaHydrohasaccumulatedawealthofknowledgeandlessonslearnedfrompreviousmonitoringprograms.ThesuccessesofthoseprogramshavebeenusefulindevelopingtheEEMPfortheProject.Thispreviousexperiencehasbeenusedtoimproveupontheplan’sapproach,methodsandkeyenvironmentalmonitoringactivities.
Goingforward,anadaptivemanagementframeworkwillcontinuetobeusedtodealwithunexpectedoutcomesoreventsbasedonmonitoringinformationgathered.DatawillbereviewedascollectedtodetermineifanyoftheenvironmentalthresholdsspecifiedintheEEMPhavebeenexceededduetoshortfallsinimpactprediction,ineffectivemitigationmeasuresorinadequatemonitoringapproaches.Actionswillbedevelopedinresponsetothesecontingencies.
5 IMPLEMENTATION OF MONITORING AND FOLLOW-UP ACTIVITIES
Environmentalmonitoringhelpsvalidatetheaccuracyoftheenvironmentalassessmentandeffectivenessofmitigationmeasures.ManitobaHydroutilizesinternalstafffortheimplementationoftheEEMP,fundedparticipationofIndigenouscommunityrepresentatives,andretainedhighlyqualifiedspecialistsinappropriatedisciplines.ManitobaHydro’sEnvironmentalProtectionInformationManagementSystem(EPIMS)willalsoplayamajorroleinmanagingtheEEMPimplementation,coordinationoffieldwork,datacollectionandcommunicationsamongstthemonitoringteam.
Environmental Inspection Staff ReportingtoaSeniorManitobaHydroEnvironmentalAssessmentOfficer,anon‐siteconstructionEnvironmentalInspectorwasretainedandtrainedforthe2017/18transmissionlineconstructionseason.Inaddition,ManitobaHydro’sLicensingandEnvironmentalAssessmentDepartmentprovidedadviceandguidancetoenvironmentalinspectorsonallconditionsoutlinedintheEnvironmentActlicence.
Community Involvement
InadditiontoprovidingemploymentandbusinessopportunitiesthroughtheProject,ManitobaHydroiscommittedtoengaginglocalcommunity‐basedenvironmentalexpertiseduringtheconstructionoftheProject.In2017/18,ManitobaHydroapproachedaffectedFirstNationcommunitiestorequesttheyrecommendinterestedindividualsfromtheircommunitytoworkascommunityrepresentativesfortheProject.
ThiscommunitiyrepresentativepositionprovidedanopportunityforanindividualfromSagkeengFirstNationtoperformsitevisitsandobserveongoingconstructionactivities.Thecommunityrepresentitivewastrainedinenvironmentalprotectionprocedures,equipmentandinspectiondocumentation.Environmentalysensitivesiteswereevaluatedforpropersignageandidentificationand
mitigationmeasurecompliance(Photo3and4).Thecommunityrepresentitiveservedasbothenvironmentalmonitorandcommunityliaison.AsacommunityliaisonhekeptcommunityleadershipinformedonthestatusofconstructionactivitiesthroughdailyreportingandalsoinformedtheManitobaHydroconstructionsupervisorofanycommunityrelatedconcerns.
Data Management AstheProject’sEEMPrequiresandgenerateslargeamountsofdata,theEPIMSwasdevelopedtomanage,storeandfacilitatethetransferofEnvironmentalProtectionProgramdataandinformationamongsttheProjectteam.TheEPIMSwillfacilitatethetransferofknowledgeandexperiencesencounteredonadailybasisduringconstructionactivitiesfromenvironmentalinspectorsandcommunityenvironmentalmonitorstospecialiststhatareresponsibleformonitoringprojecteffectsonarealtimebasis.Aswell,monitoringresultsandmitigationmeasureadaptationswillbecommunicatedbacktoconstructionstaffandcontractors.
Photo3: Environmentalprotectionsignageinstalledtoassistconstructioncrews
Photo4: Accesstrailmonitoringiscontinuingafterdecommissioning
Lake Winnipeg East System Improvement Transmission Project 2017/18 Environmental Effects Monitoring Report
Page 5
6 ENVIRONMENTAL COMPONENT
MONITORING
Multipleenvironmentalcomponentswereidentifiedforfollow‐upintheenvironmentalassessmentandtechnicalreports.Foreachenvironmentalcomponent,oneormoreenvironmentalindicatorswereselectedtofocusmonitoringandfollow‐upeffortsasindicatedintheEEMP(Table1).Map2showsanoverviewofmonitoringsitelocations.
7 AQUATICS
ThepotentialeffectoftheProjectonaquaticswasacomponentoftheenvironmentalassessment.Oneofthemainriskstoexistingfishhabitatfromtransmissionlineconstructionisdamagetostreambanksandriparianvegetationleadingtolossofcoverandin‐streamsedimentdelivery.Inrecognitionofthis,mitigationmeasuressuchasbufferswereprescribedtoprotectstreamsandhabitat.Themonitoringprogramforthiscomponentwasfocusedonevaluatingtheeffectivenessofmitigationatstreamcrossingsandprescribinganyremedialactions.Finalsitevisitswereconductedin2017fromahelicopterandgroundsurveys.Allsiteswereincompliancewithnoadditionalmitigationrequired.Thefinalreportwascompletedin2016/17.Noaquaticsrelatedsurveyswereconductedin2017/18.
Photo5: AsmallcreeksouthoftheSandyRivershowingthepreservationoftheriparianzoneandregrowthofvegetationalongtheROW
8 VEGETATION
VegetativechangecanbeanimportantindicatorofenvironmentaleffectsoftheProject.
8.1 Species of Conservation Concern
SurveysconductedfromJuly24‐27,2018atsevenplotsidentifiedthatmostspeciesofconservationconcern(SCC)wereingoodconditionwithsomepotentiallybenefitingfromtheright‐of‐wayclearingactivitiesasaresultofadditionalsunlightandreducedcompetitionaffordedtoherbaceousplants.
Table 1: 2017/18 Monitoring Activities by Environmental Component
Component EnvironmentalIndicator 2017/18MonitoringStatus
Aquatics ConditionofWatercourseandBanks Completed
Vegetation
VegetationSpeciesofConservationConcern Plantsurveyconducted
PlantsandPlantCommunitiesimportanttoAboriginalpeoples Plantsurveyconducted
Rehabilitation Plantsurveyconducted
InvasiveandNon‐NativeSpecies Plantsurveyconducted
Birds
StickNests NoneidentifiedwithintheProjectright‐of‐way
BirdCollisionandBirdDiverterMonitoring Conductedinspringandautumn2018
BirdSpeciesofConservationConcern Completed
Mammals
Moose Aerialandgroundsurveysconducted
White‐tailedDeer Aerialandgroundsurveysconducted
Wolves Aerialandgroundsurveysconducted
Access HumansonROW Humanaccesssurveyongoing
Lake Winnipeg East System Improvement Transmission Project 2017/18 Environmental Effects Monitoring Report
Page 6
ConfirmthenatureandmagnitudeofpredictedenvironmentaleffectsasstatedintheEA:
AspredictedintheEA,somelossofhabitathasoccurredforrareanduncommonplantswithintheProjectarea,includingsomeelmandashspecies.HoweverthehabitatchangeshavebeenconfinedtotheProjectright‐of‐wayandstationsite.Dwarfbilberry(Vacciniumcaespitosum)hasstillnotreemergedatonesitewhereitwaspreviouslyfoundontheROW.There‐appearanceofDwarfBilberrymayrequireseveralyears.
Assesstheeffectivenessofmitigationmeasuresimplemented:
Withtheexceptionofdwarfbilberry,whichcouldnotberelocatedatonesite,mitigationmeasureshaveensuredthatvegetationatEnvironmentallySensitiveSitesisingoodconditionfollowingconstruction.
IdentifyunexpectedenvironmentaleffectsoftheProject,iftheyoccur:
Withtheexceptionofdwarfbilberry,whichcouldnotberelocatedatonesite,nounexpectedenvironmentaleffectshavebeenobserved.
Identifymitigationmeasurestoaddressunanticipatedenvironmentaleffects,ifrequired:
Todate,nonerequired.
Confirmcompliancewithregulatoryrequirements:
Compliancewithregulatoryrequirementscontinues.
Providebaselineinformationtoevaluatelong‐termchangesortrends:
Surveyinformationwillcontributetoevaluatinglong‐termchangesortrendsinSCCinthisProjectarea.
Photo6: HerbaceousvegetationregrowthontheROW
8.2 Plants and Plant communities important to Indigenous Peoples
SurveysconductedJuly24‐27,2018at17plotsidentifiedthatmostspeciesofimportancetoIndigenouspeoplesappearedtobethrivingintheProjectROW.
ConfirmthenatureandmagnitudeofpredictedenvironmentaleffectsasstatedintheEA:
AspredictedintheEA,somelossofhabitathasoccurredforplantsimportanttoIndigenouspeopleswithintheProjectarea.Howevermanyspecieswerehavinganexcellentyearforfruitingwithblueberryandcranberryspeciesfruitingprofuselywithintheright‐of‐way.Aquaticpalntspeciesincludingsweetflag(weekay),wildriceandsessile‐fruitedarrowheadwereallobservedtobeingoodconditionwithabundantfloweringorfruiting.
Assesstheeffectivenessofmitigationmeasuresimplemented:
Ingeneral,dueinparttotheeffectivenessofmitigationmeasuresandsuitablemoistureconditionsplantsinsurveyedplotsappearedtobeingoodandhealthycondition.
IdentifyunexpectedenvironmentaleffectsoftheProject,iftheyoccur:
Despitetheremovalofmulchmaterial,there‐appearanceofdwarfbilberryatonesurveysitehasnotoccurredasexpected.Dependingonfuturemoistureconditionsthisplotmayrequireafewmoreyearstoreestablish.
Identifymitigationmeasurestoaddressunanticipatedenvironmentaleffects,ifrequired:
Todate,nonerequired.
Confirmcompliancewithregulatoryrequirements:
Compliancewithregulatoryrequirementscontinues.
Providebaselineinformationtoevaluatelong‐termchangesortrends:
Surveyinformationwillcontributetoevaluatinglong‐termchangesortrendsinplantsimportanttoIndigenouspeoplesinthisProjectarea.
Lake Winnipeg East System Improvement Transmission Project 2017/18 Environmental Effects Monitoring Report
Page 7
Photo7: Monitoringplotwithhealthy,fruit‐bearingplantswithintheROW
8.3 Invasive and Non Native Plants SurveyswereconductedinJuly2018atkeylocationsalongtheROW.Whitesweetclover(Melilotusalbus)andCanadathistle(Cirsiumarvense)continuetobethetwomostprevalentnon‐nativeandinvasivespecieswithintherightofway.
ConfirmthenatureandmagnitudeofpredictedenvironmentaleffectsasstatedintheEA:
AspredictedintheEA,Projectconstructionhadminimaleffectonthespreadofinvasivespecies.Non‐nativeorinvasiveplantswereobservedalongsomeportionsofthetransmissionline,typicallyclosetoPTH304, but these species were very likely present prior to the clearing of vegetation and have since benefitted from the reduction in tree and shrub cover.Thesespeciescontinuetobefoundonlywithinuplandareaswithwetlandcommunitieslargelyfreeofthesespecies.
Assesstheeffectivenessofmitigationmeasuresimplemented:
MitigationactionsintheconstructionEnvironmentalProtectionPlantolimittheexposureofmineralsoilsbyclearingequipmentappearedtobeatleastpartiallysuccessfully.Theperiodicregrowthoftreeandshrubcoverwillnaturallysuppressthesespeciesinthefuture.
IdentifyunexpectedenvironmentaleffectsoftheProject,iftheyoccur:
Nounexpectedenvironmentaleffectshavebeenobserved.
Identifymitigationmeasurestoaddressunanticipatedenvironmentaleffects,ifrequired:
ManitobaHydroanditscontractorswillcontinuetoapplyacleanequipmentprotocoltolimitthespreadofthesespecies.
Providebaselineinformationtoevaluatelong‐termchangesortrends:
Surveyinformationwillcontributetoevaluatinglong‐termchangesortrendsininvasiveplantsinthisProjectarea.
Photo8: Highwaycrossingwithencroachingwhitesweetclover
9 BIRDS 9.1 Bird-Wire Collision Monitoring Thepresenceoftransmissionlinesinproximitytoareasofhighbirdactivitymayleadtobird–wirecollisions.ManitobaHydroinstalledbirddivertersalongtransmissionlinesectionsthattransectareasofhighbirdactivity.Pre‐constructionsurveysidentifiedsensitivesitesforbirds,whichwereusedtoselectlocationsforbirddiverters.Bird‐wirecollisionmonitoringwasconductedinthespringandautumnof2018,aftertheprojectwascompleted.
ConfirmthenatureandmagnitudeofpredictedenvironmentaleffectsasstatedintheEA:
AspredictedintheEA,somebird‐wirecollisionswereanticipatedasaresultoftheProject.Itwasalsopredictedthatalthoughsomeindividualbirdsmaycollidewithwires,otherwisehealthypopulationsarenotexpectedtobeaffected.Monitoringsurveyshaveconfirmedthatbird‐wirecollisionratesarewellbelowNorthAmericanaverages,andhealthypopulationshavenotbeenaffected.
Assesstheeffectivenessofmitigationmeasuresimplemented:
Mitigationefforts,includingProjectroutingandinstallationofbirddivertersappeartobeeffective.
Lake Winnipeg East System Improvement Transmission Project 2017/18 Environmental Effects Monitoring Report
Page 8
IdentifyunexpectedenvironmentaleffectsoftheProject,iftheyoccur:
Nounexpectedenvironmentaleffectshavebeenobserved.
Identifymitigationmeasurestoaddressunanticipatedenvironmentaleffects,ifrequired:
Todate,nonerequired.
Confirmcompliancewithregulatoryrequirements;
Compliancewithregulatoryrequirementscontinues.
Providebaselineinformationtoevaluatelong‐termchangesortrends:
Surveyinformationwillcontributetobroaderandlong‐termtrendsinbird‐wirecollisionsacrossManitobaHydroinfrastructure.
Photo9: Biologistconductingabird‐wirecollisionsurveyalongtherightofway
Photo10: Canadageesemigratingoverthetransmissionline.Birddiverterdeviceswereinstalledinareasofhighbirdactivity.
9.2 Stick Nests
AnaerialsticknestsearchwasconductedbyanexperiencedbiologistpriortoProjectclearingin2015.Nosticknestsweredetectedandthereforenoadditionalmitigationormonitoringwasrequired.
9.3 Bird Species of Conservation Concern
Birdspeciesofconservationconcernmonitoringiscompleteandwasreportedoninthe2016/17annualreport.
Lake Winnipeg East System Improvement Transmission Project 2017/18 Environmental Effects Monitoring Report
Page 9
Map2: LakeWinnipegEastSystemImprovementTransmissionProjectMonitoringSiteLocations
Lake Winnipeg East System Improvement Transmission Project 2017/18 Environmental Effects Monitoring Report
Page 10
10 MAMMALS
ThepotentialeffectoftheProjectonmammalswasthefocusoftheenvironmentalassessmentespeciallyformoose(Alcesalces),wolves(Canislupus),andwhite‐taileddeer(Odocoileusvirginianus).AllspeciesoccurwithintheLakeWinnipegEastSystemImprovementTransmissionProjectstudyarea.
Theoverallobjectivesofthemammalsmonitoringprogramaretoexpandbaselineknowledge,ensurecompliancewithregulatoryrequirementsandenvironmentalreportcommitments,monitorandmeasuremammalresponsestoROWcreation,andassessthesuccessofmitigationmeasures.TheEEMPoutlinesthespecies‐specificmonitoringcommitmentsformoose,wolves,andwhite‐taileddeer.
10.1 Moose
ManitobaHydroconductedanintensiveaerialungulatesurveyoftheProjectareafromFebruary11‐14,2018.47surveyblockswereidentified(‘3minutegrid’–3.5kmx5.5km)thatintersectafivekilometerbufferoftheLWESIright‐of‐way.ThesesurveyblockswerederivedfromthesamespatialgridManitobaSustainableDevelopmentutilizesinconductingGassaway‐stylemoosepopulationsurveysinGameHuntingArea26.
ABell206JetRangerhelicopterwasusedtoflya500mspacingintensivegridsurveyata122maltitudewithanaverageairspeedof100km/hr.Pre‐loadedGPSflightlinesensuredcompletecoverageonaeasttowestorientation.Twoexperiencedobserversrecordedobservationsofmoose,white‐taileddeer,wolves,andtracksofmoose,deer,wolvesandsnowmobiles.
Atotalof94mooseweredetectedduringthesurveywiththebull:cow:calfratioof35:40:19.7.5%ofthecowshadtwins.Thisequatestoanaveragedensityofapproximately10moose/100km².Areducednumberofmooseweredetectedin2018than2017,butnumbersweresimilarto2016.
Mooseappearedtohaveanunevendistributioninthesurveyarea,butweregenerallyfoundinhighernumberstotheeastoftheProjectarea.
TheaveragedistanceofmoosetotheROWwas3,914m,asmallincreasefrom3,753min2017,butsimilarto3,915mdetectedin2016.AveragedistancetoProvincialTrunkHighway304was3,483m,alsoasmallincreasefrom3,093min2017butsimilarto3,525mdetectedin2016.Approximately25%ofmooseexhibitedmoderatehairlossduetowintertick.
Although2017/18wasthefinalyearforaerialsurveys,anadditionalyearofmonitoringwillbeaddedtothesurveyschedule.Thischangeisbeingmadeasapartofadaptivemanagementtoaccountfordelaysintheconstructionscheduleandvariationinsurveyresults.Theadditionalsurveywillhelpinunderstandingchangesinmoosedistributionandprovidesomeinferencesonchangesinrelativeabundanceofbothmooseandwhite‐taileddeer.
Earlyresultsfromthecameratrapsurveyhaveshownthepresenceofmooseoccuringat4of5ROWmonitoringsitesand4of5controlmonitoringsitesoveranaverage158trapdaysin2017/18.Whendatawaspooled,therewasnosignificantdifferencebetweenthenumberofmoosedetectedontheROWmonitoringsitesversusthecontrolmonitoringsites(p‐value=0.0867).Alargersamplesizeinfutureyearstoallowformorefulsomeanalysis.
NomoosewerekilledorinjuredaspartoftheProjectactivitiesandnomoosecarcassesorevidenceofmoosemortalitieswereidentifiedbyconstrutioncrewsin2017/18.Inadditionbird,vegetation,mammalsmonitoringcrewsdidnotfindanyevidenceofmoosemortalitieswhileconductingtheirfieldactivities.
ConfirmthenatureandmagnitudeofpredictedenvironmentaleffectsasstatedintheEA:
AspredictedintheEA,somehabitatlossandalterationhasoccurredasaresultoftheProject.HoweverthechangeshavebeenconfinedtotheProjectright‐of‐wayandstationsite.Whenconsideringthedatacollectedaspartofmultiyearaerialsurveys,therehasbeenlittleevidencethatmoosehaveavoidedtheProjectarea.NoProjetrelatedmoosemortalitiesduetovehiclecollisionsorothersourceshavebeenreportedbyenvironmentalinspectorsorconstructioncrews.
PreliminaryinformationfromaPhDstudyonwolfmovementsintheregionindicatesthatwolveshaveavoidedtheProjectarea,todate,thereforelimitingthelikelyhoodofincreasedmoosepredationasaresultoftheProject.
Assesstheeffectivenessofmitigationmeasuresimplemented:
Mitigationefforts,includingProjectrouting,vegetationbuffers,accessmanagement,andconstructiontimingwindowsappeartohavebeeneffective.
IdentifyunexpectedenvironmentaleffectsoftheProject,iftheyoccur:
Nounexpectedenvironmentaleffectshavebeenobserved.
Identifymitigationmeasurestoaddressunanticipatedenvironmentaleffects,ifrequired:
Todate,nonerequired.
Confirmcompliancewithregulatoryrequirements:
Compliancewithregulatoryrequirementscontinues.
Providebaselineinformationtoevaluatelong‐termchangesortrends:
Thismonitoringwillhelpinunderstandingchangesinmoosedistributionandprovidesomeinferencesonchangesinrelativeabundanceofbothmooseandwhite‐taileddeerintheProjectarea.
Lake Winnipeg East System Improvement Transmission Project 2017/18 Environmental Effects Monitoring Report
Page 11
Photo11:Moosedetectedinacameratrap
10.2 White-tailed Deer
ManitobaHydroconductedanintensiveaerialungulatesurveyoftheProjectareafromFebruary11‐14,2018.47surveyblockswereidentified(‘3minutegrid’–3.5kmx5.5km)thatintersectafivekilometerbufferoftheLWESIright‐of‐way.ThesesurveyblockswerederivedfromthesamespatialgridManitobaSustainableDevelopmentutilizesinconductingGassaway‐stylemoosepopulationsurveysinGameHuntingArea26.
ABell206JetRangerhelicopterwasusedtoflya500mspacingintensivegridsurveyata122maltitudewithanaverageairspeedof100km/hr.Pre‐loadedGPSflightlinesensuredcompletecoverageonaeasttowestorientation.Twoexperiencedobserversrecordedobservationsofmoose,white‐taileddeer,wolves,andtracksofmoose,deer,wolvesandsnowmobiles.
Atotalofninedeerweredetectedinthesurvey.Nodeerordeertracksweredetectedinthenorthernportionofthestudyarea.
Earlyresultsfromthecameratrapsurveyhaveshownthepresenceofwhite‐taileddeeroccuringat2ofthe5ROWmonitoringand2ofthe5controlsitesafter~158trapdaysin2017/18.Whendatawaspooled,significantlymoredeerweredetectedontheROWmonitoringsitesthenatcontrolmonitoringsites(p‐value<0.001).White‐taileddeerwereprimailydetectedinthesouthernportionofthestudyarea.
Nowhite‐taileddeerwerekilledorinjuredaspartoftheProjectactivitiesin2017/18.
Theoveralllownumberofwhite‐taileddeerdetectedduringthissurveyperiodcorrespondestowhatwasdetectedinprevioussurveyperiods.Therecentscarcityofdeerinthisstudyareahasbeenattributedtoseverewintersin2013/14and2014/15.
ConfirmthenatureandmagnitudeofpredictedenvironmentaleffectsasstatedintheEA:
AspredictedintheEA,somehabitatlossandalterationhasoccurredasaresultoftheProject.HoweverthechangeshavebeenconfinedtotheProjectROWandstationsite.
Assesstheeffectivenessofmitigationmeasuresimplemented:
Mitigationefforts,includingProjectrouting,vegetationbuffes,accessmanagement,andconstructiontimingwindowsappeartobeeffective.
IdentifyunexpectedenvironmentaleffectsoftheProject,iftheyoccur:
Nounexpectedenvironmentaleffectshavebeenobserved.
Identifymitigationmeasurestoaddressunanticipatedenvironmentaleffects,ifrequired:
Todate,nonerequired.
Confirmcompliancewithregulatoryrequirements;
Compliancewithregulatoryrequirementscontinues.
Providebaselineinformationtoevaluatelong‐termchangesortrends:
Thismonitoringwillhelpinunderstandingchangesinwhite‐taileddeerdistributionandprovidesomeinferencesonchangesinrelativeabundanceofbothmooseandwhite‐taileddeerintheProjectarea.
Photo12: White‐taileddeerdetectedinacameratrapontherightofwaynearPineFallsgeneratingstation
Lake Winnipeg East System Improvement Transmission Project 2017/18 Environmental Effects Monitoring Report
Page 12
10.3 Wolves
Earlyresultsfromthecameratrapprogramhaveshownthatwolveshavebeendetectedon1of5ROWmonitoringsites,and2of5controlmonitoringsitesafter~157trapsdaysin2017/18.Whendatawaspooled,significantlymorewolvesweredetectedonthecontrolmonitoringsitesthenatROWmonitoringsites(p‐value<0.001).
Twowolvesweredetectedaspartofintensiveaerialungulatesurveysformooseandwhite‐taileddeer.
ManitobaHydrohassponseredaMemorialUniversityPhDstudentwhoisinvestigatingthemovementpatternsofwolvesalonglinearfeatures(e.g.highways,gravelroads,trails,transmissionlines)insoutheasternManitoba.Thismulti‐yearstudyinvolvesplacingGPScollarsonwolvesandtrackingthemthroughouttheyear.TheresultswillhelpManitobaHydrounderstandtheextentwolvesuselinearfeatures,andothernaturalfeaturestomovewithintheirenvironment.
EarlyresultsofthisstudyhaveshownthatalllinearfeaturesinthestudyareawereselectedforbywolveswiththeexceptionoftransmissionROWsadjacenttoaprimaryroad.Amonglinearfeaturesselectedfor,secondaryroadshadthehighestprobabilityofuse,followedbyROWswithoutanadjacentprimaryroadandwaterways.
TransmissionROWswithanadjacentprimaryroad,includingtheLakeWinnipegEastSystemImprovementProjectwereavoidedbywolves.Thecontinuationofthismulti‐yearstudywillhelpimproveourunderstandingofwolfmovements.
NowolveswerekilledorinjuredaspartoftheProjectactivitiesin2017/18.InadditionnowolfmortalitieswereobservedbyProjectstaff(i.e.hunterorvehiclecollisions).
ConfirmthenatureandmagnitudeofpredictedenvironmentaleffectsasstatedintheEA:
AspredictedintheEA,somehabitatlossandalterationhasoccurredasaresultoftheProject.HoweverthehabitatchangeshavebeenconfinedtotheProjectright‐of‐wayandstationsite.
Assesstheeffectivenessofmitigationmeasuresimplemented:
Mitigationefforts,includingProjectrouting,vegetationbuffes,accessmanagement,andconstructiontimingwindowsappeartobeeffective.
IdentifyunexpectedenvironmentaleffectsoftheProject,iftheyoccur:
Nounexpectedenvironmentaleffectshavebeenobserved.
Identifymitigationmeasurestoaddressunanticipatedenvironmentaleffects,ifrequired:
Todate,nonerequired.
Confirmcompliancewithregulatoryrequirements;
Compliancewithregulatoryrequirementscontinues.
Providebaselineinformationtoevaluatelong‐termchangesortrends:
ThismonitoringwillhelpinunderstandingchangesinwolfdistributionandprovidesomeinferencesonchangesinmovementsbeforeandaftertheProject.
Photo13: GraduatestudentsfromMemorialUniversityareconductinganalysisofwolfhomerangeandmovementsintheProjectarea
Photo14: Studentconductinganalysisofwolfdeninthe
Projectarea
Lake Winnipeg East System Improvement Transmission Project 2017/18 Environmental Effects Monitoring Report
Page 13
11 ACCESS InSeptember2015,ManitobaHydrobeganright‐of‐wayaccessmonitoringwithcameratrapsonexistingall‐weatheraccesstrailsalongtheProjectarea.InMay2016,aftertheconstructionseason,allcameratrapswereredeployedalongtheexistingsitesaswellasfourmorealongtheclearedROWtodocumentthefrequencyofaccessalongtheaccessroadaswellastheROW.These20cameraswillcontinuetobemaintainedinthe2017/18monitoringperiod.Analysisofthephotoscapturedhasyettobeconducted,butpreliminaryresultsindicatelowhumanuse.DetailedanalysiswillassistindocumentingchangeofwildlifeandhumanuseoftheProjectarea.OncetheProjectwasin‐serviceaccesstraildecommissioningwasinitiatedasrequiredbyManitobaSustainableDevelopment.Thisinvolvedtheplacinglargeboulders,trenching,andfellingtreesoverunnecessaryaccesstrailstopreventfuturevehiculartraffic.
12 COMPLIANCE MONITORING
CompliancemonitoringinvolvesreviewingProjectactivitiesforadherencetolegislation,licenceconditions,permits,andenvironmentalprotectionplans.
ThecompliancemonitoringprogramincludedtheuseofadedicatedenvironmentalinspectortoobserveandverifytheimplementationofallProjectrelatedmitigationmeasures.Communityrepresentativesalsosupportedtheseeffortstowardscompliancemonitoring.Informationgeneratedfromthisprogramisusedwithinadaptivemanagementtoimprovebothmitigationmeasureeffectivenessandoverallmonitoringprogramdesign.
AManitobaSustainableDevelopmentConservationOfficerconductedroutineinspectionsoftheProject.Forthe2017/2018constructionseason,noenforcementwarningsornoticeswereissued.
13 FUTURE MONITORING
Thefollowingmonitoringactivitiesareplannedfor2018/19.Theenvironmentaleffectsmonitoringplancontainsdetaileddescriptionsofallmonitoringactivities.Communityrepresentativesfromlocalindigenouscommunitieswillcontinuetobeinvitedtoparticipateandandprovideinputintothemonitoringprogram.
Aquatics
Streamcrossingsurveysarenowcompleted.
Birds
Birdrelatedsurveysarenowcompleted.
Vegetation
Postconstructionsurveyswillcontinuein2018/19inaccordancewiththeEEMP.Thisincludessurveysforspeciesofconservationconcern,non‐nativeandinvasiveplants,plantsandplantcommunitiesimportanttoIndigenouspeoples.
Mammals
Postconstructionsurveyswillcontinuein2018/19inaccordancewiththeEEMP.Theseincludecameratrapandaerialsurveysformoose,white‐taileddeer,andwolves.
Access
Surveyswillcontinuein2018/19inaccordancewiththeEEMP.TheseincludecameratrapsurveysalongtheProjectarea,includingaccesspoints.
ComplianceMonitoringSummary2017/18
EnvironmentalinspectorswereemployedbyManitobaHydrofortheLakeWinnipegEastSystemImprovementTransmissionProjecttoconductcompliancemonitoringtoensuremitigationmeasuresoutlinedintheenvironmentalprotectionplan,licences,permitsandapprovalwereadheredtoduringconstruction.
Constructionrelatedactivitiesdidnotresultinanywildlifemortalities. Throughoutthewinterconstructionseason,anenvironmentalinspectorconducteddailyinspectionsofallProject
sections.Inspectionreportsindicatedtherewerenomajorissuesandworkwasincompliancewithapplicableapprovalsandpermits.Minorspillsandruttingwerecleanedupandreportedtoregulators,asrequired.
TheregionalConservationOfficerperiodicallytouredthesitewithManitobaHydrostafftoensurecompliancewiththeProjectlicenceandenvironmentalprotectionplans.