LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 THE CHAZEN COMPANIES Closing Session

Upload: others

Post on 10-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette

September 20, 2014 THE CHAZEN COMPANIES

Closing Session

Page 2: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

Charrette Background & Recap…

THE CHAZEN COMPANIES

ADVISORY COMMITTEE • DAVID REDPATH, CHAIRMAN • KAREN HANCHETT, VICE CHAIRPERSON • JOHN CARR • KIM CORNELIUS • JOANNE GAVIN • JANIE GREEN • PETER KEATING • PATRICIA MAREK • GEORGE MATHEWSON • SEAN QUIRK

TOWN STAFF • KEITH OBORNE • ADELE BEHRMANN

PLANNING TEAM • THE CHAZEN

COMPANIES • PLANNING4PLACES • TRAMPOLINE DESIGN

Page 3: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

Charrette Background & Recap…

THE CHAZEN COMPANIES

SPECIAL THANKS

LUKE DOW PHOTOGRAPHY FORT WILLIAM HENRY HOTEL & CONFERENCE CENTER

Page 4: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

• In 2012, the Town of Lake George was awarded Local Waterfront Revitalization Program (LWRP) funding to update its Comprehensive Plan

• Town Board appointed members of a Project Advisory Committee and tasked them with the preparations of the Comprehensive Plan update

• The project goal is update the Comprehensive Plan through a robust and meaningful public Participatory Process.

Charrette Background & Recap…

THE CHAZEN COMPANIES

Page 5: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

• ENGAGES THE COMMUNITY IN A COLLABORATIVE VISIONING PROCESS

• IDENTIFIES SHORT- & LONG-TERM COMMUNITY GOALS & RECOMMENDATIONS

• PROVIDES A WELL ORGANIZED IMPLEMENTATION STRATEGY • SERVES AS THE BASIS FOR ZONING, LAND USE, BUDGETING,

AND ORGANIZATIONAL DECISIONS • A TOOL FOR OBTAINING GRANTS & FUNDING

Charrette Background & Recap…

THE CHAZEN COMPANIES

Page 6: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

You Are Here

Page 7: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

• OPENING SESSION TONIGHT'S PUBLIC WORKSHOP • THURSDAY OPEN HOUSE 8:30AM - CLOSE • FRIDAY OPEN HOUSE 8:30AM - CLOSE • CLOSING SESSION SATURDAY 1:00PM - 3:00PM @ TOWN HALL • PROJECT WEBSITE WWW.LAKEGEORGELWRP.WORDPRESS.COM • SOCIAL MEDIA #LG2014PLAN

Charrette Process & Schedule…

THE CHAZEN COMPANIES

Page 8: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

Charrette Background & Recap…

Page 9: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

Community Character

Economic & Tourism Development

Infrastructure & Transportation

Next Generation Thinking

Natural & Environmental

Resources

THREE 20 MINUTE FACILITATED BREAKOUT SESSIONS

Breakout Sessions…

Page 10: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

A. Full Time Resident B. Seasonal Resident C. Weekend Warrior D. Tourist E. Other

Full Tim

e Resident

Seasonal Resid

ent

Weekend Warrio

rTourist

Other

83%

17%

0%0%0%

Type of Residents…

Page 11: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

A. Local Business Owner B. Nonlocal Business Owner C. Locally Employed D. Out of Town Commuter E. Retired F. Other

Local Business Owner

Nonlocal Business Owner

Locally Employed

Out of T

own CommuterRetire

dOther

28%

0%

6%

44%

0%

22%

Type of Employment…

Page 12: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

Charrette Background & Recap…

Page 13: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

Charrette Background & Recap…

Page 14: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

Existing Conditions…

THE CHAZEN COMPANIES

Page 15: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

• ECONOMIC DEVELOPMENT & TOURISM • NATURAL/ENVIRONMENTAL RESOURCES • TRANSPORTATION & INFRASTRUCTURE • NEXT GENERATION THINKING • COMMUNITY CHARACTER

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 16: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT • IDENTITY/BRAND CONFUSION • SEASONALITY & TOURISM MONOCULTURE • NOT LEVERAGING ALL ASSETS • PERCEIVED POOR BUSINESS CLIMATE • COMMUNICATION & COORDINATION

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 17: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT BRAND CONFUSION

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 18: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 19: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 20: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 21: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 22: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 23: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT • Entertain a Cultural Shift • Expand Arts/Entertainment/Experience • Establish a Community Hub & Center of

Activity

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 24: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT Improve Business Climate • Establish a Business Start Up Concierge • Establish an Entrepreneurship Program (e.g.

SUNY Adirondack) • Create a Tech Savvy (Business & Institutional)

Community – Provide Internet/Social Media Training – Establish a WiFi Hub

• Encourage Cottage Industry/HB Business through proportioning and zoning

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 25: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT Take a leadership role in event coordination & leverage Existing Resources • Active/Outdoor Recreation Focus:

Prospect Mountain Run, LG Triathlon, Centurion Ride, Camp Chingacook Half Marathon

• Identify/Establish an Entity for Event Coordination

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 26: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT Fully Leverage Existing Assets • Improve NYS Battleground Park

Connectivity & Access (Update Master Plan)

• Open (Remove Fence) Million Dollar Beach

• New Festival Space • Snowmobile Friendly Improvements

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 27: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 28: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 29: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT Heritage Tourism and Promotion

• Tour guides in period costumes providing information for visitors on the history of the area, sites to visit, and maps and information

• Promotion of cultural resources online, in print, and through development of maps and signage placed at key locations throughout town

• Wayfinding signage to notify the public about key culture resources

• Develop and/or publicize driving and walking history tours • Develop additional scavenger hunts, treasure hunts, and

geocaching to encourage additional exploration throughout the Town of Lake George

Preliminary Recommendations

Page 30: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT • Promote sale and rental of outdoor

recreation gear, watercraft, and bicycles at locations specific to their market. (i.e. Prospect Mountain, Million Dollar Beach)

• Develop vendor permit process to promote these activities

Preliminary Recommendations

Page 31: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT Consider Establishing a Community/Cultural Center • Arts/Entertainment • Experiential/Natural Resource Education • Gym/Recreation

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 32: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 33: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 34: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

ECONOMIC & TOURISM DEVELOPMENT Engage County in Retooling the Occupancy Tax Distribution Process • Place process in private sector hands

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 35: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

INFRASTRUCTURE & TRANSPORTATION Prioritize existing public sewer infrastructure Improvements • Partner with Village to Address WWTP

Needs • Slip lining of sewer pipe infrastructure • Rehabilitation of manhole structures • Replacement where need is recognized

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 36: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

INFRASTRUCTURE & TRANSPORTATION Continue Private Septic Systems Program • Finalize existing septic inventory • Target areas for upgrade and create new sewer district • Create a Responsible Management Entity (RME) and establish

review/ permitting process for system upgrades • Develop inspection/maintenance requirements for private

septic systems • Establish requirement for inspection/upgrade upon transfer of

propert • Create incentive program for upgrades (Trust fund) • PARTNER WITH WCSWCD OR OTHERS TO PROVIDE TECHNICAL ASSISTANCE

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 37: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

INFRASTRUCTURE & TRANSPORTATION Consider Extension of Caldwell Sewer District infrastructure north of Village • 2,000LF to the north along Route 9N

– Potential coverage of higher density residential areas to the west of 9N

• 5,500LF to the north along Route 9

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 38: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

INFRASTRUCTURE & TRANSPORTATION Prioritize public water infrastructure improvements Example: Diamond Point Water District • Replace distribution main downstream of PRV • Full replacement of all infrastructure downstream

of PRV with meters at each connection • Extend district infrastructure 5,500LF to the north

along Route 9

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 39: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

INFRASTRUCTURE & TRANSPORTATION Expand Dry Hydrant Network • Inventory dry hydrants and target new

installation locations

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 40: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

INFRASTRUCTURE & TRANSPORTATION Local Roadways • Incorporate shoulder & drainage

improvements in road maintenance/construction projects

• Target areas to improve sight distance and implement visible warning signage

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 41: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

INFRASTRUCTURE & TRANSPORTATION Multimodal Enhancements • Adopt a Complete Streets Road Standard • Identify Priority Improvements • Improve Bike Pedestrian Facilities • Improve Safety on NYS Route 9N/9L • Extension of WC Bike Trail along Route 9

(old Trolley Line)

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 42: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

INFRASTRUCTURE & TRANSPORTATION Improve Warren County Bikeway Connectivity • Trailhead Improvements (Air, tool, Secure

Storage, • Wayfinding Improvements • Establish connections to Village, Prospect

Mtn., Route 9, LG Recreation Park

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 43: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

INFRASTRUCTURE & TRANSPORTATION Multimodal Enhancements • Identify Priority Recommendations from the

Trails Master Plan for The West Side of Lake George

• Promote additional snowmobiling trail opportunities, signage, and dedicated crosswalks along local roadways (e.g. Route 9)

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 44: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

NATURAL RESOURCES Stormwater Management • Expand inspection program to improve compliance with

Planning Board/SWPPP requirements • Consider Establishing Regional (or shared) Stormwater

Management Officer • Use revenue from penalty/fines to address stormwater

issues • Prioritize existing problem areas (i.e. high-density

commercial/residential development) to implement strategic stormwater management, with potential grant funds (i.e. NYS EFC GIGP)

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 45: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

NATURAL RESOURCES Stormwater Management • Establish Collaborative non-regulatory support/training to

encourage proactive stormwater approach on private properties

• Establish a trust/fund to create incentive for stormwater retrofit projects

• Ensure compliance with LGPC regulations regarding full site retrofits

• Creation of Stormwater Management District to create funding source for Stormwater/water quality improvements-incentives

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 46: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

NATURAL RESOURCES Invasive Species • Identify opportunities to promote

educational awareness regarding water quality, stormwater, and invasive species.

• Increase training and oversight of stem injection devices

• Consider employing a roving inspector as shared service between communities

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 47: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

NATURAL RESOURCES Other Considerations • Establish hydro-fracking activities as

inconsistent with the natural and community character of Lake George.

• Continue monitoring of trees and/or limbs to minimize wildfire threats

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 48: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

LAND USE & ZONING • Conduct Zoning Audit/Update to address definition

conflicts and poor organization • Reduce number of zoning districts to promote

flexibility, and allow for more focused growth and conservation.

• Revise terms within the zoning code to promote simplicity and ease of administration (i.e. bedroom, attic, easement, outdoor recreation)

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 49: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

LAND USE & ZONING Allow for higher density infill along Route 9 (between Town line and Exit 21). In addition to this area, north of the Village along Route 9 should be explored if wastewater treatment facilities were expanded to the area. • Allow for more mixed use development to include commercial and

residential uses along the Route 9 Gateway. • Allow for reduced parking based on shared parking, access management,

and/or performance standards. • Encourage/require more rear and/or side parking • Develop design standards that focus on form as opposed to use. This includes

the use of Lake George architectural characteristic (To Be Determined). • Incorporate enhance pedestrian access and connectivity to buildings along

the Route 9 corridor. • Interest in Form Based Code approach

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 50: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

LAND USE & ZONING

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 51: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

LAND USE & ZONING Adopt a Conservation Subdivision Ordinance

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 52: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

LAND USE & ZONING Adopt Low Impact Design Standards for Sensitive Areas and/or Higher Density Commercial Districts possibly with overlays and performance standards coupled with incentives: • Steep Slopes and Ridgelines: limit tree and vegetative clearing

and grading. Mirror existing landscape and focus on water quality and volume runoff reduction

• Lake George Shoreline: Focus on riparian health, visual impacts, runoff, law impacts

• Stream Corridors: Focus on riparian health and preservation • High Density Commercial Development: Incorporate green

infrastructure that could allow for reduction of impervious limitations

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 53: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

LAND USE & ZONING • Create designation for Cottage Industry that

would allow for increased arts/crafts/trade opportunities within a designated arts district.

Preliminary Recommendations

THE CHAZEN COMPANIES

Page 54: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

Land Use & Zoning Code Enforcement Issues

• Ensure that there is adequate code enforcement staff to conduct inspections

• Review zoning language related to tourist accommodations

• Quality of Life Issues related to rental properties

• Ensure Zoning Code/Local Law clarity for enforcement

Preliminary Recommendations

Page 55: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

Community Character Encourage Additional Communication and Collaboration

• Website alerts for notifications and weather alerts to increase communication of immediate information

• Utilize social media to encourage additional communication

• Encourage additional coordination and collaboration between volunteer organizations (e.g., Rotary Club and the Warren County School Safety Officer)

Preliminary Recommendations

Page 56: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

Community Character Encourage additional Volunteer and Civic Engagement

• Creation of school program in collaboration with the Warren County School Safety Officer to require a certain number of hours of civic participation in area organizations.

• Consider shared services between municipalities to leverage resources and staff related to public safety.

• Consider creation of a paid county-wide EMS service. • Encourage participation in the junior fire department

program to encourage interest in serving in the fire department in collaboration with the Warren County School Safety Officer.

Preliminary Recommendations

Page 57: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

• PREPARE DRAFT COMPREHENSIVE PLAN UPDATE • ADVISORY COMMITTEE INPUT, REVIEW, AND EDITS • ADDITIONAL COMMUNITY OUTREACH AND PUBLIC

WORKSHOPS • TOWN BOARD REVIEW AND ADOPTION

PLEASE VISIT: WWW.LAKEGEORGELWRP.WORDPRESS.COM GIVE US FEEDBACK USING: #LG2014PLAN

Next Steps…

Page 58: Lake George 2014 Vison Project · 2014-10-01 · LAKE GEORGE 2014 VISON PROJECT Comprehensive Plan Update Charrette September 20, 2014 . T. HE. C. HAZEN. C. OMPANIES. Closing Session

THANK YOU!

PLEASE VISIT: WWW.LAKEGEORGELWRP.WORDPRESS.COM GIVE US FEEDBACK USING: #LG2014PLAN