Page 1: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM

OVERVIEW AND PROGRAM PRIORITIES

Paula J. Trigg, County Engineer

Public Works and Transportation Committee

April 29, 2015

Page 2: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Presentation Schedule

2

PWTC 2015 Meeting Date

Presentation Topic

April 29 • Overview and Program Priorities

June 3 • Funding and Projects / Draft Program Document

Page 3: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Improving transportation a top strategic goal for Lake County and regional partners

3

Page 4: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Efficient Transportation Contributes To:

Quality of life Environmental value Economic growth

Page 5: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

2015 Construction Program

Continued from 2014

Preservation Modernizatio

n Expansion

Page 6: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

$60M continued from 2014

River Road and Roberts Road: New Roundabout

Peterson Road, US 45 to w of IL 83: Add lanes

Rollins Road at IL 83: Grade separation

Wadsworth Road at IL 131: Reconstruct and widen

Page 7: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

$75M in new projects

24 projects, 11 contain non-motorized travel improvements, (bike paths, or adding bike friendly lanes)

Two significant expansion projects: Peterson Road Corridor Washington Street Thoroughfare

Page 8: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Communicating with the public PASSAGE LCDOT/Lake County website Facebook Twitter LCTV Public Meetings

Page 9: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

2015-2020 Five Year Highway Improvement Program

9

LCDOT’s management philosophy sets system priorities:

1. Preservation2. Modernization3. Expansion

Page 10: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Priority One: Preservation

10

Tools in the Toolbox: ARGUS

Pavement Management Software

Asset Inventories

Unit cost information

Industry standards

22%Preservation projects: approximately

of program

Page 11: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

LCDOT Uses ARGUS Pavement Management System

11

To make cost-effective decisions:

Where repairs are needed

What repair strategies to use

When the repairs should be done

Using these program components:

County highway database

Automated pavement testing

Repair strategies with costs

Pavement aging prediction

Optimization program

Laser surface testing

Dynaflect

Page 12: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Pavement Aging Prediction Costs

12

Repairs Made at the Best Time to Maximize Return

Page 13: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

LCDOT ARGUS results

13

Implemented in 1986

Condition rating has improved from 68 to 81

Backlog/failing pavement areareduced from 55% to 8%

Page 14: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Current Pavement Rating is 81(Good)

14

Good (80 – 100)Sections may require crack sealing or a thin overlay. These sections do not require immediate attention. Pavement in this category is generally less than 12 years old.

Satisfactory (70-79)Sections may require resurfacing or other rehabilitation in the near future. Pavement is generally 12-14 years old.

Failing (60-69)Will require some type of improvement in the near future to preserve the usability of the surface and avoid the need for reconstruction. This is pavement that is approaching the end of its useable life.

Backlog (10-59)May require surface and base course reconstruction to restore roadway serviceability. Some may require total reconstruction, including reconstruction of the subgrade. Pavement in this category is generally more than 15 years old.

Page 15: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Traffic Volumes

15

Page 16: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

ARGUS Summary

16

Pavement Management System does…

Assess the present condition of the system

Estimate future road conditions

Identify and rank road projects

Maximize the condition of the system within the given budget

Pavement Management System does not… Replace professional judgment

Provide certain detailed project-specific information

Evaluate storm sewer and other roadway assets

Page 17: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

ARGUS System Preservation Projects2016-2020

17

Page 18: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Keeping Tabs on the System:Asset Inventories

18

Pavement and bike facilities Guardrail, bridges, railroad crossings Signals and signs Drainage and stormwater facilities Fencing More…

Page 19: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Pavement: Our most obvious asset

lane miles 864centerline miles 297

miles bike facilities 62miles paved shoulder 58

average age of roadway 47average age of surface 12

Page 20: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Lake County’s Bridges

Highway Bridges:

number of bridges 40average age 26

average deck age 13

Bike and Pedestrian Bridges:

number of bridges 21average age 24

Page 21: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Culverts

21

• Variety of culvert materials:

• Concrete• Corrugated metal

pipe (CMP)• Composite• PVC

• Culverts are routinely inspected

9.8 miles in LCDOT inventory

Page 22: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

By the NumbersInventory: Non-Pavement Assets

22

16,114 Storm sewer structures

725 Culverts

215 Miles of storm sewer pipe

47 Detention basins

44,642 Feet of fencing

17,785 Feet of retaining wall

22 Miles of guardrail

29 Landscape areas (50 acres)

April 2015

Page 23: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Inventory: Signs

23

Page 24: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Priority Two: Modernization

24

Tools in the Toolbox: Traffic analysis Level of Service

data Non-motorized

policy/2040 bike and pedestrian priorities

Typically intersection and safety improvements, bike and pedestrian accommodations

24%Modernization projects: approximately

of program

Page 25: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Bike and Pedestrian Priorities

25

LCDOTexisting

planned

LCFPDexisting

planned

Other jurisdictionexisting

planned

2040 Non-motorizedPlan

Page 26: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Level of Service Data

26

Traffic engineers use LOS

data to evaluate how a given

intersection is functioning.

Better levels of service mean

fewer delays at the

intersection

C or better meets driver

expectations

LCDOT uses Synchro traffic

analysis software to evaluate

intersection operations and

performance

• Roundabouts (4 total)Level of Service AM Peak Hour PM Peak Hour

(best) A 2 1B 2 2C 0 1D 0 0E 0 0

(worst) F 0 0

• Signalized intersections (268 total)Level of Service AM Peak Hour PM Peak Hour

(best) A 63 30B 66 54C 72 69D 31 53E 14 24

(worst) F 22 38

Page 27: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Average Daily Traffic: Then & Now

27

Page 28: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

2015 Crash Summary (2013 TCAS data)

28

Page 29: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Historical Perspective: Crash Data

29

5 year averages

2006-2010

2007-2011

2008-2012

2009-2013

Number of crashes 4236 3994 3704 3485

Fatality 8 8 8 7

Crash with injury 942 931 952 974

Property damage only 3286 3147 2744 2504

Page 30: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Lake County’s Traffic Signal and Fiber Network

30

268 miles of fiber optic in place

22 miles under construction

10 miles planned

502 County-involved signals

Page 31: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Expanding Computer Aided Dispatch (CAD) Coverage

31

Connected to 17

dispatch centers

Adding 3 dispatch

centers

93% of the

county is covered

5.52% in

progress

Page 32: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

32

PASSAGE: Asset Inventories (2008-2014)

signals 502miles of fiber optic 268hubs and switches 313

PTZ cameras 317HAR towers 5

Page 33: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Priority Three: Expansion

33

Tools in the Toolbox: 2040 plan State Consensus

list Demographic

trends Traffic data

Typically add lanes or new/extended roads

43%Expansion projects: approximately

of program

Page 34: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Keeping up? County-Owned Roads

34

Lane Mile Growth:1990 6342014 864

Growth in Daily Vehicle Miles:1990 1,801,7172014 3,691,839

Page 35: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

2040 Roadway Priorities

Peak period trips estimated to increase by 36% between 2010 and 2040

212 miles of roadway Improvements recommended 7 interchange 9 intersection 65 corridor

Page 36: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

History: Daily Vehicle Miles

36

Page 37: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

2040 Roadway Improvements Consensus projects 2040 projects Both LCDOT and

IDOT projects LCDOT has projects

right now in planning that can’t even be programmed for construction in this 5-year plan because of available funding.

$1.8 billion still needed to fund remaining projects in the Consensus Plan

Page 38: LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED 2015-2020 HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public

Presentation Schedule:2015-2020 5-year Highway Improvement Program

38

PWTC 2015 Meeting Date

Presentation Topic

April 29 • Overview and Program Priorities

June 3 • Funding and Projects / Draft Program Document