lago energy presents,lagoenergyusa.com/lago energy - jackup rig le22 - for...make/model: rauma...
TRANSCRIPT
Argentina-Bolivia-Canada-Chile-Colombia-Ecuador India-Indonesia-Mexico-Panama-Peru-Spain-Turkey United Arab Emirates-UK-USA-Venezuela
LAGO Energy Presents,
JACKUP RIG LE22 for LEASE
• Location: South Asia • Available: June 2008 • Max Water Depth: 328 feet / Drilling Depth: 21,325 feet
• Lease Price: US$ 190.000 day rate.
For detailed information on this project or other "World Wide Oil, Gas & Alternative Projects", please contact: Hernan Arizmendi at: [email protected] or Margaret Ball at: [email protected] The information listed here is Private and Confidential, and is intended solely for the consideration of the individual to whom it is addressed. This is a limited presentation and all those with a potential interest must pre-qualify before confidential information can be made available. Should there exist any serious interest on your behalf, LAGO Energy would provide the necessary introductions. The information contained in this presentation is preliminary information only in relation to the overview of the project and does not contain all the data needed. This presentation does not constitute an offer to sell or a solicitation of an offer to buy any of the above listed projects or properties. Additional future interest regarding any of the information presented herewith will only be made to persons to whom and in jurisdictions in which it is lawful to make such request.
LAGO Energy – Houston, TX.
www.lagoenergyusa.com
LAGO Energy Presents, Unit Name: Rig 22
2/74 Date of Udpate: 27 Oct 2006
STANDARD FORMAT EQUIPMENT LIST
BASED ON THE
INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS
FORMAT
Rig LE22 For More Information, Please Contact to: Margaret Ball at [email protected] or Hernan Arizmendi at [email protected] TABLE OF CONTENTS
A.UNIT SPECIFICATIONS A.1 MAIN DIMENSIONS / TECHNICAL DESCRIPTION A.2 STORAGE CAPACITIES A.3 JACKUP SYSTEMS A.4 OPERATIONAL CAPABILITIES A.5 VARIABLE LOAD CAPACITY (VL) A.6 ENVIRONMENTAL LIMITS A.7 MOORING SYSTEM A.8 MARINE LOADING HOSES A.9 CRANES, HOIST, AND MATERIAL HANDLING A.10 HELICOPTER LANDING DECK A.11 AUXILIARY EQUIPMENT B.GENERAL RIG SPECIFICATIONS B.1 DERRICK AND SUBSTRUCTURE B.2 DRAWWORKS AND ASSOCIATED EQUIPMENT B.3 DERRICK HOISTING EQUIPMENT B.4 ROTATING SYSTEM C. POWER SUPPLY SYSTEMS C.1 RIG POWER PLANT C.2 EMERGENCY GENERATOR D. DRILLSTRING EQUIPMENT D.1 TUBULARS D.2 HANDLING TOOLS D.3 FISHING EQUIPMENT E. WELL CONTROL E.1 DIVERTER E.2 LOW PRESSURE BLOWOUT PREVENTERS E.3 HIGH PRESSURE BLOWOUT PREVENTERS E.4 OTHER BLOWOUT PREVENTERS E.5 BOP CONTROL SYSTEM E.6 CHOKE MANIFOLD E.7 FLEXIBLE CHOKE & KILL LINES E.8 FLEXIBLE BOP CONTROL HOSES E.9 BOP TESTING EQUIPMENT E.10 BOP HANDLING F. MUD SYSTEM/BULK SYSTEM F.1 HIGH PRESSURE MUD SYSTEM F.2 LOW PRESSURE MUD SYSTEM F.3 BULK SYSTEM G. CASING/CEMENTING EQUIPMENT G.1 CASING EQUIPMENT G.2 CEMENTING EQUIPMENT
Unit Name: Rig 2
3/74 Date of Udpate: 27 Oct 2006
H. INSTRUMENTATION/COMMUNICATION H.1 DRILLING INSTRUMENTATION AT DRILLER’S POSITION H.2 DRILLING PARAMETER RECORDER H.3 INSTRUMENTATION AT CHOKE MANIFOLD H.3.1 Standpipe Pressure Gauge H.4 INSTRUMENTATION AT STANDPIPE H.5 DEVIATION EQUIPMENT H.6 RIG COMMUNICATION SYSTEMS H.7 ENVIRONMENTAL INSTRUMENTATION H.8 NAVIGATION INSTRUMENTATION H.9 EXTERNAL COMMUNICATIONS EQUIPMENT I. PRODUCTION TEST EQUIPMENT I.1 BURNERS I.2 BURNER BOOMS I.3 PIPING ON BURNER BOOMS I.4 SPRINKLER SYSTEM I.5 FIXED PIPING FOR WELL TESTING I.6 AUXILIARY POWER AVAILABILITY J.WORKOVER TOOLS K. ACCOMMODATION K.1 OFFICES K.2 LIVING QUARTERS L. SAFETY EQUIPMENT L.1 GENERAL SAFETY EQUIPMENT L.2 GAS/FIRE/SMOKE DETECTION L.3 FIRE FIGHTING EQUIPMENT L.4 BREATHING APPARATUS L.5 EMERGENCY FIRST AID EQUIPMENT L.6 HELIDECK RESCUE EQUIPMENT L.7 EMERGENCY WARNING ALARMS L.8 SURVIVAL EQUIPMENT M. POLLUTION PREVENTION EQUIPMENT M.1. SEWAGE TREATMENT M.2 GARBAGE COMPACTION M.3 GARBAGE DISPOSAL/GRINDER M.4 INCINERATOR M.5 OILY WATER SEPARATOR N. DRILLING DATA EQUIPMENT N.1. COMPUTERS (HARDWARE & SOFWARE) O. DRAWINGS O.1. REFERENCES
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: Rig 2
4/74 Date of Udpate: 27 Oct 2006
A.UNIT SPECIFICATIONS
Rig type: Independant leg Jack-up
Unit/Design/Shape: Gusto Engineering BV Schiedam / Triangular Unit flag: Cyprus Unit classification: A2 Self-elvating mobile offshore drilling unit IMO Certification: yes/no no Which code version: Year of Construction: 1985 Construction Yard: Rauma Repola Shipyard, Finland
A.1 MAIN DIMENSIONS / TECHNICAL DESCRIPTION
Light ship: kips 25,196 Displacement at 10.76 ft draft: kips 32,650 Overall length of unit (including Helideck): ft 227.2 Overall width of unit (including anchor racks): ft 262.5 Hull length ft 218.22 Hull width ft 262.48 Hull depth ft 27.07 Number of legs/length: no. x ft 3 x 464 Leg length available below hull: ft 385 Type of leg: Triangular truss type Leg spacing (centre to centre) Transverse: ft 176.18 Longitudinal ft 152.6 Independent leg or matt: independent Spud can diameter: ft 49.68 Spud can height: ft 12.63 Spud can footing area sq. ft 1937.5 Spud can jetting system: Low & High yes/no yes (low pressure only) Bottom jets: yes/no yes Top jets: yes/no yes Mat dimensions: Length: ft N/A Width: ft N/A Depth: ft N/A Cantilever or slot: cantilever Cantilever envelope: Reach AFT, from / to: ft/ft 13.1 / 44.3 Transverse, port/stbd: ft/ft 12 / 12 Slot dimensions: Length: ft N/A Width: ft N/A Mat slot dimensions: Length: ft N/A Width: ft N/A Max. cantilever load (combined): lbs 1,256,000 (40 ft aft & 12 ft port/stbd) Max. hook load: kips 992 Max. rotary load: kips 1300 Max. setback load: kips 595 Fuel Consumption (avg. drilling): bbl/day 115 Accommodation for max. # of personnel: no. See K.2.1
A.2 STORAGE CAPACITIES
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: Rig 2
5/74 Date of Udpate: 27 Oct 2006
Fuel: bbl 3830 Drilling water: bbl 3768 Potable water: bbl 942 Mud processing tank (see F.2): bbl See F.2 Active liquid mud (see F.2): bbl See F.2 Independent oil base mud storage: bbl none Agitated: yes/no no Independent base oil storage: bbl none Independent brine storage: bbl none Heavy brine accepted (e.g. bromide): yes/no no Bulk Bentonite/barite: (see F.3) ft3 See F.3 Bulk cement: (see F.3) ft3 See F.3 Sack storage: sacks 6,500 Pipe rack: ft2 1289 Upper racks dimensions: ft x ft 39.3 x 45.9 Maximum load capacity: lb/ft2 341.9 Lower rack dimensions: ft x ft 32.8 x 39.3 Maximum load capacity: lb/ft2 513 Other rack: ft x ft 14.4 x 32.8 Maximum load capacity: lb/ft2 280 Miscellaneous storage area: ft2 Port / 1272 Stbd / 436 Operator storage area: ft2 Preload capacity (Required): kips 17,776 Time to fill and dump preload: hrs 24
A.3 JACKUP SYSTEMS
A.3.1 Jacking Systems
Make/type: Rauma Repola No. - Jacks or pinions: no. 36 (3 legs x 3 sets/leg x 4 units/leg) Maximum variable jacking load: kips 2300lt (2337MT) Jacking speed: ft/min 1 Rack chocks available: yes/no No Required for field tow: yes/no No Required for ocean tow: yes/no Weld chocks in place
A.3.2 Raw Water Systems
Quantity: no. 5 Pump location (water tower or leg): 2 on Leg 1 / 3 on leg 3 Suction distance below hull (max): ft 100 Salt water service pump: Quantity: no. 8 Make/Type: JMW / Sweden Z-16 Capacity: M3/hr 50 @ pressure: psi 40 Horsepower: hp 10 Salt water service pump: Quantity: no. 8 Make/Type: JMW/Sweden CIV 100-350 CF Capacity: M3/hr 150 @ pressure: psi 43 Horsepower: hp 23 Dedicated preload pumps: Quantity: no. 5 Make/Type: Pleuger/QN 103-3A-M10-50-2
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
6/74 Date of Udpate: 27 Oct 2006
Capacity: bbl/min 31 @ pressure: psi 40 Horsepower: hp 93
A.4 OPERATIONAL CAPABILITIES
Maximum design water depth capability: ft 328.08 Outfitted max/min water depth capability: ft 328 / 98 Can work in shallower depths with a minor modifications Normal minimum water depth capability: ft 100 Draft at load line (deepest): ft 15.58 Drilling depth capability (rated): ft 21,325 Transit speed towed (historical avg.): knots 3.2 Leg (spud can) below hull in transit (Field Move): ft 5.4 / 32.8 / 49.2 Maximum leg length permitted in tow: Ocean tow (Wet): ft 431 Field tow: ft 431 Number of tugs for field tow: no. 2 (3 required for positioning) Associated minimum bollard pull per tug: st 80 (subject always to warranty surveyor approval) Anti-roll system: yes/no yes Maximum preload reaction: kips 6492 lt Bearing pressure at maximum preload: lb/ft2 24380 Thrusters: yes/no no Quantity: no. N/A Fixed/Azimuthing N/A Total horsepower per thruster: hp N/A
A.5 VARIABLE LOAD CAPACITY (VL)
(inclusive of drilling loads) Transit VL capacity: kips 1000lt (1016MT) Drilling VL capacity: kips 2650lt (2693MT) Survival VL capacity: kips 2300lt (2337MT) Jacking VL capacity: kips 2300lt (2337MT)
A.6 ENVIRONMENTAL LIMITS
Transit Max. wave height: ft 16.4 Max. wave period: sec 6 Max. wind velocity knots 58 Max. current velocity: knots 2 Max. heave (double amplitude): ft Max. pitch (double amplitude): degrees 90 Max. roll (double amplitude): degrees 90 Working water depth: ft 328 Drilling: Air gap (below bottom of main hull): ft 32.8 Max. wave height: ft 42.6 Max. wave period: sec 11 Max. wind velocity: knots 72 Max. current velocity: knots 2.6 Survival: Air gap (below bottom of main hull): ft 41.3 – 71.3 Max. wave height: ft 60.7 Max. wave period: sec 13.5 Max. wind velocity: knots 90 Max. current velocity: knots 2.6 Jacking/Preloading:
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
7/74 Date of Udpate: 27 Oct 2006
Air gap (below bottom of main hull): ft N/A Max. wave height: ft 5.9058 (combined with Max. wind velocity) Max. wave period: sec 6 (combined with Max. wind velocity) Max. wind velocity: knots 23.328 Max. current velocity: knots 1.94
A.7 MOORING SYSTEM
A.7.1 Anchor Winches
Quantity: no. 4 Make/model: Rauma Repola, Finland, Type (electric/hydraulic/diesel): Electric / MW 500 E-S Total HP per winch: hp 81.6 Rated pull: st 160/140 Control locations (local/remote/both): Both
A.7.2 Anchors
Quantity: no. 4, (2 x fwd, 2 x aft) Make/type: Baldt/Stevin MK3 Weight : lbs. 2 x 7t 2 x 10t
A.7.3 Anchor Lines
Wire Quantity: (installed + spare): no. 4 Make/type: Bleel wires Construction: 6 x 36WS = W.R.C Diameter: in 2 x 2 2 x 2 Useful length (nominal): ft 3280.8
A.7.4 Towing Gear
Towing bridle size: in 2-7/8 Hook-up system: Rating: lt 120 Spare bridle: yes/no yes
A.7.5 Supply Vessel Mooring System
System description: None Rating: st Location (port/stbd/both):
A.8 MARINE LOADING HOSES
Location of loading manifolds (port/Stbd/both): no. Both
A.8.1Potable Water Hoses
Quantity: no. 1 Size: in 3 Make/type: Dunlop Color coding: yes/no yes
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
8/74 Date of Udpate: 27 Oct 2006
Make/type connection: Camlock
A.8.2 Drilling Water Hose
Quantity: no. 1 Size: in 3 Make/type: Dunlop Color coding: yes/no yes Make/type connection: Camlock
A.8.3 Gas/Fuel Oil Hose
Quantity: no. 2 Size: in 3 Make/type: Dunlop Color coding: yes/no yes Make/type connection: Flange / Camlock
A.8.4 Mud Chemical Hose (Liquid Mud)
Quantity: no. None Size: in Make/type: Color coding: yes/no Make/type connection:
A.8.5 Cement Hose
Quantity: no. 1 Size: in 4 Make/type: Alfa Gomma T202 Color coding: yes/no yes Make/type connection: Cam lock
A.8.6 Liquid Mud Hose
Quantity: no. Size: in Make/type: Color coding: yes/no Make/type connection:
A.8.7 Brine Hose
Use: None Quantity: no. Size: in Make/type: Color coding: yes/no Make/type connection:
A.8.8 Other
Use: Barite / Bentonite Quantity: no. 1
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
9/74 Date of Udpate: 27 Oct 2006
Size: in 5 Make/type: Color coding: yes/no yes Make/type connection: Flange / Cam lock
A.9 CRANES, HOIST, AND MATERIAL HANDLING
A.9.1 Cranes, Revolving
Quantity: no. 2 Specification (API, etc.): DNV Make: Lokomo Type: LDC 340/40 Location (frwd/aft/port/stbd): Stbd/port Boom length: ft 100 Hook reach below main deck (block/whip): ft/ft Block capacities and hoisting speeds: Load/radius/speed (minimum radius): st/ft/(ft/sec) 40t/27.9ft Load/radius/speed (maximum radius): st/ft/(ft/sec) 7t/91.8ft Whip capacity and hoist speed: st/ft/(ft/sec) Hook load indicator automatically: corrected for boom angle: yes/no yes Alarm (audible, visual, both): Both Automatic brake: yes/no yes Safety latch on hooks: yes/no yes Crown saver (limit switch): yes/no yes Boom illumination: yes/no yes Quantity: no. 1 Specification (API, etc.): DNV Make: Lokomo Type: LDC 120/5 Location (frwd/aft/port/stbd): port at cantilever Boom length: ft 78FT Hook reach below main deck (block/whip): ft/ft Block capacities and hoisting speeds: Load/radius/speed (minimum radius): st/ft/(ft/sec) 5T / 9FT Load/radius/speed (maximum radius): st/ft/(ft/sec) 5T / 78FT Whip capacity and hoist speed: st/ft/(ft/sec) Hook load indicator automatically: corrected for boom angle: yes/no yes Alarm (audible, visual, both): both Automatic brake: yes/no yes Safety latch on hooks: yes/no yes Crown saver (limit switch): yes/no yes Boom illumination: yes/no yes A.9.2 Forklifts Quantity No 1 Make Toyota 4FB 25FV Rated capacity ton 1.5 Explosion proof yes A.9.3 Monorail Overhead Cranes Quantity no 2 Make Beebe Type 50ton Hercu-Linkbop Handling System Rated capacity 2 X 25 Ton Location below drill floor
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
10/74 Date of Udpate: 27 Oct 2006
A.9.4 Air Hoists / Derrick Winches
A.9.4.1Rig Floor Winches (Non man-riding)
Quantity: no. 2 Make: Ingersoll Rand Type: K6UL Rated capacity: lbs 10000 Wire diameter: in 3/4 19mm Automatic brakes: yes/no yes Overload protection: yes/no No Automatic spooling: yes/no no Quantity: no. 1 on the Cantilever Make: Ingersoll Rand Type: K6UL Rated capacity: lbs 11000 Wire diameter: in ¾ Automatic brakes: yes/no yes Overload protection: yes/no No Automatic spooling: yes/no no Monkey board work winch Quantity: no. 1 Make: Ingersoll Rand Type: D6UL Rated capacity: lbs ½ ton Wire diameter: in 8mm Automatic brake: yes/no yes Overload protection: yes/no no Automatic spooling: yes/no no
A.9.4.3 Rig Floor Man-Riding Winch
Quantity: no 1 Make: Ingersoll Rand Type: Force 5 Rated capacity: lbs 4,400 (top layer) Wire diameter: in 0.5 Non-twisted wire: yes/no yes Automatic brakes: yes/no yes Overload protection: yes/no yes Automatic spooling: yes/no yes
A.9.4.4 Utility Winch (i.e. Deck Winch)
Quantity: no. 1 Make: Ingersoll Rand Type: H25.OUWB114 Rated capacity: lbs 14000 Wire diameter: in 3/4 Automatic brakes: yes/no yes Overload protection: yes/no no Automatic spooling: yes/no No Certified for man-riding: yes/no No Locations: Main deck, bow for pennant handling
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
11/74 Date of Udpate: 27 Oct 2006
Air hoists BOP deck Quantity: no. 2 Make: Ingersoll Rand Type: FA2MR Rated capacity: st 3200 Wire diameter: in ½ Automatic brakes: yes/no yes Overload protection: yes/no No Automatic spooling: yes/no No Certified for man-riding: yes/no No Locations: Cellar Deck port/stbd Quantity: no. 2 Make: Ingersoll Rand Type: H5UL Rated capacity: st 2000 Wire diameter: in ½ Automatic brakes: yes/no yes Overload protection: yes/no no Automatic spooling: yes/no no Certified for man-riding: yes/no no Location Cellar deck centre
A.9.4.5 BOP Hoists (see E.10.1) See E.10.1
A.9.5 Transfer Baskets/Containers yes
A.9.5.1 Personnel Transfer Baskets Quantity / type 1 / Billy Pugh
A.9.5.2 Cargo Containers
Quantity: no. none Make/type:
A.10 HELICOPTER LANDING DECK
Location (frwd/aft/port/stbd): Stbd Dimensions: ft / ft 83 / 83 Perimeter safety net: yes/no yes Deck load capacity: lb/ft2 3.8 Maximum helicopter weight: lbs 26,432 Designed for helicopter type: MI-8 or Equivillant Tie down points: yes/no yes Covered by foam fire system (see L.3.6): yes/no yes
A.10.1 Helicopter Refuelling System
System make/type: Fuel storage capacity: gal Jettisonable: yes/no Fuel transport container, quantity: no. Volume: gal Fuel transport containers: no. Volume: gal Covered by foam fire system (see L.3.6) yes/no
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
12/74 Date of Udpate: 27 Oct 2006
A.11 AUXILIARY EQUIPMENT
A.11.1 Water Distillation
Quantity: no. 1 Make/type: Stromme NME AS / NWC3-60 Capacity (each/total): gal/day 15,850 (660 gph) Quantity: no. 1 Make/type: DANMARK / ATLAS / AFGU2SE Capacity (each/total): gal/day 10,560
A.11.2 Boilers
Quantity: no. none Make/type: Capacity (total system): lbs/hr
A.11.3 Air Conditioning
Make/type: Carrier,SH80,2SET Capacity (total system): tons 200 Max. temperature rating: F
A.11.4 Electric Welding Sets
Quantity: no. 1 Current capacity: amp 500 Make/model: Lincoln,usa/r3r-501 Type (fixed/portable): Fixed Quantity: no. 2 Current capacity: amp 450 Make/model: Norway / IT-450A Type (fixed/portable): Fixed
A.11.5 High Pressure Cleaner
Quantity: no. no Make/type: Electric/pneumatic/diesel: Max delivered pressure: psi With steam: yes/no
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
13/74 Date of Udpate: 27 Oct 2006
B.GENERAL RIG SPECIFICATIONS
B.1 DERRICK AND SUBSTRUCTURE
B.1.1 Derrick / Mast
Make/type: DRECO Rated for wind speed With full set back: knots 100 With no set back: knots 100 Height: ft 147 Dimensions of base: ft x ft 30 x 30 Dimensions of crown: ft x ft 8 x 8 Gross nominal capacity: kips 1,330,000 lbs Static hook load: lbs 1,044,000 lbs Maximum number of lines: no. 12 Ladders with safety cages and rests: yes/no yes Platform for crown sheave access: yes/no yes Counter balance, system for rig tongs and yes pipe spinning tong: yes/no yes Lighting system explosion proof: yes/no yes
B.1.2 Racking Platform
Make/type: Rauma Repola Total current simultaneous capacity - drill pipe: 5 in DP: ft 16,600 (176 stands) 6-1/2 in DC: stnds 0 8 in DC: stnds 8 9-1/2 in DC: stnds 3 Total 18,360 ft Tubing belly board: yes/no no
B.1.3 Automated Pipe Handling
Make/type: Rauma Repola Pori Works (BJ type) Description: Overhead standlifter
B.1.4 Casing Stabbing Board
Make/type: Adjustable from/to height above rotary: ft/ft 20 / 50
B.1.5 Substructure
Make/type: Rauma Repola Drill floor height (above main deck): ft 31.5 Length: ft 46.2 Width: ft 65.3 Setback capacity: kips 597 ton Simultaneous setback + hook load capacity: kips 500 ton Rotary beam capacity (total): kips 590 ton Clear height below rotary table beams (to main deck):
ft 31.3
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
14/74 Date of Udpate: 27 Oct 2006
B.1.6 Weather Proofing
Rig floor windbreaks: yes/no yes Derrickman windbreaks: yes/no no Around process pits: yes/no no
B.1.7 Derrick TV Camera System
Camera located at: Monkey board / Stabbing board / Cellar deck / shakers Make/type: Philips CDD-8061 OOW Zoom/Pan/Tilt-function: yes/no yes Monitor located at: Drillers console.
B.1.8 Mechanical Mouse Hole yes/no no
B.2 DRAWWORKS AND ASSOCIATED EQUIPMENT
B.2.1 Draw-works
Make/type: Oilwell / E-3000 Motors make/type: Stromberg / GRCH 8048 Quantity: no. 3 Rated input power: hp 3000 Drum size (diameter x length): in x in 35 x 62 Drum type (grooved/smooth) Grooved For drill line size: in 1-3/8 Brake type (disc/drum) Drum Maximum line pull 12 lines: lbs 1,100,000 Makeup cathead type: Foster Breakout cathead type: Foster Crown block safety devices: yes Make/type: TCB Independent fresh water cooling system for Drawworks and electric brake:
yes/no yes
Automatic driller: yes/no yes Make/type: Kontram
B.2.2 Auxiliary Brake
Make: Dretech Model: 1025 Independent back-up system type: No
B.2.3 Sandline
Make: none Length capacity: ft Line size/type: Breaking strength: st Safe working load: st
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
15/74 Date of Udpate: 27 Oct 2006
B.2.4 Slickline Unit
Make/model: Mid Continent Wire length (nominal): ft 25000 Wire size: in .092 Breaking strength: lbs Safe working load: lbs Depth counter: yes/no yes Pull indicator: lbs. No
B.3 DERRICK HOISTING EQUIPMENT
B.3.1 Crown Block
Make/type: Rauma Repola Oilwell A-500 Rated capacity: st 580 No. of sheaves: no. 9 Sheave diameter: in 60 Sheave grooved for line size: in 1-3/8
B.3.2 Travelling Block
Make/type: Rauma-Repola Oilwell A-500 Rated capacity: st 500 (454MT) No. of sheaves: no. 6 Sheave diameter: in 60 Sheave grooved for line size: in 1-3/8
B.3.3 Hook
Make/type: Byron Jackson Inc./BJ 5500 Dynaplex Rated capacity: st 500 (453MT) Complete with spring assembly/hook Locking device: yes/no yes
B.3.4 Swivel
Make/type: N/A – integrated in TDS Rated capacity; st Test/working pressure: psi/psi Gooseneck and wash pipe minimum ID: in Left hand pin connection type: Access fitting for Wireline entry on Top gooseneck: yes/no yes
B.3.5 Drilling Line
Diameter: in 1-3/8 Construction: 6 x19 Length (original): ft 7500 Drilling line reel: yes Drum cover: yes/no yes Drilling line drum power driven: yes/no yes Spare drilling line: yes/no No Location (rig, shore, etc.) yes/no N/a
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
16/74 Date of Udpate: 27 Oct 2006
Roller guides: yes/no yes
B.3.6 Dead Line Anchor
Make/type: Hercules 131T Weight sensor: yes/no yes Deadline dampener: yes/no yes
B.3.7 Block Guidance System
Make Aker Rauma Offshore
B.4 ROTATING SYSTEM
B.4.1 Rotating Table
Make/type: Oilwell / A 49-1/2 Maximum opening: in 49-1/2 Rated capacity: st 590 Two speed gearbox: yes/no yes Emergency chain drive: yes/no yes Driven by an independent electric motor: yes/no yes Electric motor make/type: Stromberg / GRCH 8048 Output power: hp 800 Maximum continuous torque: ft/lbs 15,500 Drip pan/mud collection system: yes/no yes
B.4.2 Master Bushings
Make/type: Varco / MPCH Insert bowls: 1-2-3
B.4.3 Kelly Bushing
Make/type: None Lock down assembly: yes/no
B.4.4 Top Drive
Make: National Oilwell Type (electric/hydraulic): PS-350/5OO Electric Rated capacity: st 350 for DP / 500 for casing Test/working pressure: psi/psi 5000 Output power: hp 1130 Maximum continuous torque: ft-lbs 34425 Two-speed gear box yes/no no Maximum rotary speed: rpm 255 Remote operated kelly cock: yes/no yes Cooling system type: Air Upper inside BOP (see also D.1.15) Quantity: no. 1 Make/type: Ps 00467 Working pressure: psi 15,000 Max. OD body: in 7-3/4 Max. ID body: in 3
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
17/74 Date of Udpate: 27 Oct 2006
Connection type (box): NC50 Connection type (pin): NC50
B.4.4.1 Top Drive Makeup / Breakout System
Make/type: National Oilwell Model: PS-350/500 Hydraulic Grabs Max. makeup torque: ft/lbs 91,000 Max. break out torque: ft/lbs 46,500 Raised backup system: yes/no No Make/type: Working height (range): ft/ft
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
18/74 Date of Udpate: 27 Oct 2006
C. POWER SUPPLY SYSTEMS
C.1 RIG POWER PLANT
C.1.1 Diesel Engines
Quantity: no. 4 Make/type: Wartsila 8R 22 MD Maximum continuous power: hp 1423 At rotation speed of: rpm 1000 Equipped with spark arrestors: yes/no yes Mufflers installed: yes/no yes Total fuel consumption, drilling (avg): bbl/day 115 / per day 4x engines running Quantity: no. 1 Make/type: 8HN2S/34 Russian Maximum continuous power: hp 725 At rotation speed of: rpm 500 Equipped with spark arrestors: yes/no yes Mufflers installed: yes/no yes
C.1.2 DC – Generator
Quantity: no. Make/type: Continuous power: kw At rotation speed of: rpm Output volts: volts
C.1.3 AC – Generator
Quantity: no. 4 Make/type: Stromberg / HSPT L 11/653 Continuous power: kw 1452 At rotation speed of: rpm 1000 Output volts: volts 660 Quantity: no. 1 Make/type: GSM 14-41-12 OM4 Continuous power: kw 500 At rotation speed of: rpm 500 Output volts: volts 400
C.1.4 SCR System
Number of SCR: no. 7 Make/type: Stromberg Maximum continuous power (total): kw 7 x 630 Output volts: volts 720 C.1.5 Transformer systems Quantity No. 2 Make / Type Electra – Sundberg AB TLFP-31 Continuous power (each) Kva 1800 Output Volts volts 600/400
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
19/74 Date of Udpate: 27 Oct 2006
Frequency Hz 50 Quantity No. 3 Make / Type Electra – Sundberg AB TC3M-100 Continuous power (each) Kva 100 Output Volts volts 400/230 Frequency Hz 50
C.1.6 Emergency Shutdown
Emergency shutdown switches for the complete power system (AC & DC), located at the
Following points: Rig floor, SCR room
C.1.7 Compressed Air Systems
Air compressors - Cold Start: Quantity: no. 2
Make: Sperre Model: HL2/105 Rated capacity: ft3/min 25.4 Working pressure: psi 510 Prime mover (electric/diesel): ELECTRIC Continuous power: hp 16 Air compressors - Medium Pressure (rig air): Quantity: no. 2 Make: Ingersoll Rand SSR-2000 Model: SSR-2000 Rated capacity: ft3/min 700 Working pressure: psi 125 Prime mover (electric/diesel): Electric Continuous power: hp 162 Air dryers: Quantity: No. 1 Make: Ingersoll Rand RDA 300 Rated capacity: Ft3/min 200 Quantity: No. 1 Make: Ingersoll Rand RDA 160 Rated capacity: Ft3/min 588
C.1.8 Air Receivers
Volume (total): ft3 159 Pressure: psi 125 Location: Engine Room Volume (total): ft3 70 Pressure: psi 125 Location: Drill Floor
C.2 EMERGENCY GENERATOR
C.2.1 Engine
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
20/74 Date of Udpate: 27 Oct 2006
Quantity: no. 1 Make/type: USSR/ADGR 200/1500/438 Maximum output: hp 268 At rotation speed: rpm 1500 Automatic starting: yes/no yes Starting methods (air, hydraulic, battery): battery Max. angle of operation: degrees
C.2.2 AC - Generator
Quantity: no. 1 Make/type: USSR/MCC Maximum output: amps 250 At rotation speed: rpm 1500 Output volts: volts 380 Capable of back-feeding power to main bus: yes/no yes
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
21/74 Date of Udpate: 27 Oct 2006
D. DRILLSTRING EQUIPMENT
D.1 TUBULARS
D.1.1 Kelly’s
D.1.2 Kelly/TDS Saver Subs
D.1.3 Drill Pipe
Drill pipe OD: in 5 Grade: S-135 Total length: ft 16,400 Range: 2 Weight: lbs/ft 19.5 Internally plastic coated: yes/no yes Tool joint OD/ID: in/in 6-5/8 / 2-3/4 Tool joint pin length (original): in 9 Tapered shoulder tool joints 18 (box/pins): Connection type: 4 ½ IF / NC50 Hard facing: SmoothX equivalent API classification: Premium Thread protectors: yes/no yes
D.1.4 Drill Pipe Pup Joints
Tool joint OD/ID: in/in 5 Grade: S135 Length: ft 10 Quantity: no. 1 Length: ft 15 Quantity: no. 1 Length: ft Quantity: no. Weight: lbs/ft 19.5 Connection type: NC50 Internally plastic coated: yes/no API Classification: Thread protectors: yes/no yes
D.1.5 Drill Pipe Casing Protectors
Initial stock: no. None Make/type: OD: in Installation tools (manual/hydraulic/none):
D.1.6 Heavy Wate Drill Pipe
Quantity: no. 30 Nominal size OD: in 5 Weight: lbs/ft 49.2 Range: 2 Tool joint OD / ID: in/in 6 3/8
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
22/74 Date of Udpate: 27 Oct 2006
Type of hardfacing: SmoothX equivalent Internally plastic coated: yes/no Connection type: NC50 Thread protectors: yes/no yes
D.1.7 Drill Collars
Quantity: no. 6 OD body: in 9 ID body: in 3 Nominal length of each joint: ft 30 Drill collar body (slick/spiral): spiral Recess for zip elevator: yes/no yes Recess for slips: yes/no yes Stress relief pin groove: yes/no yes Boreback on box: yes/no no Connection type: 7 5/8 Reg Quantity: no. 18 OD body: in 8 ID body: in 3 Nominal length of each joint: ft 30 Drill collar body (slick/spiral): spiral Recess for zip elevator: yes/no yes Recess for slips: yes/no yes Stress relief pin groove: yes/no yes Boreback on box: yes/no No Connection type: 6 5/8 Reg Quantity: no. 21 OD body: in 6 ½ ID body: in 2 13/16 Nominal length of each joint: ft 30 Drill collar body (slick/spiral): spiral Recess for zip elevator: yes/no yes Recess for slips: yes/no yes Stress relief pin groove: yes/no yes Boreback on box: yes/no no Connection type: 4 ½ IF
D1.8 Short Drill Collars
Quantity: no. None OD body: in ID body: in Nominal length of each joint: ft Stress relief pin groove: yes/no Boreback on box: yes/no Connection type:
D.1.9 Non-Magnetic Drill Collars
Quantity: no. None OD body: in ID body: in Nominal length of each joint: ft Drill collar body (slick/spiral): Recess for zip elevator: yes/no Recess for slips: yes/no
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
23/74 Date of Udpate: 27 Oct 2006
Stress relief pin groove: yes/no Boreback on box: yes/no Connection type:
D.1.10 Core Barrels
Quantity: no. none Make: Model: Size OD x ID: in x in Length: ft Top connection type: Spiral stabilizing ribs: yes/no Subs and handling tools: yes/no
D.1.11 Stabilizers
Hole size: in none Quantity: no. Make: OD blades: in Type blades (straight/spiral/welded/integral/sleeve): Type of blade hardfacing: OD body or fishing neck: in ID body: in Connection type: Float valve receptacle: yes/no
D.1.12 Roller Reamers
Hole size: in none Quantity: no. Make: OD body: in ID body: in OD fishing neck: in Cutters supplied sets: no. Cutters, type: Connection, type:
D.1.13 Shock Absorbers
Quantity: no. none Make/type: OD body: in ID body: in OD fishing neck: in Connection type:
D.1.14 Drilling Jars
Quantity: no. none Make: Type (mechanical/hydraulic; up/down): OD body: in Min. ID body: in OD fishing neck: in
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
24/74 Date of Udpate: 27 Oct 2006
Stroke: in Connection type:
D.1.15 Inside BOP Valve (see also B.4.4)
Quantity: no. 1 Make: National OD: in Min. ID: in 3 Connection type: NC50 Pin down Working pressure: psi 15,000
D.1.16 Fast Shut-Off Coupling
Make/type: None Quantity: no. Size tool joint to fit:
D.1.17 Circulation Head
Quantity: no. None Make/type: Bottom connection type: Top connection type: Wireline stripper: yes/no Working pressure: psi
D.1.18 Kelly Cocks
Upper: Quantity: no. None Make/type: Working pressure: psi Max. OD body: in Min. ID body: in Connection type: Lower: Quantity: no. Make/type: Working pressure: psi Max. OD body: in Min. ID body: in Connection type: Used as full open safety valve: yes/no
D.1.19 Circulation Subs
Quantity: no. None Make/type: OD body: in Ball size: in Dressing kits: no. Connection type:
D.1.20 Cup Type Testers
Quantity: no. None
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
25/74 Date of Udpate: 27 Oct 2006
Make: Size: in test cup for casing weight: lb/ft Connection type: Quantity: no. Make: Size: in test cup for casing weight: lb/ft Connection type:
D.1.21 Plug Type Testers
Quantity: no. None Make: Size test plugs: in Connection type:
D.1.22 Drop-In Valves
Quantity: no. None For nom. OD drillpipe: in Make/type: Max. OD of dart.: in
D.1.23 Near Bit - Subs (Box-Box)
Quantity: no. 2 OD size: in 9 ½ ID size: in 3 Top connection type: 7 5/8 Reg Bottom connection type: 7 5/8 Reg Bored for float valve: yes/no yes Float size: in 4.84 Quantity: no. 2 OD size: in 8 ID size: in 3 Top connection: 6 5/8 Reg Bottom connection: 6 5/8 Reg Bored for float valve: yes/no yes Float size: in 4.84 Quantity: no. 2 OD size: in 6 ½ ID size: in 2 13/16 Top connection: 4 ½IF Bottom connection: 4 ½ Reg Bored for float valve: yes/no yes Float size: in 4.44
D.1.24 Crossover Subs
Quantity: no. 2 OD size (max/min): in/in 9 ½ x 8 ID size: in 3 Top connection size: 6 5/8 Reg Type (pin/box): Box
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
26/74 Date of Udpate: 27 Oct 2006
Bottom connection size: 7 5/8 Reg Type (pin/box): Pin Quantity: no. 2 OD size (max/min): in/in 9 ½ x 6 ½ ID size: in 3 Top connection size: 4 ½IF Type (pin/box): Box Bottom connection size: 7 5/8 Reg Type (pin/box): Pin Quantity: no. 2 OD size (max/min): in 8 x 6 ½ Id Size in 2 13/16 Top connection size: 4 ½IF Type (pin/box): Box Bottom connection size: 6 5/8 Reg Type (pin/box): Pin
D.1.25 Drilling Bumper Subs
Quantity: no. none Make: OD: in Stroke: in Connection type:
D.1.26 Hole Openers
Quantity: no. none Make: OD: in Connection type:
D.1.27 Under reamer none
Quantity: no. Make/type: OD min/OD max: in/in Connection type:
D.2 HANDLING TOOLS
D.2.1 Drill Pipe Elevators
Size: in 5 Quantity: no. 2 Make: Varco, BJ Model: GG Air operated Rated capacity: st 350 Size: in 5 Quantity: no. 1 Make: WTM Model: Center latch Rated capacity: st 350t
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
27/74 Date of Udpate: 27 Oct 2006
D.2.2 Drill Collar Elevators
Size: in Quantity: no. None – against Seadrill policy. Make: Model: Rated capacity: st
D.2.3 Tubing Elevators
None Size (max/min): in/in Quantity: no. Make: Model: Rated capacity: st
D.2.4 Drill Pipe Hand Slips
Size: in 4 ½ – 5 Quantity: no. 2 Make/type: Varco SDXL
D.2.5 Semi-Automatic DP Slips
Size range (largest/smallest): in/in 5 Quantity: no. 1 Make/type: Varco PS-15
D.2.6 Drill Collar Slips
Size: in 8 – 9 ½’ Quantity: no. 1 Make/type: Varco / DCS-L Size: in 6-3/4 to 8-1/4 Quantity: no. 1 Make/type: Varco / DCS-L Size: in 5 ½ – 7 Quantity: no. 1 Make/type: Varco / DCS-R D.2.7 Drill Collar Safety Clamps Quantity: no. 1 Range: in/in Varco, MP-R 6 ¾ – 8-1/4 Quantity: no. 1 Range: in/in Varco, MP-S, 6 1/4 – 8 1/4 Quantity: no. 1 Range: in/in Varco MR-R 9 ¼ – 10 ½
D.2.8 Tubing Slips
Size: in None
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
28/74 Date of Udpate: 27 Oct 2006
Quantity: no. Make/type:
D.2.9 Tubing Spider
Slip size (max/min): in/in None Quantity: no. Make: Adapter Plate:
D.2.10 Drill Collar Lifting Subs
Quantity: no. 3 For DC OD: in 9-1/2 Connection Type: 7 5/8 reg Quantity: no. 6 For DC OD: in 8 Connection Type: 6 5/8 reg Quantity: no. 7 For DC OD: in 6 ½ Connection Type: 4 ½ IF
D.2.11 DC Lifting Plugs
Quantity: no. Various sizes For OD DC: in Connection Type:
D.2.12 Bit Breakers
Quantity: no. 1 For bit size: in 26 Quantity: no. 1 For bit size: in 17 ½ Quantity: no. 1 For bit size: in 12 ¼ Quantity: no. 1 For bit size: in 8 ½ Quantity: no. 1 For bit size: in 6 1/8
D.2.13 Elevator Links
Quantity of sets: no. 1 Make/type: BJ / Forged Size: in 3-1/2 Length: ft 11 Rated capacity: st 500 Quantity of sets: no. 1 Make/type: National Oilwell Forged
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
29/74 Date of Udpate: 27 Oct 2006
Size: in 2 ¾ Length: ft 9.8 Rated capacity: st 350
D.2.14 Kelly Spinner
Make/type: none Size
D.2.15 Drill pipe Spinner
Make/type: Spinmaster hawk /950 A Size (max/min): in/in 3 ½ – 8
D.2.16 Mud Saver Bucket
Make: Bob Herbert Size: in 5
D.2.17 Hydraulic Make-Up/Breakout Machine (e.g. EZ Torque)
Make/type: Rexroth Maximum line pull: st 20
D.2.18 Rotary Rig Tongs
Quantity (sets): no. 1 Make/type: Varco HT65 Size range (max OD/min OD): in/in 3 ½ – 8 ¼ Torque rating: ft-lbs 65K Quantity (sets): no. 1 Make/type: Varco HT100 Size range (max OD/min OD): in/in 3 ½ – 17 Torque rating: ft-lbs 100K
D.2.19 Tubing Tongs (manual)
Quantity (sets): no. none Make/type: Size range (max OD/min OD): in/in Torque rating: ft/lbs
D.2.20 Tubing Tong Power
Quantity: no. none Make/type: Size range (max OD/min OD): in/in Max output torque: ft/lbs Torque indicator: yes/no Back-up arm: yes/no
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
30/74 Date of Udpate: 27 Oct 2006
D.2.21 Iron Roughneck
Make/type: Varco / ST80 Size range (max OD/min OD): in/in 8 ½ - 4 ¼ Max. makeup torque ft/lbs 60,000 Max. breakout torque ft/lbs 80,000
D.3 FISHING EQUIPMENT Contractor will supply adequate fishing equipment to fish its
tubulars as identified in this equipment list
D.3.1 Overshots
Quantity: no. Make/type: Overshot OD: in To catch size: in To catch size: in To catch size: in Overshot guide OD: in Extension sub length: in Lipped guide (oversize, regular): Grapples (spiral, basket, both): Pack offs: yes/no Top subs connection type:
D.3.2 Hydraulic Fishing Jar
Quantity: no. Make/type: OD body: in Min. ID: in Stroke: in Connection type: Repair kit: yes/no
D.3.3 Jar Intensifier
Quantity: no. Make/type: OD body: in Min. ID: in Connection type: Repair kit: yes/no
D.3.4 Surface Jar
Quantity: no. Make/type: OD body: in Stroke: in Connection type: Repair kit: yes/no
D.3.5 Fishing Bumper Subs
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
31/74 Date of Udpate: 27 Oct 2006
Quantity: no. Make/type: OD body: in Min. ID: in Stroke: in Connection type:
D.3.6 Safety Joints
Quantity: no. Make/type: OD body: in Min. ID: in Connection type:
D.3.7 Junk Baskets (Reverse Circulation)
Quantity: no. Make/type: For hole size: in OD body: in Connection type: Inside magnet available: yes/no Mill shoes type (A, B, C):
D.3.8 Junk Subs
Quantity: no. Make/type: For hole size: in OD body: in Connection type:
D.3.9 Flat Bottom Junk Mill
Quantity: no. Make/type: OD flat mill: in Connection type:
D.3.10 Magnet Fishing Tools
Quantity: no. Make/type: OD body: in Connection type: Ditch Magnet In Flow Channel yes /No
D.3.11 Taper Taps
Quantity: no. Make: Tap OD (max/min): in/in OD body: in Length overall: ft Connection type:
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
32/74 Date of Udpate: 27 Oct 2006
D.3.12 Die Collars
Quantity: no. Make/type: OD (Max/Min): in/in OD body: in Length: ft Connection type:
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
33/74 Date of Udpate: 27 Oct 2006
E. WELL CONTROL
E.1 DIVERTER
Fixed: yes/no No Make/type: Hughes offshore / KFDL-500 Maximum bore: in 36 ½ ID of insert packer: in 10 Working pressure: psi 500 Annular: no. 1 Make/type: Hydraulic packing system Maximum bore: in ID of insert packer: in Working pressure: psi 250 Bottom connection: Overshot hydraulic system Size: in 39 Working pressure: psi Gasket type: Rams: no. no Make/type: Ram packer type: Ram packer type: Max bore size: Working pressure: psi Bottom connection: Size: in Working pressure: psi Gasket type: Number of Diverter outlets: no. 2 Outlet OD (nominal): in 10
E.1.1 Diverter Flow Lines
Quantity: no. 2 Nominal size of flow lines: in 12 (2000psi) Running from Diverter to: Port and Starboard Valve make/type: CIW Ball valve Quantity: no. 2 Size: in 10 Working pressure: psi 150 Valve operator (air/hydraulic): Hydraulic Valve make/type: System pressure rating: psi 500 Flex hose in flow line: yes/no No
E.1.2 Diverter Control Panel
Primary make/type: Cameron / 38-7-3-3 Location: BOP control unit Primary make/type: Cameron / GERC 10 - 3 Location: Drillers house
E.2 LOW PRESSURE BLOWOUT PREVENTERS
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
34/74 Date of Udpate: 27 Oct 2006
All appropriate components H2S rated yes/no yes
E.2.1 Ram Type Preventers
Quantity: no. 1 Make/model: Cameron U Type: (single/double/triple): Double Size: in 20-3/4 Working pressure: psi 3000 Ram locks: yes/no yes Type (manual/hydraulic): Manual / hydraulic H2S service: yes/no yes Side outlets: no. 2 Size: in 3-1/16 WP: psi 10,000 Bottom connection: 20 ¾ x 3000 hubbed Top connection: 20 ¾ x 3000 hubbed Shear ram boosters: yes/no yes
E.2.2 Available Rams (installed & spare)
Quantity/type/size no./type/in 1 set 20 ¾ 5’ pipe Quantity/type/size no./type/in 1 set 20 ¾ blind
E.2.3 BOP Ram Configuration (normal)
Upper: Blind Middle Upper: No Middle Lower: No Lower: pipe
E.2.4 Annular Preventer
Quantity: no. 1 Make/type: Cameron DL Size: in 20 3/4 Working pressure: psi 3000 Bottom Connection: 20 3/4 x 3000 hubbed Top Connection: studded Lifting Frame yes
E. 2.5 Kill Line Valves
Quantity: no. 2 Make/type: EEC Size: in 3-1/16 Working pressure: psi 10000 Gasket type BX154 Hydraulic/manual/non-return: Manual Quantity: no. 1 Make/type: Shaffer DB Size: in 3-1/16 Working pressure: psi 10000 Gasket type BX154 Hydraulic/manual/non-return: Hydraulic
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
35/74 Date of Udpate: 27 Oct 2006
E.2.6 Choke Line Valves
Quantity: no. 1 Make/type: EEC Size: in 3-1/16 Working pressure: psi 10000 Gasket type BX154 Hydraulic/manual: Manual Quantity: no. 1 Make/type: EEC Size: in 3-1/16 Working pressure: psi 10000 Gasket type BX154 Hydraulic/manual: Hydraulic
E.3 HIGH PRESSURE BLOWOUT PREVENTERS
All appropriate components H2S rated: yes/no yes
E.3.1 Ram Type Preventers
Quantity: no. 1 Make/model: Shaffer SL Type (single/double/triple): Double Size: in 13 5/8 Working pressure: psi 10,000 Ram locks: yes/no yes Type (manual/hydraulic): Manual / hydraulic H2S service: yes/no yes Side outlets: no. 2 Size: in 3-1/16 WP: psi 10,000 Bottom connection: Flanged Top connection: Flanged Shear ram boosters: yes/no no Quantity: no. 1 Make/model: Shaffer SL Type (single/double/triple): Double Size: in 13 5/8 Working pressure: psi 10,000 Ram locks: yes/no yes Type (manual/hydraulic): Manual / hydraulic H2S service: yes/no yes Side outlets: no. 2 Size: in 3 1/16 WP: psi 10,000 Bottom connection: Flanged Top connection: Flanged Shear ram boosters: yes/no no
E.3.2 Available Rams (installed & spare)
Quantity/type/size: no./type/in 2 / pipe / 5 Quantity/type/size: no./type/in 1 / Blind – shear / N/A
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
36/74 Date of Udpate: 27 Oct 2006
E.3.3 BOP Ram Configuration (normal)
Upper: Pipe Upper middle: Middle: Blind / shear Middle lower: Lower: Pipe
E.3.4 Annular Preventer
Quantity: no. 1 Make/type: Shaffer Size: in 13-5/8 Working pressure: psi 5000 Bottom connection: hub Top connection: Stud H2S service: yes/no yes Lifting Frame yes
E.3.5 Kill Line Valves
Quantity: no. 2 Make/type: EEC Size: in 3-1/16 Working pressure: psi 10000 Gasket type: BX154 Hydraulic/manual/non-return: Manual Quantity: no. 1 Make/type: Shaffer DB Size: in 3-1/16 Working pressure: psi 10000 Gasket type: BX154 Hydraulic/manual/non-return: Hydraulic
E.3.6 Choke Line Valves
Quantity: no. 1 Make/type: EEC Size: in 3-1/16 Working pressure: psi 10000 Gasket type: BX154 Hydraulic/manual: Manual Quantity: no. 1 Make/type: EEC Size: in 3-1/16 Working pressure: psi 10000 Gasket type: BX154 Hydraulic/manual: Hydraulic
E.4 OTHER BLOWOUT PREVENTERS
All appropriate components H2S rated yes/no none
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
37/74 Date of Udpate: 27 Oct 2006
E.4.1 Ram Type Preventers
E.4.2 Available Rams (installed & spare)
E.4.3 BOP Ram Configuration (normal)
E.4.6 Choke Line Valves
E.5 BOP CONTROL SYSTEM
E.5.1 Accumulator Unit
Make/model: Cameron W.S320-2-20E Quantity: no. 1 Location: Below Cantilever deck Fluid reservoir capacity: gal 400 Oil/water mix. rate: gals/min Glycol reservoir capacity: gal 80 Total accumulator capacity (w/o precharge): gal 320 System working pressure: psi 3000 Control manifold model: SK – 16474 - 01 Regulator type: ¾2760-D-H Total useful accumulator volume Gal 160 equals all preventer opening and closing volumes: yes/no yes plus percent additional volume: %
E.5.2 Accumulator Hydraulic Pumps
Electric Driven: Quantity: no. 1 Make/model: Cameron DP403 Each driven by motor of power: hp 20 Flow rate of each pump: gals/min 10 At operating pressure: psi 3000 Operable off emergency generator: yes/no yes Air Driven: Quantity: no. 2 Make/model: Cameron C-7-50 CD-i 11 Flow rate of each pump: gals/min 4 AT operating pressure: psi 2000
E.5.3 Primary Control Panel
Control panel make/model: GERC -10(16)-3(6) Location: BOP Control unit Panel controls for the following functions: All annular BOP’s: yes/no yes All ram BOP’s: yes/no yes Lock for ram BOP’s: yes/no yes Diverter system: yes/no yes Kill and choke line valves: yes/no yes
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
38/74 Date of Udpate: 27 Oct 2006
Low accumulator pressure warning: yes/no yes Low reservoir level warning: yes/no yes Low rig air pressure warning: yes/no yes System pressure regulator: yes/no yes Pressure regulator for annular: yes/no yes Flowmeter: yes/no no Quantity of pressure gauges: no. 3 Other control functions: yes/no none
E.5.4 Remote Control Panels
Make/model: Cameron GERC -8-0 Location: Driller control room Location: Drilling office Location: Ability to operate main closing unit: valves directly: yes/no yes System routing (direct or through panel): Remote control of - system pressure regulator: yes/no no Remote control of - annular pressure regulator: yes/no yes Make/model: N/A Location: Location: Location: Ability to operate main closing unit: valves directly: yes/no System routing (direct or through panel): Remote control of - system pressure regulator: yes/no Remote control of - annular pressure regulator: yes/no
E.6 CHOKE MANIFOLD
All appropriate components H2S rated yes/no yes E.6.1 Choke Manifold (for instrumentation, See H.3) Nominal size: In 3-1/16 Minimum ID: in 3-1/16 Maximum WP: psi 10,000 Quantity of fixed chokes: no. none Make/model: Size (ID): in Make/model: Size: in Quantity of adjustable chokes: no. 2 Make/model: Cameron H2 Size (ID): in 3 1/16 Quantity of power chokes: no. 1 Make/model: Swaco super choke Size (ID): in 1-3/4 Make/model: Size (ID): in
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
39/74 Date of Udpate: 27 Oct 2006
Power choke remote control panel: yes/no yes Make/model: Cameron / iron works Location: Drillfloor Glycol injection: yes/no No
E.7 FLEXIBLE CHOKE & KILL LINES
(BOP to MANIFOLD) Quantity: no. 2 Make/type: Cameron FC ID: in 3-1/16 Working pressure: psi 10,000 H2S service: yes/no yes
E.8 FLEXIBLE BOP CONTROL HOSES
Quantity: no. 19 Make/type: ENZED 100119 ID: in 1 Working pressure: psi 3000 Fire resistant: yes/no yes Quantity: no. 10 Make/type: ENZED 100119 ID: in ½ Working pressure: psi 4000 Fire resistant: yes/no yes
E.9 BOP TESTING EQUIPMENT
E.9.1 Hydraulic BOP Test Pump
Make/model: CAMERON / DP - 10183 Type: AIR OPERATED Pressure rating: psi 10,000 Chart recorder: yes/no No
E.9.2 BOP Test Stump
Size: in 20 - 3/4 Size: in 13-5/8
E.10 BOP HANDLING
E.10.1 BOP Hoist System
Make/type: Ingersoll Rand /BHS50MA6 – 30 -30 Quantity of hoists: no. 2 X 25 st Number of lift point on BOP: no. 2 System safe working load (max BOP wt): st 50
E.10.2 Work Platforms
BOP work platform (adjustable/fixed/none): Adjustable Conductor pipe platform: yes/no yes
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
40/74 Date of Udpate: 27 Oct 2006
E.10.3 Conductor Pipe Tensioning System
Make/type: Tension capacity: st none Number of lift points: no. Stroke: in
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
41/74 Date of Udpate: 27 Oct 2006
F. MUD SYSTEM/BULK SYSTEM
F.1 HIGH PRESSURE MUD SYSTEM
System working pressure: psi 5000 System test pressure: psi 7000
F.1.1 Mud Pumps
Quantity: no. 2 Make: Oilwell Model: A1700 - PT Type: (Triplex/Duplex): Triplex Liner sizes available: in Various (at Operator cost) Mud pump drive motors/pump: no. 2 Motor type: Stromberg / GRCH 8048 Continuous power rating per motor: hp 804 Fluid end type: OEM or OEM approved Maximum working pressure: psi 5000 Test pressure: psi 3000 Pump stroke counter type: Camille Bauer / linex 7K2 Supercharging pump: Mission Driven by motor of power: hp 100 Discharge/Suction line ID: in/in 4 x 11 Mud pump pulsation dampener type: Hydril K-20-5000 Reset Relief Valve type: Oteco 3 X 5000 Working flow rate per pump at 90% of max SPM: As per OEM Liner size: in As per OEM Pump speed (90% of max.): spm As per OEM Pump pressure: psi As per OEM Working flow rate: U.S. gal/min As per OEM Accessories
F.1.2 Transfer Pumps/Mixing Pumps
Mixing Quantity: no. 4 Make/model: Mission 6 x 8R TRW Type/Size Output Capacity: gpm 950 @42 psi Drive motor type: AC Power output: hp 100
F.1.3 Booster / Charging Pump
Quantity: no. 1 Make/Mode: Mission Type/Size 2 x3 Capacity (each): gals/min 950 @ 42 psi Drive motor type: Electric Power output: hp 100
F.1.4 Standpipe Manifold
Quantity of standpipes: no. 2
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
42/74 Date of Udpate: 27 Oct 2006
Standpipe/ID: in 4 H-Type standpipe manifold: yes/no yes Kill line outlet: yes/no yes Fill-up line outlet: yes/no yes Bleed-off line outlet: yes/no yes
F. 1.5 Rotary Hoses
Quantity: no. 2 Make/type: Goodwill & Taurus ID x length: in x ft 3 ½ x 80 Working pressure: psi 5000 Snubbing lines: yes/no yes
F.1.6 Cementing Hose
Quantity: no. none Type (armor sheath/flexible steel pipe): Length: ft ID: in Working pressure: psi
F.1.7 High Pressure Flexible Steel Pipe
Make/type: none Integral connections/fittings (non-threaded): yes/no ID: in Working pressure: psi Section length: ft Quantity: no. Section length: ft Quantity: no. Sweep swivels, make/type: Nom. size ID: in Suitable for H2S service: yes/no
F.2 LOW PRESSURE MUD SYSTEM
F.2.1 Mud Processing Tank
Sand trap tank, usable volume bbl 22 Degasser tank,usable volume bbl 43.4 Agitated yes/no no Desander tank, usable volume bbl 47.8 Agitated yes/no no Desilter tank, usable tank volume bbl 46.5 Agitated yes/no no Mud cleaner tank, usable volume bbl 28.3 Agitated yes/no no Centrifuge tank, usable volume bbl no Agitated yes /no No Other tanks, Usable volume bbl No Agitated yes /no No Total usable capacity bbl 188
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
43/74 Date of Udpate: 27 Oct 2006
F.2.2 Mud Tanks
Quantity: no. 6 Total capacity (usable): bbl 2131 Usable capacity No. 1: bbl 566 Type (active/reserve): reserve Height: ft Mixer: yes/no yes Mud guns: yes/no yes Usable capacity No. 2: bbl 440 Type (active/reserve): Reserve Height: ft Mixer: yes/no yes Mud guns: yes/no yes Usable capacity No. 3: bbl 377 Type (active/reserve): Reserve Height: ft Mixer: yes/no yes Mud guns: yes/no yes Usable capacity No. 4: bbl 566 Type (active/reserve): Active Height: ft Mixer: yes/no yes Mud guns: yes/no yes Usable capacity No. 5: bbl 113 Type (active/reserve): Slug Height: ft Mixer: yes/no yes Mud guns: yes/no yes
F.2.3 Pill/Slug Tank
Capacity (usable): bbl 69 Mud agitator: yes/no yes Mud guns: yes/no No
F.2.4 Trip/Stripping Tanks
Capacity (usable): bbl 23.3 Capacity/foot: bbl/ft Level indicator: yes/no yes Electric pump make: Centrifugal 2 x 3 Model/type: Mission 2 x 3 Rated capacity: hp 25 Facility for casing fill-up: yes/no yes Alarm and strip chart recorder: yes/no yes
F.2.5 Chemical Mixing Tank
Capacity (usable): bbl 69 Chemical mixer type: Air
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
44/74 Date of Udpate: 27 Oct 2006
F.2.6 Shale Shakers
Primary: Quantity: no. 3 Make/model: Varco / VSM - 300 Type: Nominal flow rate (total): bbl/min
F.2.7 Desander
Quantity: no. 1 Make/model: Swaco Type: 212 Number of cones x size: no. x in 2 x 12 Feed pump make/model Harrisburg Type/size 6 x 8 Capacity gpm Drive motor hp hp 100
F.2.8 Desilter
F.2.9 Mud Cleaner
Quantity: no. 1 Make/model: Swaco Type: 8T4 Number of cones x size: no. x in 8 x 4 Feed pump make/model Harrisburg Type/size 6 x 8 Capacity gpm Drive motor hp hp 100 Capacity: gpm Drive motor hp: hp Is pump dedicated to mud cleaner: yes/no yes
F.2.10 Mud/Gas Separator (Poor Boy)
Make/type: Vertical Dimensions (height x OD): ft x in 15 x 43 Gas discharge line ID: in 6 Gas discharge location, primary: Top of the derrick Can discharge be tied into burner system: yes/no No Vacuum breaker: yes/no No Mud seal height: ft Pressure gauge: yes/no No Calculated gas throughput: mmscf
F.2.11 Degasser
Make/type: Burgess magna – vac model 1000 Nominal flow rate: bbl/min Feed pump make/model: Mission Type/size: 6 x 8 Capacity: gpm 1000
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
45/74 Date of Udpate: 27 Oct 2006
Drive motor hp: hp 100 Is pump dedicated to degasser: yes/no yes Vacuum pump make type:
F.2.12 Mud Agitators
Quantity: no. 4 Make/model: Kumera / 120 -18 Driven by motor of power: Kw 18.5 Located in tanks: 1,2,3,4 Quantity: no. 2 Make/model: R – R90 / 7 x 3600 Driven by motor of power: hp 75 Located in tanks: 5,6 Quantity: no. 3 Make/model: R – R90 / 7 x 1800 Driven by motor of power: hp 75 Located in tanks: 1BC,2BC,3BC (see F.2.1 and F.2.2 for tank designations)
F.2.13 Mud Centrifuge
Quantity: no. None Make/model: Feed pump make/model: Type/size: Capacity: bbl/min Drive motor hp: hp Is feed pump dedicated to centrifuge(s) yes/no
F.2.14 Mud Laboratory And Facilities
Separate room: yes/no yes Equipped with: Mud balance: yes/no No Marsh funnel: yes/no No Filtration kit: yes/no No Sand content kit: yes/no No Air Conditioning: yes/no yes Positive pressure: yes/no yes
F.3 BULK SYSTEM
F.3.1 Barite/Bentonite Silos
Quantity: no. 4 Capacity of each silo: ft3 4887 Locations: Twin deck stbd side Type weight loadcell: Kontram Manufacturer: Ralima - Repola Pressure rating: psi 40 Relief valve(s) installed: yes/no yes
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
46/74 Date of Udpate: 27 Oct 2006
F.3.2 Cement Silos
Quantity: no. 4 Capacity of each silo: ft3 4887 Locations: Twin deck port side Type weight loadcell: Kontram Pressure rating: psi 40 Relief valve(s) installed: yes/no yes Separate mud/cement loading facilities: yes/no yes Cement discharge independent from barite/Bentonite: yes/no yes
F.3.3 Surge Tank For Barite/Bentonite
Quantity: no. 1 Capacity of each tank: ft3 140 Type weight load cell: Martin decker SD8FK Manufacturer: Rauma - Repola Pressure rating: psi 40 Relief valve(s) installed: yes/no yes
F.3.4 Mud Hopper
Quantity: no. 2 Make/model: Harrisburg / H-6 Feed pump make/model: TRW Mission Type/size: 6/8 Capacity: bbl/min Drive motor hp: hp 100 Is feed pump dedicated to mud hopper(s): yes/no yes
F.3.5 Shear Jet
Quantity: no. Make/model: Feed pump make/model: Type/size: Capacity: bbl/min
F.3.6 Surge Tank For Cement
Quantity: no. 1 Capacity of each tank: ft3 140 Type weight load cell: Martin Decker SD 8FK Manufacturer: Halliburton Pressure rating: psi 40 Relief valve(s) installed: yes/no yes
F.3.7 Bulk Transfer System
(see also C.1.7 - Compressed Air Systems) Independent air system for the silos and surge Tanks consisting of a high-volume low-Pressure compressor and air drier: yes/no No
Air reduced from main air supply through Pressure regulators: yes/no yes
Separate volume tank and drier: yes/no
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
47/74 Date of Udpate: 27 Oct 2006
G. CASING/CEMENTING EQUIPMENT
G.1 CASING EQUIPMENT
G.1.1 Drive Hammer
Make/type: none Minimum casing/conductor OD: in
G.1.2 API Casing Drifts
For casing OD, weight, quantity: in/lbs/ft/no. none
G.1.3 Clamp-On Casing Thread Protectors
For casing OD, quantity: in/no. none
G.1.4 Side Door Casing Elevator
Quantity: no. none For OD casing: in Make/type: Capacity: st
G.1.5 Single Joint Casing Elevators
Quantity: no. none For OD casing: in Make/type:
G.1.6 Slip Type Elevator/Spiders
Quantity: no. none Make/type: Pneumatic/manual: Capacity: st Slips for OD casing sizes: in
G.1.7 Casing Slips
Quantity: no. none Make/type: For OD casing: in
G.1.8 Casing Bowls
Quantity: no. None Make/type: For OD casing (max/min): in/in
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
48/74 Date of Udpate: 27 Oct 2006
G.1.9 Manual Casing Tongs
Quantity (sets): no. None
Make/type: W/jaws for OD casing (max/min): in/in
G.1.10 Power Casing Tongs
Quantity: no. None Make/type: W/jaws for OD casing (max/min): in/in Max output torque: ft-lbs Torque indicator: yes/no Back-up arm: yes/no
G.1.11 Power Unit for Casing & Tubing Tongs
Quantity: no. none Make/type: Capacity (ea.): gpm Output pressure: psi Dedicated unit: yes/no
G.1.12 Casing Circulating Head (Swedge)
none
G.1.13 Casing Spears (Internal)
none
G.1.14 Casing Cutters (Internal)
none
G.1.15 Crossover to Handle Casing with Drill Pipe
none
G.1.16 Casing Scrapers
none
G.2 CEMENTING EQUIPMENT
G.2.1 Cement Unit
3rd Party Equipment installed on free-placement basis – to be provided at operator cost
Owner: BJ Cementing Free placement basis: yes/no yes Make/type: No. of triplex pumps: no. Maximum working pressure: psi Maximum flow rate (total): bbl/min Unit power by (electric/diesel): Re-circulating mixing system: yes/no Capacity: bbl Motor power: hp Liquid additive system: yes/no
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
49/74 Date of Udpate: 27 Oct 2006
Premix/batch tank: gal/min Quantity: no. Capacity (total): bbl Pressure recorder: yes/no Densionmeter recording device: yes/no
G.2.2 Cementing Manifold
Discharge manifold working pressure: psi Cement pump discharge lines min. ID: in Cement pump discharge lines working pressure: psi Manifold safety pressure relief valve: yes/no G.2.3 Cementing Standpipe Quantity: no. Working pressure: psi ID: in Connection to choke manifold: psi Connection to standpipe manifold: yes/no
G.2.4 Cementing Kelly
Quantity: no. none Nominal size OD: in Total length: ft Working length: ft Connection type: Cement head: yes/no
G.2.5 Cementing Tubing
Size: in none Length (total): ft X-overs to drillpipe (specified in section D.1.3): yes/no
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
50/74 Date of Udpate: 27 Oct 2006
H. INSTRUMENTATION/COMMUNICATION
H.1 DRILLING INSTRUMENTATION AT DRILLER’S POSITION
H.1.1. Weight Indicator
Make/Type: Martin Decker / EB Sensor type: Martin Decker / HA131T
H.1.2 Standpipe Pressure Gauges
Quantity: no. 1 Make/type: Chessel / 700v Maximum pressure reading: psi 5000 Quantity: no. 1 Make/type: Labom Maximum pressure reading: psi 6000
H.1.3 Choke Manifold Pressure Gauges
Quantity: no. 1 Make/type: Labom Maximum pressure reading: psi 10000
H.1.4 Rotary Instrumentation
H.1.4.1 Tachometer
Make/type: Muller & Weigert / DVM72 – 2000B Maximum RPM: rpm 400
H.1.4.2 Torque Indicator
Make/type: Chessel / 700v Maximum torque: ft-lbs 36,000
H.1.5 Top Drive Instrumentation
H.1.5.1 Tachometer
Make/type: National Oilwell Maximum RPM: rpm 300
H.1.5.2 Torque Indicator
Make/type: Varco Maximum torque: ft-lbs 40,000
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
51/74 Date of Udpate: 27 Oct 2006
H.1.6 Pump Stroke Counters
Quantity: no. 2 Make/type: Camille Bauer / linex 7K2 Stroke indicator and cumulative stroke counter for each pump: yes/no yes
H.1.7 Tong Torque Indicator
Make/type MD-Totco / H6 DP Maximum torque: ft-lbs 22,000
H.1.8 Pit Volume Totaliser
Make/model: Delaval Chessel 7000 Float in active mud tanks: yes/no yes Quantity per tank: no. 1 Floats in reserve mud tanks: yes/no yes Quantity per tank: no. 1 Floats in mud processing tanks: yes/no yes Quantity per tank: no. 1 Loss/Gain indicator: yes/no yes Audio Alarm: yes/no yes Visual Alarm: yes/no yes
H.1.9 Mud Flow Indicator
Make/model: Martin Decker TX4A-S High/low alarm: yes Audio Alarm: yes/no yes Visual Alarm: yes/no yes Sensor location: Return line
H.1.10 Trip Tank Indicator
Make/model: Chessel /700v Chart recorder: yes/no No Alarm: yes/no yes
H.1.11 Automatic Driller (see B.2.1) See B.2.1
H.1.12 Remote Choke Control Unit (see E.5)
See E.5
H.1.13 Crown Clearance Indicator
Make/type: yes/no yes , Stromberg / SDT – R26D
H.2 DRILLING PARAMETER RECORDER
Quantity: no. none Make/type:
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
52/74 Date of Udpate: 27 Oct 2006
Location - 1: Type (display/recorder/both): Location - 2: Type (display/recorder/both): Location - 3: Type (display/recorder/both): Number of parameters recorded: no. Parameter recorded:
H.3 INSTRUMENTATION AT CHOKE MANIFOLD
H.3.1 Standpipe Pressure Gauge
(Drill pipe pressure gauge) Quantity: no. 1 Make/type: Labon Pressure range (maximum): psi 6000 Quantity: no. 1 Make/type: Chessel / 700v Pressure range (maximum): psi 5000 Visible from choke operating position: yes/no yes
H.3.2 Choke Manifold Pressure Gauge
(Casing pressure gauge) Quantity: no. 1 Make/type: Cameron Iron/F Pressure gauge: psi/psi 10,000 Visible from choke operating position yes/no yes
H.4 INSTRUMENTATION AT STANDPIPE
H.4.1 Standpipe Pressure Gauge
Quantity 1 Make/Type Martin Decker / GM6A 507 Pressure range PSI 350 Visible from Standpipe manifold yes /no yes
Quantity 1 Make/Type Labom
Pressure range PSI 6000 Visible from Choke operating system yes /no yes Quantity 1 Make/Type Chessel – 700v Pressure range PSI 350 Visible from drillers position yes /no yes H.5.1 Deviation Recorder Quantity: no. 2 Make/type: MD /TOTCO Double Deviation range: degree/degree 0 / 8deg and 0 / 16 deg
H.5.2 Slickline Unit (see B.2.4)
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
53/74 Date of Udpate: 27 Oct 2006
H.6 RIG COMMUNICATION SYSTEMS
H.6.1 Rig Telephone System
No. of stations: no. 48 Make/type: Omega / Auteldac 4 Explosion proof: yes/no Where required
H.6.2 Public Address System
Can be combined with H.6.1 above: yes/no Yes No. of stations: no. 8 Make/type: Gaitronics / OME-SD-SAK Explosion proof: yes/no yes
H.6.3 Drill Floor Talkback System
No. of stations: no. 2 Location: Drill floor – Monkey board Location: Drill floor – Cellar deck Location: Make/type: VRC – 10M – Stenhas CS -5 Explosion-proof: yes/no yes
H.6.4 Hand Held VHF Radios See also H.9.3 & H9.5
Quantity: no. 17 Quantity intrinsically safe: no. 11
H.6.5 Crane Communication System
Quantity: no. 1 in each crane Make/type: Stenhans/Cs/TBO Explosion proof: yes/no no Part of rig telephone system (H.6.1): yes/no yes Part of public address system (H.6.2): yes/no yes
H.6.6 Computer Network LAN
H.7 ENVIRONMENTAL INSTRUMENTATION
H.7.1. Temperature Indicators
Air temperature (make/model): Davis 1 weather monitor Recorder: yes/no None Sea water temperature (make/model): yes/no None Recorder: yes/no None
H.7.2 Barometric Pressure Indicator
Make/model: Davis 1 weather monitor Recorder: yes/no none
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
54/74 Date of Udpate: 27 Oct 2006
H.7.3 Humidity Sensing Indicator
Make/model: none Recorder: yes/no
H.7.4 Wind Speed/Direction Meter
Make/model: Recorder: yes/no yes
H.7.5 Wave Profile Recorder
Make/model: none Recorder: yes/no
H.7.6 Current Indicator
Make/model: none Located at: Recorder: yes/no
H.7.7 Weather Facsimile
Make/model: Russian / INEY - P Located at: Radio room Recorder: yes/no yes
H.8 NAVIGATION INSTRUMENTATION
H.8.1 Gyro Compass
Make/model: Russian,CURS-4 Located at: Top Deck
H.8.2 Depth Sounder
Make/model: NFL-3B Located at: Bridge Recorder: yes/no yes
H.8.3 Radar
Quantity: no. 1 Make/model: USSR / Nayada 1 Located at: Radio room Bandwidth: cm S Band 3 cm
H.9 EXTERNAL COMMUNICATIONS EQUIPMENT
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
55/74 Date of Udpate: 27 Oct 2006
H.9.1 SSB Transceiver
Location(s): Radio room Quantity: no. 1 Make/model: Standard Radio / STR 2000 MF/HF Power: watts 400 Frequency ranges (low/high): mhz/mhz 1.6 / 26.5 – Tx; 100 kHz to 30 MHz - Rx (Synthesized crystal): Synthesized Facsimile capable (see also H.9.9): yes/no No Telex capable (see also H.9.10): yes/no No
H.9.2 E.P.I.R.B’s
Quantity: no. 2 Make/model: Jotron / Tron – 40S Location(s): Bridge and Heli-deck
H.9.3 Marine VHF Radio
Quantity: no. 1 Make/model: Russia / Reyd-1 Power: watt 60 Channels: Location: Radio-room Quantity: no. 2 Make/model: Standard Radio /STR-8400 Power: watt 23-25 Channels: 54 (153.9 – 163.1 MHz) Location: Bridge/radio room Quantity: no. 7 Make/model: Motorola / GP-328 Power: watt 5 Channels: 156,300 to 156,875 Mhz Location: Radio-room Quantity: no. 4 Make/model: Motorola / GP-900 Power: watt 5 Channels: 156,300 to 156,875 Mhz Location: Radio-room Quantity: no. 1 Make/model: ICOM / IC F30LT Power: watt 5 Channels: 156,900 to 163,100 Mhz Location: Radio-room
H.9.4 Aircraft Radio Beacon Transmitter (NDB)
Quantity: no. 1 Make/model: SA / 25-100M Power: watts 80
H.9.5 Aeronautical VHF Transceiver
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
56/74 Date of Udpate: 27 Oct 2006
Quantity: no. 1 Make/model: ICOM/IC-A200 Power: watts 10 Frequency range (low/high): mhz/mhz 118 – 137 (Synthesized/crystal): Synthesized Location(s): Radio room Quantity: no. 1 Make/model: ICOM/IC-A3E (Hand held radio for HLO) Power: watts 1.5 Frequency range (low/high): mhz/mhz 118 – 137 (Synthesized/crystal): Synthesized Location(s): Radio room
H.9.6 Watch Receiver
Quantity: no. 1 Make/model: Standard Radio / OCU 2000A Frequency: khz 1.5305 to 1.5450
H.9.7 Satellite Communication System
Make/model: Denmark Phillips Type: Safecom-cm Facsimile capable (see also H.9.9) yes/no No Telex capable (see also H.9.10) yes/no yes Location(s): Radio-room Make/model: Sweden/STR 1500 Type: Standard – C Facsimile capable (see also H.9.9) yes/no No Telex capable (see also H.9.10) yes/no yes Location(s): Radio-room Make/model: Sweden / NERA Type: Saturn BM Facsimile capable (see also H.9.9) yes/no yes Telex capable (see also H.9.10) yes/no yes Location(s): Radio-room Mke/model: Ascom 21/Thuraya Type Satellite Telephone GSM-900 + GPS Facsimile capable (see also H.9.9) yes/no No Telex capable (see also H.9.10) yes/no No
H.9.8 Inmarsat
Number of phone lines: no. 2 (Standard Radio/CC 2000 & Standard Radion/STR 1500
H.9.9. Facsimile
Make/model: Panasonic, Japan/ KX-46 Connected to: Nera Saturn BM
H.9.10 Telex
Make/model: Philips/STR 1500
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
57/74 Date of Udpate: 27 Oct 2006
Connected to: Nera Saturn BM
H.9.11 Scrambler
Make/model: Connected to:
H.9.12 Other Communication System
Type/Make/Model NavTex Receiver/Furuno/NX-500
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
58/74 Date of Udpate: 27 Oct 2006
I. PRODUCTION TEST EQUIPMENT
I.1 BURNERS
Make/type: None Quantity: no. Capacity: bbl/day Weight: st Water requirement at 100 psi: bbl/min
I.2 BURNER BOOMS
Make/type: None Quantity: no. Length: ft Horizontal: yes/no Maximum wind speed: knots Walkway and handrails: yes/no Burner platform size: ft x ft Burner mounting rotatable: yes/no
I.3 PIPING ON BURNER BOOMS
I.3.1 Oil Line
ID: in None Working pressure: psi Connection type at burner end: H2S: yes/no Pressure gauge connection at barge end: in
I.3.2 Gas Line
ID: in None Working pressure: psi Extended beyond burner by: ft Connection type at burner end: H2S: yes/no Pressure gauge connection at barge end: in
I.3.3 Water Line
ID: in none Working Pressure: psi Connection type at burner end: Pressure gauge connection at barge end: in
I.3.4 Air Line
ID: in None Working Pressure: psi Connection type at burner end: type
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
59/74 Date of Udpate: 27 Oct 2006
Pressure gauge connection at barge end: in
I.3.5 Pilot Gas line
ID: in None Working Pressure: psi Connection type at burner end: type Pressure gauge connection at barge end: in
I.4 SPRINKLER SYSTEM
System in place: yes/no yes Pump source: Fire pump
I.5 FIXED PIPING FOR WELL TESTING
I.5.1 Drill Floor to Separator Area
Type (screwed/welded, both): None Quantity: no. Size ID: in Working pressure: psi Connection on drill floor: type Connection at separator: type Number of valves/lines: no. Size of valves: in H2S: yes/no
I.5.2 Separator Area to Burner Booms
Service (oil/gas): None Type (screwed/welded, both): Quantity: no. Size ID: in Working pressure: psi Connection at separator: type Connection at boom: type Number of valves/lines: no. Size of valves: in H2S: yes/no Valves installed near separator area for switching gas to either burner: yes/no
I.5.3 Water Lines to Burner Booms
Type (screwed/welded/both): Quantity: no. None Size ID: in Working pressure: psi Number of valves required: no. Size of valves: in 3 Pump source: Main fire pump, aux fire pump Rated line capacity at 300 psi: bbl/hr
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
60/74 Date of Udpate: 27 Oct 2006
I.5.4 Air System to Burner Booms
Type (screwed/welded/both): None Quantity: no. Size ID: in Working pressure: psi Non-return valves fitted: yes/no Air source:
I.5.5 Oil Storage Tank to Offload
Type (screwed / welded / both): None Quantity: no. Size ID: in Working pressure: psi Connection at separator area: type
I.5.6 Separator to Vent Stack of Rig
Type (screwed/welded, both): None Quantity: no. Size ID: in Working pressure: psi Connection type at separator area: type
I.6 AUXILIARY POWER AVAILABILITY
I.6.1 For Field Laboratory
Quantity: no. None Volts: volts Frequency: hz Breaker: amp
I.6.2 For Crude Transfer Pump
Quantity: no. Volts: v Frequency: hz Breaker: amp
I.6.3 For Electric Heaters
Quantity: no. Volts: v Frequency: hz Breaker: amp
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
61/74 Date of Udpate: 27 Oct 2006
J.WORKOVER TOOLS
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
62/74 Date of Udpate: 27 Oct 2006
K. ACCOMMODATION
K.1 OFFICES
K.1.1 Company Representative’s Office
Quantity: no. 1 Number of combination office/ State rooms in above: no. no Complete with desk, filing cabinets(s) and other necessary furniture: yes/no no Quantity with unrestricted view to drill floor: no. 1
K.1.2 Contractor’s Representative’s Office
Quantity: no. 1 Quantity with unrestricted view to drill floor: no. 1
K.1.3 Control Room
Quantity: no. 1
K.1.4 Radio Room
Quantity: no. 1
K.1.5 Helicopter Ready Room
Quantity: no. 1
K.1.6 Hospital Room
Number of beds/bunks: no. 3 Dangerous drugs locker: yes/no yes
K.2 LIVING QUARTERS
K.2.1 Accommodations
Total Beds: no. 92 No. of beds per room type (1,2,3, etc): no. 1 Number of rooms: no. 8 Toilets (private/shared/communal): Private Showers (private/shared/communal): Private No. of beds per room type (1,2,3, etc): no. 2 Number of rooms: no. 36
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
63/74 Date of Udpate: 27 Oct 2006
Toilets (private/shared/communal): Shared for 2 cabins Showers (private/shared/communal): Shared for 2 cabins No. of beds per room type (1,2,3, etc): no. 3 Number of rooms: no. 4 Toilets (private/shared/communal): Shared Showers (private/shared/communal): Shared
K.2.2 Galley
Quantity: no. 1
K.2.3 Mess Seating Capacity
Main mess: no. 30 Aux. mess: no. 0
K.2.4 Meeting Rooms
Quantity: no. None
K.2.5 Recreation Rooms
Quantity: no. 1 Recreation facilities TV: no. 2 VCR: no. 1 Pool Table: no. Ping Pong Table: no. 1 Computer: no. Workout/weight room: no. 1 Other:
K.2.6 Other Rooms
Change rooms: no. 1 Prayer room: no. Gym used when needed Cinema: no. See K.2.5 Other:
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
64/74 Date of Udpate: 27 Oct 2006
L. SAFETY EQUIPMENT
L.1 GENERAL SAFETY EQUIPMENT
L.1.1 General Personnel Protective Gear
Safety glasses (contractor/everyone/not supplied): Contractor Safety hats (contractor/everyone/not supplied): Contractor Safety boots (contractor/everyone/not supplied): Contractor Safety clothing (contractor/everyone/not supplied): Contractor Ear protection (contractor/everyone/not supplied): Contractor Rubber gloves (contractor/everyone/not supplied): Contractor Rubber aprons (contractor/everyone/not supplied): Contractor Rubber gloves - elbow length Contractor (contractor/everyone not/supplied): Contractor Full-face visors (contractor/everyone/not supplied): Contractor Eye shields (contractor/everyone/not supplied): Contractor Dust masks (contractor/everyone/not supplied): Contractor Explosion proof hand torches (contractor/everyone/not supplied):
Contractor
Safety belts c/w lines: (contractor/everyone/not supplied):
Contractor
L.1.2 Decontamination Stations
L.1.2.1 Eye Wash Stations
Quantity - fixed: no. 5 Make/model: Haws Drinking faucet Co / 8300 eyewash Location(s): Shaker deck, rig floor, Galley,mixing area,Welder
L.1.2.2 Safety Showers
Quantity: no. 3 Make/model Location(s): Shaker deck, rig floor, Mix Area
L.1.3 Derrick Safety Equipment
Derrick escape chute (rem chute): no. No Make/type: Geronimo line: yes/no yes Derrick safety belts: no. yes Make/type: Derrick safety belts: no. yes Make/type:
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
65/74 Date of Udpate: 27 Oct 2006
L.1.4 Derrick Climbing Assistant
Make/type: None
L.1.5 Fresh Air Blowers (Bug Blowers)
Quantity: no. 2 Make/type: Located at: Drill floor
L.2 GAS/FIRE/SMOKE DETECTION
L.2.1 H2S Monitoring System
Make/type: Sensorex AVA – Unit 20 Sampling points at: 18 Bellnipple: yes/no yes Drillfloor: yes/no yes Shale shaker: yes/no yes Mud tanks: yes/no yes Ventilation system into living quarters: yes/no yes Other: Eng cont room,tv office Alarms at: Driller’s console (audible/visual/both): Both Engine room (audible/visual/both): Both Mud room (audible/visual/both): Both Living quarters each level (audible/visual/both): Audible Central area each structural level (audible/visual/both):
Audible
Other: Tied to general alarm: yes/no yes Central control panel: yes/no yes Located at: SCR room Local alarm (audible/visual/both): Audible
L.2.2 Combustible Gas Monitoring System
Make/type: Finland/AVA-unit 20 Sampling points at: Bellnipple: yes/no yes Drillfloor: yes/no yes Shale shaker: yes/no yes Mud tanks: yes/no yes Ventilation system into living quarters: yes/no yes Other: Toolpushers office Alarms at: Driller’s console (audible/visual/both): Both Engine room (audible/visual/both): Both Mud room (audible/visual/both): Both Living quarters each level (audible/visual/both): Audible Central area each structural level (audible/visual/both):
Audible
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
66/74 Date of Udpate: 27 Oct 2006
Other: Tied to general alarm: yes/no yes Central control panel: yes/no yes Located at: Engine cont room Local alarm (audible/visual/both): Audible
L.2.3 H2S Detectors (Portable)
Quantity: no. 2 Make/type: Draeger M21 /31 Quantity: no. Make/type: Stain types for H2S: measuring range: from 1 to 20 percent: % 25PPM from 5 to 60 percent: %
L.2.4 Explosimeters
Quantity: no. None Make/type:
L.2.5 CO2 Gas Detectors (portable)
Quantity: no. None Make/type: Stain tubes for CO2: measuring range from 1 to 20 percent: % from 5 to 60 percent: %
L.2.6 O2 Meter (portable)
Quantity: no. None Make/type:
L.2.7 Fire/Smoke Detectors in Accommodation
Make/type: Finland, Signalko / BSK-S Fire detection: yes/no yes Smoke detection: yes/no yes Central control panel: yes/no yes Location: Control room Alarms: no. Pull boxes: no. 7 Mud room (audible/visual/both): Audible Living quarters each level (audible/visual/both) Audible Central area structural level: Audible (audible/visual/both): Other: Tied to general alarm: yes/no yes Central control panel: yes
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
67/74 Date of Udpate: 27 Oct 2006
Located at: Radio room Local alarm (audible/visual/both): Audible
L.3 FIRE FIGHTING EQUIPMENT
L.3.1 Fire Pumps
Quantity: no. 2 Make/model: Garbarino mu80-315L Type: Centrifugal Output (each): gals/min 1008 Location: Engine room/Sack store All off-take points supplied by all pumps: yes/no yes
L.3.2 Hydrants and Hoses
Hydrants positioned such that any point may be reached by a single hose length from two separate hydrants:
yes/no yes
Quantity of hydrants: no. Hose connections/hydrant: no. Hose. max. diameter: in 2 Length: ft 65.6
L.3.3 Portable Fire Extinguishers
Quantity (total): no. 77 Type 1 - CO2 no./lbs 4/15 no./lbs 14/13 no./lbs no./lbs no./lbs Type 2 - Dry chemical no./lb 21/26 9/13 3/17 Type 3 - Foam no./lbs 17/22 no./lbs no./lbs Water no./lbs 9/22 no./lbs Halon no./lbs none Dry powder none
L.3.4 Fire Blankets
Quantity: no. 5 Location(s): Fire posts
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
68/74 Date of Udpate: 27 Oct 2006
L.3.5 Fixed Foam System
Make/type: Ginge Quantity of foam concentrate stored: gal 157 Foam type: Ginge 714 Application rate: gals/min Foam nozzles: no. 4 Located at: Well test room Located at: Located at: Automatically injected into fixed fire water system: yes/no yes Make/type: Ginge Quantity of foam concentrate stored: gal 105 Foam type: Ginge -714 Application rate: U.S. gals/min Foam nozzles: no. 2 Located at: Fuel pump room Located at: Located at: Automatically injected into fixed fire water system: yes/no yes
L.3.6 Helideck Foam System
Make/type: Ginge Quantity of monitors: no. 2 Quantity of foam concentrated stored: Gal 2 x 342 Foam type: Ginge -714 Application rate: gals/min
L.3.7 Fixed Fire Extinguishing System
Protected spaces: Engine room, type (Halon/CO2/other): CO2 Remote manual release located at: Engine control room Paint locker, type (Halon/CO2/other): None Remote manual release located at: None Emergency generator type (Halon/CO2/other): CO2 Remote manual release located at: Door of emergency gen room SCR room type (Halon/CO2/other): CO2 Remote manual release located at: Engine control room Other (specify location & type): Shakers,Pit room,Heli-deck –Dry powder Remote manual release located at: Driller cont room,sack store and heli-deck Alarms *audible, visual, or both): Both Automatic shutdown of ventilation fans in protected spaces: yes/no yes
L.3.8 Manual Water Deluge System
Protected spaced:
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
69/74 Date of Udpate: 27 Oct 2006
Protected spaced: Water supplied from fire main line: yes/no yes
L.3.9 Water Sprinkler System in Accommodation
Automatic activation: yes/no no Working pressure: psi Tank capacity: gal Salt water backup: yes/no Type (wet pipe/dry pipe)
L.4 BREATHING APPARATUS
L.4.1 General Sets
Quantity: no. 6 Make Droger,west germany Type (demand/positive pressure): Air 250 bar Cascade system quick connects: yes/no No Cylinder duration: min 30-40 Located at: qty/loc 2 / Helideck fire post Located at: qty/loc 2 / Maindeck fire post Located at: qty/loc 2/ Engine cont room
L.4.2 Escape Sets
Quantity: no. none Make Type (demand/positive pressure): Cascade system quick connects: yes/no Cylinder duration: min Located at: qty/loc
L.4.3 Cascade Stations
Quantity: no. none Make/type: Manifold locations/outlets at location:
L.4.4 Breathing Air Recharge Compressor
Quantity: no. no Make/type: Compressed air storage capacity: ft3 Working pressure: psi Located at:
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
70/74 Date of Udpate: 27 Oct 2006
L.4.5 Compressed Air Breathing Apparatus Trolley Unit
Make: no Type (demand/positive pressure): Air line length: ft Compressed air storage capacity: ft3 Working pressure: psi Including: Face Mask: yes/no Demand valve: yes/no Microphone: yes/no Safety harness: yes/no Safety line (incorporating telephone line): yes/no
L.4.6 Breathing Air Purity Test Equipment
Quantity: no. no Make/type:
L.5 EMERGENCY FIRST AID EQUIPMENT
L.5.1 First Aid Kits
Quantity: no. 8
L.5.2 Burn Kits
Quantity: no. no
L.5.3 Resuscitators
Quantity: no. 1 Charged (spare) oxygen cylinders: no. 1
L.5.4 Stretchers
Quantity: no. 2 Type: Evacuation Located at: Hospital
L.6 HELIDECK RESCUE EQUIPMENT
Aircraft Axe: yes/no yes Large fireman’s rescue axe: yes/no yes Crowbar: yes/no yes Heavy duty hacksaw: yes/no yes
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
71/74 Date of Udpate: 27 Oct 2006
Spare blades: yes/no yes Grapnel hook: yes/no yes Length of wire rope attached: ft 98.4 Quick release knife: yes/no yes Bolt croppers: yes/no yes Fireman’s outfit: yes/no yes CO2 Lance: yes/no yes Other:Dry powder lance yes Other:
L.7 EMERGENCY WARNING ALARMS
Approved system to give warning of different emergencies: yes/no yes Activated from drill floor: yes/no yes
L.8 SURVIVAL EQUIPMENT
L.8.1 Lifeboats
Make/type: Fiskars AB371 Quantity: no. 2 Capacity: person/craft 80/1 Locations (frwd/aft/port/stbd): Port/stbd Fire protection: yes/no yes Radio/EPIRB (see section H.9): yes Fast Rescue Boat Make/Type: Solas - Marine Power: HP 36 hp
L.8.2 Life rafts
Make/type: Russian Quantity: no. 8 Capacity: person/craft 10 Davit launched: yes/no No Locations (frwd/aft/port/stbd): fwd/port/stbd Make/type: Russian Quantity: no. 1 Capacity: person/craft 20 Davit launched: yes/no No Locations (frwd/aft/port/stbd): port
L.8.4 Personal Floatation Devices
Make/type: Russian/GOST22336-77
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
72/74 Date of Udpate: 27 Oct 2006
Quantity: no. 120
L.8.5 Survival Suits
Make/type: Quantity: no. 97
L.8.6 Life Ring Buoys
Make/type Dolphin /Japan Quantity total: no. 12 with lights: no. 4 with smoke: no. 2 with EPIRB: no. none
L.8.7 Work Vests
Quantity: no. 12
L.8.8 Escape Ladders/Nets
Make/type: Ralima – Repola/legs ladders Quantity: no. 3 Make/type: Ralima – Repola/jack ladders Quantity: no. 6 Make/type: Ralima – Repola / Abondon Knotting rope Quantity: no. 12
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
73/74 Date of Udpate: 27 Oct 2006
M. POLLUTION PREVENTION EQUIPMENT
M.1 SEWAGE TREATMENT
Make/model: Finland / UNEX BIO-80 System type: Biological (capapble to handle 100-men crew)
M.2 GARBAGE COMPACTION
Make/model: none System type:
M.3 GARBAGE DISPOSAL/GRINDER
Make/model: none System type:
M.4 INCINERATOR
Make/model: Rauma – Repola/unex F-1 System type: Incinerated
M.5 OILY WATER SEPARATOR
Quantity: no. 1 Make/model: Schroder/BBE-5 System type: 2 - stage Nominal throughput: gpm 5 m3 /hr
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
74/74 Date of Udpate: 27 Oct 2006
N. DRILLING DATA EQUIPMENT
N.1 COMPUTERS (HARDWARE & SOFWARE)
N.1.1 Server System
Make / System CPU Monitor Harddrive Optical Storage Backup Facility Operating System Software System Misc. N.1.2 Peripherals Printers Ethernet link
N.1.2 Workstations
Make / System Monitor Software System
N.1.3 ACQUISITION NETWORK
LAGO Energy-JkUp Rig. Ref. LE22
Unit Name: West Janus
75/74 Date of Udpate: 27 Oct 2006
O. DRAWINGS
O.1. REFERENCES
------------------------------------------------------------------------
www.lagoenergyusa.com
LAGO Energy-JkUp Rig. Ref. LE22