8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 1/22 Page 1 of 22  ATTACHMENT C LACTO ASIA  A. Main Equipment: Figure 1. Receiving Hopper, 2 units with a unit price of P1,330,987.14 for the total amount of P2,661,794.24; Figures 2, 3, 4,& 5.(2) Parallel Conveyor, (3) Cut-off Conveyor, (4) Conveyor Leading to Trommel Screener, 2 units each has a unit price of P484,670.20 for the total amount of P2,908,021.20;

Upload: jess-villarin-quijano

Post on 03-Jun-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 1/22

Page 1 of 22 

 ATTACHMENT “C” 

LACTO ASIA

 A. Main Equipment:

Figure 1. Receiving Hopper, 2 units with a unit price of P1,330,987.14 for the total

amount of P2,661,794.24;

Figures 2, 3, 4,& 5.(2) Parallel Conveyor, (3) Cut-off Conveyor, (4) Conveyor Leading

to Trommel Screener, 2 units each has a unit price of P484,670.20 for the total

amount of P2,908,021.20;

Page 2: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 2/22

Page 2 of 22 

Page 2 

Figures 6 & 7. Trommel Screener, 1 unit with a price of P605,854.80;

Page 3: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 3/22

Page 3 of 22 

Page 3

Figure 8. Plastic Blower Equipment, 1 unit with a price of P547,888.06. This plastic

blower could not be installed as to specifications due to lack of building space thus

reducing the efficiency of the Trommel Screener by at least 10 (%) per cent to

separate plastics from the solid waste due to plastic blockage of the trommel sieves.

Equipment is now stored in the warehouse.

Page 4: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 4/22

Page 4 of 22 

Page 4

Figure 9. Four (4) way sorting with in and out Mechanical Conveyor (1 set Main

conveyor, 4 units and 1 set out feed conveyor, 4 units) in the amount of

P2,925,307.16.

Page 5: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 5/22

Page 5 of 22 

Page 5

Figure 10 & 11. Out Feed Extension Conveyor, 1 unit with a price of P387,736.16;

Page 6: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 6/22

Page 6 of 22 

Page 6

Figure 12. Hammermill Loading Conveyor, 2 units with unit price of P442,816.73 forthe total cost of P885,632.54.

Page 7: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 7/22

Page 7 of 22 

Page 7

Figure 13. Hammermill / Shredder / Decorticator, 3 units with unit price of

P872,662.64 for the total cost of P2,617,987.92.

Page 8: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 8/22

Page 8 of 22 

Page 8

Figures 14. Hammermill off-loading mechanical convey, 2 units with unit price of

P348,170.20 for the total cost of P696,340.20.

Page 9: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 9/22

Page 9 of 22 

Page 9

Figure 15. Steel Trolleys, 6 units with unit price of P37,930.71 for the total cost of

P227,584.26.

Page 10: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 10/22

Page 10 of 22 

Page 10

Figure 16. Portable Power Sprayer, 2 units with unit price of P151,722.84 for the

total cost of P303,445.68. These units are stored in the warehouse. These sprayers

are the same sprayers used in car wash.  

Page 11: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 11/22

Page 11 of 22 

Page 11

B. For Composting System and Support Equipment

Figures 17 & 18. Rotary Composter Drum 2000 liter capacity, 27 units with unit

price of P360,341.63 for the total cost of P9,729,224.01. These 27 drums were

placed on the Material Recovery Bldg. 2. and only 14 drums were used for compose

drying.

Page 12: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 12/22

Page 12 of 22 

Page 12

Figure 19. Steel Ladder to Composter Drum, 2 units with unit price of P160,464.11

for the total cost of P320,968.2. The ladder has seven (7) steps and if the

computation of costing is made per step, each step costs P22,923.44.

Page 13: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 13/22

Page 13 of 22 

Figures 20 & 21. Compost Buggy, 10 units with unit price of P37,930.71 for the total

cost of P379,307.10.

Page 14: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 14/22

Page 14 of 22 

Page 14

Figure 22. Rotary Screener, 3 units with price of P330, 065.05 and total cost of

P990,195.15.

Page 15: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 15/22

Page 15 of 22 

Page 15

Figure 23. Bagging Equipment, 1 set with price of P66,196.17. This baggingequipment is not in storage and could not be accounted for, although documents

showed the units have been delivered and received. What remained is the weighing

scale.

Page 16: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 16/22

Page 16 of 22 

Page 16

C. Baling and Composting Equipment

Figure 24. Mechanical Baler/Compactor, 1 unit with price of P1,222,742.60. This

baling machine is manually operated and could not perform the specifications of six

bales per hour. When used, baling machine produced only one baling per hour.

Page 17: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 17/22

Page 17 of 22 

Page 17

D. Residuals to Concrete Block Equipment

Figure 25. Residuals Crusher, 1 unit with price of P1,300,012.45. This unit was notused but tested on the coconut husk and not on residuals.

Page 18: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 18/22

Page 18 of 22 

Page 18

Figure 26. Tools and Spare Parts and Others in the total amount of P522,193.66. The

total cost of the entire project is P29,683,485.27.

Page 19: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 19/22

Page 19 of 22 

Page 19

Figure 27. Hammermill in the amount of P170,000.00, intended for Barangay MRF,and awarded to Barangay Luinab in 2006 that has no functional MRF.

Page 20: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 20/22

Page 20 of 22 

Page 20

Figure 28. The current state of the Pilot project in Del Carmen showed a dilapidatedstructure and a failed system of the Barangay MRF.

Page 21: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 21/22

Page 21 of 22 

Page 21

Figure 29.  Bucket Loader in the amount of P4,429,824.92. The said equipment

detached the backhoe and compactor since the same could not be used in the

facility.

Page 22: LACTO ASIA Photos - Task Force CMRCF Report

8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report

http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 22/22

Page 22 of 22

Page 22

Figures 30 and 31. Detached backhoe and compactor.