labour hero of renovation era profilesongda6.com.vn/editor/elfinder/files/ho so nang...

56
SONG DA 6 JOINT STOCK COMPANY PROFILE www.songda6.com.vn LABOUR HERO OF RENOVATION ERA

Upload: others

Post on 16-Sep-2019

2 views

Category:

Documents


0 download

TRANSCRIPT

1www.songda6.com.vn

SONG DA 6 JOINT STOCK COMPANY

PROFILE

www.songda6.com.vn

LABOUR HERO OF RENOVATION ERA

HEAD OFFICETM Building, Van Khe Urban, La Khe Ward, Ha Dong District, Ha NoiTel: 024.22253666Fax: 024.22253366Email: [email protected]: www.songda6.com.vn

Des

igne

d an

d Pr

oduc

ed b

y w

ww

.hal

i.vn

2 www.songda6.com.vn

HYDROPOWER AND IRRIGATION CONSTRUCTION

CIVIL AND INDUSTRIAL CONSTRUCTION

ENERGY PROJECT AND REAL ESTATE PROJECT

INVESTMENT

RENEWABLE ENERGY CONSTRUCTION

URBAN TRANSPORTATION CONSTRUCTION

BLASTING, DRILLING AND EXCAVATION OF ROCK

MATERIAL PRODUCTION

ROLLER COMPACTEDCONCRETE WORK

CONVENTIONAL VIBRATED CONCRETE WORK

FOUNDATION TREATMENT

· Crushed Stone production· Sand production· Conventional vibrated concrete production· Roller compacted concrete production

· Mining, foundation excavation· Soil, dirt excavation· Transport of soil, material

· RCC work· Concrete work· Precast concrete production

Promoting the cutural strength of Song Da artisans along with experiences in each national key project, Song Da 6 is heading toward the goal of being the professional construction entity, being EPC contractor in Vietnam and worldwide.

3www.songda6.com.vn

content

[4-5] LETTER OF GENERAL DIRECTOR

[6-7] OVERVIEW OF SONG DA 6

[8-9] HISTORY OF ESTABLISHMENT AND DEVELOPMENT

[10-13] ORGANIZATION STRUCTURE

[14-15] FINANCIAL CAPACITY - BUSINESS REGISTRATION

[16-17] HUMAN RESOURCES

[18-28] HYDROPOWER CONSTRUCTION

[29-32] CIVIL AND INDUSTRIAL CONSTRUCTION

[33-34] TRANSPORTATION CONSTRUCTION

[35] RENEWABLE ENERGY CONSTRUCTION

[36-43] EQUIPMENT CAPACITY

[44-45] ACHIEVEMENTS

[46-47] TITLE AND QUALITY CERTIFICATE

[48-51] SOME PHOTOS OF SONG DA 6 JSC’S OPERATION

[52] SOCIAL ATIVITIES

[53-55] PARTNERS OF SONG DA 6 JSC

4 www.songda6.com.vn

to our customers!Song Da 6 JSC was established on 1st May 1983 (formerly Hydraulic Construction Company) from the early days of Hoa Binh Hydropower construction which has layed the foundation for our construction industry. Over 30 years of working and developing, Song Da 6 JSC’s name has been associated with prominent achievement in national key projects which Song Da 6 was entrusted the construction such as Hoa Binh hydropower, Yaly hydropower, Son La hydropower, Lai Chau hydropower,etc. Nowadays, beside our coreprofession Hydropower and Irrigation Construction, Song Da 6 has grown to become a multi-sectors company in transportation construction, civil and industrial construction. Some of Song Da 6’s significant projects recently such as National Assembly House, Ngang Pass Tunnel, Hanoi metropolitan railway, line

LetteR oF GeneRAL DIRectoR

5www.songda6.com.vn

With the criterion: “Quality and progress are trademarks, effectiveness the best marketing approach in the market mechanism”. Song Da 6 has affirmed the prestige brand in the field of infrastructure construction, contributed remarkably to the industrialization and modernization of Vietnam and to the prosperity of Lao PDR, step by step applied modern technologies to construction and developed towards sustainable values in the future.

Sincerely,

GENERAL DIRECTOR

DAo XuAn tuAn

Cat Linh - Ha Dong, Ho Chi Minh metropolitan railway, line Ben Thanh - Suoi Tien, Nam An Khanh Complex Buildings are highly evaluated by investors. Song Da 6 is possessing quality human resources with over 300 engineers, technical staffs, modern production procedures according to ISO9001-2008, high technology plants and equipment from G8 countries, etc contributing to the capabilities of construction and material production by which Song Da 6 is qualified to serve as the maincontractor, EPC for hydropower projects, civil and industrial projects in Vietnam and worldwide.

With the criterion “Quality, progress are trademarks - Customer satisfaction is the purpose of business of the Company”, we never stop learning, innovating and investing in training our personnel to become knowledgeable, understand the law, professional in working; researching and applying new technique on production; at the same time improving our technologies to bring environmental-friendly, reasonable price construction products and meet requirements on progress, quality.

We define our future development that is constructed by the attempt of Song Da 6’s personnel as well as by the trust of our Partners and Customers. We pledge to be a reliable and long-term companion of Customers on the path of development; commit to deliver quality, durable construction products with fastest progress and reasonable market price.

TỔNG QUAN VỀ CÔNG TY· Tên công ty: Công ty Cổ phần Sông Đà 6· Tên tiếng Anh: Song Da 6 Joint Stock Company· Trụ sở chính: Toà nhà TM, Khu đô thị Văn Khê, Phường La Khê,

Quận Hà Đông, Hà Nội· Tel: 024.2225 3666 | Fax: 024.2225 3366· Website: www.songda6.com.vn· Email: [email protected]· Mã số thuế: 4400135552· Vốn điều lệ: 347.716.110.000 VNĐ

6 www.songda6.com.vn

oVeRVIeW oF SonG DA 6· name: Song Da 6 Joint Stock Company· Head office: TM Building, Van Khe Urban, La Khe Ward, Ha Dong District, Ha Noi· tel: 024.2225 3666· Fax: 024.2225 3366· Website: www.songda6.com.vn · email: [email protected]· tax code: 4400135552· charter capital: 347.716.110.000 VNĐ

7www.songda6.com.vn

VISIon 2025

To develop Song Da 6 to be a professional construction contractor, qualified to serve as the main contractor or EPC contractor for hydropower, renewable energy, transportation, civil and industrial construction projects, to master the construction technology for modern, high-tech required projects, to possess management model that consists with international practice, to have quality workforce, qualified to integrate in the International market.

MISSIon

to our customers

Song Da 6 is the trustful and long-term companion on the development path, commits to provide construction products with the best quality, sustainability and the best progress with market price.

to our Shareholders

Song Da 6 is a sustainable and profitable organization that ensures long-term interest to shareholders.

to our employees

Song Da 6 provides a professional, friendly, safe environment to ensure material and spiritual life; creates motivation and support for employees to expand their capabilities and development.

to our Society

Song Da 6 accompanies with the development of Song Da Corporation and the modernization of Vietnam, fulfills obligations to pay taxes, actively participates in social activities, commits to bring environment-friendly construction products.

coRe VALue

Profession in construction by possessing modern management model and high technology to create quality work with suitable progress and reasonable price.

8 www.songda6.com.vn

HIStoRY oF eStABLISHMent AnD DeVeLoPMent

1/5/1983

1986 - 1995

3/1/2006

25/12/2006

Year

Year

Year

Year

Year

12/2011

Song Da 6 JSC was established with the initial name Hydraulic Construction Company

Song Da 6 honourably received "Second Class Labour Medal" in 1986; "First Class Labour Medal" in 1989; "Third Class Independence Medal" in 1995; "Third Class Victory Medal" in 1996. To earn these awards, Song Da 6 was continuously heading forward, overcoming all difficulties and challenges to complete all tasks assigned. This was the pride of all generations that have worked at Song Da 6 and this was our motivation to develop and grow.

Song Da 6 was awarded "Labour Hero of Renovation Era" and "Second Class Independence Medal" by the Communist Party and the State. These were honourable and noble prizes for Companies who had remarkable achievements in business and production.

Until now, Song Da 6 JSC is operating in compliance with business registration with tax code 4400135552 dated 12th May 2017 issued by Hanoi Planning and Investment Department.

Song Da 6 JSC was officially actived in form of Joint Stock Company according to Business Registration no 3903000072 issued by Gia Lai Province's Planning and Investment Department.

Song Da 6 was officially listed in Hanoi Stock Exchange.

9www.songda6.com.vn

10 www.songda6.com.vn

oRGAnIZAtIon StRuctuRe

Shareholder

Internal SupervisoryBoard Board Of Management

General Director

Supervisory Board

Technical DeputyDirector

Economic & Financial

Deputy Director

Investment & Bidding

Deputy Director

SONG ĐA 6. 06

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6 SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SONG ĐA 6.01SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SONG ĐA 6.04SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6 SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SONG ĐA 6 - Ha Noi

SONG ĐA 6.05

SONG ĐA 6.03

Representative O�ce in Laos

Vientiane

Hoang Sa islands

Changsha Islands

LAOS

Human Resources Department

Project and Bidding Department

Engineering and Technology Department

Economic and Strategy Department

Finance and Accounting Department

Material andEquipment Department

Risk Management Department

Song Da 6.01 Branch

Song Da 6.03 Branch

Song Da 6.04 Branch

Song Da 6.05 Branch

Song Da 6.06 Branch

Hanoi Branch

Representative O�ce In Vientiane, Laos

· Supervisory Board: 03 members

· Board of Management: 05 members

· Board of Director: 4 members

· 07 Departments

· 06 Branches

· Representative Office in Laos

11www.songda6.com.vn

Shareholder

Internal SupervisoryBoard Board Of Management

General Director

Supervisory Board

Technical DeputyDirector

Economic & Financial

Deputy Director

Investment & Bidding

Deputy Director

SONG ĐA 6. 06

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6 SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6 SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SONG ĐA 6.01SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SONG ĐA 6.04SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6 SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6 SÔNG ĐÀ 6

SÔNG ĐÀ 6SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SÔNG ĐÀ 6

SONG ĐA 6 - Ha Noi

SONG ĐA 6.05

SONG ĐA 6.03

Representative O�ce in Laos

Vientiane

Hoang Sa islands

Changsha Islands

LAOS

Human Resources Department

Project and Bidding Department

Engineering and Technology Department

Economic and Strategy Department

Finance and Accounting Department

Material andEquipment Department

Risk Management Department

Song Da 6.01 Branch

Song Da 6.03 Branch

Song Da 6.04 Branch

Song Da 6.05 Branch

Song Da 6.06 Branch

Hanoi Branch

Representative O�ce In Vientiane, Laos

Song Da 6.01 Branch+ Add: Phi Nhu Commune, Dien Bien Dong District, Dien Bien ProvinceSong Da 6.03 Branch+ Add: San Xay District, Attapeu Province, Laos

Song Da 6.04 Branch+ Add: Nam Nhun commune, Nam Nhun District, Lai Chau Province+ Tel: 02313 880 988+ Fax: 02313 880 688

Song Da 6.05 Branch+ Add: Loc Bac Commune, Bao Lam District, Lam Dong Province

Song Da 6.06 Branch+ Add: Thong Nhat Commune, Hoanh Bo District, Quang Ninh Province+ Tel: 0333699 830+ Fax: 0333699 818

Ha noi Branch+ Add: TM Building, Van Khe Urban, La Khe Ward, Ha Dong District, Ha Noi+ Tel: 04 2225 3818+ Fax: 04 2225 3828

Representative office in Laos+ Add: Phontong Street Chanthabuly District, Vientiane, Laos.+ Tel: +856 20 98247606

BRAncHeS

12 www.songda6.com.vn

Mr. Dao Xuan tuan Member

Mr. Bui Dinh Dong Member

BoARD oF MAnAGeMent

Mr. Dang Quoc BaoChairman

Mr. Ho Sy Hung Member

Mr. nguyen Sinh thao Member

13www.songda6.com.vn

BoARD oF DIRectoR

Mr. nguyen Minh tuan Deputy Director

Mr. Dao Xuan tuan General Director

Mr. Le tien thu Deputy Director

Mr. Ha Quoc thinh Deputy Director

14 www.songda6.com.vn

BUSINESS PERFORMANCE FROM 2012 TO 2016

FInAncIAL cAPAcItY

2013 20152014 2016 20170

200

400

600

800

1000

1200

1400

REVENUE

TOTAL VALUE OF PRODUCTION AND BUSINESSTOTAL ASSETS

PROFIT AFTER TAX

2013 2014 2015 2016 20170

200

400

600

800

1000

1200

1400

1600

20170

200

400

600

800

1000

1200

1400

1600

2013 2014 2015 2016

0

10

20

30

40

50

70

80

60

2013 2014 2015 2016 2017

Billion Dong

Billion Dong Billion Dong

Billion Dong

no content unit 2013 2014 2015 2016 2017

1 Total value of production and business Billion Dong 1,203.6 1,402.3 1,423.3 1,427.6 1,131.0

2 Revenue Billion Dong 1,164.0 1,299.1 1,246.8 919.7 959.3

3 Profit after tax Billion Dong 44.3 71.3 63.1 48.5 31.5

4 Average personal income Million Dong 7.9 9.3 9.2 9.2 9.8

5 Payment to National Budget Billion Dong 90.4 83.9 76.7 77.1 54.4

6 Total Asset Billion Dong 1,338.3 1,299.0 1,400.7 1,453.4 1,475.0

7 Equity Billion Dong 441.2 513.6 509.9 500.2 485.8

8 Dividend rate % 15 15 15 12 8

15www.songda6.com.vn

SONG DA 6 BUSINESS REGISTRATION

16 www.songda6.com.vn

HuMAn ReSouRceS

With the orientation of sustainable development and affirm the prestige of Song Da 6 in each project, Song Da 6 concentrates on enhancing quality of workforce to meet partners’ requirements. We nurture talents and management skill through experience at project site, at the same time create a hard-working, effective environment so that all members reach to their fullest potential and contribute to develop an united and professional company.

17www.songda6.com.vn

employee Structure chart Total labour: 1581 people = 100%

+ Bachelor degree and above: 207 people = 13.1%

+ Diploma degree and associate: 44 people = 2.81%

+ Technical workers, unskilled workers: 1298 people = 82.1%

Bachelor degree and above

13.1%

2.81%

Diploma degree and associate

82.1%

Technical workers, unskilled workers

18 www.songda6.com.vn18 www.songda6.com.vn

Hydropower construction is Song Da 6’s strength since its establishment. With experienced, competent employees, engineers to survey, plan, set up method statement for high-capacity hydropower projects and modern, high-technology equipments, Song DA 6 is heading toward to master to construction technology and move forward to be the investor of national and international hydropower projects, assisting to reduce electricity shortage.

HYDRoPoWeR conStRuctIon

Annual Electricity Production: 8,16 billion kw/hr

Investor: Electricity of Vietnam

Construction period: 1979 - 1996

Dam: Rock with clay core

Dam length: 734 m

Dam height: 128 m

Reservoir Capacity: 9 billion cubic meter

Turbine: 8 unitsExcavation quantity: 50,000,000 cubic meter

Concrete quantity: 1,899,000 cubic meter

Grouting: 205,000 m

Metal equipment installation: 46,721 ton

Investor: Electricity of Vietnam

Contract value with Song da 6: 100 billion Dong

Construction period: 1993 - 2000

Dam: Rock with clay core

Dam height: 60 m

Reservoir capacity: Over 1 billion cubic meter

Turbine: 4 units

Excavation quantity: 18,000,000 cubic meter

Concrete quantity: 5,010,000 cubic meter

Grouting: 116,000 m

Metal equipment installation: 17,500 ton

Tunnel drilling length: 7,582 m

Yaly Hydropower ProjectCapacity 720 MW

Hoa Binh Hydropower ProjectCapacity 1920 MW

Hoa Binh Hydropower ProjectCapacity 1920 MW

19www.songda6.com.vn 19www.songda6.com.vn

Investor: Can Don Hydropower Joint Stock Company

Contract value with SD6: 127 billion Dong

Construction period: 2000 - 2004

Dam: Gravity Concrete Dam

Dam Length: 745 m

Dam Height: 45.5 m

Reservoir Capacity: 165.5 million cubic meter

Turbine: 02 units

Excavation quantity: 2,000,000 cubic meter

Concrete quantity: 219,000 cubic meter

Grouting: 8,377 m

Metal Equipment Installation: 3,730 ton

Can Don Hydropower Project - Capacity 776 MW

Se San 3A Hydropower Project - Capacity 108 MW

Investor: Electricity of Vietnam

Contract value with SD6: 686.6 billion Dong

Construction period: 2003 - 2010

Dam length: 850 m

Dam height: 74.13 m

Dam crest width: 10 m

Dam: RCC Dam

Average water level: 36 m

Reservoir Capacity: 893 million cubic meter

Turbine: 3 units

Excavation quantity: 2 million cubic meter of rock, soil

Concrete quantity: 1.42 x 106 cubic meter

Grouting: 53.79 x 103 long meter

Se San 4A Hydropower Project - Capacity 360 MW

Investor: Se San 3A Power Investment and Development Joint Stock Company

Contract value with SD6: 381 billion Dong

Construction period: 2002 - 2007

Dam: Gravity Concrete Dam

Dam length: 110.73 m

Dam height: 35 m

Dam crest width: 13 m

Average water level: 36 m

Reservoir Capacity: 80.6 million cubic meter

Turbine: 2 units

Excavation quantity: 820 x 103 cubic meter

Concrete quantity: 282.73 x 103 cubic meter

20 www.songda6.com.vn

The largest Hydropower in South East AsiaInvestor: Electricity of Vietnam

Construction period: 2005 - 2012

Annual Electricity Production: 9,429 billion kw/h Contract value with SD6: 430 billion Dong

Dam: RCC Dam

Dam height: 138.1 m

Reservoir Capacity: 9.26 x 106 cubic meter

Turbine: 6 units

Son La Hydropower - Capacity 2400 MW

Lai Chau Hydropower Project - Capacity 1200 MW

Investor: Electricity of Vietnam

Construction period: 2011 - 2016

Contract value with SD6: 710 billion Dong

Dam: Gravity Concrete Dam

Turbine: 2 units

21www.songda6.com.vn

Investor: Viet - Lao Power Joint Stock Company

Contract value with SD6: 639 billion Dong

Construction period: 2006 - 2011

Dam length: 650 m Dam height: 94 m

Dam crest width: 10 m

Reservoir capacity: 930 million cubic meter

Turbine: 2 units

Excavation quantity: 8.5 million cubic meter

Concrete quantity: 2.46 cubic meter

Tunnel: 8.79 x 103 long meter

Xekaman 3 Hydropower Project - Lao PDR Capacity 250 MW

Xekaman 1 Hydropower Project - Capacity 290 MW

Investor: Viet - Lao Power Joint Stock Company

Contract value with SD6: 631.27 billion Dong

Construction period: 2010 - 2015

Dam: RCC Dam

Dam length: 310 m Dam height: 120 m

Turbine: 2 units

Concrete quantity: 880,000 cubic meter

Basin area: 3,580 square km

Reservoir: 4.8 square km

22 www.songda6.com.vn

Investor: Petro Vietnam

Contract value with SD6: 359 billion dong

Construction period: 2008 - 2013

Dam: Gravity concrete dam

Dam length: 366.9 m

Dam height: 244.6 m

Dam crest width: 8 m

Turbine: 2 units

Basin area: 5,345 square km

Hua Na Hydropower Project - Capacity 180 MW

Investor: Vietnam National Coal - Mineral Industries Holding Corporation Limited

Construction period: 2013 - 2015

Contract value with SD6: 415 billion dong

Dam length: 471 m

Dam height: 72 m Dam crest width: 10 m

Dam: RCC dam

Turbine: 2 units

Construction period: 3 years

Dong Nai 5 Hydropower Project - Capacity 150 MW

Investor: Electricity of Vietnam

Contract value with SD6: 1099 billion Dong

Construction period: 2007 - 2016

Dam: Gravity Concrete Dam

Dam length: 267 m Dam height: 374 m Reservoir Capacity: 184.2 million cubic meter

Turbine: 2 units

Excavation quantity: 2,869,400 cubic meter Concrete quantity: 936,720 cubic meter

Grouting: 30,050 long meter

Metal Equipment Installation: 13,378.2 ton

Huoi Quang Hydropower Project - Capacity 520 MW

23www.songda6.com.vn

Investor: Viet - Lao Power Joint Stock Company

Contract value with SD6: 285 billion Dong

Construction period: 2010 - 2017

Dam: Gravity Concrete Dam

Dam length: 166.6 m

Dam height: 26 m

Turbine: 2 units

Concrete quantity: 66,298 cubic meter

Reservoir capacity: 8.56 million cubic meter

Basin area: 3,740 square km

Xekaman - Sanxay Hydropower Project - Capacity 32 MW

Nam Chien Hydropower Project - Capacity 200 MW

Investor: Nam Chien 1 Hydropower Joint Stock Company

Contract value with SD6: 172 billion dong

Construction period: 2005 - 2012

Dam height: 135 m Turbine: 2 units

24 www.songda6.com.vn

Pac Ma Hydropower Project - Capacity 140 MW

Investor: Dakrong Hydropower Joint Stock Company

Contract value with SD6: 298 billion Dong

Construction period: 2015 - 2017

Dam: Gravity Concrete Dam

Dam length: 229.19 m

Dam height: 51.8 m

Turbine: 2 units

Excavation quanity: 483,000 cubic meter

Concrete quantity: 131,030 cubic meter

Grouting: 4,750 cubic meter

Dong Van Hydropower Joint Stock Company - Capacity 28 MW

Investor: Pac Ma Hydropower Joint Stock Company

Contract value with SD6: 652 billion Dong

Construction period: 2016 - 2019

Turbine: 4 units

25www.songda6.com.vn

Investor: Viet Long Industrial JSC

Contract value with SD6: 74 billion Dong

Construction period: 2016 - 2017

Dam: Arch Dam

Turbine: 2 units

Concrete quantity: 55,000 cubic meter

Su Pan 1 Hydropower Project - Capacity 30 MW

Nam Cum 4 Hydropower Project - Capacity 54 MW

Investor: Nam Cum Hydropower Joint Stock Company

Contract value with SD6: 400 billion Dong

Construction period: 2017 - 2019

Dam: Gravity Concrete Dam

Turbine: 2 units

Concrete quantity: 160,450 cubic meter

26 www.songda6.com.vn

Investor: Dong A Investment - Construction Joint Stock Company

Contract value with SD6: 247 billion Dong

Construction period: 2016 - 2018

Dam: Gravity Concrete Dam

Turbine: 2 units

Concrete quantity: 141,200 cubic meter

Song Ma 3 Hydropower Project - Capacity 29.5 MW

Song Lo 2 Hydropower Project - Capacity 28 MW

Investor: Thanh Binh Limited Company

Contract value with SD6: 251.81 billion Dong

Construction period: 2015 - 2018

Dam: Gravity Concrete Dam

Dam length: 173.20 m

Dam height: 36.2 m

Turbine: 2 units

Basin area: 8,330 square km

Excavation quanity: 294,140 cubic meter

Concrete quantity: 61,520 cubic meter

Investor: Nam Luc South East Asia Hydropower Joint Stock Company

Construction period: 15/01/2018

Nam Luc Hydropower Project - Capacity 24MW

27www.songda6.com.vn

no Project capacity (MW)

Investor contract value (billion Dong)

I PRoJectS coMPLeteD

1 Hoa Binh Hydropower 1920 Electricity of Vietnam

2 Yaly Hydropower 720 Electricity of Vietnam 100

3 Selabam Hydropower 70 Lao PDR 100

4 Vinh Son Hydropower 66 Vinh Son hydropower JSC 62

5 Song Hinh Hydropower 70 Electricity of Vietnam 370

6 Can Don Hydropower 72 Can Don hydropower JSC 127

7 Se San 3 Hydropower 260 Electricity of Vietnam 50

8 Se San 3A Hydropower 108 Se San 3A Power Investment and Development Joint Stock Company

381

9 Se San 4 Hydropower 360 Electricity of Vietnam 686.6

10 Se San 4A Hydropower 63 Se San 4A hydropower JSC 246

11 Pleikrong Hydropower 100 Electricity of Vietnam 25

12 Son La Hydropower 2400 Electricity of Vietnam 430

13 Binh Dien Hydropower 44 Binh Dien Hydropower JSC 25

14 Huong Son Hydropower 33 Song Da Corporation 15

15 Xekaman 3 Hydropower 250 Viet-Lao Power JSC 639

16 Nam Chien 1 Hydropower 200 Song Da Corporation 172

17 Huoi Quang Hydropower 520 Electricity of Vietnam 1099

18 Lau Chau Hydropower 1200 Electricity of Vietnam 710

19 Ngoi Phat Hydropower 72 2 Northern Hydropower Construction and Consultant Joint Stock Company

39

20 Hua Na Hydropower 180 Petro Vietnam 359

21 Dong Nai 5 Hydropower 150 Vietnam National Coal - Mineral Industries Holding Corporation Limited

415

22 Ban Chat Hydropower 220 Electricity of Vietnam 18

23 Xekaman 1 Hydropower 290 Viet-Lao Power JSC 631.27

ReMARKABLe HYDRoPoWeR AnD IRRIGAtIon PRoJectS

28 www.songda6.com.vn

ReMARKABLe HYDRoPoWeR AnD IRRIGAtIon PRoJectS

no Project capacity (MW)

Investor contract value (billion Dong)

24 Truoi irrigation project - Hue 408 Irrigation Project Management Board 5

25 National border embankment - Quang Ninh Province

Basic Water and irrigation Construction Management Board

5

26 Watering irrigation System Kon Tum people’s Committee 1.2

II PRoJect In PRoGReSS

1 Xekaman - Sanxay Hydropower

32 Viet-Lao Power JSC 285

2 Dong Van Hydropower 28 Dakrong Hydropower JSC 2989

3 Song Lo 2 Hydropower 28 Thanh Binh JSC 251.81

4 Song Ma 3 Hydropower 29.5 Dong Da Investment and Construction JSC - Hung Hai Group

247

5 Nam Cum 4 Hydropower 54 Nam Cum Hydropower JSC - Hung Hai Group

400

6 Pac Ma Hydropower 140 Pac Ma Hydropower JSC - Hung Hai Group

652

7 Su Pan 1 Hydropower 30 Viet Long Industrial JSC 74

8 Nam Ban 1 Hydropower 6.3 Hung Hai Construction Investment and Trade JSC - Hung Hai Group

55

9 Song Cho 2 Hydropower 7 Song Cho Hydropower JSC 120

29www.songda6.com.vn

Investor: Ministry of Construction

Contract value with SD6: 470 billion Dong

Construction period: 2011 - 2015

Location: Lot D and E - Ba Dinh Politics Center - Hanoi

Scale: 2 basements, 5 floors, total floor area: 63,240 square meter

Investor: Song Da - Hoang Long Joint Stock Company

Contract value: 267 billion Dong

Construction period: 2014 - 2016

Location: Lot HH6 - Nam An Khanh New Urban, Hoai Duc, Hanoi

Scale: 1 basement, 18 floors, total floor areas 44,300 square meter

18T1 Building - Hh6 - Nam An Khanh Urban

cIVIL AnD InDuStRIAL conStRuctIonPrior to the international economic integration trend, with the goal of sustainable development, creating jobs for the Company, Song Da 6 has involved in the construction of civil projects, urban areas, contributed to the growth of the Country.

National Assembly House

30 www.songda6.com.vn

32T Building - Hh6 - Nam An Khanh Urban

Ct2 Building - Van Khe Urban

TM Building - Van Khe Urban

Investor: Song Da - Hoang Long Joint Stock Company

Contract value: 295 billion Dong

Construction period: 2015 - 2018

Location: Lot HH6 - Nam An Khanh New Urban, Hoai Duc, Hanoi

Scale: 32 floors, total floor areas 49,300 square meter

Investor: Song Da 6 Joint Stock Company

Contract value: 214 billion Dong

Construction period: 2007 - 2010

Location: Van Khe Urban, Ha Dong District, Hanoi

Scale: 1 basement, 25 floors, total floor areas 42,750 square meter

Investor: Song Da 6 Joint Stock Company

Contract value: 41 billion Dong

Construction period: 2009 - 2010

Location: Van Khe Urban, Ha Dong District, Hanoi

Scale: 1 basement, 10 floors, total floor areas 8,460 square meter

31www.songda6.com.vn

Housing For Vice Ministers And Equivalent - Xuan Phuong Urban

Investor: Song Da 7 Urban Investment and Industrial Zone Joint Stock Company

Contract value: 62 billion Dong

Location: Xuan Phuong Urban, Tu Liem District, Hanoi

Investor: Luks Limited Company, Thua Thien Hue Province

Contract value with SD6: 30 billion Dong

Construction period: 2004 - 2007

Scale: 2.4 billion ton per year

Luks Cement Factory

HOUSING FOR VICE MINISTERS AND EQUIVALENT WORKING AT PARLIAMENT OFFICESLocation: Lot TTS, TT10, Xuan Phuong Urban, Tu Liem District, HanoiInvestor: Song Da 7 Urban Investment and Industrial Zone Joint Stock CompanyConsultant: Consultancy Company Limited of University of Civil Engineering

32 www.songda6.com.vn

no Project Investor contract value (billion Dong)

I PRoJect coMPLeteD

1 National Assembly House Ministry of Construction 470

2 18T1 Building - HH6 - Nam An Khanh Urban, Hoai Duc, Hanoi Song Da - Hoang Long JSC 267

3 CT2 Building - Van Khe Urban, Ha Dong District, Hanoi Song Da 6 JSC 214

4 TM Building - Van Khe Urban, Ha Dong District, Hanoi Song Da 6 JSC 41

5 Housing for vice ministers and equivalent - Xuan Phuong Urban

Song Da 7 Urban Investment and Industrial Zone Joint Stock Company 62

6 Hoa Binh Cement Factory Song Da Corporation 50

7 Luong Son Cement Factory, Hoa Binh Hoa Binh Industry Department 30

8 X18 Cement Factory, Hoa Binh Hoa Binh Industry Department 25

9 Sugar Factor, Hoa Binh Hoa Binh Industry Department 15

10 Luks Cement Factory Luks Thua Thien Hue Limited Company 30

11 Operator House Noi Bai Airport Vietnam Airlines Corporation 7

12 Social Insurance Headquarter in Gia Lai, Ninh Thuan, Hai Duong

Gia Lai, Ninh Thuan, Hai Duong Provincial Social Insurance 7

13 Phu Tho Starch Processing Factory Phu Tho Crushing Company 2

14 Universal crematorium, Bia Ria - Vung Tau Ba Ria Province Industrial Department 7

15 Juice Factory, Kien Giang Province Kien Giang Juice Company 3

16 Thuan Hoa Hotel, Thua Thien Hue Hue Travel Company 3

17 Investment and Construction of Van Tuong City infrastructure, Quang Ngai Song Da 6 JSC 30

II PRoJect In PRoGReSS

1 32T Building - HH6 - Nam An Khanh - Hoai Duc - Hanoi Song Da - Hoang Long JSC 295

2 Mining and supplying limestone for Ha Long Cement Factory Ha Long Cement JSC 540

ReMARKABLe cIVIL - InDuStRIAL PRoJectS

33www.songda6.com.vn

tRAnSPoRtAtIon

Ho Chi Minh Urban Railway Project, Line Ben Thanh - Suoi Tien

Investor: Song Da Corporation

Contract value with SD6: 25 billion Dong

Construction period: 2003 - 2004

Main tunnel length: 495 m

Width: 11.5 m

Height: 7.5 m

Ngang Pass Tunnel

Investor: Ho Chi Minh City People’s Committee

Contract value with SD6: 67 billion Dong

Construction period: 2015 - 2016

34 www.songda6.com.vn

no Projects Investor contract value (billion Dong)

1 Ho Chi Minh Road Ministry of Transport 70

2 Ngang Pass Tunnel Song Da Corporation 25

3 Access Road to Dung Quat Oil Refinery Factory

Oil Refinery Management Board 56

4 Road in Dong Dang, Lang Son Lang Son Transport Department 5

5 Song Cau Road, Phu Yen Song Cau Commune people’s committee

67

6 Hanoi Urban Railway Project, Line - Cat Linh - Ha Dong

Ministry of Transport 58

7 Ho Chi Minh Urban Railway Project, line Ben Thanh - Suoi Tien

Ho Chi Minh City People’s Committee 67

Hanoi Urban Railway Project, Line Cat Linh - Ha Dong

ReMARKABLe tRAnSPoRtAtIon PRoJectS

Investor: Ministry of Transport

Contract value with SD6: 58 billion Dong

Construction period: 2013 - 2014

35www.songda6.com.vn

With the development through many national key projects and the orientation of diversifying business lines, Song Da 6 is always ready to cooperate in the investment and construction in the field of renewable energy nationally and internationally to supply electricity to the country and promote the development of other economic sectors.

ReneWABLe eneRGY conStRuctIon

WInD PoWeR PRoJectS

SoLAR PoWeR PRoJectS

36 www.songda6.com.vn

eQuIPMent cAPAcItY

Mechanical Consrtruction CAT Crawler Crane

Hydraulic Rock Drilling Machine

Furukawa rock drilling machine in Xekaman 3 Hydro-power Project Site

Song Da 6 JSC has over 400 plants and equipments with total value of 500 billion Dong including: sand, stone crushing plants (METSO 500.000 m3 per year crushing plant; TDU-90; PDSU-110;CEMCO TUBOR 80 capacity from 180 ton per hour to 250 ton per hour, etc), concrete batching plants (batching plants with cooling tower, capacity from 60 m3 per hour to 125 m3 per hour); 12ton tower crane; MD900B 50 ton tower crane; crawler cranes from 20 ton to 70 ton; mechanical equipments such as Furukawa rock driller, excavators, dump trucks, mixing trucks,etc. One of Song Da 6’s advantages and strength is the modern plants and equipment capacity. Majority of plants and equipments are manufactured according to G7 and Northern Europe technology to not only create products with quality and safety but also minimize impacts to the environment.

37www.songda6.com.vn

Transporting trucks launching emulation activities in Huoi Quang Hydropower Project Site

Wheel Loader Compactor

38 www.songda6.com.vn

+ Crushed stone Production: 1,000,000 m3 per year+ Sand Production: 600,000 m, per year

350 Ton per hour Sand, stone crushing and filtering plant

250 Ton per hour Sand, stone crushing and filtering plant

Material Production

39www.songda6.com.vn

+ Conventional Vibrated Concrete Production (Cool): 500,000 m3 per year+ Roller Compacted Concrete Production (Cool): 800,000 m3 per year

120 m3 per hour CVC Batching Plant (Cool)

Concrete Production

RCC Bathching Plant

40 www.songda6.com.vn

concRete conStRuctIon cAPAcItY

To bring into play more than 30 years of operation efforts, with the orientation to master the modern technology, dynamic and creation, Song Da 6’s concrete construction capacity has been extraordinary improved.

Conveyor belt system at Dong Nai 5 Hydropower Project

Roller Compacted Concrete work at Dong Nai 5 Hydropower Project

41www.songda6.com.vn

Potain Tower Crane at Se San 4 Hydropower Project

MD-900B and Zoomlion Tower Crane at Huoi Quang Hydropower Project

Potain Tower crane and 1200 ton Crawler Crane at National Assembly House Project

42 www.songda6.com.vn

KeY conStRuctIon eQuIPMent

no equipment unit Specification Quantity (pcs)

1 Bulldozer CV 110 ÷ 180 8

2 Excavator m3 0.8 ÷ 3.6 19

3 Wheel Loader m3 2.2 ÷ 3.2 22

4 MD 900B Tower Crane Ton 50 2

5 Tower crane Ton 10 ÷ 12 9

6 Crawler Crane & Crane tire Ton 25 ÷ 70 11

7 Concrete Batching Plant m3/hr 60 ÷ 125 9

8 Rock Drilling Machine Mm 76 ÷ 105 5

9 Air Compressor m3/min 2 ÷ 30 7

10 Crushing Plant T/hr 150 ÷ 350 7

11 Mixing Truck m3 6 ÷ 8 36

12 Dump Truck m3 12 ÷ 25 63

13 Generator KVA 50 ÷ 500 12

43www.songda6.com.vn

44 www.songda6.com.vn

AcHIeVeMentS

Title and Medal Song Da 6 was awarded

+ Labour Hero of Renovation Era Medal (2011)+ 1st Class Labour Medal (1989), 2nd Class Labour

Medal (1986)+ 2nd Class Independence Medal (2011), 3rd Class

Independence Medal (1995)+ 3rd Class Victory Medal (1996)+ 1st Class Enterprise (1999)+ Certificate of Merit from Electricity of Vietnam

(2000,2001,2002)+ Certificate of Merit from Ministry of Construction

(2003,2004)+ Certificate of Merit from Gia Lai People’s Committee,

Certificate of Merit from Electricity of Vietnam (2008)

+ Certificate of Merit from Portal of Vietnamese Trade Unions, Outstanding Labour in Construction (2006)

+ Excellent Construction Emulation Flags (2005, 2007, 2008, 2009)

+ Excellence Union Activity in Construction Flag (2005)+ Outstanding Member of Song Da Corporation Flag

(2007)+ Government emulation flags (2010, 2013)+ Ministry of Construction’s Emulation Flag (2012)+ Emulation flags of the Government, Ministries

LISt oF tItLe SonG DA 6 WAS AWARDeD

45www.songda6.com.vn

+ 3rd Labour Medal : 20 individuals+ Certificate of Merit from Prime Minister: 10 Collectives

and 25 individuals+ Certificate of Merit from Ministry of Construction: 78

collectives and 340 individuals+ Ministerial Emulation Fighter: 220 individuals+ Excellence Labour Unit: 65 units+ Certificate of Merit from Party Committee of the

Centrally-run Businesses’ Sector for achievements in “Learning and following the moral Example of Ho Chi Minh” Campaign from 2007 to 2010

+ The Golden Table of the Organizer of the program “Anthem of Ancient Citadel” for the first time

+ Labour HeroCollectiveMr. Nguyen Van Nhi - Position: Team Leader

- Labour Hero- National Emulation soldiers

Mr. Nguyen Van Tung - Position: Party Committee Sec-retary, ChairmanMr. Ho Sy Hung - Position: Former Party Committee Secretary, Former Chairman

+ 2nd Class Labour HeroMr. Do Dinh HienMr. Nguyen Van Tung

LISt oF tItLe SonG DA 6’S eMPLoYeeS HAVe AWARDeD

46 www.songda6.com.vn

tItLe AnD QuALItY ceRtIFIcAte

47www.songda6.com.vn

48 www.songda6.com.vn

SoMe PHoto oF SonG DA 6 JSc’S oPeRAtIon

Song Da 6 always strives to maintain the title of a integrity, strong party and leads employees, people to implement well internal labor rules, promote democracy and continue to build and maintain the corporate culture of Song Da 6.

1. Operation of Communist party

Mr. Dang Quoc Bao - General Director received Red Star Award in 2014

Mr. Dang Van Nhi was awarded “Labour Hero Medal” by the Minister of Construction Nguyen Hong Quan.

Mr. Dang Quoc Bao - party committee secretary of Song Da 6 Joint Stock Company

The Company 12th Executive Committee, term 2015-2020

49www.songda6.com.vn

Deputy prime Minister Hoang Trung Hai awarded Labour Hero in Renovation Area flag and medal to Song Da 6 Joint Stock Company

Mr. Dang Quoc Bao - General Director received Vietnam Gold Star 2015 Award

Meeting on Song Da 6 30th anniversary

50 www.songda6.com.vn

The Song Da 6 Union has well performed its glorious mission, keeping abreast of the production and life of employees, launching emulation activities, encouraging and protecting the legitimate rights and interests of employees, become the firm support for employees.

2. Operation of Trade Union

The Company Trade Union Congress, term 2012 - 2017

Promoting the emulation activities at National Assembly House

Mr. Nguyen Khac Ha - President of Trade Union

51www.songda6.com.vn

The Song Da 6 Youth Union always affirms the youth, the leading role of the youth through various activities, emulation, actively contributes to improve the political spirit, community awareness and preserve traditional culture in the company.

3. Operation of Youth Union

Mr. Pham Van Mai - Central Union Secrectary awards “For the young generation” Medal to executives and employees

of Song Da 6

Executive Board of the Youth Union 13th (2017 - 2019)

Mr. Doan Van Quyet and Mr. Bui Van Quyen in national “Young skilled workers” Ceremony 2014

52 www.songda6.com.vn

Mr. Nguyen Van Tung, Party Secretary - Chairman presents gifts to flood victims in 3 central provinces of Vietnam

Song Da 6 JSC presents gifts to the flood victims in Quang Binh

Song Da 6 JSC is the sponsor of charity program “ Ha Giang Lunar New Year”

Sustainable business development is a solid foundation for Song Da 6 to express their responsibility to the community. By charitable and practical humanitarian activities, Song Da 6 has shown kindness, sharing love with the unfortunates, the poor or the people in disaster. .. above all is the deep gratitude to the generations who have fallen for the independence and freedom of the nation.

SocIAL ActIVItIeS

53www.songda6.com.vn

PARtneRS oF SonG DA 6 JSc

54 www.songda6.com.vn

Joint Stock Commercial Bank for Investment and Development of Vietnam

Joint Stock Commercial Bank for Foreign Trade of Vietnam

Vietnam Joint Stock Commercial Bank for Industry

and Trade

Military Commercial Joint Stock Bank

Vietnam National Coal - Mineral Industries Holding Corporation

Limited

Se Sa 4A Hydropower Joint Stock Company

Viet Long Industrial Joint Stock Company

Petro Vietnam Institute of Machine and Tool Industry

Luks Cement Vietnam Limited Company

Hung Hai GroupVietnam Railway

Authority

POSCO E&C

Thanh Binh Limited Company

Viet - Lao Power Joint Stock Company

55www.songda6.com.vn

SÔNG ĐÀ 10

CÔN

G TY

CỔ PHẦN CƠ ĐIỆN & XÂY DỰNG VIỆT NAM

MECO JSC

Song Da 10 Joint Stock Company

Can Don Hydropower Joint Stock Company

Long Viet Joint Stock Company

Binh Dien Hydropower Joint Stock Company

Ministry of Construction

Ha Long Cement Joint Stock Company

Huong Son Hydropower Joint Stock Company

Power Engineering Consulting Joint Stock

Company 1

Northern Cement Trading Joint Stock

Company

SÔNG ĐÀ 4 SÔNG ĐÀ 5 SÔNG ĐÀ 9

Song Da 4 Joint Stock Company

Song Da 5 Joint Stock Company

Song Da 9 Joint Stock Company

Electricity of Vietnam GS Engineering and Construction

Vietnam - Italia Steel Joint Stock Company

56 www.songda6.com.vn

SONG DA 6 JOINT STOCK COMPANY

PROFILE

www.songda6.com.vn

LABOUR HERO OF RENOVATION ERA

HEAD OFFICETM Building, Van Khe Urban, La Khe Ward, Ha Dong District, Ha NoiTel: 024.22253666Fax: 024.22253366Email: [email protected]: www.songda6.com.vn

Des

igne

d an

d Pr

oduc

ed b

y w

ww

.hal

i.vn