labotek project - centralised conveying and drying system - for juelsminde, dk
TRANSCRIPT
![Page 1: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/1.jpg)
![Page 2: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/2.jpg)
Labotek Project - Centralised Conveying and Drying System -
for
Juelsminde , DK
![Page 3: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/3.jpg)
Labotek Project
Project start – October 2005
Last follow-up actions – May 2007
![Page 4: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/4.jpg)
Labotek Project
• Central Conveying and Drying Control
• 3 x Desiccant Flex Dryer, DFD
• 51 x Drying Hopper , DH
• 51 x Stainless Vacuum Receiver, SVR
• 85 x SVR with Integrated Dosing Valve, IDV
• 85 x Material Hoppers
• 3 x Scan Vacuum Station, SVS- I
• 4 x WAM filters
• 4 x Couplings stations
• 6.1 Kilometre pipe system
• 1.4 Kilometre hose system
![Page 5: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/5.jpg)
Control System
Flexible technical solutions prepared for future expansions • Visualization of Plant Data
• Based WinCC
• Network interface (Ethernet)
• Material database – Production database - Service database
• Alarm logs and reports
• Web enabled communication for service and diagnostics
![Page 6: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/6.jpg)
Customers design control
• Access to data for the 3 factory
• Database: Drying parameters for 1000 materials
• Alarm logs
• Production planning of drying
• Multi display application
Centralised database
Factory 1
Factory 2
Factory 3
Control System
![Page 7: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/7.jpg)
Drying Hopper
The drying hopper ensure that the material lines are completely cleared after each conveying cycle and that an equal amount of material is conveyed in each cycle.
![Page 8: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/8.jpg)
51 Drying Hoppers are placed on a platform in 4 lines at SP Moulding
The capacity are from 40 to 380 litre Drying Hoppers
With a total capacity of 6530 litre
Drying Hopper
![Page 9: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/9.jpg)
Desiccant Flex Dryer
The Desiccant Flex Dryer is designed for continuous drying of granular plastic materials
Hygroscopic, non-hygroscopic raw materials and regrinds in the temperature
The Desiccant Flex Dryer is able to supply dry air with a dew point down to ÷40ºC or lower
![Page 10: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/10.jpg)
• 3 x Desiccant Flex Dryer 1500 are placed under the platform at SP Moulding
• With a total air volume at 4500 m³/hour
Desiccant Flex Dryer
![Page 11: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/11.jpg)
Coupling stations links the processing machines to the drying system
4 Coupling stations, one to each hall at SP Moulding
With: 54 in, 208 out
Coupling station
![Page 12: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/12.jpg)
Piping system
Piping system: Conveying the raw material to the processing machines
6.1 Kilometre of piping and 1.4 Kilometre hose system at SP Moulding
![Page 13: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/13.jpg)
Stainless Vacuum Receiver
Stainless Vacuum Receiver forConveyance the Free-Flowing Granules
51 SVR are mounted on the Drying Hoppers at SP Moulding
The capacity are from 4 to 26 litre receivers
![Page 14: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/14.jpg)
Integrated Dosing Valve
Stainless Vacuum Receiver with an Integrated Dosing Valve
85 SVR/IDV are mounted on the processing machinery at
SP Moulding
The capacity are from 4 to 50 litre receivers with IDV
![Page 15: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/15.jpg)
Material Hopper
The capacity are from 5 to 50 litre Material Hopper.
85 Material Hopper are mounted under the IDV
![Page 16: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/16.jpg)
The SVR/IDV with Hopper are mounted on the IMMs at SP Moulding
And connected via the piping system to the central drying system
SVR/IDV with Hopper
![Page 17: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/17.jpg)
Scan Vacuum Station - I
Generates the vacuum necessary to convey the plastic materials.
Blower:LT6-I , 3,4kW
2 x LT6-I 3 x LT6-I
![Page 18: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/18.jpg)
Scan Vacuum Station - I
3 x SVS-I are placed under the platform at SP Moulding
1 x 3xLT6-I Vacuum Station
2 x 2xLT6-I Vacuum Station
![Page 19: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/19.jpg)
WAM filter
The self-purifying filter is located between the vacuum station and the vacuum receivers and is cleaned after each conveying cycle.
4 x WAM filters are placed under the platform at SP Moulding
![Page 20: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/20.jpg)
Centralised system
By changing decentralised systems, to a centralised, have SP Moulding now 62 IMMs in the same area, where they had 46 IMMs in 2005.
The system is designed, dimensioned and customised in accordance with SP Moulding machine layout, requirements and requests.
Follow the expansion, step by step
![Page 21: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/21.jpg)
Machine layout
Project date: November 2005
16 IMM in Hal 1
30 IMM in Hal 2
![Page 22: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/22.jpg)
Step I
Project date: January 2006
15 IMM in Hal 1
31 IMM in Hal 2
![Page 23: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/23.jpg)
Step II
Project date: February 2006
21 IMM in Hal 1
35 IMM in Hal 2
![Page 24: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/24.jpg)
Step III
Project date: January 2007
25 IMM in Hal 1
35 IMM in Hal 2
![Page 25: Labotek Project - Centralised Conveying and Drying System - for Juelsminde, DK](https://reader035.vdocuments.us/reader035/viewer/2022062421/56649d185503460f949edacf/html5/thumbnails/25.jpg)
Step IIII
Project date: May 2007
26 IMM in Hal 1
36 IMM in Hal 2