Why bother?
• Improve efficiency
– Reduce wasted time waiting for work
– Reduce unnecessary staff movement
– Improve flow
– Minimise handling distances and costs
– Reducing walking distances
• Can save up to 30% of material handling costs
![Page 3: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/3.jpg)
Basic lab components
• Pre-analytical– Phlebotomy areas– Reception / sorting– Data capture– Filing
• Analytical – Variable
• Post analytical– Office space– Filing– Printing / sorting
![Page 4: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/4.jpg)
The process
Programming SchematicsDesign
Development
Construction documents and
contractsConstruction
All issues discussed Floor plan outline
More detailed floor plan, casework, engineering equipment etc
Final stages, usually only architect / builders involved
![Page 5: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/5.jpg)
Where to start?
• Three major elements to consider
Efficiency
Equipment
Safety
Reducing costs, waiting times, walking times, errors
Reducing accidents / exposures
Functioning, properly located and installed
![Page 6: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/6.jpg)
Efficiency
• Space– Quality and quantity
– Access and Movement• Between labs and within lab
– Staff in the space
• Storage
• Ventilation
• Lighting
• Plumbing
![Page 7: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/7.jpg)
Space – the final frontier
• Usually too little
• Existing space gets squeezed
– Unsafe
– Inefficient
– Error prone
• Control space by
– Quantity
– Quality
– Access and traffic
![Page 8: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/8.jpg)
Space – how much?– Needs assessment
• Functional
• Storage (see later)
• Support
![Page 9: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/9.jpg)
![Page 10: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/10.jpg)
Space
• Quantity– Needs assessment
• Functional
• Storage (see later)
• Support
• Quality– Functional
relationships
– Proximity diagram / bubble diagram
![Page 11: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/11.jpg)
![Page 12: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/12.jpg)
Movement
• Personnel, patients and specimens
• Functional relationships between depts
– Reflect all of above
![Page 13: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/13.jpg)
CLSI
![Page 14: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/14.jpg)
Movement
• Personnel, patients and specimens
• Functional relationships between depts
– Reflect all of above
• Details of casework, doors, equipment in a lab
– Specimen movement most useful
![Page 15: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/15.jpg)
Some design concepts
• Single entry point
– Access control, streamlining
• L-shaped benches
• Mobile benches
• Try to separate disciplines
• Use spaghetti diagrams
![Page 16: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/16.jpg)
Specimen Movement
![Page 17: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/17.jpg)
Spaghetti diagrams
![Page 18: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/18.jpg)
Single entry point L-shaped benches
Separate disciplines
![Page 19: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/19.jpg)
Flexibility
• Plan for expansion– Don’t let “unused” expansion
space be hijacked!
• Flexible casework– Affected by plumbing,
electricity supply, ventilation
– Place floors before casework
• Size of doors – changing large pieces of equipment
• Electrical supply, ventilation, plumbing, etc etc…
![Page 20: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/20.jpg)
![Page 21: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/21.jpg)
People
![Page 22: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/22.jpg)
![Page 23: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/23.jpg)
People• Space for people to move
comfortable
• Not too much space –inefficient
• Some take up more space than others
• Cater for staff with disabilities
• Rest/personal space (tea room, sleeping area, locker rooms etc)
![Page 24: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/24.jpg)
Ventilation, lighting
• Ventilation expensive, important– Safety and comfort
– Must build in expansion capacity (15-25%)
– Ideally directional (clean to dirty)
• Lighting– Different types of lighting for
different work
– Plan for expansion!
![Page 25: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/25.jpg)
NCCLS, 1998
![Page 26: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/26.jpg)
Storage design
• Space (again…)
• Storage conditions
• Location
• Nature of materials being stored
• Access control
• Safety
![Page 27: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/27.jpg)
Storage space
• Determined by
– Workload
• Current and projected
– Nature of testing
– Annual orders and usage
– Stock management systems
• Lead time
• Shelf life
![Page 28: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/28.jpg)
Location, location, location
• Hazardous substances
– Away from lab / office areas
– In line with local / national regulations
• Adequate ventilation – not into working areas
• Adequate drainage if necessary
• But also accessible for retrieval…
![Page 29: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/29.jpg)
Conditions
• Temperature
– Room temp – 18-26 C
– Fridge – 2-8
– Freezer - <-20
• Walk in fridge / freezer vs portable units
• Humidity
– <20% - static electricity
– >50% - condensation
![Page 30: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/30.jpg)
Nature of materials
• Hazardous
– Structural safety, location
• Weight
– Paper records, heavy containers
• Duration
– Paper records may need to be stored for 2 years or more
![Page 31: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/31.jpg)
Access control
• Who needs access to storage?
• What form of access control
• Number of doors
• Centralised vs decentralised
![Page 32: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/32.jpg)
Safety
• Nature of materials
– Fire risk
– Fume risk
– Corrosive liquids
• Additional requirements
– Ducting, drainage, access control, monitoring
![Page 33: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/33.jpg)
Safety – general design
• Access control (again…)– More doors = more difficult to maintain
• No carpets in lab – difficult to keep clean
• Chairs – easily cleanable
• Sinks and hand washing– Number and location
• Spacing between equipment / furniture
• Benches impervious to solvents etc
![Page 34: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/34.jpg)
Biosafety levels
0: No contact with blood, body fluids, secretions, infectious agents
1: Contact with closed biological specimens; work with well characterised agents that rarely cause disease
2: Direct exposure to body fluids, tissue; little chance of exposure through inhalation
3: Agents can cause serious / lethal disease through inhalation
4: High risk of aerosol transmitted infections, frequently fatal, treatment unknown / not available
![Page 35: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/35.jpg)
Level 1
• Pre-analytical area
• Some research labs (depending on work)
• No specific extra design features
![Page 36: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/36.jpg)
Level 2
• Most clinical laboratories
• Biosafety cabinet (or other containment)
– If procedures produce aerosols
– High concentration of infectious agents
– Located away from doors / windows; away from heavy people traffic
• Eyewash station available
![Page 37: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/37.jpg)
Level 3
• TB lab
• Access through anteroom
• Sealable doors
• Sealed windows
• Ducted air ventilation; unidirectional flow (clean to dirty)
• All work in BSCs
![Page 38: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/38.jpg)
Level 4
• Either working in suit, or a cabinet
• HEPA filters
• Showers
• Double door autoclave
• Hands free sinks
![Page 39: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/39.jpg)
Equipment
• Automation
– Chemistry, immunology, haem, toxicology
• more automated
• often consolidated
– Linear arrangement often best
– Adjacent to specimen receiving / prep area
– Microbiology – less automated, but changing
![Page 40: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/40.jpg)
Equipment issues
• Comprehensive list– Current and future
• Size / footprint / weight
• Electrical supply / emergency power
• Plumbing / type of water
• Noise / vibration
• Cables
• Clearance
• Heat generation
• Fumes generated / ventilation
• Airflow around equipment
![Page 41: Lab Design - Stellenbosch Universityacademic.sun.ac.za/stellmed/CourseMaterial/Leadership and... · 2016-09-06 · Why bother? •Improve efficiency –Reduce wasted time waiting](https://reader033.vdocuments.us/reader033/viewer/2022042110/5e8b66d8eb173e45076d0875/html5/thumbnails/41.jpg)
Summary
• One size does not fit all• Need to understand your laboratory• Use diagrams to illustrate workflow, and