la portfolio
DESCRIPTION
Brett Lezon landscape architecture + design portfolioTRANSCRIPT
B_LEZON
B_LEZON
Table of Contents
Studio Projects 1.0 Skills 2.0
Professional Experience 3.0 Travel 4.0
Resume 5.0 Comprehensive Studio Project 6.0
B_LEZON
Brett Lezon, Associate ASLALandscape Designer
Address:
1710 Villa Capri CircleUnit 10-204Odessa, FL 33556
Cell:
815.545.2197
Email:
Attending Ball State University the past fi ve years and through professional experience landscape architecture has become an important part of my life. I am persistently striving to become a better designer through study and guidance, while developing the ability to effectively communicate project ideas. My goal is to apply industriousness and steadfast enthusiasm to contribute to your fi rm’s needs.
Thank you for your time and consideration.
Sincerely,
Brett Lezon
B_LEZON
Studio Projects 1.0
Main Street Muncie 1.1 CERES Roof Garden 1.2
Moon Garden 1.3 Pogue’s Run Park 1.4
Albion Community Garden 1.5 Merry Lea Learning Center 1.6
Main St. Section
Framework Plan Master Plan
Main St. Perspective
1.1
Main Street MuncieA downtown ‘green fi nger system’ will connect to the surrounding neighborhoods and enliven the businesses.
To accomplish this method, a portion of land behind the buildings situated on Main Street was allocated for open space.
A key element to the street design is the use of colors to distinguish each block.
1.2
Master Plan
Roof Garden Perspective
Roof Garden Section
CERES Roof Garden
Located atop the Energy Center labs at Ball State University, this roof garden provides an escape for students and professors.
Highlights include an elevated viewing deck to observe Shafer Tower, terraced planters along the back of the space, and a sedge planted boardwalk leading guests to tranquility.
Plants selected include plantain lilies, two-row stonecrop, weeping brown sedges, ostrich ferns, japanese maples, and vine maples.
1.3
Master Plan
Moon Garden Section
Moon Garden Section
Moon Garden
Moon gardens were used in ancient times as places of gathering for worship. This garden utilizes the quarters of the moon to shape the rooms.
Plants were chosen based on their night blooming abilities, fragrance, silvery appearance, and ornamental qualities.
Experiences range from smelling the pungent scent of fragrant columbine to viewing the illuminated moon forms at the gardens highest point, the full moon phase.
1.4
Master Plan
Pogue’s Run Park Section
Pogue’s Run Park Perspective
Pogue’s Run Park Perspective
Pogue’s Run ParkPrimary medium of the site involves vegetation. Transitions between planting zones worked out deliberately to create a visually engaging mix.
Program elements include a three weir system acting as hydrology control, islands serve as resting areas, and water basins radiate from islands.
Generating visual interest from 1-70 was mandatory. To achieve this goal a line of Norway spruce and redbuds were planted along 1-70. Grand entrance lined with sycamores.
Team project completed by Andy Burrus, TJ Dwyer, and Brett Lezon. I was responsible for assisting in the creation of the sections and rendering the plan and sections.
1.5
Master Plan Albion Community Garden Character Sketch
Albion Community Garden Section
Albion Community GardenLocated adjacent to the Noble County Courthouse in Albion, Indiana this 1.06 acre site will become Albion’s own community garden.
Goals include improving downtown Albion’s recreation, economy, tourism, and zoning. Establishing additional green space was key in the progress.
Designed for both adults and children this community garden offers a variety of activities including an educational garden, children’s garden, and market stand.
1.6
Site Plan
Amphitheater Section
Merry Lea Learning CenterDesigned to bring people together to understand environmental impacts and principles of sustainability.
Programmed spaces include a compost center, which will educate guests about composting and using recycled materials to create environmental art.
Water is a primary element within the site. The Water Education Center allows guests to view water samples through plexi-glass.
Cub Lake Perspective
B_LEZON
Skills 2.0
Hand Graphics 2.1 AutoCAD Drafting 2.2
Model Building 2.3 Google SketchUp 2.4
Plans 2.5 Adobe Creative Suite 2.6
Cub Lake Perspective
2.1
Night Rendering of Alley Historic Facade Elevation St. Clair Housing Design Sketch
Street Cross-Section St. Clair Housing Design Sketch
Hand Graphics
I enjoy sketching and employing hand graphics. Sketch books accompany me when I travel.
Experimentation with a variety of hand graphics is showcased above.
Sketching is an excellent communication tool.
2.2
St. Clair Housing Design Sketch
St. Clair Housing Design Sketch
Magnifi cent Amberson’s Planting Plan
Comprehensive Project Planting Plan of Active Recreation Area
AutoCAD Drafting
Beachwalk Shower Drainage
2.3
Moon Garden Model Residential Grading Model
Model Building
Model building is an important skill to showcase your designs.
The Moon Garden model (shown on left) was built primarily using a laser cutter. In addition, plant material was applied by hand.
The Residential Grading model (shown on right) was constructed by a laser cutter. Pieces were glued and assembled by hand.
2.4
Residential Grading Model
Google SketchUp
Looking North Looking North
Looking South Close-Up Looking North
SketchUp allows for quick and simple 3D digital modeling.
The images above showcase design work from the Indiana Inter Church Center immersive learning project.
Our goal was to use native plants, best management practices, and planning to obtain the Indiana Wildlife Friendly Habitat certification.
2.5
Residential Plan Sketch
Plan Sketch
Magnificent Amberson’s PlanStreetscape Plan Sketch
Plans
2.6
Adobe Creative Suite
Main St. Muncie Enlarged Plan using Photoshop
Craddock Wetland Section using Photoshop
Board Layout using Illustrator
Plan Rendering using Photoshop
Team project completed by Andrea Borkowski, Pat Stout, and Brett Lezon. As a group, we developed the layout.
B_LEZON
Professional Experience 3.0
Clearwater Parks & Rec. 3.1 Immersive Project 3.2
The Morton Arboretum 3.3 John Craddock Wetland 3.4
3.1
Clearwater Parks & RecreationLandscape Designer_May 2011-
Moccasin Lake Boardwalk Existing Condition
Wood Railing Section
Clearwater, Florida
Moccasin Lake is a 51-acre nature park owned and operated by the City of Clearwater. My task was to design retrofit boardwalks to replace the existing structures.
I was responsible for the design, calculation of materials, meeting with contractors, and some project management with the help of the Project Manager for the City of Clearwater Parks and Recreation Department.
Deck Section
Improvement Plan
3.2
Immersive Learning ProjectSpring 2011
Conceptual Plan for Phase 1-2 (Tree planting + prairie)
Contemplative Garden Looking EastConceptual Plan for Phase 1 (Tree planting)
Client Presentation
Indianapolis, IN
As a class we led several design charrettes, which ultimately produced a master plan, maintenance plan, and the creation of an Indiana Certifi ed Wildlife Friendly Habitat.
Getting Directions
Client Presentation
3.1
3/8"
18"
3'-0"3'-0"
1'-0"
6"
1/4" 1/4"
6"
1'-0"
EQUAL EQUAL
EQUAL EQUAL
3/4"3/4"
1'-0"
EQUAL EQUAL
EQUAL EQUAL
3/4"3/4"
1'-0"
EQUAL EQUAL
EQUAL EQUAL
3/4"3/4"
1'-4
"TO
FIN
. GR
.1'
-2" M
AX.
2'-6
"M
AX.
TO
FIN
. GR
.1'
-0"
MIN
.10
"
2'-4"
8"8"1'-0"
1'-0
"O
.C. T
OR
EVE
AL
CONCRETE
POLY EXPANSION JOINT 1/4" x 6"
TRENCH DRAIN STAR PATTERN STAR PATTERN
EXISTING EXPANSIONJOINT 1/2" x 6"
SAND/SEAT WALL
PREPARED SUBGRADE
EXISTING EXPANSIONJOINT 1/2" x 6"
Section B-B DimensionsScale: 2 1/2" = 1'-0"
1 Section B-BScale: 2 1/2" = 1'-0"
2
3/8" Thick Brushed Aluminum Grate, Typ.
Stainless Steel 1/4-20 x 1 Flat Head Torx Security Screw, Typ.
Stainless Steel 1/4-20 Drop In Anchor SS 18-8, Typ.
Vulcum Caulk to Match Concrete, Typ.1/4" Backer Rod, Typ.
1/4" x 6" Poly Expansion Joint, Typ.
6" Existing Concrete Slab, Typ.
Existing Beach Sand Subgrade, Typ.
Screw DetailScale: 6" = 1'-0"
5
CL
North Beach Shower Screw LayoutScale: 2 1/4" = 1'-0"
6
Middle Beach Shower Screw LayoutScale: 2 1/4" = 1'-0"
7 South Beach Shower Screw LayoutScale: 2 1/4" = 1'-0"
8
5
Section C-CScale: 3/4" = 1'-0"
9
OF
EHTOF
Y
,
DIA
ROLFRETAWR
AE
LC
TI
CYTIC
LAES
7 7 7 7
7 7 7
7
3/8" Stainless Steel Aluminum Grate, Typ.
1/4 x 1" Stainless Steel Drop In Anchor(Pre Drill & Slip in Anchor)
o
Beach Walk- Shower RemediationProposed Details
Section D-DScale: 3/32" = 1'-0"
37
47
Aluminum Angle Iron Detail
Scale: 6" = 1'-0"47
Aluminum Angle Iron, Typ.
3/8" Thick Brushed Aluminum Grate, Typ.
Existing Seat Wall,Typ.
3,000 PSI Concrete in 28 days, with Commercial Fiber Mesh Typ.
3,000 PSI Concrete in 28 Days with Commercial Fiber Mesh, Typ.
CL
3/4"
3/4"
2'-0"
2'-0" 2'-0"
LakeChautauqua
B.S.A. Camp Soule
Lake Chautauqua Park
Chautauqua Park South
Pro
ject
Bou
ndar
y
Future Connectionto Local Trails
Shared UseEquestrian andNature Trail
Pond
Proposed Parking withBike Rack
Futu
re E
ast W
est T
rail
PicnicPavillion Picnic
Pavillion
TrashTrash
Project BoundaryFuture Facilities (Not grant related)
Existing FacilitiesExisting PondProposed Grant Facilities Interpretive Signage Locations
Trash ReceptaclePicnic Pavillion
KEY
2
1
Future Connectionto Local Trails
New Bridge
Existingprimitive trailto bereplacedwith new trail
New bridge
Primitive Bridges To BeRemoved & Replaced
Land
mar
k D
r.
Landmark Dr.
Entrance to parking
Exit toLandmark Dr.
Primitivebridge tobe removed& replaced
Primitivebridge tobe removed& replaced
Clearwater Parks & RecreationInternship_Summer 2010
Beachwalk Shower Trench Drain Details Lake Chautauqua Equestrian Trail System
Completed Beachwalk Shower Trench Drain
Lake Chautauqua Equestrian Parking
Clearwater, Florida
One of my initial projects, Lake Chautauqua, was to make enhancements to the master plan for a grant, design a 12 stall equestrian parking lot, and perform cost estimation.
Three of the Beachwalk showers had drainage issues. As a result, my task was to resolve the issues. I chose to design and install trench drains. Details and completed design shown above.
Lake Chautauqua Equestrian Parking
Getting Directions
3.3
The Morton ArboretumVolunteer_Summer 2009Lisle, Illinois
3.4
John Craddock Wetland2009-2010Muncie, Indiana
Group Design Studies
Character SketchSe rpe ntine Wa ll Pla n
Serpentine Wall Concept
Travel 4.0
4.1
Olympic Sculpture Park Freeway Park
Elliott Bay Gas Works Park
Seattle, WA
4.2 Portland, OR
Keller Fountain Park
Tanner Springs Park Riverfront
Stormwater Design
B_LEZON
Resume 5.0
BRETT LEZON
Objective
Education
Landscape Architecture + Design P r o f e s s i o n a l R e s u m e
1710 Villa Capri Circle | Unit 10-204 | Odessa, FL 33556 | 815.545.2197 | [email protected]
To obtain an entry level position as a landscape designer
Ball State University_Bachelor of Landscape Architecture_May 2011
ASLA Advocacy Day 2010_One of five students nominated nationally to attend
Community Service_Helped design & construct John Craddock Wetland in Muncie_2009-2010
Eagle Scout Award_Earned BSA’s highest achievement in March 2004
The Morton Arboretum Branches newsletter_Highlighted in an article in Fall 2009 edition
Leadership President, Ball State Student Chapter ASLA_April 2009 to May 2011
Student Advisory Board_January 2011 to May 2011
Undergraduate Curriculum Committee_February 2011 to May 2011
ProfessionalActivities
LABASH_2009-Penn State_2010-UNLV_2011-Purdue
ASLA Annual Meeting & EXPO_Chicago, IL_2009
INASLA Annual Meeting_Indianapolis, IN_2009-2010
Chicago Flower & Garden Show_2009-2011
Craddock Design/Build Charrette_Muncie, IN_2009
Skills & Abilities AutoCAD 2011
Google SketchUp Pro 8 Adobe Illustrator_InDesign_Photoshop Microsoft Word_Excel_Powerpoint Google Earth
SketchingDraftingHand Rendering marker_colored pencilDigital Rendering photoshop_illustrator
Software GraphicFundamentalTeam WorkCommunication verbal_written_graphicCritical ThinkingProblem SolvingConceptual Development
ProfessionalExperience
Landscape Designer City of Clearwater_Parks & Recreation (Clearwater, FL) May 2011- While working under a registered landscape architect my tasks include conceptual design, preparing construction documents, technical writing, meeting with contractors, and cost estimation
Participant Immersive Learning Project (Indianapolis, IN) March 2011 - April 2011As a class we led multiple design charrettes for the Indiana Interchurch Center, prepared a master plan, planting plan, maintenance plan, sought out donations/grants, and installed our design. Ultimately, we met the requirements for an Indiana certified wildlife friendly habitat.
Intern City of Clearwater_Parks & Recreation (Clearwater, FL) May 2010 - August 2010 Responsibilities included preparation of construction documents, conceptual design, master planning, site design, and meeting with contractors.
Volunteer The Morton Arboretum (Lisle, IL) June 2009 - August 2009Assisted horticulturists and plant biologists in maintaining display gardens and lake environment.
Laborer Fawn Landscaping & Nursery, Inc. (Frankfort, IL) May 2008 - July 2008Duties included constructing residential and commercial landscapes.
Achievements
, Associate ASLA
B_LEZON
Contacts
Address:
1710 Villa Capri CircleUnit 10-204Odessa, FL 33556
Cell:
815.545.2197
Email:
BRETT LEZON
Objective
Education
Landscape Architecture + Design P r o f e s s i o n a l R e s u m e
1710 Villa Capri Circle | Unit 10-204 | Odessa, FL 33556 | 815.545.2197 | [email protected]
To obtain an entry level position as a landscape designer
Ball State University_Bachelor of Landscape Architecture_May 2011
ASLA Advocacy Day 2010_One of five students nominated nationally to attend
Community Service_Helped design & construct John Craddock Wetland in Muncie_2009-2010
Eagle Scout Award_Earned BSA’s highest achievement in March 2004
The Morton Arboretum Branches newsletter_Highlighted in an article in Fall 2009 edition
Leadership President, Ball State Student Chapter ASLA_April 2009 to May 2011
Student Advisory Board_January 2011 to May 2011
Undergraduate Curriculum Committee_February 2011 to May 2011
ProfessionalActivities
LABASH_2009-Penn State_2010-UNLV_2011-Purdue
ASLA Annual Meeting & EXPO_Chicago, IL_2009
INASLA Annual Meeting_Indianapolis, IN_2009-2010
Chicago Flower & Garden Show_2009-2011
Craddock Design/Build Charrette_Muncie, IN_2009
Skills & Abilities AutoCAD 2011
Google SketchUp Pro 8 Adobe Illustrator_InDesign_Photoshop Microsoft Word_Excel_Powerpoint Google Earth
SketchingDraftingHand Rendering marker_colored pencilDigital Rendering photoshop_illustrator
Software GraphicFundamentalTeam WorkCommunication verbal_written_graphicCritical ThinkingProblem SolvingConceptual Development
ProfessionalExperience
Landscape Designer City of Clearwater_Parks & Recreation (Clearwater, FL) May 2011- While working under a registered landscape architect my tasks include conceptual design, preparing construction documents, technical writing, meeting with contractors, and cost estimation
Participant Immersive Learning Project (Indianapolis, IN) March 2011 - April 2011As a class we led multiple design charrettes for the Indiana Interchurch Center, prepared a master plan, planting plan, maintenance plan, sought out donations/grants, and installed our design. Ultimately, we met the requirements for an Indiana certified wildlife friendly habitat.
Intern City of Clearwater_Parks & Recreation (Clearwater, FL) May 2010 - August 2010 Responsibilities included preparation of construction documents, conceptual design, master planning, site design, and meeting with contractors.
Volunteer The Morton Arboretum (Lisle, IL) June 2009 - August 2009Assisted horticulturists and plant biologists in maintaining display gardens and lake environment.
Laborer Fawn Landscaping & Nursery, Inc. (Frankfort, IL) May 2008 - July 2008Duties included constructing residential and commercial landscapes.
Achievements
, Associate ASLA
B_LEZON
Comprehensive Studio Project 6.0
Problem/Inventory/Analysis 6.1 Concepts 6.2
Schematic Design 6.3 Master Plan 6.4
Perspectives 6.5 Sections 6.6
6.1
Harborview Center
Problem/Inventory/Analysis
The 5th year of the program at Ball State requires a research phase and comprehensive design project.
I chose my project site in Clearwater, FL. The site is comprised of Coachman Park, Harborview Center, and Bayfront Tennis Complex.
The site is adjacent to Clearwater Harbor, creating an opportunity for the site. Currently, an abundance of parking poses a strong disconnect to the neighboring context.
Strong disconnect due to parking lot, complete linear pattern
Lack of connectivity to Cleveland Street, borrow elements to unify
Strong disconnect due to parking lot, complete linear pattern
Terminate Cleveland St. at Osceola to increase water views and establish pedestrian entry
Terminate Drew St. to fishing pier, allow for a drop off area and turn around zone
Extend Pierce Blvd. to connect with Drew St., locating parking on the perimeter
Establish parking on north and south perimeter of park, allowing for views of Clearwater Harbor in center
Coachman Park
Site Analysis
Vicinity Map
6.2
The Solar Canopy Equation
Concepts
By borrowing elements from the Singapore helix bridge and the Treepods in Boston, I’ve developed a solar canopy concept.
Due to the average 240 sunny days per year in Clearwater implementing a solar generating system while linking key nodes begins to set the framework.
The solar canopy has several benefits: provides cover, artistic element, educational opportunity, remove carbon dioxide and release oxygen, and create an attractive environment.
Solar Canopy Concept
Great Lawn Solar Canopy
Solar Canopy Promenade
6.3
Schematic Design
Galleria
Looking South Toward Great Lawn
Looking Southwest
Solar Canopy Promenade
Above are a series of renderings produced in Google Sketchup Pro 8 at the schematic design stage. I enhanced the images using Photoshop.
The galleria was envisioned to attract tourists and locals which will help to keep the site lively on a consistent basis.
The great lawn, as shown on the bottom left, will be host to a variety of events including the Jazz Holiday and Sea Blues, to name a few.
6.4
Master Plan
Legend:
1_Parking/Staging Area2_Boat Slips North3_Boat Slips South4_Clearwater Harbor5_Great Lawn/Bandshell6_Rec. Space/Vendor/Staging7_Water Feature8_Gathering Space9_Bosque10_Solar Canopy Promenade11_Central Active Quad12_Bayfront Tennis Complex13_Parking14_City Hall15_Boardwalk/Pinellas Trail Ext.16_Galleria17_Urban Oasis18_Clearwater Public Library19_Restrooms20_Residential Tower21_Mixed-Use22_Housing23_Mixed-Use24_Underground Parking25_Pond26_Memorial Causeway
1
2
3
44 5
6
7
89
10
11
12
1314
1516
17
18
19
20 21
22
23
24
25
26
6.5
Bandshell/Great Lawn
RenderingsBandshell/Great Lawn at Night
View Looking East
Urban Oasis at Night
6.6
Sections
Section B: Boat Slips to Clearwater Public Library Looking North
Section A: Parking to Galleria and Solar Canopy System
Section C: Boardwalk Looking West toward Clearwater Harbor
Key Words:-Dynamic-Transitional-Anchors
Key Words:-Entertainment-Accessible-Connective
Key Words:-Linear-Diverse-Active
B_LEZON