la paloma in - urbaser · la paloma msw treatment plant client madrid city government residents...

1
LA PALOMA MSW TREATMENT PLANT Client Madrid City Government Residents served 540,000 residents Processes Treated waste (total): 245,567 t Recovered materials (total): 28,795 t Pre-treatment of remaining waste: 12,789 t Packaging treatment: 16,006 t Composting: 566 t of compost produced 2016 data Treatment capacity 219,000 t/year remaining waste 36,500 t/year local entities 70.6 kt CO 2 prevented

Upload: others

Post on 24-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: La Paloma IN - Urbaser · LA PALOMA MSW TREATMENT PLANT Client Madrid City Government Residents served 540,000 residents Processes • Treated waste (total): 245,567 t • Recovered

LA PALOMA MSW TREATMENT PLANT

ClientMadrid City Government

Residents served540,000 residents

Processes• Treated waste (total): 245,567 t• Recovered materials (total): 28,795 t

• Pre-treatment of remaining waste: 12,789 t

• Packaging treatment: 16,006 t• Composting: 566 t of compost produced

2016 data

Treatment capacity• 219,000 t/year remaining waste• 36,500 t/year local entities

70.6 kt CO2 prevented