l12-518 - jefferson parish council, consolidated sewerage ... … · web views12-039 - louisiana...
TRANSCRIPT
PRELIMINARY NOTICE AND AGENDA STATE BOND COMMISSION
MEETING OF NOVEMBER 15, 2012 10:00 A.M. - SENATE COMMITTEE ROOM A
STATE CAPITOL BUILDING
1. Ca11 to order and roll call.
2. Approval of the minutes of the October 18, 2012
meeting. TAB 4 - LOCAL POLITICAL SUBDIVISIONS -
LOANS
3. L12-290 - Ascension Parish, Consolidated Utilities District No. 1 - Not exceeding $550,000 Certificates of Indebtedness, not exceeding 4%, not exceeding 10 years, improvements and additions to the water system.
4. Ll2-530 - Ascension Parish, Consolidated Utilities District No. 1 - Approval of a previously executed Promissory Note in the amount of not exceeding $50,000, not exceeding 5.9%, not exceeding 10 years, making improvements to the water distribution system.
5. L12-531 - Ascension Parish, Consolidated Utilities District No. 1 - Approval of a previously executed Intergovernmental Agreement by the Ascension Parish and the Ascension Consolidated Utilities District No. 1 in which the Parish provided funds to the District in an amount of not exceeding $90,177, non-interest bearing, mature no later than 2017, improvements to the water distribution system.
6. L12-512 - LaSalle Parish, Recreation District No. 22 - Not exceeding $25,000 Certificates of Indebtedness, Series 2012, not exceeding 4%, mature no later than March 1, 2013, current operations.
7. L12-513 - Orleans Parish School Board - Not exceeding $50,000,000 Revenue Anticipation Notes, Series 2012, not exceeding 6%, mature no later than June 30, 2013, current expenses.
8. L12-084 - Tensas Parish Police Jury - Not exceeding $22, 100 Certificates of Indebtedness, Series 2012, not exceeding 4.25%, not exceeding 10 years, acquiring and purchasing an herbicide truck and equipment.
9. L12-520 - Webster Parish, North Webster Parish Industrial District - Not exceeding $525,000 Taxable Certificates of Indebtedness, Series 2012, not exceeding 6%, mature no later than July 1, 2021, expanding and improving a building.
TAB 5 - LOCAL POLITICAL SUBDIVISIONS - BONDS - PRELIMINARY APPROVAL
10. L12-522 - Washington Parish, Mount Hermon Water District - Notice oflntention to issue not exceeding $700,000 Water Revenue Bonds, or other evidences of indebtedness, in one or more series, not exceeding 6%, not exceeding 25 years pursuant to R.S. 39: 1011 et seq., or not exceeding 40 years pursuant to R.S. 39:821 et seq., acquiring and constructing additions, extensions and improvements to the drinking water system.
TAB 5 - LOCAL POLITICAL SUBDIVISIONS - BONDS - FINAL APPROVAL
11. L12-507 - East Carroll Parish, Bunches Bend Protection District - Not exceeding $5,000,000 Revenue Bonds, in one or more series, not exceeding 6%, not exceeding 30 years, (1) repair, improve and maintain the Wilson Point Levee System, (2) fund capitalized interest and (3) fund a debt service reserve fund if necessary.
2
12. L12-518 - Jefferson Parish Council, Consolidated Sewerage District No. 1 - Not exceeding$40,000,000 Revenue Bonds, in one or more series, not exceeding 4%, not exceeding 22 years, (1) construction, acquisition and equipping of improvements to wastewater disposal and treatment facilities and (2) fund a debt service reserve fund if required.
13. L12-519 - Lincoln Parish, Ruston Lincoln Convention & Visitors Bureau - Not exceeding$1,200,000 Revenue Refunding Bonds, not exceeding 3.25%, mature no later than July 1, 2022, refunding and extending Revenue Bonds, Series 2007.
14. L12-525A - Orleans Parish, Parish Hospital Service District - District A - Not exceeding$97,604,300 Note, on a taxable basis, not exceeding 4.5%, not exceeding 40 years, (1) construct, equip and operate a state-of-the-art hospital at the site of the former Pendleton Memorial Methodist Hospital at 5620 Read Boulevard, New Orleans to provide emergency and other essential hospital services to the residents of New Orleans East; (2) acquisition of improvements, extensions and replacements, including appurtenant equipment, accessories and properties, both movable and immovable; (3) fund capitalized interest, and (4) fund a debt service reserve.
15. L12-521 - Ouachita Parish, City of Monroe (Economic Development Project-Garrett Road Economic Development Area) - Not exceeding $21,000,000 Sales Tax Increment Revenue and Refunding Bonds, in one or more series, not exceeding 4.40%, mature no later than March 1, 2025, refunding all or a portion of Sales Tax Increment Revenue and Refunding Bonds, Series 2008.
16. L12-524 - Ouachita Parish, City of Monroe (Economic Development Project - Tower Drive Economic Development Area) - Not exceeding $10,835,000 Sales Tax Increment Revenue and Refunding Bonds, in one or more series, not exceeding 4.30%, mature no later than March 1, 2025 to be issued as (1) approximately $8,540,000 Refunding Bonds, refunding Sales Tax Increment Revenue and Refunding Bonds, Series 2007; (2) approximately $2,295,000 Revenue Bonds, (a) acquisition, engineering, construction, reconstruction or relocation of certain roads, streets, highways, drainage, sewers and other public infrastructure; (b) other economic development projects within the Area; (c) funding a debt service reserve fund if necessary; (d) providing for capitalized interest if necessary and (e) paying any credit enhancement.
17. L10-162A - Rapides Parish, Town of Lecompte - (1) Not exceeding $784,000 Sewer Revenue Bonds, not exceeding 2.75%, not exceeding 40 years, constructing and acquiring improvement and replacements to the sewerage system, including appurtenant equipment and accessories; (2) not exceeding $784,000 Bond Anticipation Notes, not exceeding 3%, not exceeding 10 months, interim financing.
18. Lll-447A - St. Helena Parish, Waterworks District No. 2 - (1) Not exceeding $2,659,000 Water Revenue Bonds, Series 2013, not exceeding 3.375%, not exceeding 40 years, acquiring and constructing improvements, extensions and replacements to the waterworks system, including equipment and accessories; (2) not exceeding $2,659,000 Bond Anticipation Notes, not exceeding 4%, not exceeding 1 year, interim financing.
19. L12-472A - St. Tammany Parish, Hospital Service District No. 1(St. Tammany Parish Hospital Project) - Not exceeding $25,000,000 Hospital Revenue Bonds, Series 2012, not exceeding 5% fixed rate, not exceeding 35 years, (1) acquisition and construction of capital improvements and equipment to the hospital in Covington, including funding an expansion to the emergency department and (2) funding a reserve fund if necessary.
20. L12-517 - Webster Parish School Board, School District No. 6 - Not exceeding $8,750,000 General Obligation School Refunding Bonds, not exceeding 4.5%, mature no later than March 1, 2030, refunding all or any portion of General Obligation School Bonds, Series 2005.
3
TAB 6 - STATE AGENCIES, BOARDS & COMMISSIONS
21. S12-041 - Louisiana Agricultural Finance Authority (Agricultural Loan Acquisition Project) - Not exceeding $7,000,000 Revenue Bonds, Series 2012, not exceeding 5% fixed rate, not exceeding 10 years, acquisition of certain agricultural loans incurred by Lake Charles Cane - Lacassine Mill,L.L.C. as follows: (1) Fixed Rate Promissory Notes, Series 2006 issued in the original principal amount of $7,000,000 and currently outstanding in the amount of $3,500,000, the sole holder of which is Bank of America Merrill Lynch and (2) Jeff Davis Bank and Trust Company Loan issued in the original principal amount of $4,000,000 and currently outstanding in the amount of $2,800,000.
TAB 7 - POLITICAL SUBDIVISIONS - BONDS
22. S12-034 - Louisiana Community Development Authority (Summit Live Oak Manor, LP Project) - Not exceeding $6,500,000 Multifamily Housing Revenue Bonds (Volume Cap), in one or more series, not exceeding 6%, not exceeding 40 years, acquisition, rehabilitation and equipping of a 119 unit multifamily housing complex located in Abbeville.
23. S12-040 - Louisiana Community Development Authority (GMF - Pare Fontaine, LLC Project)- Not exceeding $35,000,000 Multifamily Housing Revenue Bonds, in one or more series, approximately $34,000,000 Tax-Exempt and approximately $1,000,000 Taxable, not exceeding 8%, not exceeding 40 years, (1) acquisition, rehabilitation and equipping a 702 unit multifamily housing complex located in New Orleans and (2) fund a reserve fund.
TAB 9 - PUBLIC TRUSTS - FINAL APPROVAL AND/OR SALE
24. S12-039 - Louisiana Public Facilities Authority (Impala Warehousing (US) LLC Project) - Not exceeding $130,000,000 Revenue Bonds, in one or more series, not exceeding 12%, fixed or variable, not exceeding 30 years, (1) acquisition, construction, reconstruction, refurbishment, improvement and equipping of a marine terminal for handling bulk materials located in Burnside and(2) funding interest on Bonds during construction.
TAB 10 - RATIFICATIONS AND/OR AMENDMENTS TO PRIOR APPROVALS
25. L08-467B - Lafayette Parish, City of Broussard - Amendment of prior approvals granted on November 20, 2008 and August 20, 2009 to reflect change in cost of issuance and professionals.
26. L12-019A - Lafayette Parish, City of Scott - Amendment of a prior approval granted on March 15, 2012 to reflect change in cost of issuance and professionals.
27. L12-035A - Allen Parish School Board, School District No. 5 - Amendment of a prior approval granted on February 16, 2012 to reflect change in cost of issuance.
28. L12-181A - Washington Parish, City of Bogalusa - Amendment of a prior approval granted on April 19, 2012 to reflect change in cost of issuance and professionals.
29. L12-254A - Ouachita Parish, City of Monroe - Amendment of a prior approval granted on June 21, 2012 to reflect change in cost of issuance and professionals.
30. L12-339A - St. Tammany Parish, Village of Folsom - Amendment of a prior approval granted on August 16, 2012 to reflect change in cost of issuance and professionals.
31. S08-032A - Louisiana Housing Finance Agency (Woodcrest Apartments Project) - Amendment of a prior approval granted on June 19, 2008 to reflect change in cost of issuance and professionals.
4
32. S09-056B - East Baton Rouge Mortgage Finance Authority - Amendment of prior approvals granted on November 19, 2009 and December 17, 2009 to reflect change in cost of issuance and professionals.
33. Sll-047A - Louisiana Housing Finance Agency (The Garden Senior Apartments Project) - Amendment of a prior approval granted on October 20, 2011 to reflect change in cost of issuance and professionals.
34. Sll-052B - Louisiana Community Development Authority (Algiers Development District Project) - Ratification of prior approvals granted on October 20, 2011 and July 19, 2012 to reflect a change in cost of issuance.
35. S12-018A - Lafayette Public Trust Financing Authority (Ragin Cajuns Facilities, Inc. Project) - Amendment of a prior approval granted on July 19, 2012 to reflect change in cost of issuance and professionals.
36. S12-025A - Louisiana Community Development Authority (Parking Facilities Corporation Garage Project) - Amendment of a prior approval granted on August 16, 2012 to reflect change in cost of issuance and professionals
TAB 10 - CERTIFICATES OF IMPOSSIBILITY OR IMPRACTICALITY - PRIORITY 1
37. Consideration of Certificates of Impossibility or Impracticality request submitted by Office of the Commissioner, Division of Administration, Office of the Governor, for a rescission of cash lines of credits for projects previously approved as Priority 1 cash lines of credit in amount of $25,960,000 as listed in the attached exhibit.
TAB 10 - RESCISSION OF CASH LINES OF CREDIT - PRIORITY 1
38. Consideration of a request submitted by Office of the Commissioner, Division of Administration, Office of the Governor, issued for a rescission of cash lines of credits for projects previously approved as Priority 1 cash lines of credit in amount of $25,960.000 as listed in the attached exhibit.
TAB 10 - CASH LINES OF CREDIT - PRIORITY 2
39. Resolution setting forth the official intent by the State Bond Commission to reimburse lines of credit expenditures with proceeds of general obligation bonds for requests submitted by the Office of the Commissioner, Division of Administration, Office of the Governor, for the granting of lines of credit and authorization to issue general obligation bonds in the amount of $181,820,000 for projects listed and contained in Priority 2 of the current Capital Outlay Act (Act 23 of the 2012 Regular Legislative Session) and listed in the attached exhibit.
TAB 10 - NON-CASH LINES OF CREDIT - PRIORITY 5
40. Request submitted by the Office of the Commissioner, Division of Administration, Office of the Governor, for the granting of lines of credit for which no cash expenditures will be made this fiscal year in the amount of $386,070,000 for projects contained in Priority 5 of the current Capital Outlay Act (Act 23 of 2012 Regular Legislative Session) and listed in the attached exhibit.
5
TAB 10 - OTHER BUSINESS
41. State of Louisiana Highway Improvement Revenue Bonds, Series 2012 General Bond Resolution.
42. Louisiana Stadium and Exposition DistrictAn Executive Session, in accordance with Louisiana Law, may be held to discuss the issue(s) related to the Series 2006 A, B, C, & D.
43. Adjourn.
In compliance with Americans with Disabilities Act. contact DeNesia Anderson at (225) 342- 0067 to advise special assistance is needed and describe the type o f assistance necessary.
Item No. 37
CERTIFI CATE OF I MPOSSIBILITY OR IMPRACTICALITY
Pursuant to the Louisiana Revised Statute 39:1410.32, as Director of the Office of Facility Planning and Control,I, John L. Davis, Director, DO HEREBY CERTIFY:
That at this time it Is either Impossible or impractical to proceed with the funding of the following Act 23 of 2012 project below due to the reason shown below. This certification is made with the understanding that if at a later date it Is determined that it is possible or practical to proceed with the funding of the project, then this certificate may be rescinded by the State Bond Commission.
DIVISJON OF ADMINISTRATIONCapitol Complex Acquisitions, Demolitions, Sitework, Construction and Renovation of Facilities (East Baton Rouge)Priority 1 $19,440,000
Reason:The project's current schedule indicates that the amount requested is not needed for cash flowi n FY 2012-13.
November 7, 2012 ....Q John L. Davis
Director, Office of Facility Planning and Control
CERTIFICATE OF IMPOSSIBILITY OR
Pursuant to the Louisiana Revised Statute 39:1410.32, as Undersecretary of Louisiana Economic Development, I,Anne G. Villa, DO HEREBY CERTIFY:
That at this time it is either impossible or impractical to proceed with the funding of the following Act 23 of 2012 project below due to the reason shown below. This certification is made with the understanding that if at a later date it is determined that it is possible or practical to proceed with the funding of the project, then this certificate may be rescinded by the State Bond Commission.
DEPARTMENT OF ECONOMIC DEVELOPMENTAerospace Manufacturing Infrastructure(Orleans) Priority 1 $4,985,000
Reason:The project's current schedule indicates that the amount requested is not needed for cash flow in FY 2012-13.
November 7, 2012
Anne G. VillaUndersecretary, Louisiana Economic Development
CERTI FICATE OF IMPOSSIBILITY OR
Pursuant to the Louisiana Revised Statute 39:1410.32, as Director of the Office of Facility Planning and Control,I,John L Davis, Director, DO HEREBY CERTIFY:
That at this time it is either impossible or impractical to proceed with the funding of the following Act 23 of 2012 project below due to the reason shown below. This certification is made with the understanding that if at a later date it is determined that it is possible or practical to proceed with the funding of the project, then this certificate may be rescinded bythe State Bond Commission.
GREATER NEW ORLEANS SUPPORTS AND SERVICES CENTEREmergency Generator Upgrade/Replacement, Peltier Lawless Developmental Center,Planning and Construction(Lafourche)Priority 1 $650,000
Reason:The project's current schedule indicates that the amount requested is not needed for cash flow in FY 2012-13.
November 7, 2012
V-John L. DavisDirector, Office of Facility Planning and Control
CERTIFICATE OF I MPOSSIBILITY OR I
...
Pursuant to the Louisiana Revised Statute 39:1410.32, as Director of the Office of Facility Planning and Control, I, John L. Davis, Director, DO HEREBY CERTIFY:
That at this time it is either impossible or impractical to proceed with the funding of the following Act 23 of 2012 project below due to the reason shown below. This certification is made with the understanding that if at a later date it is determined that it is possible or practical to proceed with the funding of the project, then this certificate may be rescinded by the State Bond Commission.
LSU HEALTH SCIENCES CENTER HEALTH CARE SERVICES DIVISIONNew Maintenance Building and Hospital Repairs (Lafayette)Priority 1 $150,000
Reason:The project's current schedule indicates that the amount requested is not needed for cash flow in FY 2012-13.
November 7, 2012
CERTIFICATE OF IMPOSSIBILITY OR
Pursuant to the Louisiana Revised Statute 39:1410.32, as Director of the Office of FacilityPlanning and Control,I,John L. Davis, Director, DO HEREBY CERTIFY:
That at this time it is either impossible or impractical to proceed with the funding of the following Act 23 of 2012 project below due to the reason shown below. This certification is made with the understanding that if at a later date it is determined that it is possible or practical to proceed with the funding of the project, then this certificate may be rescinded by the State Bond Commission.
LOUISIANA SCHOOL FOR THE VISUALLY IMPAIREDRemoval of Existing Modular Building and Replacement Modular Building{East Baton Rouge)Priority 1 $160,000
Reason:The projecrs current schedule indicates that the amount requested is not needed for cash flowin FY 2012-13.
November 7, 2012 ,I J. DavisDirector, Office of Facility Planning and Control
CERTIFICATE OF IMPOSSIBILITY OR
Pursuant to the Louisiana Revised Statute 39:1410.32, as Director of the Office of Facility Planning and Control, I, John L. Davis, Director, DO HEREBY CERTIFY:
That at this time it is either impossible or impractical to proceed with the funding of the following Act 23 of 2012 project below due to the reason shown below. This certification is made with the understanding that if at a later date it is determined that it is possible or practical to proceed with the funding of the project, then this certificate may be rescinded by the State Bond Commission.
CADDO PARISHCaddo Parish Fire District Number 3, GM Fire Station, Planning and Construction (In-Kind Match)(Caddo)Priority 1 $165,000
Reason:The project's current schedule indicates that the amount requested is not needed for cash flow in FY 2012-13.
November 7, 2012 oDavis
.....
Director, Office of Facility Planning and Control
CERTIFICATE OF IMPOSSIBI LITY OR
-
Pursuant to the Louisiana Revised Statute 39:1410.32, as Director of the Office of Facility Planning and Control,I,John L. Davis, Director, DO HEREBY CERTIFY:
That at this time it is either impossible or impractical to proceed with the funding of the following Act 23 of 2012 project below due to the reason shown below. This certification is made with the understanding that if at a later date it is determined that it is possible or practical to proceed with the funding of the project, then this certificate may be rescinded by the State Bond Commission.
EAST CARROLL PARISHGovernment and/or Head Start Complex, Planning and Construction (East Carroll)Priority 1 $175,000
Reason:The project's current schedule indicates that the amount requested is not needed for cash flow in FY 2012-13.
November 7, 2012 c14-) JDavisDirector, Office of Facility Planning and Control
CERTIFICATE OF IMPOSSIBILITY OR
Pursuant to the Louisiana Revised Statute 39:1410.32, as Director of the Office of FacilityPlanning and Control,I,John L. Davis, Director, DO HEREBY CERTIFY:
That at this time it is either impossible or impractical to proceed with the funding of the following Act 23 of 2012 project below due to the reason shown below. This certification is made with the understanding that if at a later date it is determined that it is possible or practical to proceed with the funding of the project, then this certificate may be rescinded by the State Bond Commission.
JEFFERSON PARISHCarol Sue Avenue Drainage Improvements, Planning and Construction (Jefferson)Priority 1 $200,000
Reason:The project's current schedule indicates that the amount requested is not needed for cash flow in FY 2012-13.
November 7, 2012
CERTIFICATE OF I MPOSSIBILITY OR I
Pursuant to the Louisiana Revised Statute 39:1410.32, as Director of the Office of Facility Planning and Control, I, John L. Davis, Director, DO HEREBY CERTIFY:
That at this time it is either impossible or impractical to proceed with the funding of the following Act 23 of 2012 project below due to the reason shown below. This certification is made with the understanding that if at a later date it is determined that it is possible or practical to proceed with the funding of the project, then this certificate may be rescinded by the State Bond Commission.
JEFFERSON DAVIS PARISHJanise Road Bridge Repair, Planning and Construction (Jefferson Davis)Priority 1 $35,000
Reason:The project's current schedule indicates that the amount requested is not needed for cash flow in FY 2012-13.
November 7, 2012
John L. DavisDirector, Office of Facility Planning and Control
Item No.
Act 23 of 2012Priority 1Cash Lines of Credit Recommended to be RescindedNovember 2012 Meeting of the State Bond Commission
Agy. No. Agency Name Project ntte Parish FY13Priority 1
Priority 1 cash Unes of Credit to
be Rescinded01-107 Division of
Administrationcapital Complex Acquisitions, Demolitions, Sitework, Construction and Renovation of Facilities
East Baton Rouge
19,440,000 19,440,000
05-252 Office of Business Development
Aerospace ManufacturingInfrastructure Orleans 20,000,000 4,985,000
09-342 Greater New Orleans Supports and Services Center
Emergency Generator Upgrade/Replacement, Peltier Lawless Developmental Center, Planning and Construction
Lafourche 650,000 650,000
19-610 LSU Health Sciences Center Health care Services Division
New Maintenance Building and Hospital Repairs Lafayette 150,000 150,000
19-651
I
Louisiana School for the Visually mpaired
Removal of Existing Modular Building and Replacement Modular Building
East Baton Rouge
180,000 160,000
50-J09 caddo Parish caddo Parish Fire District Number 3, GM Fire Station, Planning and Construction {In-Kind Match)
caddo 165,000 165,000
50-J18 East carroll Parish Government and/or Head Start Complex, Planning and Construction
East carroll 175,000 175,000
50-J26 Jefferson Parish carol Sue Avenue Drainage mprovements, Planning and Construction
Jefferson 1,800,000 200,000
50-J27 Jefferson Davis Parish
Janise Road Bridge Repair, Planning and Construction
Jefferson Davis 100,000 35,000
25,960,000
Page 1 of
Item No.
Act 23 of 2012Priority 2 Cash Lines of CreditNovember 2012 Meeting of the State Bond Commission
Agy. No. Agency Name Project Tltle ParishRecommendedPriority 2 CLOC
FY12·13
01-107 Division of Administration Local Government Assistance Program Statewide 10,000,000
01-107 Division of Administration Community Water Enrichment Program Statewide 5,000,000
01-107 Division of Administration Exterior Waterproofing at the State Capitol Building, Planning and Construction
East Baton Rouge 360,000
01-109 Office of Coastal Protection and Restoration
Morganza to Gulf of Mexico Flood Control Feasibility Study, Planning, Design, Right of Way and Construction of Levees, Floodgates and Other Flood Control Systems ($100,000,000 I Local Match; $25,000,000 LocalIn-Kind Match; $442,000,000 Federal Match)
Ascension, Assumption, Iberia, berville, Lafourche, Pointe Coupee, St. Martin, St. Mary, Terrebonne, West Baton Rouge
1,500,000
01-112 Department of Military Affairs
Statewide Backlog of Maintenance and Repair (BMAR), Phase 3, and StatewideInfrastructure Rehabilitation, Phase 3
Statewide 500,000
01-124 Louisiana Stadium and Exposition District I
Zephyrs Baseball Facilities Repair, Renovation and mprovement
Jefferson 800,000
01-124 Louisiana Stadium and Exposition District
New Orleans Sports ArenaImprovements, Planning and Construction
Orleans 21,500,000
03-130 Department of Veterans Affairs
Fire Alarm/Call System, Planning and Construction East Feliciana 180,000
04-139 Secretary of State Louisiana State Exhibit Museum, Planning and Construction Caddo 200,000
05-252 Office of Business Development
Economic Development Award Program ForInfrastructure Assistance (Supplemental Funding)
Statewide 10,000,000
05-252 Office of Business Development
Louisiana Cancer Research Center in New Orleans, Planning, Construction, and Equipment
Orleans 3,000,000
06-A20 New Orleans City Park City Park Maintenance ComplexImprovements, Planning and Construction
Orleans 100,000
06-A20 New Orleans City Park New Tennis CenterImprovements, Planning and Construction Orleans 50,000
07-270 DOTO - Administration Port of Lake Charles Access Road, Planning and Construction ($3,500,000 Local Match, $17,500,000 Federal Match)
Calcasieu 500,000
07-270 DOTO - Administration LA 42 (US 61to LA 44) Widening Ascension 2,000,000
07-270 DOTO - Administration IntersectionImprovement Program, Real Estate Acquisition, Planning and Construction
Ascension 200,000
07-270 DOTO - Administration Secretary's Emergency Fund for Bridge Damages, Other Reimbursements, Local Matching Dollars, Federal Funds, and Opportunity Grants Subject to the Provisions of R.S. 48:232
Statewide 2,500,000
Act 23 of 2012Priority 2 Cash Lines of CreditNovember 2012 Meeting of the State Bond
Page 2 of
Agy. No. Agency Name Projed lttle ParishRecommended
Priority 2 CLOC FY12-13
07-270 DOTO - Administration Hooper Road Extension (LA 37 to LA 16), Environmental,Planning, Engineering, Right of Way, Utilities and Construction
East Baton Rouge, Livingston
800,000
07-270 DOTO - Administration Louisiana Highway 1Resurfacing - Plaquemine to White Castle,I Planning and Construction
berville 1,000,000
07-270 DOTO - Administration Highway 23 Elevation for Three Miles of Emergency Route Flood Protection, Planning and Construction
Plaquemines 1,000,000
07-270 DOTO - Administration State Streets, Algiers Planning and Construction Orleans 1,400,000
07-270 DOTO - Administration Jimmie Davis Bridge Rehabilitation, Planning and Construction Bossier, Caddo 1,300,000
07-270 DOTO - Administration LA 64 Widening from LA 16 to Magnolia Bridge Planning and Construction
Livingston 400,000
07-274 DOTO - Public Improvements
Bayou Dechene Reservoir, Planning, Land Acquisition and Construction
Caldwell 5,000,000
07-274 DOTO - Public Improvements
Mississippi River Levee Raising, Arkansas to Old River, Planning and Construction
Avoyelles, Concordia, East Carroll,Madison, Pointe Coupee, Tensas
500,000
08-400 Corrections - Administration
Statewide Fencing Project, Planning and Construction Statewide 600,000
08-402 Louisiana State Penitentiary
Electrical Distribution System Upgrade, Planning and Construction
West Feliciana 300,000
08-402 Louisiana State Penitentiary
Main Prison Shower and Cellblock Plumbing Upgrade, Planning and Construction
West Feliciana 165,000
09-304 Metropolitan Human Service District
New Mental Health Clinic for New Orleans Behavior, Social, and Medical Support Detox Clinic, ncluding Expansion and Renovation of the Existing Facility, Planning and Construction
Orleans 2,000,000
09-304 Metropolitan Human Service District
New Mental Health Center for Desire/Florida Mental Health Clinic,Including the Purchase, Construction or Renovation of a New Facility in New Orleans East, Planning and Construction
Orleans 1,250,000
09-320 Office of Aging and Adult Services
Replace Fire Alarm and Sprinkler System, Planning and Construction
East Feliciana 50,000
09-344 l\lorth Lake Supports and Services Center
Repairs and Renovation at the North Lake Supports and Services Center, Planning and Construction
Tangipahoa 500,000
16-513 Office of Wildlife Region 5/Lake Charles Office, Planning and Construction Calcasieu 900,000
19-604S
LSU Health Sciences Center Shreveport
High Voltage Electrical Distribution System Upgrade, Planning and Construction
Caddo 350,000
Act 23 of 2012Priority 2 Cash Lines of CreditNovember 2012 Meeting of the State Bond
Page 3 of
Agy. No. Agency Name Pn>Ject Title ParishRecommended
Priority 2 CLOC FY12-13
19-604S
LSU Health Sciences Center Shreveport
Patient Care HVAC Replacement, Planning and Construction Caddo 300,000
19-604S
LSU Health Sciences Center Shreveport
Children's Hospital, Renovation and Expansion, Planning and Construction
Caddo 1,000,000
19-607 LSU Agricultural Center Livestock Education Facility, Planning and Construction East Baton Rouge 2,140,000
19-616 Southern University Baton Rouge
Southern University Laboratory School Addition and Upgrades, Planning and Construction
East Baton Rouge 1,200,000
19-618 Southern University Shreveport
New Classroom Building, Southern University - Shreveport, Planning and Construction
Caddo 2,000,000
19-621 Nicholls State University Athletic Facilities, Renovation, Planning and Construction Lafourche 200,000
19-625 Louisiana Tech University Visual Arts Building Renovation for Business, Planning and Construction
Lincoln 500,000
19-625 Louisiana Tech University Water Distribution System Repairs and Improvements Lincoln 300,000
19-627 McNeese State University Alpha Hall Renovations, Planning and Construction Calcasieu 500,000
19-627 McNeese State University Shearman Fine Arts Building - Renovation of Existing Space, Planning and Construction
Calcasieu 340,000
19-627 McNeese State University Health/Human Performance Education Complex, Planning and Construction
Calcasieu 1,000,000
19-627 McNeese State University Contraband Bayou Erosion Retaining Wall Phase II, Planning and Construction
Calcasieu 350,000
19-629 University of Louisiana - Monroe
Stubbs Hall Reroofing, Planning and Construction Ouachita 635,000
19-634 Southeastern Louisiana University
Computer Science and Technology FacilityImprovements and Expansion, Planning and Construction
Tangipahoa 1,000,000
19-649 Louisiana Community and Technical College System
Automotive Training Facility, Planning and Construction East Baton Rouge 2,400,000
19-657 Louisiana School for Math, Science and the Arts
HVAC Issues in Caddo Hall, Planning and Construction Natchitoches 600,000
19-657 Louisiana School for Math, Science and the Arts
Stair Railings - Addressing Code Violations, Planning and Construction
Natchitoches 70,000
19-673 New Orleans Center for the Creative Arts
Replace HVAC System, Planning and Construction Orleans 700,000
Act 23 of 2012Priority 2 Cash Lines of CreditNovember 2012 Meeting of the State Bond
Page 4 of
Agy. No. Agency Name Project lltle ParishRecommendedPriority 2 CLOC
FY12·1319-731 LE. Fletcher
Technical Community College
Diesel Marine, Welding and Transportation Building for Aetcher Technical Community College
Terrebonne 200,000
19-731 LE. Fletcher Technical ICommunity College
ntegrated Petroleum Technologies Program (IPT) Lab and Classroom Building, Planning and Construction
Terrebonne 4,000,000
36-L37 I beria Parish Levee Hurricane and Conservation District
Planning, Permitting, Engineering and Right of Way Acquisition I for theIberia Hurricane Protection Master Plan
beria 250,000
36-P03 Greater Baton Rouge I Port Commission
nland River Marine Terminal Dock and Access Roadway Construction Project, Planning and Construction
West Baton Rouge 1,000,000
36-P17 Port of New Orleans Milan Upland YardImprovements, Planning and Construction Orleans 1,000,000
36-P20 St. Bernard Port Rehabilitation of Dock # 1Section A Seawall, Planning and Construction
St. Bernard 3,800,000
36-P21 Port of South Louisiana Warehouse, Planning and Construction St. John the Baptist 100,000
36-P23 Terrebonne Port Commission
Slip Dredging andImprovements for Terrebonne Port Commission Government Multi-Use Complex
Terrebonne 710,000
36-P26 Port of Lake Charles Command and Control Center at City Docks, Planning and Construction ($1,125,000 Federal and/or Local Match)
Calcasieu 300,000
36-P26 Port of Lake Charles I ndustrial Canal Dockside MonopileImprovements (LEEVAC), Planning and Construction
Calcasieu 195,000
36-P33 South Tangipahoa Parish Port
Port Manchac TerminalImprovements, Planning and Construction
Tangipahoa 470,000
36-P41 Jefferson Parish Port District
Jefferson Parish Business Park: Science and Technology Academy and Conference Center
Jefferson 500,000
36-P43 Columbia Port Commission
Railroad Spur, Planning and Construction Caldwell 670,000
36-P49 Pointe Coupee Port Commission
Pointe Coupee Parish Port Capital mprovements, Planning and Construction
Pointe Coupee 300,000
50-J03 Ascension Parish Oak Grove Community and Recreational Center, Planning and Construction
Ascension 120,000
50-J03 Ascension Parish Lamar Dixon Development, Purchase and Land Acquisition Ascension 100,000
50-J06 Beauregard Parish Lumas Road, Planning and Construction Beauregard 400,000
Act 23 of 2012Priority 2 Cash Lines of CreditNovember 2012 Meeting of the State Bond
Page 5 of
Agy. No. Agency Name Project 11tfe ParishRecommended
Priority 2 CLOCFY12·13
50-J09 Caddo Parish Caddo Parish Fire District No. 3, Station #4 Addition Planning and Construction
Caddo 165,000
50-JlO Calcasieu Parish Gravity Sewer Trunk Mains and Pumping Stations South Ward 3 and South Ward 4, Planning and Construction
Calcasieu 900,000
50-Jll Caldwell Parish Wiles Road Reconstruction, Planning and Construction Caldwell 80,000
50-Jll Caldwell Parish Parish Detention Facility, Planning and Construction Caldwell 250,000
50-J18 East Carroll Parish Courthouse and Jail Renovations East Carroll 175,000
50-J23 I beria Parish Five Lane Road Extension from Highway 675 to Highway 3212, I Planning and Construction
beria 520,000
50-J23 I beria Parish Recreational Complex, SportsIncluding Baseball, Planning and Construction (Supplemental Funding)
Iberia 100,000
50-J23 Iberia Parish Road Extension from Sidney Blanchard Road to Ed Broussard Road, Planning and Construction
Iberia 150,000
50-J26 Jefferson Parish Bayou Segnette Sports ComplexImprovements,Including Hall B Expansion, Planning and Construction
Jefferson 4,500,000
50-J26 Jefferson Parish 18th Street DrainageImprovements, Edenborn Avenue Phase 2 (18th Street to West Esplanade Avenue Canal)
Jefferson 100,000
50-J26 Jefferson Parish Airline Drive (US 61) at 17th Street Canal Drainage Crossing and Railroad Bridge Replacement, Planning and Construction
Jefferson 2,000,000
50-J26 Jefferson Parish Bonnabel Canal Rehabilitation and Bank Stabilization (Veterans Boulevard to West Esplanade), Planning and Construction
Jefferson 2,150,000
50-J26 Jefferson Parish Canal 10 Concrete Lining Widening Between Canal 7 and West Esplanade Avenue, Planning and Construction
Jefferson 50,000
50-J26 Jefferson Parish Codifier Boulevard, Homestead Avenue, and Brockenbraugh Court Subsurface DrainageImprovements, Planning and Construction
Jefferson 200,000
50-J26 Jefferson Parish Performing Arts Center Modifications Jefferson 2,600,000
50-J26 Jefferson Parish Woodmere Community Center, Real Estate Acquisition, Planning, and Construction ($15,000 Match)
Jefferson 100,000
50-J26 Jefferson Parish South Kenner Road Rehabilitation from Live Oak Boulevard to River Road, Planning and Construction
Jefferson 300,000
50-J26 Jefferson Parish Martin Luther King PlaygroundImprovements, Planning and Construction
Jefferson 100,000
Act 23 of 2012Priority 2 Cash Lines of CreditNovember 2012 Meeting of the State Bond
Page 6 of
Agy. No. Agency Name Project Title PartshRecommended
Priority 2 CLOC FY12-
1350-J26 Jefferson Parish Waggaman Subsurface DrainageImprovements, Planning and Construction
Jefferson 740,000
50-J27 Jefferson Davis Parish Third Street West Bridge Repair, Planning and Construction Jefferson Davis 40,000
50-J30 LaSalle Parish Pine Hill RoadImprovements, Planning and Construction LaSalle 665,000
50-J35 Natchitoches Parish Old River Bridge, Planning and Construction Natchitoches 535,000
50-J38 Plaquemines Parish Emergency Evacuation Complex, Planning and Construction Plaquemines 500,000
50-J38 Plaquemines Parish Belle Chasse Parks, Planning and Construction Plaquemines 100,000
50-J39 Pointe Coupee Parish False River Ecosystem Restoration Project, Planning and Construction
Pointe Coupee 500,000
50-J42 Richland Parish Sapa DriveImprovements, Planning and Construction Richland 250,000
50-J43 Sabine Parish Plainview Road Rehabilitation, Planning and Construction Sabine 1,000,000
50-J45 St. Charles Parish West Bank Hurricane Protection Levee St. Charles 525,000
50-J47 St. James Parish St. James Parish Land Acquisition, Planning and Construction St. James 1,000,000
50-J49 St. Landry Parish Hurricane Evacuations and Homeland Security Coordination and Related Renovations, Planning and Construction
St. Landry 195,000
50-J50 St. Martin Parish RoadImprovements on the Four-Mile Bayou Road, Planning and Construction
St. Martin 200,000
50-J51 St. Mary Parish I nfrastructureImprovements at the Charenton Canal ndustrial Park
St. Mary 150,000
50-J51 St. Mary Parish I nstallation of Culverts and Associated Infrastructure in Middle Road Drainage Canal - Bayou Vista La. for Sub-Gravity Drainage District #1 of St. Mary Parish Gravity Drainage District #2, Planning and Construction
St. Mary 460,000
50-J52 St. Tammany Parish St. Tammany Parish Fishing Pier, Planning and Construction St. Tammany 400,000
50-J52 St. Tammany Parish Emergency Shelter and Livestock Facility Addition, Planning and Construction
St. Tammany 980,000
50-J55 Terrebonne Parish Terrebonne Parish Consolidated Government, Upper Bayou Dularge Pump Station, Planning and Construction
Terrebonne 200,000
Act 23 of 2012Priority 2 Cash Lines of CreditNovember 2012 Meeting of the State Bond
Page 7 of
Agy. No. Agency Name Project Title ParishRecommended
Priority 2 CLOC FY12-13
50-J58 Vernon Parish Vernon/Fort Polk Thoroughfare, Planning and Construction Vernon 5,700,000
50-M05 Alexandria Sugarhouse Road/Eddie Williams Blvd. to LA Hwy. 1, Phase I and Phase II, Planning and Construction ($5,000,000 Local Match)
Rapides 500,000
50-M19 Bastrop Bastrop Central Fire Station, Replace Driveway City Hall, Roof Construction, Planning and Construction
Morehouse 200,000
50-M20 Baton Rouge Hooper Road SewerImprovements ($1,200,000 Local Match) East Baton Rouge 100,000
50-M29 Bossier City Hwy. 71 Street Lighting Project from LA 3032 (Westgate Drive) to LA 511 (Jimmie Davis Hwy), Planning and Construction
Bossier 390,000
50-M32 Broussard Three Lane LA 182 in the City of Broussard, Planning and Construction ($750,000 Local Match)
Lafayette 150,000
50-M32 Broussard Rehabilitate LA Hwy 182 from US 90 to LA Hwy 89, Planning and Construction
Lafayette 250,000
50-M32 Broussard Reconstruct South Bernard Road From LA Hwy 182 to US Hwy 90, Planning and Construction
Lafayette 150,000
50-M37 Campti Town of Campti Multi-Purpose Community Center, Planning and Construction
Natchitoches 150,000
50-M39 Carencro Wastewater and CityInfrastructure Flood Damages, Planning and Construction
Lafayette 200,000
50-M60 Delcambre Water Distribution and Storage SystemImprovements, Planning and Construction
Vermilion 450,000
50-M61 Delhi Richland Parish Recreational and Learning Center, Planning and Construction
Richland 100,000
50-M65 DeRidder Community Recreational Building and Shelter, Planning and Construction and/or Acquisition and Rehabilitation of the Existing Facility ($1,500,000 Local Match)
Beauregard 250,000
50-M69 Downsville Downsville Recreational FacilityImprovements, Planning and Construction
Lincoln 145,000
50-M93 Forest Hill Renovation of Community Facilities, Planning and Construction ($375,000 Local Match)
Rapides 150,000
50-MA5 Gonzales Improvements on LA 3038,Including Patching, Repairing, and Overlaying of the Highway, Planning and Construction
Ascension 800,000
50-MA9 Grand Coteau Police and Utility Departments Roof, Air Conditioning Unit for Town Hall, Handheld Meter Reader, Abandon and Plug Water Well
St. Landry 60,000
Act 23 of 2012Priority 2 Cash Lines of CreditNovember 2012 Meeting of the State Bond
Page 8 of
Agy. No. Agency Name Project 11tie ParishRecommended
Priority 2 CLOC FY12-13
50-MBl GrandIsle Historic Recreation Center/Community Center, Planning and Construction
Jefferson 100,000
50-MBS Gretna McDonoghville Fire Station, Land Acquisition, Planning and Construction
Jefferson 1,000,000
50-MBS Gretna Mel Ott Exterior Lighting andImprovements Jefferson 225,000
50-MBS Gretna Hancock Street CanalImprovements (Kepler Street - Virgil Street), Planning and Construction
Jefferson 250,000
50-MB7 Gueydan StreetImprovements, Planning and Construction ($112,000 Local Match)
Vermilion 150,000
50-MB9 Hammond Air Traffic Control Tower, Planning and Construction ($450,000 Local Match)
Tangipahoa 750,000
50-MB9 Hammond Police Station, Acquisition and Renovation, Planning and Construction
Tangipahoa 600,000
50-MCl Harahan Penfold Place Drainage, Planning and Construction Jefferson 50,000
50-MCS Heflin Conversion of Gym into Multipurpose Facility, Planning and Construction
Webster 150,000
50-MC9 Homer Town of Homer, Town Hall Renovations, Planning and Construction
Claiborne 150,000
50-MDl Hornbeck Emergency Connection with West Vernon Waterworks District andInline Booster Station, Planning and Construction
Vernon 300,000
50-MDl Hornbeck Emergency Connection with Anacoco Water System, Planning and Construction
Vernon 300,000
50-MDS I ndependence Sewerage Treatment and Sewer/Water Lines Repairs, Planning and Construction (Cash and/orIn-Kind Match Required)
Tangipahoa 20,000
50-MDS Independence Independence Area Community Pavilion, Planning and Construction
Tangipahoa 155,000
50-MEl Jean Lafitte Lafitte Seafood Pavilion, Planning and Construction Jefferson 100,000
SO-MES Kaplan Public Safety Complex, Planning and Construction Vermilion 150,000
50-MFl Kenner Wastewater System Corrective Measures Jefferson 250,000
50-MFl Kenner DrainageImprovements AlongIdaho Avenue, 26th Street to West Napoleon Canal, Planning and Construction
Jefferson 150,000
Act 23 of 2012Priority 2 Cash Lines of CreditNovember 2012 Meeting of the State Bond
Page 9 of
Agy. No. Agency Name Project 11t:le ParishRecommendedPriority 2 CLOC
FY12·1350-MF9 Lake Charles National Hurricane Museum and Science Center, Planning
and ConstructionCalcasieu 300,000
50-MH3 Loreauville Loreauville Wastewater Treatment PlantImprovements and Demolition Project, Planning and Construction
Iberia 65,000
50-MH3 Loreauville Loreauville Water TowerImprovements, Planning and Construction
Iberia 50,000
50-MHB Mandeville Mandeville Trailhead Property Acquisition, Planning and Construction
St. Tammany 400,000
50-MJ5 Minden Potable Water Ground Storage Tank, Planning and Construction
Webster 215,000
50-MJB Montpelier Administration Building, Acquisition, Planning and Construction St. Helena 190,000
50-MK2 Morgan City Lake End Parkway Cabins, Planning and Construction St. Mary 1,000,000
50-ML2 New Llano StreetImprovements, Planning and Construction Vernon 75,000
50-ML3 New Orleans Behrman ParkImprovements - New Soccer Facility, Planning and Construction, Master Planning
Orleans 500,000
50-ML3 New Orleans Fourth District Police Station, Planning and Construction Orleans 300,000
50-ML3 New Orleans Algiers Playgrounds, Renovation of Restrooms, Lighting, Fencing, and Playground Equipment
Orleans 225,000
50-ML3 New Orleans Algiers Fire Station, Planning and Construction Orleans 150,000
50-ML3 New Orleans George W. Carver Playground, Renovations and Upgrades, Including Repair and Renovation of Basketball Courts andPavilion, Renovations to Bathrooms and Concession Building, Demolition of Existing Playground andInstallation of New Play Equipment, Planning and Construction
Orleans 450,000
50-ML3 New Orleans Taylor Pool and Playground, Renovations and Upgrades,Including Repair and Renovation of Basketball Courts and Pavilion, Replacing Perimeter Fencing,Installation of New Water Fountains, and Re-Grade Fields, Planning and Construction
Orleans 250,000
50-MM4 Oil City Highway 538 Water Line Extension, Planning and Construction Caddo 425,000
50-MN5 Plain Dealing Wastewater Treatment PlantImprovements, Planning and Construction
Bossier 160,000
50-M09 Rayville Railroad Spur, Planning and Construction Richland 250,000
Act 23 of 2012Priority 2 Cash Lines of CreditNovember 2012 Meeting of the State Bond
Page 10 of
Agy. No. Agency Name PfoJeCt Title ParishRecommended Priority 2 CLOC
FYU-1350-MQl Rosepine Rosepine Wastewater Treatment Plant
Improvements, Planning and ConstructionVernon 550,000
50-MQl Rosepine Water SystemImprovements, Town of Rosepine, Planning and Construction
Vernon 200,000
50-MQ3 St. FrancisvilleINatural Gas Distribution System Rehabilitation and mprovement, Planning and Construction
West Feliciana 305,000
50-MQ5 St. Martinville Sewer Upgrade, Planning and Construction St. Martin 350,000
50-MQ8 ScottII
Apollo Road Extension (Rue Du Belier and Dulles Drive ntersection to Old Spanish Trail and Apollo Road ntersection), Planning, Construction, and Land Acquisition
Lafayette 500,000
50-MQ8 Scott Scott Events Center, Planning and Construction Lafayette 60,000
50-MR2 Sibley Wastewater CollectionImprovements, Planning and Construction
Webster 100,000
50-MR4 Sikes Village of Sikes Water System Extensions andImprovements, Planning and Construction
Winn 1,000,000
50-MR7 Simsboro Water Well and Water Main Lincoln 50,000
50-MR7 Simsboro Village of Simsboro Renovate "Old" Fire Station into Town Hall, Planning and Construction
Lincoln 100,000
50-MS4 Springfield Water System Planning and Construction Livingston 400,000
50-MS5 Springhill Wastewater Collection SystemImprovements, Planning and Construction
Webster 75,000
50-MS7 Sterlington Service Road, Planning and Construction Ouachita 120,000
50-MT6 Tickfaw DrainageImprovements on Highway 442 East and West, Planning and Construction
Tangipahoa 115,000
50-MU2 Vidalia Development of a Slackwater Port on the Mississippi River, Planning and Construction
Concordia 1,000,000
50-MU5 Vinton Town of Vinton, Vinton StreetImprovements Calcasieu 200,000
50-MU6 Vivian Water and Wastewater SystemImprovements and Extension, Planning and Construction
Caddo 250,000
50-MU6 Vivian Town of Vivian, StreetImprovements, Planning and Construction
Caddo 400,000
50-MU7 Walker Widening of Highway 447 andI-12 OverpassImprovements, Environmental Phase Commencement, Planning and Construction
Livingston 300,000
Act 23 of 2012Priority 2 Cash Lines of CreditNovember 2012 Meeting of the State Bond
Page 11 of
Agy No. Agency Name Pnlject ntte ParishRecommended
Priority 2 CLOC FY12-13
50-MV2 West. Monroe Creation of a Hurricane/Disast.er Shelter by Expanding the West. Ouachita Senior Center, Planning and Const.ruction
Ouachita 30,000
50-MV3 West.lake Ellis and Linda DriveImprovements, City of West.lake, Planning and Const.ruction
Calcasieu 750,000
50-MV4 Westwego Park Land andImprovements, IncludingImprovements to Exist.ing Parks and Land Acquisition, Planning and Const.ruction
Jefferson 800,000
50-MV4 Westwego Sala Avenue Street andInfrastructureImprovements Jefferson 150,000
50-MV4 Westwego Water PlantImprovements, Planning and Const.ruction (50% Local Match)
Jefferson 1,000,000
50-MW2 Youngsville Community Center, Planning and Construction Lafayette 200,000
50-MW8 Central Administration Building East. Baton Rouge 150,000
50-MW8 Central Expand, Repair, and Modify City of Central Drainage Syst.em, Planning and Const.ruction
East. Baton Rouge 100,000
50-N05 New Orleans Exhibition Hall
Hall A Renovation, Planning and Construction Orleans 10,000,000
50-N07 St. Bernard Parish Sheriff
Arabi Sub-Station, Planning and Const.ruction St. Bernard 200,000
50-N12 Louisiana Children's Museum
Louisiana Children's Museum Early Learning Village, Planning and Design
Orleans 485,000
50-N25 WYES TV New Orleans WYES Katrina Rebuilding/Equipment Project, Planning and Const.ruction
Orleans 1,000,000
50-N51 N.O. Jazz & Heritage Foundation
The Jazz & Heritage Center Renovation and Addition 1225 North Rampart, Planning and Const.ruction
Orleans 75,000
50-N62 Plaquemines Parish Law Enforcement District
Sheriff's Training Center, Planning and Const.ruction Plaquemines 60,000
50-N74 National World War II Museum
Natl. WWII Museum Campaigns Gallery Exhibits Const.. and LA Memorial Pavilion Train Station ExperienceIncluding Connecting Higgins Ped. Bridge and Canopy, Planning and Const.ruction
Orleans 750,000
50-N98 Kingsley House Kingsley House Renovations, New Const.ruction, and Major Repairs
Orleans 100,000
50-NA2 Lafayette Airport Commission
Const.ruction of Cargo Facilities, Planning and Construction Lafayette 4,500,000
50-NAH West Carroll Parish Sheriff
West. Carroll Parish Jail Education and Visitation Room, Planning and Const.ruction
West. Carroll 55,000
Act 23 of 2012Priority 2 Cash Lines of CreditNovember 2012 Meeting of the State Bond
Page 12 of
Agy. No. Agency Name Project lltle ParishRecommended PrioritylCLOC
FY12-1350-NAY Ogden Museum
of Southern ArtOgden Museum{raylor Library Renovation, Planning and Construction
Orleans 265,000
50-NBB Lighthouse for the Blind Economic Development Project, Planning and Construction Orleans 500,000
50-NC2 Baton Rouge Recreation and Parks Commission
Central Community Sports Park, Planning and Construction East Baton Rouge 150,000
50-NCN South Toledo Bend Waterworks District
Esto Booster Station Discharge and Supply Line Replacement Sabine 65,000
50-ND3 Orleans Parish Sheriff Mental Health Facility, Planning and Construction Orleans 100,000
50-NFU Jackson Parish Dugdemona Water Authority
Jackson-Bienville Reservoir, Planning and Construction Jackson 200,000
50-NG2 Northshore Harbor Center
Northshore Harbor Center Purchase of Additional Equipment St. Tammany 175,000
50-NI9 Ascension-St. JamesAirport
Automobile Parking LotImprovements for the Louisiana Regional Airport
Ascension 50,000
50-NJP Waterworks District #1 DeSoto Parish
Water SystemImprovements and Extension, Planning and Construction ($1,977,300 Local Match)
DeSoto 100,000
50-NLR Horseshoe Road Water System,Inc.
Horseshoe Water System, Planning and Construction Webster 125,000
50-NM3 Natchitoches Council on Aging
Reconstruct Natchitoches Parish Council on Aging Activities Building, Planning and Construction
Natchitoches 700,000
50-NMG Livingston Association for Retarded Children,Inc. I
New Facility for Livingston Association for Retarded Children, nc. Planning and Construction
Livingston 230,000
50-NML Gretna Police Department
Gretna Police Department, Construction of Armory, Elevation/Flood Proofing/Wind Retrofit, Planning and Construction
Jefferson 940,000
50-NNL Hungarian Settlement Historical Society
Hungarian Settlement Historical Museum, Planning and Construction
Livingston 170,000
50-NPD Iberia Economic Development Authority
Progress Point Business Park and Airport Gateway, Land IAcquisition
beria 1,075,000
50-NPW Avondale Booster Club Avondale Booster Club and Playground Upgrades, Planning and Construction
Jefferson 400,000
50-NQV Beauregard Parish Waterworks District #6
Water SystemImprovements, Planning and Construction Beauregard 25,000
Act 23 of 2012Priority 2 Cash Lines of CreditNovember 2012 Meeting of the State Bond
Page 13 of
Agy. No. Agency Name Project TIUe ParishRecommended Priority 2 CLOC
FYU-1350-NRO Natchitoches
Communications DistrictNatchitoches Parish Emergency Communications District, Planning and Construction
Natchitoches 500,000
50-NRS l\lorth DeSoto Water SystemInc.
Expansion andImprovements to the Water System, Planning and Construction
DeSoto 100,000
50-NSI Walker Community Water System,Inc.
Water Distribution System Expansion, LA 810 Extension, Planning and Construction
Jackson 600,000
50-NSM Natchitoches Veterans Memorial Park Commission
Natchitoches Veterans and Memorial Park, Planning and Construction
Natchitoches 50,000
50-NSR Junior League of Greater New Orleans
Renovate Headquarters Building,Including HVAC System, Planning and Construction
Orleans 65,000
50-NSR Junior League of Greater New Orleans
Renovate Thrift Shop and Annex,Including Parking Lot, Planning and Construction
Orleans 135,000
50-NSR Junior League of Greater New Orleans
Renovate Annex Building and Re-Purpose Space,Including Installation of Handicap Accessibility Ramp and Bathroom Upgrades, Planning and Construction
Orleans 200,000
50-NSS Louisiana Emergency Medical Unit
Louisiana Emergency Medical Unit Storage Facility, Planning and Construction
Lafayette 125,000
50-NST Downtown Development District
Improvements to Girod Street, Planning and Construction Orleans 300,000
50-NSU Bayou Civic Club Facilities Upgrade/Roof and Kitchen, Planning and Construction
Lafourche 135,000
50-NT2 Mercy Endeavors I rish Channel St. Andrew Street Elderly Resource Center, Planning and Construction
Orleans 75,000
50-NWl Union Parish Law Enforcement District
New Law Enforcement/Services/Training/Emergency Shelter Complex, Planning and Construction ($500,000 Local n-Kind Match; $1,100,000 Federal Match)
Union 50,000
181,820,000
Page 1
Item No. 40
Act 23 of 2012Priority S Noncash Lines of CreditNovember 2012 Meeting of the State Bond Commission
IAgy. No.!li ..,
Agency Name Project lltle ParishRecommended
Priority 5 NLOC FY12-13
01-107 Division of Administration Community Water Enrichment Program Statewide 5,000,000
01-107 Division of Administration Exterior Waterproofing at the State capitol Building, Planning and Construction
East Baton Rouge 3,800,000
01-109 Office of Coastal Protection and Restoration
Morganza to Gulf of Mexico Flood Control Feasibility Study, Planning, Design, Right of Way and Construction of Levees, Floodgates and Other Flood Control Systems ($100,000,000 Local Match; $25,000,000 Local n-Kind Match; $442,000,000 Federal Match)
Ascension, Assumption, Iberia,
Iberville, Lafourche, Pointe Coupee, St. Martin, St. Mary, Terrebonne, West Baton Rouge
25,000,000
01-124 Louisiana Stadium and Exposition District
Zephyrs Baseball Facilities Repair, Renovation and Improvement
Jefferson 1,000,000
01-124 Louisiana Stadium and Exposition District
Professional Sports Facilities, Planning and Construction and Lease HoldImprovements
Jefferson, Orleans 10,000,000
01-124 Louisiana Stadium and Exposition District
New Orleans Sports ArenaImprovements, Planning and Construction
Orleans 20,000,000
04-139 Secretary of State Louisiana State Exhibit Museum, Planning and Construction Caddo 1,800,000
07-270 DOTO - Administration Port of Lake Charles Access Road, Planning and Construction ($3,500,000 Local Match, $17,500,000 Federal Match)
Calcasieu 4,500,000
07-270 DOTO - Administration LA 42 (US 61 to LA 44) Widening Ascension 27,000,000
07-270 DOTO - Administration Louisiana Highway 1Resurfacing - Plaquemine to White Castle,I Planning and Construction
berville 8,000,000
07-270 DOTO - Administration Highway 23 Elevation for Three Miles of Emergency Route Flood Protection, Planning and Construction
Plaquemines 5,000,000
07-270 DOTO - Administration State Streets, Algiers Planning and Construction Orleans 1,000,000
07-270 DOTO - Administration Jimmie Davis Bridge Rehabilitation, Planning and Construction Bossier, Caddo 9,200,000
07-274IDOTO - Public mprovements
Bayou Dechene Reservoir, Planning, Land Acquisition and Construction
Caldwell 12,000,000
Page 2
Act 23 of 2012Priority 5 Noncash Lines of CreditNovember 2012 Meeting of the State Bond Commission
Agy. No. AgetJCY Name Project Titfe ParishRecommendedPriority 5 NLOC
FY12·13
07-274IDOTO - Public mprovements
Mississippi River Levee Raising, Arkansas to Old River, Planning and Construction
Avoyelles, Concordia, East Carroll,Madison, Pointe Coupee, Tensas
1,500,000
08-400 Corrections - Administration
Statewide Fencing Project, Planning and Construction Statewide 8,000,000
08-402 Louisiana State Penitentiary
Electrical Distribution System Upgrade, Planning and Construction
West Feliciana 2,680,000
08-403 Office of Juvenile Justice Community Based Program, Juvenile JusticeImprovements, Planning, Construction, Renovation, Acquisition, and Equipment
Statewide 2,000,000
09-304 Metropolitan Human Service District
New Mental Health Clinic for New Orleans Behavior, Social, and Medical Support Detox Clinic,Including Expansion and Renovation of the Existing Facility, Planning and Construction
Orleans 2,500,000
09-304 Metropolitan Human Service District
New Mental Health Center for Desire/Florida Mental Health Clinic,Including the Purchase, Construction or Renovation of a New Facility in New Orleans East, Planning and Construction
Orleans 2,000,000
11-431 Natural Resources - Office of the Secretary
Atchafalaya Basin Protection and Enhancement (Federal Match and Local/Sponsor Match)
I
Assumption, Avoyelles,Iberia, berville, Pointe Coupee, St. Landry, St. Martin, St. Mary
3,000,000
16-513 Office of Wildlife Region 5/Lake Charles Office, Planning and Construction Calcasieu 8,100,000
19-604S
LSU Health Sciences Center Shreveport
High Voltage Electrical Distribution System Upgrade, Planning and Construction
Caddo 5,050,000
19-604S
LSU Health Sciences Center Shreveport
Patient Care HVAC Replacement, Planning and Construction Caddo 2,700,000
19-604S
LSU Health Sciences Center Shreveport
Children's Hospital, Renovation and Expansion, Planning and Construction
Caddo 9,000,000
19-618 Southern University Shreveport
New Classroom Building, Southern University - Shreveport, Planning and Construction
Caddo 3,800,000
19-625 Louisiana Tech University Water Distribution System Repairs andImprovements Lincoln 2,650,000
19-627 McNeese State University Shearman Fine Arts Building - Renovation of Existing Space, Planning and Construction
Calcasieu 4,060,000
Page 3
Act 23 of 2012Priority 5 Noncash Lines of CreditNovember 2012 Meeting of the State Bond Commission
:Agy. No. Agency Name Projea 11tle ParishRecommended
Priority 5 NLOC
FY12·1319-627 McNeese State University Frazar Memorial Library Renovation and Repairs, Planning
and ConstructionCalcasieu 2,000,000
19-627 McNeese State University Contraband Bayou Erosion Retaining Wall Phase II, Planning and Construction
Calcasieu 3,875,000
19-634 Southeastern Louisiana University
Computer Science and Technology FacilityImprovements and Expansion, Planning and Construction
Tangipahoa 18,000,000
19-649 Louisiana Community and Technical College System
Automotive Training Facility, Planning and Construction East Baton Rouge 11,500,000
19-649 Louisiana Communityand Technical College System
Winnsboro Campus of Delta Community College, Acquisition, Planning, and Construction
Franklin 900,000
19-673 New Orleans Center forthe Creative Arts
Replace HVAC System, Planning and Construction Orleans 50,000
19-673 New Orleans Center for the Creative Arts
Press Street Studios Furniture/Fixtures/Equipment, Planning and Construction
Orleans 50,000
36-P03 Greater Baton Rouge I Port Commission
nland River Marine Terminal Dock and Access Roadway Construction Project, Planning and Construction
West Baton Rouge 2,200,000
36-P17 Port of New Orleans Milan Upland YardImprovements, Planning and Construction Orleans 9,165,000
36-P40 GrandIsle Port Commission
Port Access Road and New Commercial Boat Slip Facility Jefferson 1,000,000
36-P41 Jefferson Parish Port District
Jefferson Parish Business Park: Science and Technology Academy and Conference Center
Jefferson 5,500,000
36-P43 Columbia Port Commission
Railroad Spur, Planning and Construction Caldwell 1,340,000
36-P49 Pointe Coupee Port Commission
Pointe Coupee Parish Port capital mprovements, Planning and Construction
Pointe Coupee 500,000
50-J08 Bossier Parish Cotton Valley Road Reconstruction, Planning and Construction Bossier 255,000
50-JlO calcasieu Parish Gravity Sewer Trunk Mains and Pumping Stations South Ward 3 and South Ward 4, Planning and Construction
Calcasieu 4,000,000
Page 4
50-Jll Caldwell Parish Parish Detention Facility, Planning and Construction Caldwell 1,370,000
Act 23 of 2012Priority 5 Noncash Lines of CreditNovember 2012 Meeting of the State Bond
Page 5
Agy. No. Agency Name Project Tide ParishRecommended
Priority 5 NLOC
FY12·1350-)26 Jefferson Parish Bonnabel Canal Rehabilitation and Bank Stabilization (Veterans
Boulevard to West Esplanade), Planning and ConstructionJefferson 2,200,000
50-)26 Jefferson Parish Performing Arts Center Modifications Jefferson 3,400,000
50-)26 Jefferson Parish Terry Parkway Drainage Between Carol Sue Drive andIndustry Canal, Planning and Construction ($500,000 Local Match)
Jefferson 5,000,000
50-J26 Jefferson Parish South Kenner Road Rehabilitation from Live Oak Boulevard to River Road, Planning and Construction
Jefferson 3,700,000
50-J32 Livingston Parish Cook Road Extension Economic Development Corridor (Pete's Highway Frontage Road)
Livingston 4,000,000
50-J38 Plaquemines Parish Peters Road Bridge and Extension, Planning and Construction Jefferson, Plaquemines
19,500,000
50-J38 Plaquemines Parish Emergency Evacuation Complex, Planning and Construction Plaquemines 1,750,000
50-J39 Pointe Coupee Parish False River Ecosystem Restoration Project, Planning and Construction
Pointe Coupee 2,200,000
50-J43 Sabine Parish Plainview Road Rehabilitation, Planning and Construction Sabine 3,000,000
50-J47 St. James Parish St. James Parish Land Acquisition, Planning and Construction St. James 6,000,000
50-)58 Vernon Parish Vernon/Fort Polk Thoroughfare, Planning and Construction Vernon 3,675,000
50-M19 Bastrop Bastrop Central Fire Station, Replace Driveway City Hall, Roof Construction, Planning and Construction
Morehouse 250,000
50-M29 Bossier City Hwy. 71 Street Lighting Project from LA 3032 (Westgate Drive) to LA 511 (Jimmie Davis Hwy), Planning and Construction
Bossier 390,000
50-M32 Broussard Three Lane LA 182 in the City of Broussard, Planning and Construction ($750,000 Local Match)
Lafayette 2,100,000
50-M37 Campti Town of Campti Multi-Purpose Community Center, Planning and Construction
Natchitoches 50,000
50-M39 Carencro Wastewater and CityInfrastructure Flood Damages, Planning and Construction
Lafayette 5,770,000
Act 23 of 2012Priority 5 Noncash Lines of CreditNovember 2012 Meeting of the State Bond
Page 6
Agy. No. Agency Nilme Project 11tle ParishRecommended
Priority 5 NLOC
FY12·1350-M64 Dequincy New City Hall, Planning and Construction Calcasieu 1,050,000
50-MB5 Gretna Hancock Street CanalImprovements (Kepler Street - Virgil Street), Planning and Construction
Jefferson 1,700,000
50-MC5 Heflin Conversion of Gym into Multipurpose Facility, Planning and Construction
Webster 335,000
50-MDl Hornbeck Emergency Connection with West Vernon Waterworks District andInline Booster Station, Planning and Construction
Vernon 600,000
50-MJ5 Minden Potable Water Ground Storage Tank, Planning and Construction
Webster 320,000
50-MK9 Natchitoches South Natchitoches DrainageImprovements, including Adjacent Roadwork, Planning and Construction
Natchitoches 1,000,000
50-ML3 New Orleans Eastern New Orleans Hospital, Planning, Design, and Construction
Orleans 7,000,000
50-MN5 Plain Dealing Wastewater Treatment PlantImprovements, Planning and Construction
Bossier 160,000
50-MQl Rosepine Rosepine Wastewater Treatment PlantImprovements, Planning and Construction
Vernon 1,070,000
50-MQB Scott Apollo Road Extension (Rue Du Belier and Dulles Drive Intersection to Old Spanish Trail and Apollo RoadIntersection), Planning, Construction and Land Acquisition
Lafayette 4,500,000
50-MR2 Sibley Wastewater CollectionImprovements, Planning and Construction
Webster 365,000
50-MR4 Sikes Village of Sikes Water System Extensions andImprovements, Planning and Construction
Winn 700,000
50-MS4 Springfield Water System Planning and Construction Livingston 400,000
50-MU2 Vidalia Development of a Slackwater Port on the Mississippi River, Planning and Construction
Concordia 4,000,000
50-MW2 Youngsville Community Center, Planning and Construction Lafayette 2,800,000
Act 23 of 2012Priority S Noncash Lines of CreditNovember 2012 Meeting of the State Bond
Page 7
Agy. No. Agency NameII
I I Project Title Part.shRecommended Priority 5 NLOC
FY12-13
50-MWS Central Administration Building East Baton Rouge 1,715,000
50-N03 The AudubonInstitute Audubon 2020 Exhibits (50% Local Match) Orleans 3,000,000
50-N05 New Orleans Exhibition Hall
Hall A Renovation, Planning and Construction Orleans 10,000,000
50-N12 Louisiana Children's Museum
Louisiana Children's Museum Early Learning Village, Planning and Design
Orleans 500,000
50-l'J25 WYES TV New Orleans WYES Katrina Rebuilding/Equipment Project, Planning and Construction
Orleans 2,000,000
50-N74 National World War II Museum
Natl. WWII Museum Campaigns Gallery Exhibits Const. and LA Memorial Pavilion Train Station ExperienceIncluding Connecting Higgins Ped. Bridge and Canopy, Planning and Construction
Orleans 16,250,000
50-N98 Kingsley House Kingsley House Renovations, New Construction, and Major Repairs
Orleans 2,965,000
50-NAY Ogden Museum of Southern Art
Ogden Museum/Taylor Library Renovation, Planning and Construction
Orleans 1,000,000
50-NBB Lighthouse for the Blind Economic Development Project, Planning and Construction Orleans 1,300,000
50-NC2 Baton Rouge Recreation and Parks Commission
Anna T. Jordan Site and FacilityImprovements (Non-State Match Required)
East Baton Rouge 345,000
50-NC2 Baton Rouge Recreation and Parks Commission
Central Community Sports Park, Planning and Construction East Baton Rouge 900,000
50-ND3 Orleans Parish Sheriff Mental Health Facility, Planning and Construction Orleans 2,000,000
50-NJP Waterworks District #1 DeSoto Parish
Water SystemImprovements and Extension, Planning and Construction ($1,977,300 Local Match)
DeSoto 965,000
50-NRO Natchitoches Communications District
Natchitoches Parish Emergency Communications District, Planning and Construction
Natchitoches 1,900,000
50-NSI Walker Community Water System,Inc.
Water Distribution System Expansion, LA 810 Extension, Planning and Construction
Jackson 200,000
386,070,000