IS5540 Project Management & Quality IS5540 Project Management & Quality AssuranceAssurance
Week 7 - Project Quality ManagementWeek 7 - Project Quality Management
Schwalbe: Managing Information Technology Projects, Chapter 8Schwalbe: Managing Information Technology Projects, Chapter 8
Adapted by Janet Yu, Frank LoAdapted by Janet Yu, Frank Lo
![Page 2: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/2.jpg)
PMI Framework: 9 Knowledge Areas
2
Integration
ScopeTime Cost
Quality
PeopleCommunication Risk
Procurement
![Page 3: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/3.jpg)
Learning Objectives Define project quality management and
understand how quality relates to various aspects of information technology projects
Understand quality planning and the components of a Quality Assurance / Management Plan
Describe what quality assurance is Describe what quality control is Understand the tools and techniques for quality
control, such as Pareto analysis, statistical sampling, Six Sigma, quality control charts, and testing
3
![Page 4: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/4.jpg)
What Is Project Quality?The International Organization for Standardization
(ISO) defines quality as “the degree to which a set of inherent characteristics fulfills requirements” (ISO9000:2000)
Other experts define quality based on:
Conformance to requirements: the project’s processes and products meet written specifications
Fitness for use: a product can be used as it was intended
4
![Page 5: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/5.jpg)
What Is Project Quality Management?
Project quality management ensures that the project will satisfy the needs for which it was undertaken
Processes include:Plan quality: identifying which quality standards are relevant
to the project and how to satisfy themPerform quality assurance: periodically evaluating overall
project performance to ensure the project will satisfy the relevant quality standards
Perform quality control: monitoring specific project results to ensure that they comply with the relevant quality standards
5
![Page 6: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/6.jpg)
Quality Planning
Quality is planned, designed, and built-in.
Quality is not inspected in.
6
![Page 7: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/7.jpg)
The Cost of QualityTotal cost to produce the product or service of the
project according to the quality standardsThe cost of quality is the cost of conformance
plus the cost of nonconformanceConformance means delivering products that meet
requirements and fitness for useCost of nonconformance means taking responsibility
for failures or not meeting quality expectationsThere is no free lunch!
7
![Page 8: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/8.jpg)
Cost of QualityPrevention costs
Keeping defects out of the hands of customersIncludes things like quality planning, training,
design reviews
Appraisal costsExpended to examine the product or process and
make certain the requirements are being metLike inspection and testing, buying test equipment
8
![Page 9: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/9.jpg)
Cost of Quality
Failure costsWhat it costs when things don’t go according to plan2 types
Internal failure costproduct is still in the control of the organization Include corrective action, rework, scrapping and downtime
External failure costProduct has reached the customer Include inspections at the customer site, returns, and customer
service costs
9
![Page 10: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/10.jpg)
Plan Quality
10
![Page 11: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/11.jpg)
Plan Quality
What quality standard?How to achieve that?
TrainingWalkthroughsReviewsQuality audits
How to make things better – process improvement?Who is responsible for what?Project managers are ultimately responsible for quality
management on their projects
11
![Page 12: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/12.jpg)
How Do you Measure Quality of IT Systems?
No. of bugsPerformance
Response time Volume of data and transactions system should be capable
of handlingUsabilityReliability
The ability of a product or service to perform as expected under normal conditions
Availability Mean time between failure (MTBF), mean time to recover
(MTTR)
12
![Page 13: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/13.jpg)
Quality Assurance/Management Plan-Sample
13
1.0 Draft Quality Assurance Plan1.1 Introduction1.2 Purpose1.3 Policy Statement1.4 Scope
2.0 Management2.1 Organizational Structure2.2 Roles and Responsibilities
2.2.1 Technical Monitor/Senior Management2.2.2 Task Leader2.2.3 Quality Assurance Team2.2.3 Technical Staff
3.0 Required Documentation4.0 Quality Assurance Procedures
4.1 Walkthrough Procedure4.2 Review Process
4.2.1 Review Procedures4.3 Audit Process
4.3.1 Audit Procedures4.4 Evaluation Process4.5 Process Improvement
5.0 Problem Reporting Procedures5.1 Noncompliance Reporting Procedures
6.0 Quality Assurance Metrics
Focus on these things in your
report
![Page 14: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/14.jpg)
Perform Quality Assurance
14
![Page 15: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/15.jpg)
Perform Quality Assurance
Determining whether standards are being met
Identifying improvementsE.g. recommend certain practices or
equipmentFocus on the process
15
![Page 16: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/16.jpg)
Tools Used in Quality Assurance
Benchmarkingcomparing specific project practices or product
characteristics to those of other projects or products within or outside the performing organization
Quality auditSee if you are complying with the standards and
proceduresCan be done by internal staff (e.g. from QA department)
or outsiderCan be scheduled or ad-hoc
16
![Page 17: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/17.jpg)
Perform Quality Control
17
![Page 18: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/18.jpg)
Perform Quality Control Looks at specific measurements to see if project
and its processes are in control Study the product/result
18
![Page 19: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/19.jpg)
Basic Tools of Quality
1. Cause & Effect Diagram2. Control Chart3. Run Chart4. Scatter Diagram5. Histogram6. Pareto Diagram7. Flowchart
19
![Page 20: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/20.jpg)
Cause-and-Effect Diagrams
Cause-and-effect diagrams trace complaints about quality problems back to the responsible production operations
They help you find the root cause of a problemAlso known as fishbone or Ishikawa diagrams
20
![Page 21: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/21.jpg)
Figure 8-2: Sample Cause-and-Effect Diagram
21
![Page 22: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/22.jpg)
Quality Control ChartsA control chart is a graphic display of data
that illustrates the results of a process over time
The main use of control charts is to prevent defects, rather than to detect or reject them
Quality control charts allow you to determine whether a process is in control or out of control
22
![Page 23: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/23.jpg)
The Seven Run RuleYou can use quality control charts and the seven
run rule to look for patterns in dataThe seven run rule states that if
seven data points in a row are all below the mean, above the mean, or are all increasing or decreasing
then the process needs to be examined for nonrandom problems
23
![Page 24: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/24.jpg)
Figure 8-3: Sample Quality Control Chart
24
![Page 25: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/25.jpg)
Run ChartA run chart displays the history and pattern of
variation of a process over timeIt is a line chart that shows data points plotted in
the order in which they occurCan be used to perform trend analysis to
forecast future outcomes based on historical patterns
25
![Page 26: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/26.jpg)
Figure 8-4: Sample Run Chart
26
![Page 27: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/27.jpg)
Scatter DiagramA scatter diagram helps to show if there is a
relationship between two variablesThe closer data points are to a diagonal line, the
more closely the two variables are related
27
![Page 28: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/28.jpg)
Figure 8-5: Sample Scatter Diagram
28
![Page 29: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/29.jpg)
HistogramsA histogram is a bar graph of a distribution of
variablesEach bar represents an attribute or characteristic
of a problem or situation, and the height of the bar represents its frequency
29
![Page 30: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/30.jpg)
Figure 8-6: Sample Histogram
30
![Page 31: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/31.jpg)
Pareto ChartsA Pareto chart is a histogram that can help you
identify and prioritize problem areas
Pareto analysis is also called the 80-20 rule, meaning that 80 percent of problems are often due to 20 percent of the causes
31
![Page 32: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/32.jpg)
Figure 8-7: Sample Pareto Chart
32
![Page 33: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/33.jpg)
FlowchartsFlowcharts are graphic displays of the logic and
flow of processes that help you analyze how problems occur and how processes can be improved
They show activities, decision points, and the order of how information is processed
33
![Page 34: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/34.jpg)
Figure 8-8: Sample Flowchart
34
![Page 35: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/35.jpg)
Quick Quiz – Which Tool?1. I want to know whether younger users take less time to
learn the system.
2. I want to know the day of the week where the workers’ productivity is the highest.
3. The system is getting slower and slower. I want to know the possible causes.
4. The error rate of the order fulfillment process is increasing. I want to know which step(s) may have problem.
5. I want to prioritize the problems so that I can tackle the most severe problems first.
6. I have just adopted a new process. I want to know if the new process produces desirable results.
35
![Page 36: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/36.jpg)
Other Quality Management Concepts & Approaches
36
![Page 37: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/37.jpg)
Statistical Sampling
Statistical sampling involves choosing part of a population of interest for inspection
The size of a sample depends on how representative you want the sample to be
37
![Page 38: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/38.jpg)
Standard Deviation= sigma (σ)If I just tell you the average mark is 70, do you
know anything about the mark distribution?Standard deviation measures how much
variation exists in a distribution of dataSmall
data clusters closely around the middlelittle variability among the data
LargeData is spread out around the middle Greater variability
38
![Page 39: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/39.jpg)
Six Sigma & Standard DeviationIn a normal distribution
1 sigma = 68.27% of the population2 sigma = 95.45%3 sigma = 99.73% (2.7m defects out of 1b)6 sigma = 99.9999998% (2 defects out of 1b)
Six SigmaImprove quality by reducing variationAims to eliminate defects
39
![Page 40: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/40.jpg)
Figure 8-9: Normal Distribution and Standard Deviation
40
![Page 41: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/41.jpg)
Motorola – Adoption of Six Sigma
Motorola, Inc. pioneered the adoption of Six Sigma in the 1980s
Why? To stay in business among Japanese competitors
Chairman set a goal of 10 times improvement in defect reduction every two years (i.e. 100 times in 4 years)
Result: excellent growth and profitability in 1980s and 1990s
Estimated to have saved about $14 billion
41
![Page 42: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/42.jpg)
ISO StandardsISO 9000 is a family of standards for quality
management systems that include:procedures keeping records checking output monitoring and reviewing processesfacilitating continual improvement
See www.iso.org for more information
42
![Page 43: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/43.jpg)
CMMICapability Maturity Model Integrated (CMMI)
From Software Engineering Institute (SEI, Carnegie-Mellon University)
www.sei.cmu.edu/cmmiDefines levels of different competencies in project
deliveryAs of 2003, the distribution is (1343 organizations)
Level 1 13.3%
Level 2 43.5%
Level 3 25.6%
Level 4 8.5%
Level 5 9.2%43
![Page 44: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/44.jpg)
CMMI
Level 1Performed
No prescribed process
Level 2Managed
Project Management established
Level 3Defined
System Development process integrated
Level 4Quantitatively Managed
Measurable goalsestablished
Level 5Optimizing
Continuous monitoring & Improving
44
![Page 45: L07 quality management](https://reader033.vdocuments.us/reader033/viewer/2022061206/5482ee7a5806b501058b4755/html5/thumbnails/45.jpg)
Revision
Cost of quality Prevention costs Appraisal costs Failure costs
Internal Vs external
Quality Management Plan Walkthroughs Reviews Quality metrics
Quality Assurance Benchmarking Quality audit
45
Quality Control Cause & Effect
Diagram Control Chart Run Chart Scatter Diagram Histogram Pareto Diagram Flowchart
Standard deviation / Sigma
Six Sigma ISO 9000 CMMI