l oc ati n m p - western australian planning commission · western australian planning commission...

3
0 25 50 75 100 metres Community Traditional Owners WAPC 13 December 2004 Local Government Layout Plan 2 endorsement 7 July 2005 4 October 2005 - N Western Australian Planning Commission Settlement layout lots are not derived from calculated dimensions. WAPC 10 August 2017 Amendment 9 endorsement Land Use public utility recreation residential road reserve commercial community industrial open space Cadastral data supplied by the Western Australian Land Information Authority (License LI 862-2016-1). Extraction date of cadastre 4/08/2017. Drinking water source protection area derived from the Kalumburu Community Drinking Water Source Protection Plan, May 2010, commissioned by the Department of Communities. April 2016 aerial image provided by Landgate. Projection : MGA zone 51, GDA 94 Map document: Kalumburu LP2 Amd9 - Living area.mxd Layout plan prepared by Department of Planning, Lands & Heritage. © Western Australian Planning Commission 2017 This layout plan does not constitute development approval. It is the responsibility of the developer to ensure that all relevant consents, approvals, licences and clearances are in place prior to commencing physical works on the site. Organisations responsible for such matters may include land owner, local government, native title representative body, Aboriginal Cultural Materials Committee, incorporated community council, Environmental Protection Authority, relevevant regulatory authorities and departments. Exclusion Boundary industry utility Land Administration 63 cadastre private lease settlement layout (SL) lot & SL-lot number airstrip approx. 0.5 km Gibb River Road approx. 268 km 4 6 157 11 4 141 10 78 7 90 9 3 156 8 154 143 144 116 115 85 113 140 153 139 150 63 73 80 138 120 16 65 72B 77 18 81 82 118 67 62 114 94 83 19 93 92 36 137 88 29 25 64 89 84 21 20 72F 119 70 57 75 39 14 97 35 34 68 40 95 30 28 26 27 66 31 15 69 74 58 87 86 59 60 135 76 61 99 33 44 43 96 42 91 45 32 41 24 52 51 46 38 13 98 53 54 48 49 55 50 56 47 127 128 130 23 125 22 72A 134 131 124 104 106 103 126 72C 112 129 110 12 37 105 108 111 107 147 123 132 152 136 109 148 151 102 149 100 146 101 155 133 72D 71 72E 17 STREET BOULEVARD MANGO KALUMBURU MAMA HILL OORARO LOOP CARSON POOMPANGALA TURN PAGO NAPIER CL MOONGOOL PIM RAMBLE KING EDWARD HONEYMOON BARTON MISSION PLACE FIRST MCGOWAN CROSS PLACE STREET CL STREET BARTON STREET STREET BOULEVARD STREET CL LOOP CARSON STREET STREET HONEYMOON MISSION 150 m industry 150 m industry 1000 m x 500 m airstrip oval school school cemetery caravan park recreation centre visitor and arts centre multi-function police facility shop office convent basketball court water storage and treatment Perth Broome Karratha Geraldton Port Hedland Kalgoorlie Kununurra Newman S Esperance NT SA location map Kalumburu SHIRE OF WYNDHAM - EAST KIMBERLEY 245,248 mE 8,418,767 mN 8,418,090 mN 246,064 mE Kalumburu Layout Plan 2 - Living Area Amendment 9

Upload: trinhnhi

Post on 30-Apr-2018

216 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: l oc ati n m p - Western Australian Planning Commission · Western Australian Planning Commission Community Traditional Owners WAPC 13 December 2004 Local Government Layout Plan 2

0 25 50 75 100metres

Community

Traditional OwnersWAPC

13 December 2004Local Government

Layout Plan 2 endorsement7 July 2005

4 October 2005-

N

WesternAustralianPlanningCommission

Settlement layout lots are not derived from calculated dimensions.

WAPC 10 August 2017Amendment 9 endorsement

Land Usepublic utilityrecreationresidentialroad reserve

commercialcommunityindustrialopen space

Cadastral data supplied by the Western Australian Land Information Authority(License LI 862-2016-1). Extraction date of cadastre 4/08/2017.Drinking water source protection area derived from the Kalumburu CommunityDrinking Water Source Protection Plan, May 2010, commissioned by theDepartment of Communities.April 2016 aerial image provided by Landgate.Projection : MGA zone 51, GDA 94Map document: Kalumburu LP2 Amd9 - Living area.mxdLayout plan prepared by Department of Planning, Lands & Heritage.© Western Australian Planning Commission 2017

This layout plan does not constitute development approval.It is the responsibility of the developer to ensure that all relevant consents,approvals, licences and clearances are in place prior to commencing physicalworks on the site. Organisations responsible for such matters may include landowner, local government, native title representative body, Aboriginal CulturalMaterials Committee, incorporated community council, Environmental ProtectionAuthority, relevevant regulatory authorities and departments.

Exclusion Boundaryindustryutility

Land Administration

63

cadastreprivate leasesettlement layout (SL) lot & SL-lot number

airstripapprox. 0.5 km

Gibb River Road

approx. 268 km

4

6

157

11

4

141

10

78

7

90

9

3

156

8

154

143

144

116

115

85

113

140

153139

150

63

73

80

138

120

16

65

72B

77

18

8182

118

67 62114

94 83

19

93

92

36

137

88

29

25

6489

84

2120

72F

119 70

57

75

39

14

97

3534

68

4095

3028

2627

66

31

15

69

74

58

8786 59

60

135

76

6199

3344

43

96

42

91

45

32

41

24

52

5146

38

13

98

5354

4849

55 5056

47

127

128

130

23

125

22

72A

134

131

124

104

106

103

126

72C

112

129

110

12

37

105

108

111

107

147

123

132

152

136

109

148

151

102

149

100

146

101

155

133 72D7172E

17

STREET

BOULEVARD

MANGO

KALUMBURU

MAMA HILLOORARO

LOOP

CARSON

POOMPA

NGALA

TURN

PAGO

NAPIER

CL

MOONGOOL

PIM

RAMBLE

KING EDWARDHONEYMOON

BARTON

MISSIONPL

ACE

FIRST

MCGOWAN

CROSS

PLACE

STREET

CLST

REET

BARTON

STREET

STREE

T

BOULEVARD

STREET

CL

LOOP

CARSON

STREE

T

STREE

T

HONEYMOON

MISSION

150 m industry

150 m industry

1000 m x 500 m airstrip

oval

school

school

cemetery

caravan park

recreationcentre

visitor andarts centre

multi-functionpolice facility

shopoffice

convent

basketballcourt

waterstorage

andtreatment

Perth

Broome

Karratha

Geraldton

Port Hedland

Kalgoorlie

Kununurra

NewmanAli ce

Sp rin gs

Esperance

NT

SA

location map

Kalumburu

SHIRE OFWYNDHAM -EAST KIMBERLEY

245,248 mE

8,418,767 mN

8,418,090 mN

246,064 mE

KalumburuLayout Plan 2- Living Area

Amendment 9

Page 2: l oc ati n m p - Western Australian Planning Commission · Western Australian Planning Commission Community Traditional Owners WAPC 13 December 2004 Local Government Layout Plan 2

N0 100 200 300 400

metresCommunity

Traditional OwnersWAPC

13 December 2004Local Government

Layout Plan 2 endorsement

7 July 2005

4 October 2005-

WAPC 10 August 2017Amendment 9 endorsement

Land Use

industrialopen spacepublic utilityrecreationresidentialroad reservewaterway

commercialcommunitydrinking water sourceprotection area

This layout plan does not constitute development approval.It is the responsibility of the developer to ensure that allrelevant consents, approvals, licences and clearances are inplace prior to commencing physical works on the site.Organisations responsible for such matters may include landowner, local government, native title representative body,Aboriginal Cultural Materials Committee, incorporated communitycouncil, Environmental Protection Authority, relevevantregulatory authorities and departments.

Land Administrationcadastreprivate leaserecommended settlement zonesettlement layout (SL) lot & SL-lot number67

Exclusion Boundaryutilitywastewater

Featuresas-constructed miscellaneous feature

Settlement layout lots are not derived from calculated dimensions.

Cadastral data supplied by the Western Australian Land InformationAuthority (Licence LI 862-2016-1).Extraction date of cadastre 4/08/2017.Drinking water source protection area derived from the KalumburuCommunity Drinking Water Source Protection Plan, May 2010,commissioned by the Department of Communities.April 2016 aerial images provided by Landgate.Projection : MGA zone 52, GDA 94Map document : Kalumburu LP2 Amd9 - Context.mxdLayout plan prepared by Department of Planning, Lands & Heritage.© Western Australian Planning Commission 2017

River

King E

dward

STREET

BOULEVARD

LIBERATOR

KALUMBURU

CARSONSTREET

42

10

5

6

1

157

141

162

1000 m x 500 m airstrip

500 m wastewater pond

oval

airstrip

power station

wastewatertreatment

ponds

Kalumburu Layout Plan 2 - Context Amendment 9

location map

NT

SA

Perth

Broome

Karratha

Geraldton

Port Hedland

Kalgoorlie

Kununurra

NewmanAli ce

Sp rin gs

Esperance

NT

SA

Kalumburu

SHIRE OFWYNDHAM -EAST KIMBERLEY

8,419,575 mN243,985 mE

246,655 mE

8,416,275 mN

Page 3: l oc ati n m p - Western Australian Planning Commission · Western Australian Planning Commission Community Traditional Owners WAPC 13 December 2004 Local Government Layout Plan 2

WesternAustralianPlanningCommission

Community

Traditional OwnersWAPC

13 December 2004Local Government

Layout Plan 2 endorsement

7 July 2005

4 October 2005-

WAPC 10 August 2017Amendment 9 endorsement

Land Administrationcadastreprivate leaserecommendedsettlement zonesettlement layout (SL) lot

Land Tenurecrown reservefreeholdunallocatedcrown land

Roadsminor road

N0 100 200 300 400 500

metresThis layout plan does not constitute development approval.It is the responsibility of the developer to ensure that allrelevant consents, approvals, licences and clearances are inplace prior to commencing physical works on the site.Organisations responsible for such matters may include landowner, local government, native title representative body,Aboriginal Cultural Materials Committee, incorporated communitycouncil, Environmental Protection Authority, relevevantregulatory authorities and departments.

Settlement layout not derived from calculated dimensions.

Cadastral data supplied by the Western Australian Land InformationAuthority (Licence LI 862-2016-1).Extraction date of cadastre 4/08/2017.Projection : MGA zone 52, GDA 94Map document : Kalumburu LP2 Amd9 - Land Tenure.mxdLayout plan prepared by Department of Planning, Lands & Heritage.© Western Australian Planning Commission 2017

UCL

lot 44P195034

lot 21Crown reserve

21675

lot 21Crown reserve

21675

lot 40Crown reserve

46596

lot 39Crown reserve

46596

Roman CatholicBishop of Broome

lease

Kalumburu AboriginalCorporation

lease

Kalumburu AboriginalCorporation

lease

MFPF lease toMinister for Works

(Land)

Regional Power CorpTrading As Horizon Power

lease

Gibb River-Kalumburu Rd

Kalumburu Layout Plan 2 - Land Tenure Amendment 9

location map

NT

SA

Perth

Broome

Karratha

Geraldton

Port Hedland

Kalgoorlie

Kununurra

NewmanAli ce

Sp rin gs

Esperance

NT

SA

Kalumburu

SHIRE OFWYNDHAM -EAST KIMBERLEY

8,419,834 mN243,752 mE

246,956 mE

8,415,874 mN